Smart Network Smarter Choices

Similar documents
Sandwell General Hospital Travel Plan 2014

Bike Friendly Business Application Form

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

Final Plan 20 December 2016

interchange audit ABERDEEN Introduction Purpose of the Interchange Audit Interchange Audit Linking cycling with public transport

Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18

University of Leeds Travel Plan

University of Birmingham Sustainable Travel Action Plan April 2018 update

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

CYCLING SCOTLAND SCOTTISH CHARITY NO.SCO29760 CYCLE FRIENDLY EMPLOYER AWARD HANDBOOK

CAMBRIDGE ACCESS STUDY: TACKLING CONGESTION WORKSHOP

Supporting Safer Cities. ENHANCING LAST MILE CONNECTIVITY a safety analysis of the RK Ashram Marg Metro Station

CAR PARKING [15] General provision

Cycle Parking Standards TfL Proposed Guidelines

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

A Travel Plan for Oxford Brookes

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Active Travel Survey for Bridgend and Pencoed towns. Page description:

UNIVERSITY CENTRE. TRAVEL AND TRANSPORT Guidelines

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

TRAVEL PLAN ANNUAL MONITORING REPORT

Help your staff get to work with the Business Travel Pack

TRAVEL PLAN ANNUAL MONITORING REPORT

DE MONTFORT UNIVERSITY TRAVEL PLAN PROGRESS REPORT

Bluebell Gardens Resident Travel Guide

Green Travel Strategy & Action Plan

2013 Staff Travel Survey Results

Riverbank Meadows Travel Information Booklet

Supporting Safer Cities. ENHANCING LAST MILE CONNECTIVITY a safety analysis of the Mandi House Metro Station

National Transport Awards Cambridge Park & Ride

Part 3: Active travel and public transport planning in new housing developments

CPC Parking Lot Riverside Drive. Transportation Rationale

Appendix 3: Action Plan Completed Objectives 9 th Revision (November 2016)

Strategy for Walking & Cycling Action Plan

Background. Caversham a vision for the future. Joint public meeting arranged by:

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

EDITORS Massimo Infunti Domenico De Leonardis

Bristol City Council has produced a draft Bristol Transport Strategy document.

Easter Bush Campus Travel Plan

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Kingswood Primary School s Travel Plan

1.0 FOREWORD EXECUTIVE SUMMARY INTRODUCTION CURRENT TRENDS IN TRAVEL FUTURE TRENDS IN TRAVEL...

UWA Commuting Survey 2013

BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

1. What is an End of Trip Facility

2017 Moor Hall Primary School School Travel Plan

WALK- AND bike-friendly TURLOCK

CAMBRIDGE SOUTH WEST PARK & RIDE

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

Access Statement for Glamorgan County Cricket Club (Domestic Matches)

4.1 Introduction. 4.2 Aspects of walkable communities

Green Travel Strategy & Action Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

1.4 The development work will also provide 30 additional car and 50 cycle parking spaces on the campus.

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

BEST PRACTICES FOR ACCESSIBLE TRANSPORT. C G B (Kit) Mitchell

Solana Beach Comprehensive Active Transportation Strategy (CATS)

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

A Guide to Your Travel Options. Chester Campuses and Buildings

UNIVERSITY HOSPITALS OF NORTH MIDLANDS NHS TRUST TRAVEL PLAN COUNTY HOSPITAL

St Anthony s School Hampstead

Groningen. welcome to the cycling paradise

Welcome! Public Open House on UBC s Transportation Plan

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Public Transport & Bicycles: Common Ground for a Successful Partnership! Caroline Cerfontaine. Velo-city. 23 June Copenhagen

Public Transport and NMT Facilities in Santiago, Chile

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

Our Cycle Promise. northernrailway.co.uk. Produced in partnership with Sustrans. July 2017

MARKHOUSE ROAD IMPROVEMENTS

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

Travel Plan Durack Institute of Technology Geraldton Campuses 2

11/28/2016 VIA

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

Student Travel Survey 2012 results

Health & Safety Standard Procedure. Pedestrian and vehicle safety in schools

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Culham Science Centre Travel Plan April 2016

Integration of Sustainable Travel Modes

2019 DGPA Volunteer Area Job Descriptions New Member Job Descriptions

Sustainable Transport Blueprint for Canterbury. Lynn Sloman

LEEDS BECKETT UNIVERSITY. Transport Strategy

El Paso County 2040 Major Transportation Corridors Plan

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Planning Regionally With Transit

Northumbria University. Travel Plan Update

ENFIELD TOWN THE REVISED DESIGN

Corridor Vision Workshop Summary James Madison Elementary February 22,2018

Non-Motorized Transportation 7-1

Manor Royal Transport Strategy

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

CONNECTING PEOPLE TO PLACES

City of Lima Bicycle Parking Guide

Get your workplace moving

Transcription:

Employer Site Audit Form Please fill in this site audit form giving as much detail as possible. Remember to take photos to support the audit. Once completed please return the form to business@centro.org.uk or Business and Employers Team, Centro House, 16 Summer Lane, Birmingham, B19 3SD Name of person undertaking audit Date of audit Weather conditions 1. Employer Information Company Name Company address Number of full time staff Number of part time staff Number of contractors/agency staff Number of visitors (per week) Number of patients (per week) Number of other users (per week) What is the main operation of this site? 2. Hours of Operation What time do you open? (weekday) What time do you close? (weekday) What time do you open? (weekend) What time do you close? (weekend) Please list staff shifts e.g. 9-5, 10-2 etc 3. Travel Information Is there a designated Travel Plan Coordinator? (If so, how many hours a week dedicated to TP) Is travel information available for the site? Do you have a site-specific travel guide? (how to get here guide) Is travel information available on company internet/intranet sites? Is a working group in place that could be used to consult on the Action plan? How do staff find out information about where their nearest bus/rail stop is? e.g. signposts, leaflet stand, RTI

4. Car park identify number of spaces for each of the below groups Type of space Staff? Disabled bays? Designated spaces for named individuals (e.g. senior management ) Designated departmental spaces Designated visitor spaces Drop off/ loading bays? Coaches Additional car park spaces offsite? Total Number Photos to be taken within car park and notes made identifying location, direction picture taken in and what image shows. If multiple car parks, take pictures of each and label clearly. 5. Car park further details Is it well signed, both from outside and flows within the car park? yes No Is there CCTV? yes No Is it well lit / is lighting present? yes No Is it secure? yes No Is it managed (i.e. is it regularly inspected, is there security in place?) yes No Are there barrier / security gates? yes No Is there a parking fee? If yes, please detail yes No Is a parking permit system in operation? yes No Is public parking available in the vicinity of the business? Yes, paid parking Yes, free parking No Does demand for car parking exceed capacity? yes No - If yes, how often does this occur? Does the site experience access problems/traffic congestion on external roads? yes No Any potential car share parking available?

6. Footpaths / pedestrians Are footpaths in & around the site well-lit? Are footpaths in & around the site in good condition? Are footpaths in & around the site covered by CCTV? Are the off-site footpaths linked by safe crossing points in the vicinity of the business? Are pedestrian routes to/from the site safe, convenient, attractive and welcoming? Are pedestrian routes to/from the site obscured or shielded from view? Are surrounding roads equipped with safe and convenient crossing points? (tactile paving, dropped kerbs etc.) Please note & identify on map where issues present Are there any restrictions to accessing the site? Action: Take pictures of external paths along with internal, so that routes to/from bus stops, rail/tram stops can be viewed. Size and quality of footpaths should be noted including condition. Note whether they are shared walk and cycle ways. 7. Cycle & Motorcycle Parking No of bikes observed on day of audit No. spaces. Type of parking Covered? Well lit? Secure? Is the parking area lockable? Secure? Covered by CCTV? Located close to the building entrance? Or located Are there cycle routes in the vicinity of the site? Are there specific access problems for cyclists? (please provide detail) Are any pool bikes available? Please provide number of bikes and detail on storage facilities and access arrangements No. of cycle lockers available identify type of locker (is it a bike storage locker or for clothes storage etc.) and take photos Are there any other onsite facilities provided for staff who do not drive to work? Cycle Motorcycle

- Please detail any showers/changing rooms/ drying areas/lockers available for staff/ visitors that walk, cycle or motorcycle to work Are there any other cycle related schemes? - Please note any loan schemes for cycle/equipment purchase or maintenance provision for cyclists. Action: Photos required of all of this. Need to ensure photos are provided for each element of the audit, so that the person writing up has access to all necessary information. 8. Bus, Rail and Metro How many bus stops are located within 400m of the site? Identify on map prior to undertaking audit then check on audit Which buses serve local bus stops? including locations served, number of services and frequency of service Is there a rail station within 900m of the site? Identify on map prior to undertaking audit then check on audit Frequency? Local stopping train? Is there a Metro station within 900m of the site? Identify on map prior to undertaking audit then check on audit Are the bus stops/rail station/metro stops well-maintained? (take photos) Bus stops/rail/metro station display up to date timetable information? Take photo of bus/rail/metro shelter, and second image of timetable / information provided. Note destinations of buses from shelter information Real time information available? Bus stops/rail platform/metro platform sheltered, or other sheltered area provided? Bus stops/rail station/metro stop provide seating? General perception of bus stop/rail station/metro station environment (i.e. isolated, overlooked by nearby businesses/homes etc.) Are any of the following measures provided to staff e.g. subsidised bus/rail season tickets or loans for purchasing bus/rail season tickets? Bus Rail/Metro It is important to get this information on-site and not rely on Google as this data may be out of date

9. On Site Facilities Ask site contact for information / to show you the areas on site Is a staff canteen provided at the site? Is a shop available within the site? Is a gym provided at the site? Is an ATM provided at the site? Other facilities available at the site? Are shops available within walking distance of the site? Are cafes available within walking distance of the site? Are ATMs available within walking distance of the site? Are there any other facilities provided for staff that do not drive to work? (please detail any showers/changing / drying area 10. Business Travel Number of staff required to travel as part of their working day? Please specify if this is short or long distance Which sites are visited? Are there any regular trips? Car mileage paid (pence per mile) Motorcycle mileage paid (pence per mile)? Cycle mileage paid (pence per mile)? 11. Car club/car sharing Car sharing scheme? Car club membership? Other 12. Additional information Electric vehicle charging points (number, usage, locality, etc.)

13. Policies Do you have an environmental/sustainable management system in place? yes No - Who is responsible for its implementation? Business travel policy? Policies regarding company car use? Is sustainable travel covered in employee s induction to the business? E.g. induction pack/travel information Yes/no Are health and wellbeing issues promoted at the business? yes No What travel initiatives are offered to staff? Shuttle bus yes No Teleconferencing yes No Home working yes No Flexible working yes No Compressed working weeks yes No Other (Please detail) FEB15043