GLAST Large Area Telescope: W.B.S Electronics, Data Acquisition & Flight Software. Gamma-ray Large Area Space Telescope

Similar documents
GLAST Large Area Telescope:

GLAST Large Area Telescope:

GLAST Large Area Telescope:

GLAST Large Area Telescope:

GLAST Large Area Telescope Monthly Mission Review

SLAC (650) DAQ & FSW

GLAST Large Area Telescope

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 09/27/05

Monthly Mission Review. TVAC at NRL? Status. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

GLAST Large Area Telescope: TEM/TPS TRR

Monthly Mission Review. Project Status Overview. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Integrated Space Systems

Monthly Mission Review. Project Status Overview. June 6, Ken Fouts SLAC Gamma-ray Large Area Space Telescope

Process. Summary results. RFA Status

Spacecraft Simulation Tool. Debbie Clancy JHU/APL

Gamma-ray Large Area Space Telescope

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

IOC Overview. Overview Requirements WBS Organization Development Plan MO&DA Plan Prototyping and Trade Studies Conclusions

Flight Software Overview

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

2017 LOCKHEED MARTIN CORPORATION. ALL RIGHTS RESERVED

MPCS: Develop and Test As You Fly for MSL

White Rabbit Applications for Data Acquisition Systems

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

05-341r0: Updated Test and Simulation Results in Support of SAS-2. Kevin Witt, Mahbubul Bari, Brad Holway

Technical Review Agenda

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

HumiSys HF High Flow RH Generator

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Safety Manual VEGAVIB series 60

NCC Cable System Order

2018 HR & PAYROLL Deadlines

Yokogawa Systems and PCI Training

Western University Unsealed Nuclear Substance Contamination Monitoring Record

Orbiter* Architecting Software Across International Partnerships. Jason LaPointe December 10 th, 2010

HASTAC High stability Altimeter SysTem for Air data Computers

Swim Ireland Masters Development Plan Ratified and adopted by the Board of Swim Ireland on 11 th December 2010

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

91 Express Lanes Model Update 2006 State Route 91 Implementation Plan. Gerald V. Nielsten May 18, 2007

Mid InfraRed Instrument (MIRI) Cooler Cold Head Assembly Acceptance Testing and Characterization

The ATLAS Tile Calorimeter LVPS hardware upgrade and testing.

Functional safety. Functional safety of Programmable systems, devices & components: Requirements from global & national standards

MIL-STD-883G METHOD

Farm Energy IQ. Wind Energy on Farms. Objectives of this Module. How windy is it? How windy is it? How windy is it? 2/16/2015

SWISS reports stable load factors

Stand-Alone Bubble Detection System

Update on Positive Train Control (PTC)

Drift-Chamber Gas System Controls Development for the CEBAF Large Acceptance Spectrometer

Bowls SA Membership and Marketing 5-Year Strategic Plan Updated

SCIENTIFIC DATA SYSTEMS, INC. Depth Tension Line Speed Panel. DTLS Manual

Safety Manual VEGAVIB series 60

Flight Systems Verification & Validation Mars 2020 Entry, Descent, and Landing

Safety Manual. Process pressure transmitter IPT-1* 4 20 ma/hart. Process pressure transmitter IPT-1*

Principles of Planning. F.P.Furniss

Technology Corner Dating of Electronic Hardware for Prior Art Investigations

Financial Project ID No(s).: and ETDM No(s).: and 14181

July 2015 Sept Cork City Pedestrian Counter Report

FREEDOM OF INFORMATION REQUEST

PEAPOD. Pneumatically Energized Auto-throttled Pump Operated for a Developmental Upperstage. Test Readiness Review

GE Grid Solutions l Grid Automation 2017 Training Schedule

1. Hardware Hardware Connection... 2 Connection Diagram... 3 DIP Switch Settings & 10 PIN Button Layout... 4

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

AIR-X COMPACT AIR-X ON-LINE LUBRICANT AERATION MEASUREMENT. Technical Brochure ON RUNNING ENGINES

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

City of Wilsonville 5 th Street to Kinsman Road Extension Project

DEPOT LEVEL MAINTENANCE OF THE PROPELLANT HANDLERS ENSEMBLE

3. EXCEL FORMULAS & TABLES

IBIS Modeling for IO-SSO Analysis. Thunder Lay and Jack W.C. Lin IBIS Asia Summit Taipei, Taiwan Nov. 19, 2013

Normet 1610B CT0032. This unit was not running and may need to be lifted on to transport.

SCHROFF MTCA.4 & ATCA PRODUCTS

Distributed Control Systems

World Leading Traffic Analysis

TEST OF GMA SPINUP ASSEMBLY PRESSURE SENSOR CALIBRATION

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

Flatfish AM Development Bycatch Savings

Field Instrumentation Training Strategy

Chapter 9: Sea operations

CRaTER Thermal-Vacuum Test Procedure. Dwg. No

Accellera Systems Initiative SystemC Standards Update

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM

WIM #36 MN 36 MP 15.0 LAKE ELMO APRIL 2014 MONTHLY REPORT

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

Test Facilities Experiment Review

Olmsted Locks & Dam. Inland Waterways Users Board. MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 01 April 2016

sorting solutions osx separator series

ASCAT Level 2 Soil Moisture Reprocessing Phase 1 - Dataset Description

TEC Petal Integration & Lt Pilot Centres

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

Modeling of Hydraulic Hose Paths

Pneumatic high-pressure controller Model CPC7000

STRATEGY (ROLL - OUT PLAN) ASA MISSION STATEMENT

Freeway ramp intersection study

Ocean Observatories Initiative. Coastal & Global Scale Nodes. Hydrogen Safety. OOI Surface Mooring Hydrogen Safety Review

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

Long term stability tests of INO RPC prototypes

New Growth Segments for the Air Cargo Industry

FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT

Electronic Oncology Systems the Management and the Safety Measures. Hansen Chen, Director, TDSI

Transcription:

Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: W.B.S 4.1.7 Electronics, Data Acquisition & Flight Software Gunther Haller SLAC LAT Chief Electronics Engineer DA & Flight Software Systems Manager haller@slac.stanford.edu (650) 926-4257 4.1.7 DA & FSW V5 1

Contents Technical Status Roadmap to Flight Hardware/Software Schedule Cost and Budget Summary 4.1.7 DA & FSW V5 2

LAT Electronics Hardware and Flight Software TKR Front-End Electronics (MCM) ACD Front-End Electronics (FREE) CAL Front-End Electronics (AFEE) TKR FSW is an integral part of the data acquisition (DA) subsystem and is managed, budgeted, and scheduled as part of the DA subsystem Global-Trigger/ACD-EM/Signal-Distribution Unit* Spacecraft Interface Units (SIU)* Storage Interface Board (SIB): Spacecraft interface, control & telemetry LAT control CPU LAT Communication Board (LCB): LAT command and data interface CAL 16 Tower Electronics Modules & Supplies 3 Event-Processor Units (EPU) (2 + 1 spare) Event processing CPU LAT Communication Board SIB Power-Distribution Unit (PDU)* Spacecraft interface, power LAT power distribution LAT health monitoring * Primary & Secondary Units shown in one chassis 4.1.7 DA & FSW V5 3

LAT Electronics TKR: Tracker CAL: Calorimeter ACD: Anti-Coincidence Detector TEM: Tower Electronics Module EPU: Event Processor Unit SIU: Spacecraft Interface Unit GAS Unit: Global Trigger-ACD- Signal Distribution Unit CRU: Command/Response Unit EBM: Event Builder Module GEM: Global trigger Electronics Module AEM: ACD Electronics Module Flight Software running on RAD750 processors in SIU and EPU cpci crates 4.1.7 DA & FSW V5 4

Components Power Distribution Unit (PDU) GASU GASU DA board with GASU ASICs & power-supply board Tower Electronics Module (TEM) incl. TEM ASIC s Tower Power Supply (TPS) Spacecraft Interface Unit (SIU) /Event-Processor Unit (EPU) Includes 4 custom boards Heater Control Unit Harness Software Front-End Simulator Test-bed/EGSE (Electrical Ground Support Equipment) 4.1.7 DA & FSW V5 5

PDU & GASU & GASU-ASIC ASIC Power Distribution Unit Switches power to TEM s, GASU, EPU crates Digitizes temperatures to be used for thermal control GASU Global trigger, event builder, command-response unit, ACD control/monitoring/data-readout GASU Power Supply Supplies power to GASU and ACD from 28V Accomplishments Designed/fabricated/assembled full enclosures (primary and redundant) with flight-like components. Functionality tested incl. FSW More detailed tests in progress Being incorporated in DA/FSW test-bed ualification model with modifications incorporated in layout GASU DA ASIC (GLTC2) Full production fabricated/packaged Screening has started at SLAC 4.1.7 DA & FSW V5 6

TEM & TEM ASIC s & TPS Tower Electronics Module (TEM) Control/readout/monitoring of TKR and CAL sub-system Tower Power Supply (TPS) Supply power to TEM/CAL/TKR from 28V Accomplishments 16 sets of engineering models were fabricated and assembled Being tested and incorporated in DA/FSW test-bed Out for RFP for flight fab/assembly, 1 st article is used for qualification TEM ASIC s (GTCC1 & GCCC1) Full production was fabricated/packaged Have started screening at SLAC ualification will start at GSFC next month PICTURE 4.1.7 DA & FSW V5 7

SIU/EPU (1) Modules Custom Enclosure (cpci crate) Holds modules Custom ccpi Backplane (CBP) Interconnects modules British AeroSpace 750 PPC processor board CPU Custom LAT Communication Board (LCB) Control/event interface from cpci processor to LAT Custom Storage Interface Board (SIB) MIL1553 interface to spacecraft, EEPROM storage in crates Custom Crate Power Supply (CPS) Supply power to PCI modules from 28V Accomplishments Designed/fabricated/assembled fully functioning engineering modules with flight-like components Integrated in crate with BAE 750 processor Tests in progress using flight software Being integrated in DA/FSW test-bed Some layout modifications in progress for qualification board fabrication 4.1.7 DA & FSW V5 8

SIU/EPU (2) Enclosure Backplane Power-Supply CPU SIB LCB 4.1.7 DA & FSW V5 9

Harness & Heater Control Unit & FES & EGSE Point-to-Point Cables ( Harness ) Designed & ordered complete set of cables for test-bed Ready to integrate when available Preparing package for RFP for flight order Heater Control Unit Designed/fabricated/assembled firstversion engineering module Ready to test Front-End Simulator Emulates CAL/TKR/ACD sub-systems for use on DA/FSW test-bed Designed/fabricated/assembled/tested front-end simulator board prototype Testing in progress, being integrated on test-bed Fabricated/assembled 34 copies 4.1.7 DA & FSW V5 10

Flight Software Incremental FSW builds coincide with the hardware builds as follows: Engineering Model 1 Run single tower, single CPU Used for EGSE test-stands for hardware development (built, tested, done) Used for LAT single-tower engineering unit by I&T group (built, tested, done) Engineering Model 2 Multiple towers, GASU, single CPU Used for EGSE test-stands for hardware development (in progress) Used as test-bed for hardware and software development & test (in progress) ISIS (Instrument Spacecraft Interface Simulator) Build & Release To be delivered to the Spacecraft vendor (Formal Release) Full LAT Build & Release Complete set of 16 towers, GASU, full set of CPU s Used as test-bed for hardware and software development & test To be delivered to I&T for full-lat testing (Formal Release) 4.1.7 DA & FSW V5 11

LAT FSW Architecture Spacecraft Solid State Recorder Discretes (to SIU PIDs) Event Builder (EB) output side. The EB is an element of the GASU. To SSR To SIU To EPU(s) 1553 Rx service LCB Rx service Spacecraft Interface Unit MSG task Other Tasks 1 PPS Interrupt GBM Interrupt LCB Rx Event Processing Unit(s) Other Tasks 1 PPS Interrupt MSG task LAT Instrument 1553 Legend Telecommand (SC to LAT) Telemetry (LAT to SC) Master to slave Slave to master Physics data from LAT Data to SSR Masters SC Att./Time Instr. Phys. File/Object HSK Watchdog TCS 1553 Tx service LCB Tx service Slaves SC Att./Time File/Object HSK Watchdog Slaves SC Att./Time Instr. Phys. File/Object HSK Watchdog LCB Tx service Command/Response * For details: FSW link on LAT main web-page From SIU From EPU(s) Event Assembly Event Builder (EB) input side. The EB is an element of the GASU. Command/Response Unit (CRU). The CRU is an element of the GASU. 4.1.7 DA & FSW V5 12

FSW Engineering Model 1 Accomplishments Designed/tested/delivered EM1 SW built Software to run full tower Configuration of tracker, calorimeter, TEM Solicited Housekeeping Event Delivery Also major progress in primary boot code of RAD750 TEM VME CPU with software Full set TKR frontend electronics Full set CAL frontend electronics * The test-stand shown does not have physics detectors 4.1.7 DA & FSW V5 13

Data-Taking with EM1 From EM1 testing as performed by I&T in the SLAC clean room Includes physics detectors Displays courtesy of the I&T group and LATTE 4.1.7 DA & FSW V5 14

Electrical Ground Support Equipment EGSE test-stand copies for ACD, CAL, TKR, DA HW & SW effort (60 total) Accomplishments Ordered and received VME crates & single-board computers VME SLAC custom transition board Custom PCI Mezzanine Card (PMC) LCB s Connectors for cables TEM & TEM PS boards and enclosures (for TKR/CAL/DA setups) GASU board and enclosure (for ACD/DA setups) 28V-power supplies Have started testing and shipping of new test-stands 4.1.7 DA & FSW V5 15

FSW/DA Test-Bed Includes full set of DA modules/harness plus front-end simulator boards to emulate CAL/TKR/ACD front-end system Accomplishments Produced DA modules for testbed Started to integrate modules Ready to start using FSW on the testbed mid/end April 4.1.7 DA & FSW V5 16

Roadmap to Flight Hardware Fabrication of printed circuit boards 2 vendors selected Fabrication of enclosures 1 Vendor selected Assembly of boards and modules 2 vendors evaluated/qualified Harness 2 vendors selected 4.1.7 DA & FSW V5 17

Modules for ualification Test and Flight Delivery ualification Unit Drawing Release Start Fab/Assembly Start ual Program End Testing TEM & TEM-PS Mar-17 Apr-17 Jun-25 Aug-2* PDU Apr-9 May-10 Aug-16 Oct-14 GASU May-24 Jun-23 Aug-31 Oct-27 EPU/SIU Apr-27 May-26 Sept-1 Nov-1 Harness Mar-30 Apr-30 May-21 Jun-21 Flight Unit Drawing Release Start Fab/Assembly Start FLT Accept. Program I&T Delivery TEM & TEM-PS Apr-17 May-21 Jul-16 Aug-30 PDU Jul-16 Aug-16 Nov-18 Jan-1 GASU Jul-27 Aug-27 Nov-19 Jan-19 EPU/SIU Aug-1 Sep-1 Nov-16 Jan-16 Harness Aug-13 Jul-13 Aug-10 Aug-20 * TEM proto-flight is used for first 2 towers 4.1.7 DA & FSW V5 18

Roadmap to Flight Software EM2 Flight Software design was reviewed by NASA/DOE committee 2/26/04 Assessment was very positive Started to implement EM2 designs Functions added for EM2 GASU/PDU configuration Streaming housekeeping Inter-task communication Primary/secondary boot of RAD750 MIL 1553 communication Telecommand / telemetry Software watchdog Functions added for Flight Unit Event-filtering/compression Event monitoring Charge injection calibration Diagnostics Thermal control Full command and telemetry support Time services Gamma-Ray-Burst (GRB) detection/alert SC repointing request 4.1.7 DA & FSW V5 19

Software Key Milestones for I&T/ISIS June 04 I&T requires software to control/readout multi-tower (i.e. GASU) configuration (EM2) July 04 Instrument Spacecraft Interface Simulator (ISIS) to Spectrum Astro August 04 Demo to LAT system engineering on fully instrumented test-bed December 04 I&T requires tested software to control/readout full LAT FU SW build to I&T December 04 FU build finish and transition to formal test FU Formal test complete Feb 05 February 05 I&T requires FU software release to operate/test (whole LAT is integrated) Start of system testing May 05 End of system test July 05 Ship LAT to NRL for environmental test Functional demonstrations every month to show progress 4.1.7 DA & FSW V5 20

Open Issues, Technical Risks and Mitigations FSW BAE RAD750 flight processor might be different than BAE engineering module in respect to operation Scheduled to receive first flight processor in May Software needs to be shown to work on integrated instrument Tests and demonstrations are planned on integrated test-bed HW Couple of components still need to be TID radiation tested (DA ASIC s, National transceiver) Radiation tests planned for April/May Overall inter-system timing in respect to trigger needs to be shown to work Test planned on test-bed once complete 4.1.7 DA & FSW V5 21

Critical Path for TEM DA Electronics to Tower A Critical Path in Red Start Fab TEM DA Board 4/17/04 (-39) Finish Test TEM DA Board 6/18/04 (-39) TEM DA Enclosure 6/1/04 (-39) Start of Test TEM DA Assembly 6/25/04 (-39) End Acceptance Test 8/2/04 (-39) TEM PS Assembly 5/10/04 (-36) Acceptance Test 7/2/04 (-36) Tower A DA Electronics Delivered 8/2/04 (-39) Design Cables Fab/Assemble Cables 4/30/04 (-42) Acceptance Test 7/9/04 (-42) Completion Dates (baseline variance) 4.1.7 DA & FSW V5 22

Approved Cost Changes Since Rebaseline (k$) 4.1.7 Baseline, November 03 $18,733 Changes: Additional FSW Manpower $ 747* Additional EGSE $ 457 SIU Cost Variance Reduction $ 258 Stanford Benefits Rate Increase $ 155 Total Change $ 1,617 4.1.7 Baseline, February 04 $20,350 Approved Changes in March 04 ISIS Upgrade $ 94* *Corresponding NASA funding increase 4.1.7 DA & FSW V5 23

Schedule/Budget Total budget: $20,350 Work Scheduled up to date: $11,472 Work Performed: $11,912 Actuals: $11,352 Schedule Variance $440k or 2.1% of total budget (ahead of schedule) Some flight components were delivered earlier than expected Cost Variance: $560k or 2.7% of total budget (under budget) Latency of invoicing/payment for components received 4.1.7 DA & FSW V5 24

Summary Technical: No technical issues which would risk sub-system Schedule Hardware is on track to provide flight hardware in time Software schedule is aggressive but feasible Cost No additional cost increases beyond what was discussed are identified Remaining budget should be sufficient to deliver subsystem 4.1.7 DA & FSW V5 25