GLAST Large Area Telescope:

Similar documents
GLAST Large Area Telescope: W.B.S Electronics, Data Acquisition & Flight Software. Gamma-ray Large Area Space Telescope

GLAST Large Area Telescope:

GLAST Large Area Telescope:

GLAST Large Area Telescope:

GLAST Large Area Telescope Monthly Mission Review

SLAC (650) DAQ & FSW

GLAST Large Area Telescope

GLAST Large Area Telescope: TEM/TPS TRR

Monthly Mission Review. Project Status Overview. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Integrated Space Systems

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 09/27/05

Monthly Mission Review. TVAC at NRL? Status. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Monthly Mission Review. Project Status Overview. June 6, Ken Fouts SLAC Gamma-ray Large Area Space Telescope

Process. Summary results. RFA Status

Spacecraft Simulation Tool. Debbie Clancy JHU/APL

Gamma-ray Large Area Space Telescope

IOC Overview. Overview Requirements WBS Organization Development Plan MO&DA Plan Prototyping and Trade Studies Conclusions

2017 LOCKHEED MARTIN CORPORATION. ALL RIGHTS RESERVED

Flight Software Overview

White Rabbit Applications for Data Acquisition Systems

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

MPCS: Develop and Test As You Fly for MSL

HumiSys HF High Flow RH Generator

05-341r0: Updated Test and Simulation Results in Support of SAS-2. Kevin Witt, Mahbubul Bari, Brad Holway

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Safety Manual VEGAVIB series 60

Drift-Chamber Gas System Controls Development for the CEBAF Large Acceptance Spectrometer

Technical Review Agenda

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Yokogawa Systems and PCI Training

Functional safety. Functional safety of Programmable systems, devices & components: Requirements from global & national standards

HASTAC High stability Altimeter SysTem for Air data Computers

Orbiter* Architecting Software Across International Partnerships. Jason LaPointe December 10 th, 2010

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

The ATLAS Tile Calorimeter LVPS hardware upgrade and testing.

MIL-STD-883G METHOD

Distributed Control Systems

AIR-X COMPACT AIR-X ON-LINE LUBRICANT AERATION MEASUREMENT. Technical Brochure ON RUNNING ENGINES

Mid InfraRed Instrument (MIRI) Cooler Cold Head Assembly Acceptance Testing and Characterization

MCQ Gas Blender 100 Series 3 Channels Gas Mixer

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Status of SuperKEKB Control System. April 25, 2012 Tatsuro NAKAMURA KEKB Control Group, KEK

sorting solutions osx separator series

Western University Unsealed Nuclear Substance Contamination Monitoring Record

Chapter 9: Sea operations

Test Facilities Experiment Review

NCC Cable System Order

PEAPOD. Pneumatically Energized Auto-throttled Pump Operated for a Developmental Upperstage. Test Readiness Review

Safety Manual. Process pressure transmitter IPT-1* 4 20 ma/hart. Process pressure transmitter IPT-1*

Coda cx1 Thermal Cycle Test Procedure

TEC Petal Integration & Lt Pilot Centres

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

Modeling of Hydraulic Hose Paths

Environmental Petrochemical, Pharmaceutical, Foods & Flavors, Chemicals, Personal Care, Forensics,...and more!

BUYER S GUIDE AQUAlogger 530WTD

ASE SOLVENT CONTROLLER INSTALLATION INSTRUCTIONS Dionex Corporation

91 Express Lanes Model Update 2006 State Route 91 Implementation Plan. Gerald V. Nielsten May 18, 2007

Servo-Assisted Lower-Body Exoskeleton With a True Running Gait

FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT

Field Instrumentation Training Strategy

Stand-Alone Bubble Detection System

Complex operations on the International Space Station training and execution in manned and unmanned situations

CRaTER Thermal-Vacuum Test Procedure. Dwg. No

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Safety-critical systems: Basic definitions

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

Quadruple mass spectrometers (transducer type)

Safety Manual VEGAVIB series 60

Agilent Dimension Software for ELSD User Manual

World Leading Traffic Analysis

Piezo-Valve Controller for the gas inlet system of the fusion experiment Wendelstein 7-X

SCIENTIFIC DATA SYSTEMS, INC. Depth Tension Line Speed Panel. DTLS Manual

Update on Positive Train Control (PTC)

Education and Research

Ocean Observatories Initiative. Coastal & Global Scale Nodes. Hydrogen Safety. OOI Surface Mooring Hydrogen Safety Review

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

Flight Systems Verification & Validation Mars 2020 Entry, Descent, and Landing

Technology Corner Dating of Electronic Hardware for Prior Art Investigations

Using MATLAB with CANoe

Farm Energy IQ. Wind Energy on Farms. Objectives of this Module. How windy is it? How windy is it? How windy is it? 2/16/2015

Top Level of CSC DCS UI

GLAST Large Area Telescope:

1. Hardware Hardware Connection... 2 Connection Diagram... 3 DIP Switch Settings & 10 PIN Button Layout... 4

APA software instruction manual

IBIS Modeling for IO-SSO Analysis. Thunder Lay and Jack W.C. Lin IBIS Asia Summit Taipei, Taiwan Nov. 19, 2013

SCHROFF MTCA.4 & ATCA PRODUCTS

The Faraday Test Centre Rochester

RARE CONDITIONS - AN IMPORTANT CAUSE OF FAILURES. Herbert Hecht SoHaR Incorporated Beverly Hills, California

QUICK START GUIDE CB-950 DATA BUOY PLATFORM

Schilling Robotics TITAN 4 Manipulator

City of Wilsonville 5 th Street to Kinsman Road Extension Project

ASCAT Level 2 Soil Moisture Reprocessing Phase 1 - Dataset Description

Swim Ireland Masters Development Plan Ratified and adopted by the Board of Swim Ireland on 11 th December 2010

UK Opportunities in SiD Calorimetry

The M-Series Eletta Flow Meter High accuracy DP Flow Meter with multiple functions

DYNAMIC MODEL DEVELOPMENT AND VALIDATION FOR AN AIRCRAFT FUEL TEST-RIG

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

Prudhoe Bay Oil Production Optimization: Using Virtual Intelligence Techniques, Stage One: Neural Model Building

Transcription:

Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: W.B.S. 4.1.7 Electronics, Data Acquisition & Flight Software Gunther Haller SLAC LAT Chief Electronics Engineer DA & Flight Software Systems Manager haller@slac.stanford.edu (650) 926-4257 4.1.7 DA & FSW V8 1

Outline DA System Overview Flight Hardware Description Accomplishments since last review Roadmap & schedule DA Test-Bed and Ground Support Equipment Instrument Flight Software Description Accomplishments since last review Roadmap & schedule Open Issues Cost Changes since Rebaseline Schedule/Cost Summary 4.1.7 DA & FSW V8 2

LAT Electronics Hardware and Flight Software TKR Front-End Electronics (MCM) ACD Front-End Electronics (FREE) CAL Front-End Electronics (AFEE) TKR FSW is an integral part of the data acquisition (DA) subsystem and is managed, budgeted, and scheduled as part of the DA subsystem Global-Trigger/ACD-EM/Signal-Distribution Unit* Spacecraft Interface Units (SIU)* Storage Interface Board (SIB): Spacecraft interface, control & telemetry LAT control CPU LAT Communication Board (LCB): LAT command and data interface CAL 16 Tower Electronics Modules & Supplies 3 Event-Processor Units (EPU) (2 + 1 spare) Event processing CPU LAT Communication Board SIB Power-Distribution Unit (PDU)* Spacecraft interface, power LAT power distribution LAT health monitoring * Primary & Secondary Units shown in one chassis 4.1.7 DA & FSW V8 3

Components PDU: Power Distribution Unit GASU: Global-trigger/ACD-module/Signal-distribution Unit GASU DA board with GASU ASICs & power-supply board TEM: Tower Electronics Module incl. TEM ASIC s TPS: Tower Power Supply SIU/EPU: Spacecraft Interface Unit/Event-Processor Unit Includes 4 custom boards Heater Control Unit Harness Front-End Simulator Test-Bed EGSE: Electrical Ground Support Equipment Enclosures Software 4.1.7 DA & FSW V8 4

PDU & GASU & GASU-ASIC ASIC Power Distribution Unit Switches power to TEM s, GASU, EPU crates Digitizes temperatures to be used for thermal control GASU Global trigger, event builder, command-response unit, ACD control/monitoring/data-readout GASU Power Supply Supplies power to GASU and ACD from 28V Accomplishments Designed/fabricated/assembled fully instrumented enclosures with flight-like components. Functionality tested incl. FSW More detailed tests in progress Being incorporated in DA/FSW test-bed ualification model with modifications incorporated in layout GASU DA ASIC (GLTC2) Full production fabricated/packaged Screening has started at SLAC PDU GASU 4.1.7 DA & FSW V8 5

TEM & TEM ASIC s & TPS Tower Electronics Module (TEM) Control/readout/monitoring of TKR and CAL sub-system Tower Power Supply (TPS) Supply power to TEM/CAL/TKR from 28V Accomplishments 16 sets of engineering models were fabricated and assembled including enclosures (not shown) Being tested and incorporated in DA/FSW test-bed Out for RFP for flight fab/assembly, 1 st article will be used for qualification TEM ASIC s (GTCC1 & GCCC1) Full production was fabricated/packaged Have started screening at SLAC ualification will start at GSFC next month PICTURE 4.1.7 DA & FSW V8 6

SIU/EPU Overview Compact PCI crate includes Custom enclosure (cpci crate) Holds modules Custom Crate backplane (CBP) Interconnects modules British AeroSpace 750 PPC processor board CPU Custom LAT Communication Board (LCB) Control/event interface from processor board to LAT Custom Storage Interface Board (SIB) MIL1553 interface to spacecraft, EEPROM storage in crates Custom Crate Power Supply (CPS) Supply power to PCI modules from 28V 4.1.7 DA & FSW V8 7

SIU/EPU Status Accomplishments Designed/fabricated/assembled fully functioning engineering modules with flight-like components Integrated in crate with BAE 750 processor Tests in progress using flight software Being integrated in DA/FSW test-bed Layout modifications in progress for qualification board fabrication LCB Enclosure Power-Supply Backplane CPU SIB 4.1.7 DA & FSW V8 8

Harness & Heater Control Unit & FES Point-to-Point Cables ( Harness ) Designed complete set of cables for testbed, in fabrication Ready to integrate when available Preparing package for RFP for flight order Heater Control Unit Designed/fabricated/assembled firstversion engineering module Ready to test Front-End Simulator (FES) Emulates CAL/TKR/ACD sub-systems for use on DA/FSW test-bed Designed/fabricated/assembled/tested front-end simulator board prototype Testing in progress, being integrated on test-bed Fabricated/assembled 34 copies 4.1.7 DA & FSW V8 9

FSW/DA Test-Bed SIU PDU Front-End Simulator GASU TEM & TEM-PS Includes full set of DA modules/harness plus front-end simulator boards to emulate CAL/TKR/ACD front-end system Accomplishments Produced DA modules for test-bed Started to integrate modules Ready to start using FSW on the test-bed mid/end April 4.1.7 DA & FSW V8 10

Electrical Ground Support Equipment EGSE test-stand copies for ACD, CAL, TKR, DA HW & SW effort (60 total) Accomplishments Ordered and received VME crates & single-board computers VME SLAC custom transition board Custom PCI Mezzanine Card (PMC) LCB s Connectors for cables TEM & TEM PS boards and enclosures (for TKR/CAL/DA setups) GASU board and enclosure (for ACD/DA setups) 28V-power supplies Have started testing and shipping of new test-stands 4.1.7 DA & FSW V8 11

Roadmap: Flight Hardware Vendors selected for Board fabrication Enclosure fabrication Assembly of boards/enclosures Roadmap TEM/TEM-Power Supply/Harness (TEM/TEM-PS is DA critical path) ual/flight Apr 17: Start board fabrication Jun 25: Start qual/acceptance testing Aug 2: Delivery to I&T PDU/GASU/SIU/EPU ual/flight May/June: Start board fabrication Aug: Start qual/acceptance testing Jan 05: Delivery to I&T 4.1.7 DA & FSW V8 12

LAT Instrument Flight Software Architecture Spacecraft Solid State Recorder Discretes (to SIU PIDs) Event Builder (EB) output side. The EB is an element of the GASU. To SSR To SIU To EPU(s) 1553 Rx service LCB Rx service Spacecraft Interface Unit MSG task Other Tasks 1 PPS Interrupt GBM Interrupt LCB Rx Event Processing Unit(s) Other Tasks 1 PPS Interrupt MSG task LAT Instrument 1553 Legend Telecommand (SC to LAT) Telemetry (LAT to SC) Master to slave Slave to master Physics data from LAT Data to SSR Masters SC Att./Time Instr. Phys. File/Object HSK Watchdog TCS 1553 Tx service LCB Tx service Slaves SC Att./Time File/Object HSK Watchdog Slaves SC Att./Time Instr. Phys. File/Object HSK Watchdog LCB Tx service Command/Response From SIU From EPU(s) Event Assembly Event Builder (EB) input side. The EB is an element of the GASU. * For details: FSW link on LAT main Command/Response Unit (CRU). The CRU is an element of the GASU. web-page 4.1.7 DA & FSW V8 13

Flight Software Development Incremental FSW builds coincide with the hardware builds as follows: Engineering Model 1 Run single tower, single CPU Used for EGSE test-stands for hardware development (built, tested, done) Used for LAT single-tower engineering unit by I&T group (built, tested, done) Engineering Model 2 Multiple towers, GASU, single CPU Used for EGSE test-stands for hardware development (in progress) Used as test-bed for hardware and software development & test (in progress) ISIS (Instrument Spacecraft Interface Simulator) Build & Release To be delivered to the spacecraft vendor (formal release) Full LAT Build & Release Complete set of 16 towers, GASU, full set of CPU s Used as test-bed for hardware and software development & test To be delivered to I&T for full-lat testing (formal release) 4.1.7 DA & FSW V8 14

Software Accomplishments Accomplishments Designed/tested/delivered EM1 SW built Software to run full tower Configuration of tracker, calorimeter, TEM Solicited housekeeping Event delivery Also major progress in primary boot code of RAD750 Testing of mini-tower with detectors Data taking performed by I&T in the SLAC clean room TEM Full set TKR front-end electronics, no detectors VME CPU with software Full set CAL front-end electronics, no detectors 4.1.7 DA & FSW V8 15

Roadmap to Flight Software EM2 software design was reviewed by NASA/DOE committee 2/26/04 Assessment was very positive Started to implement EM2 designs Functions added for EM2 GASU/PDU configuration Streaming housekeeping Inter-task communication Primary/secondary boot of RAD750 MIL 1553 communication Telecommand / telemetry Software watchdog Functions added for Flight Unit Event-filtering/compression Event monitoring Charge injection calibration Diagnostics Thermal control Full command and telemetry support Time services Gamma-Ray-Burst (GRB) detection/alert SC repointing request 4.1.7 DA & FSW V8 16

Software Key Milestones for I&T/ISIS Jun 04 I&T requires software to control/readout multi-tower (i.e. GASU) configuration (EM2) Jul 04 Instrument Spacecraft Interface Simulator (ISIS) to Spectrum Astro Dec 04 I&T requires tested software to control/readout full LAT FU SW build to I&T Dec 04 FU build finish and transition to formal test FU Formal test complete Feb 05 Feb 05 I&T requires FU software release to operate/test (whole LAT is integrated) Start of system testing May 05 End of system test Jul 05 Ship LAT to NRL for environmental test Functional demonstrations every month to show progress 4.1.7 DA & FSW V8 17

Open Issues, Technical Risks and Mitigations FSW BAE RAD750 flight processor might be different than BAE engineering module in respect to operation details Scheduled to receive first flight processor in May Software needs to be shown to work on integrated instrument Tests and demonstrations are planned on integrated test-bed HW Couple of components still need to be TID radiation tested (DA ASIC s, National transceiver) Radiation tests planned for April/May Overall inter-system timing in respect to trigger needs to be shown to work Test planned on test-bed once complete 4.1.7 DA & FSW V8 18

Approved Cost Changes Since Rebaseline 4.1.7 Baseline, Nov 03 $18,733k Additional FSW Manpower ($747k) To supplement document/test effort No net LAT cost impact Corresponding NASA funding increase Additional EGSE ($457k) To provide additional EGSE systems to other sub-systems in order to accelerate their test schedule SIU Cost Variance Reduction ($258k) Added hardware to simplify software effort Stanford Benefits Rate Increase ($155k) Total Change $ 1,617k 4.1.7 Baseline, Feb 04 $20,350k Approved Changes in March 04 ISIS Upgrade ($94k) Increase fidelity of simulator to be delivered to Spectrum Astro No LAT cost impact Corresponding NASA funding increase 4.1.7 DA & FSW V8 19

Schedule/Budget Total budget $20,350k Work Scheduled up to date $11,472k Work Performed $11,912k Actuals $11,352k Schedule Variance $440k or 2.1% of total budget (ahead of schedule) Some flight components were delivered earlier than expected/planned Cost Variance: $560k or 2.7% of total budget (under budget) Latency of invoicing/payment for components received 4.1.7 DA & FSW V8 20

Summary Technical: No technical issues which would risk sub-system Schedule Hardware is on track to provide flight hardware in time Software schedule is aggressive but feasible Cost No additional cost increases beyond the items on the lien list are identified Remaining budget should be sufficient to deliver subsystem 4.1.7 DA & FSW V8 21