What s New!!! Blackstone River Bikeway Fact Sheet: April 2004

Similar documents
APPENDIX D COST SUMMARY TABLES

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

2018 Greenway Challenge. Up River Course Maps and Cue Sheets

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

B L A C K S T O N E R I V E R B I K E W A Y

Transportation Corridor Studies: Summary of Recommendations

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

K. Circulation. Introduction

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

MIAMI & ERIE CANAL SHARED USE TRAIL

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

City of Moorhead Committee of the Whole Meeting

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Section Access Control Plan - SH 14 (Mulberry Street)

Chapter 5 Future Transportation

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Route 7 Corridor Study

Regional Bicycle Barriers Study

City of Wilsonville 5 th Street to Kinsman Road Extension Project

The Richland County Transportation Penny Program. September 21, 2015

Fitting Light Rail through Well-established Communities

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Appendix D: Concept Screening

Route 29 Solutions Projects

Executive Summary Route 30 Corridor Master Plan

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Chapter 4 Traffic Analysis

Basalt Creek Transportation Refinement Plan Recommendations

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

County of Fairfax, Virginia. Department of Transportation

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Welcome to the Open House

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Recommendations. Central Salem Mobility Study

Legislative Update Williamsburg Residency

Carbondale to Murphysboro Bike Route JACKSON COUNTY

Welcome to the Sellwood Bridge Project Open House!

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Blackstone River Bikew ay Summit May 15, 2014 RI DEM 295 Visitor Center

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

N E W P O R T L A N D Y O R K C I T Y. t o

O HARA TOWNSHIP. O Hara Township Trail Feasibility and Planning Project, prepared by PBS&J TriLine, April 2005.

Casablanca Boulevard & GO Station Access

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Foothill Expressway Improvements Between El Monte and San Antonio

Somerville Community Path Feasibility Study

Reams Road RCA Study. Board of County Commissioners Public Hearing

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Central Jersey Transportation Forum. March 2007

Giles Run Connector Road

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Comments EXECUTIVE SUMMARY

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

PEDESTRIAN NETWORK PLAN

Fairfax County Parkway Widening Fairfax County

CHAPTER 4: IDENTIFICATION OF ROAD SYSTEM DEFICIENCIES: TRANSPORTATION PLANNING MODEL

SC 41/Joe Rouse Intersection Improvements

Gandy Connector: Travel Demand. Policy Committee August 2013

2.0 Existing Conditions

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Board of Supervisors February 27, 2017

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

State Route 160 (Blue Diamond Highway)

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

4.0 Recommended Transportation Plan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

Regional Trails Corridor Assessment

Bluffdale/ UDOT South High-T Intersection Project Type Operations

I-10 Bypass Project Banning to Cabazon

SOUTHWEST SHEPHERDSVILLE SMALL AREA TRANSPORTATION STUDY

3.0 Future Conditions

Project Description Form 6V

Maywood Town Hall Meeting. May 4, 2016

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

South King County High Capacity Transit Corridor Report. Regional Transit Connections and Active Transportation

ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON. Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Parks Highway: MP Lucus Road to Big Lake Road

section 4 Existing Conditions, Issues, and Options

STUDY ADVISORY COMMITTEE. October 8, 2015

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

5.0 Roadway System Plan

Transcription:

What s New!!! Blackstone River Bikeway Fact Sheet: April 2004 Construction / Design Update: * Worcester/Millbury, MA: One mile completed with another mile within the Rt. 20 contract currently under construction. * Lincoln, RI: Six miles are complete with another mile under construction. * Uxbridge / Millville,MA: A three mile stretch is currently at the 25% design stage. Completed section within the Rt 146 project Bikeway construction in Worcester near Rt. 20. General Overview: The concept of a bikeway through the historic Blackstone River Valley, connecting Worcester, Massachusetts, to Providence, Rhode Island, has been championed by the John H. Chafee Blackstone River Valley National Heritage Corridor. The highway and environmental agencies in both states have joined together to make the concept a reality, with six miles of the 20 miles of bikeway in Rhode Island already constructed, and nearly seven of the 28 miles of bikeway in Massachusetts under design or construction. The Route 146 Project, in Worcester, has provided a singular opportunity to construct an off-road bikeway from Millbury to Quinsigamond Village in Worcester, and portions of that route are already complete. The Blackstone River Bikeway in Massachusetts was first given form in 1996 when the Conceptual Design and Feasibility Study was published. Beginning in 1994, under an agreement between the Massachusetts Highway Department (MassHighway) and the Department of Environmental Management (DEM), Cullinan Engineering Company, Inc., surveyed the potential bikeway route in

Massachusetts and developed a preferred alignment as well as several alternate alignments for the route. The route was divided into seven segments as indicated in the table below, from Segment 1 beginning at the Massachusetts-Rhode Island State Line to Segment 7 ending at Union Station/Worcester Common in Worcester, MA passing through the municipalities of Blackstone, Millville, Uxbridge, Northbridge, Grafton, Sutton, Millbury, and Worcester. Summary of Bikeway Segments In MA (South to North)* Segment 1: Blackstone/Millville - Total Length 15,425 ft (4,701 m) (2.92 miles) Segment 2: Millville/Uxbridge - Total Length 17,427 ft (5,312 m) (3.30 miles) Segment 3A: Uxbridge/Northbridge - Total Length 29,474 ft (8,983 m) (5.58 miles) Segment 3B: Northbridge - Total Length 18,528 ft (5,647 m) (3.51 miles) Segment 4: Northbridge/Grafton - Total length 7,324 ft (2,232 m) (1.39 miles) Segment 5A: Grafton/Sutton - Total Length 13,807 ft (4,208 m) (2.61 miles) Segment 5B: Sutton/Millbury Total Length 10,311 ft (3,142 m) (1.95 miles) Segment 5C: Millbury Total Length 7,715 ft (2,351 m)(1.46 miles) Segment 6: Millbury/Worcester Total length 4+ miles (6+ km) Segment 7N (Northbound): Worcester Total Length 7,082 ft (2,158 m)(1.34 miles) Segment 7S (Southbound): Worcester Total Length 6,710 ft (2,045 m)(1.27 miles) * Based on Massachusetts Blackstone River Bikeway Conceptual Design and Feasibility Study, Mass. Dept. of Environmental Management and Mass. Highway Department, September 1996 As of April 2004, the only bikeway alignments in Massachusetts that have been constructed or are under construction are located within the Route 146 Connector Project (Segment 6). The bridges of Segment 1 in Blackstone and Millville have been evaluated to determine their rehabilitation needs, and the design for Segment 2 in Uxbridge is at the 25% stage. The Massachusetts Blackstone River Bikeway Task Force, consisting of representatives of MassHighway, DEM, the National Heritage Corridor, Blackstone Valley Chamber of Commerce, CMRPC, and other bikeway stakeholders, is working to set priorities for the design and construction of the remaining bikeway segments. The expected length of the Blackstone River Bikeway in each town in Massachusetts is as follows: (from Trails & Greenways: A Vision for the Blackstone River Valley, JHC BRVNHCC, February 2003) Municipality Bikeway Mileage Blackstone MA 2.0 Grafton MA 3.0 Millbury, MA 3.5 Millville, MA 1.5 Northbridge, MA 5.5 Sutton, MA 1.0

Uxbridge, MA 6.5 Worcester, MA 5.5 Funding: Current cost estimates for completing the bikeway from the Rhode Island state line to the southern end of the Route 146 Project are in the range of $20 million. In 1998, congress provided about $6 million to MassHighway for the bikeway that has been used for the design and construction to date. As the federal transportation authorization bill is going to be renewed this year, efforts are being made to obtain a specific authorization to complete this project. The Blackstone River Bikeway has appeared as a line-item project on the Central Massachusetts Region Transportation Improvement Program (TIP) for the past five years. What Happens Next: The construction of the bikeway within the Route 146 Connector Project from Quinsigamond Village in Worcester to the Route 146/122A Interchange will be completed with that project. The design of Segment 2 in Uxbridge is undergoing the 25% design review. When the design is finalized, probably in the summer of 2004, the construction of Segment 2 will commence. Funding is believed to be available for the construction of Segment 2. The Task Force has advocated that Segment 5 (Grafton/Sutton/Millbury) be the next segment to be committed to design, and funding is believed to be available for that as well. Funding for the remaining segments is not currently assured.

Bikeway Segment Descriptions (South to North) Segment 1: Blackstone/Millville - Total Length 15,425 ft (4,701 m) (2.92 miles) [bridge type study complete] Alignment 1, Blackstone, 4,627 ft (1,410 m), Rhode island Line in Blackstone, MA & North Smithfield, RI, to SNETT junction with Church St in Blackstone via SNETT (DEM ownership, 10 bridges) Alignment 3, Blackstone/Millville, 10,798 ft (3,291 m), Church St (Millville) to Central St (Millville) via SNETT (DEM ownership, 4 bridges) Segment 2: Millville/Uxbridge - Total Length 17,427 ft (5,312 m) (3.30 miles) [segment in MHD design] Alignment 6, Millville/Uxbridge, 5,877 ft (1,791 m), SNETT intersection with Central St (Millville) to River Rd (Uxbridge), 88% public/12% private property Alignment 7, Uxbridge, 11,550 ft (3,520 m), River Rd (Uxbridge) to Millville Rd (Route 122) (Uxbridge), alignment recently altered in this area Segment 3A: Uxbridge/Northbridge - Total Length 29,474 ft (8,983 m) (5.58 miles) Alignment 8, Uxbridge, 4,712 ft (1,436 m), Millville Rd (Route 122)(Uxbridge) to Old Still Corner Rd near P&W crossing, primarily along Uxbridge sewer easement, 61% public/39% private ownership, requires one RR crossing and P&W r-o-w easement Alignment 11, Uxbridge, 1,581 ft (482 m), Old Still Corner Rd (Uxbridge) to Newell Rd (Uxbridge) east of P&W crossing, 100% private property involving sewer easement and P&W r-o-w easement Alignment 14, Uxbridge, 4,419 ft (1,346 m), Newell Rd (Uxbridge) to intersection of Cross & Oak Sts (Uxbridge), via dirt road to Depot St to Mendon St (Route 16) to Capron St to Cross St to Oak St, all on road, 65% public/35% private, tricky crossing of Route 16 Alignment 17, Uxbridge, 6,441 ft (1,963 m), Oak St (Uxbridge) to Hartford Ave East (Uxbridge), entirely on road, 100% public r-o-w, passes River bend Farm Visitors Ctr Alignment 18, Uxbridge/Northbridge, 12,321 ft (3,755 m), Hartford Ave East (Uxbridge) to 900 ft south of Church St (Northbridge), via Goat Hill Trail to a dirt road to Plummer s Trail to end, requires 2-4 bridge structures, entirely off road, 94% public/6% private lands, access to historic Blackstone Canal Segment 3B: Northbridge - Total Length 18,528 ft (5,647 m) (3.51 miles) Alignment 20, Northbridge, 906 ft (276 m), from Plummer s Trail to Church St (Northbridge), entirely off road and within the Blackstone River and Canal Heritage State Park Alignment 23, Northbridge, 1,698 ft (517 m), from Church St to point east of P&W crossing of historic Blackstone Canal, follows Northbridge sewer easement but is 98% on private land, requires one sub-grade RR crossing culvert Alignment 24, Northbridge, 3,664 ft (1,116 m), from P&W RR crossing of Blackstone Canal to Riverdale St (Northbridge), entirely off road and on private property, requires one bridge structure but uses existing road and berm

Alignment 25, Northbridge, 4,003 ft (1,220 m), from Riverdale St to intersection of South Main St & Spring Hill Ave (Northbridge), uses about 1,500 ft of Providence Road (Route 122), entirely on road and probably within public r-o-w Alignment 27B, Northbridge, 2,787 ft (849 m), from intersection of South Main St & Spring Hill Ave to Sutton St east of Fowler Rd, parallel to P&W RR and requires agreement with the P&W, entirely off road and within the P&W r-o-w, drainage features and wetlands alteration required Alignment 28A, Northbridge, 5,470 ft (1,667 m), from Sutton St (Northbridge) to Tenneco Gas Pipeline north of the P&W lot line, entirely off road and on private property-mostly P&W r-o-w, requires agreement with the P&W and at least 3 wetland crossings plus one bridge structure, also requires wetland alteration Segment 4: Northbridge/Grafton - Total length 7,324 ft (2,232 m) (1.39 miles) Alignment 28B, Northbridge/Grafton, 5,526 ft (1,684 m), from Tenneco Pipeline (Northbridge) to intersection of Maple St & Depot/Ferry St (Grafton), alignment is 93% off road (7% on road), 93% private property, requires agreement with P&W RR and private parcel owner as well as wetland alteration and two bridge structures Alignment 30, Grafton, 1,798 ft (548 m), from Maple/Depot/Ferry Sts (Grafton) to intersection of Ferry St & Old Ferry St, entirely on road and within the public r-o-w Segment 5A: Grafton/Sutton - Total Length 13,807 ft (4,208 m) (2.61 miles) Alignment 31, Grafton, 3,109 ft (947 m), from intersection of Ferry St & Old Ferry St to the intersection of Main St (Route 122A) & Elmwood St/Sunnyside Terrace (Grafton), entirely on road and within the public r-o-w along Ferry St and Route 122A Alignment 33, Grafton, 704 ft (214 m), from intersection of Route 122A & Elmwood St/ Sunnyside Terrace to P&W RR at the end of Sunnyside Terrace (a dead-end residential street providing access to the elementary school), entirely on road and within the public r-o-w Alignment 35, Grafton/Sutton, 7,690 ft (2,343 m), from Sunnyside Terrace at the P&W RR (Grafton) to Blackstone St west of Chase Rd (Sutton), via the P&W r-o-w and crossing Pleasant St and the river to the intersection of Follette & Depot Sts to Blackstone St, about 15% on road and 85% off road, with about 42% in the public r-o-w, requiring agreements with the P&W and other private property owners as well as a new bridge structure Alignment 36, Sutton, 2,304 ft (702 m), from Blackstone St (Sutton) to the Singing Dam (Sutton), via Blackstone St, entirely on road and within the public r-o-w, requiring some widening of Blackstone St, and some grades will exceed the desired maximum 5% Alignment 37A, Sutton, 3,220 ft (981 m), Segment 5B: Sutton/Millbury Total Length 10,311 ft (3,142 m) (1.95 miles) Alignment 39, Sutton/Millbury, 2,664 ft (812 m), from Singing Dam on Blackstone St (Sutton) to Cross Rd (Millbury), entirely off road and on private property, requiring some wetlands alteration and general grading but no bridge structures Alignment 41, Millbury, 646 ft (187 m), from Cross Rd (Millbury) on the north bank of the river to the intersection of Cross Rd and Providence Rd (Route 122A)(Millbury) on the south side of the

river, requiring two bridge structures of about 100 feet each, possibly utilizing existing stone abutments, may be entirely on private property but uses existing dirt roadway Alignment 43, Millbury, 7,001 ft (2,133 m), from intersection of Cross Rd and Providence Rd (Route 122A)(Millbury) to the South Main St bridge over the Blackstone River (Millbury), via Providence Rd to Maple St to South Main St, entirely on road and within the public r-o-w Segment 5C: Millbury Total Length 7,715 ft (2,351 m)(1.46 miles) Alignment 45, Millbury, 1,569 ft (478 m), from the South Main St bridge to the intersection of Elm & River Sts (Millbury), entirely off road with 64% on private property and 36% on town-owned land, requiring an agreement with the Millbury V.F.W. Post and the town but no bridge structures Alignment 48, Millbury, 3,226 ft (983 m), from intersection of Elm & River Sts (Millbury) to a point on the P&W RR r-o-w 1900 feet north of the railroad bridge over the river, about 18% on road (River St) and 82% off road on private land (primarily P&W RR plus one other owner), requiring an agreement with the P&W and a bridge crossing the Blackstone River parallel to the existing RR bridge as well as some wetland alteration Alignment 50, Millbury, 2,920 ft (890 m), from P&W RR r-o-w point to the southern terminus of the Route 146 Bikeway at Main St (Route 122A)(Millbury), entirely off road and 75% on private property (primarily Aquarion Water Company, formerly Mass. American Water Company), ending at the completed bikeway section near Route 146 Segment 6: Millbury/Worcester Total length 4+ miles (6+ km) This segment of the Blackstone River Bikeway is being constructed as part of the Route 146/Massachusetts Turnpike/Interstate 290 Connector Project and will roughly parallel the new Blackstone River Parkway (Route 146) from the Route 146/122A interchange (Millbury) to Quinsigamond Ave at Brosnihan Square (Worcester), a combination of on-road and off-road alignments Segment 7N (Northbound): Worcester Total Length 7,082 ft (2,158 m)(1.34 miles) This segment carries the northbound leg of the bikeway on city streets from the intersection of Quinsigamond Ave & Ashmont St to Union Station at Washington Square via the one-way streets appropriate for northbound traffic Segment 7S (Southbound): Worcester Total Length 6,710 ft (2,045 m)(1.27 miles) This segment carries the southbound leg of the bikeway on city streets from Union Station at Washington Square to the intersection of Quinsigamond Ave & Ashmont St via the one-way streets appropriate for southbound traffic