Management of Reactor Decommissioning

Similar documents
THE LOVIISA NUCLEAR POWER PLANT DECOMMISSIONING PLAN UPDATE Matti Kaisanlahti NKS-R Decommissioning Seminar, Halden, Norway, November 2013

R2D2P. Working group report

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

OFFICIAL. Agreement to the implementation of pressurised inerting to manage excursion hydrogen within the Magnox Swarf Storage Silo OFFICIAL

IAEA Regional Workshop Legal and Regulatory Aspects of Decommissioning of Research Reactors June Manila, Philippines

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

SEMFEW205 - SQA Unit Code H1VP 04 Joining materials by the manual MIG/MAG and other continuous wire processes

Safety of Decommissioning: International Cooperation under the IAEA Coordination

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Health, Safety and Welfare Policy

HEALTH & SAFETY GUIDANCE

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Policy Redesign Project. Plant Safety Policy. Table of Contents

Changeroom Design, Operation and Maintenance A Nuclear Industry Code of Practice

Work Equipment: LOCAL EXHAUST VENTILATION

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

Ionising Radiations Code of Practice & Guidance Contingency Arrangements

Safety Standards for Decommissioning Activities

SEMFWE305 HY20 04 Welding materials by the Semi-Automatic MIG/MAG and Flux Cored Arc processes

Syllabus for Licensable Work with Asbestos (Category C)

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

MSE CONTROLLED DOCUMENT. Radiological HS&E Precautions for Dismantling Equipment

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Level 3 Diploma in Moving Loads in Construction. Qualification Specification

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

CBRN Academy. Assistance and Protection Training Course PROGRAMME PLAN

Regulatory Review of Safety Assessment for Decommissioning of Facilities Using Radioactive Material

New Licensed Asbestos Manager Training

General maintenance engineering applications

B S Glass Ltd Safety procedures- outsourced Workplaces

SOUTHBANK PLACE Asbestos Removal (Brief Guide)

SEMEM SQA Unit Code HWAW 04 Carrying out maintenance activities on fluid power equipment

INFORMATION NOTE No 353: MICROBIOLOGICAL TESTING

PRESSURE SYSTEMS POLICY

To comply with the OHS Act, the responsible manager must carry out and document the following:

ONR GUIDE DECOMMISSIONING. Nuclear Safety Technical Assessment Guide. NS-TAST-GD-026 Revision 4

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

Radiation Safety Program Manual Part 3 Cyclotron - Isotope Production

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

Method Statement Author

INSPECTION & NON-DESTRUCTIVE TESTING

General maintenance engineering applications

MSE CONTROLLED DOCUMENT. Radiological HS&E Precautions for NORM Contaminated Tanks, Vessels & Separators

Refresher Licensed Asbestos Supervisor Training

New Licensed Asbestos Operative Training

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Understanding safety life cycles

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

New AQF Filter Polymer Filtration System

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Treatment of G1 Baskets at the CEA Marcoule Site 12027

NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE

Gas Network Craftsperson

SH&E Training Matrix (Americas, all Business Groups)

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

SURF-AIR MOBILE ATTRACTION TECHNICAL SPECIFICATION

Marine Mammal Mitigation Systems

COGPOLY39 Meet safety, health and environmental requirements in the workplace

Introduction. Seafood HACCP Alliance Training Course 8-1

The RCM Analyst - Beyond RCM

Innovative Pressure Testing Equipment

MANAGING INDUSTRIAL SITE RADIOGRAPHY WORK

[Type here] MANAGEMENT OF X-RAY GENERATING EQUIPMENT

The routine maintenance and inspection of local exhaust ventilation (LEV)

Transportation Emergency Preparedness Program (TEPP) Model First Responder Procedure for Transportation Accidents Involving Radiological Materials

NZQA registered unit standard version 3 Page 1 of 8. Operate bitumen gangbar sprayer transfer, heating, and blending equipment

Amusement Device Safety Council. Safety of Amusement Devices: Pre-use inspection

MDEP Common Position No AP

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the

Human Factor Challenges in International Marine Contracting

Winter Maintenance in Lithuania

ROLE DESCRIPTIONS BY COMPETENCY LEVEL

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Manual Crane Scale PCE-CS 300

Contractor / Exhibitor Handbook

MSE CONTROLLED DOCUMENT. Radiological HSE Precautions for Pigging Operations

Pressure Systems Safety Regulation

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

Level 4 Certificate in Asbestos Removal for Contract Managers

Instructions in the Use of Radiation Protection. Equipment and Radiation Measuring Instruments by. Disaster Response Personnel in a Nuclear Emergency

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

USING HAZOP TO IDENTIFY AND MINIMISE HUMAN ERRORS IN OPERATING PROCESS PLANT

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

Università di Pisa Facoltà di Ingegneria Dipartimento di Ingegneria Meccanica, Nucleare e della Produzione. Emergency Planning.

Maintaining mechanical devices and equipment. Outcome one

BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS

HONG KONG COLLEGE OF ANAESTHESIOLOGISTS TECHNICAL GUIDINES RECOMMENDATIONS ON CHECKING ANAESTHESIA DELIVERY SYSTEMS

Vermin, Insects and Scavenging Birds Management Plan

Skin dose assessments for contaminated individuals using VARSKIN. Izzy Styles Sellafield Ltd

SEMEM3-65 Servicing anaesthetic and ventilation equipment

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

OFFICIAL 2016 A YEAR OF CHANGE IN THE REGULATION OF DECOMMISSIONING?

International Trends and Safety Perspectives in the Decommissioning of Facilities Using Radioactive Material

Assembling and testing fluid power systems

Transcription:

Management of Reactor Decommissioning Tom McCool Project Manager Sellafield Ltd 9/24/2008 1

Introduction/ Background Managed the decommissioning of two research reactors in the UK Scottish Universities Research Reactor 300kW Argonaut Design ICI Triga reactor 250kW Managed a decommissioning project at Hunterston Magnox power reactor Managed various decommissioning projects on the Sellafield site in UK Calder Hall cooling towers Windscale pile 2 chimney Windscale AGR research reactor 9/24/2008 2

Agenda Definition of a Project/ Project Management Project Organisation Suitably Qualified and Experienced personnel (SQEP) Training Requirements Quality Assurance Project Manual Quality Plans Installation Waste Management Operations Procedures Method Statements (Installation Activities) Operating procedures Maintenance procedures Routine surveys Project Schedule Questions 9/24/2008 3

Definition of a project A unique set of co-ordinated activities, with definite starting and finishing points, undertaken by an individual or organization to meet specific objectives within defined schedule, cost and performance parameters 9/24/2008 4

Project Management The planning, monitoring and control of all aspects of a project and the motivation of all those involved in it to achive the project objectives on time and to specified cost, quality and performance QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. 9/24/2008 5

The Project Manager Project management is quite often the province and responsibility of an individual project manager. This individual seldom participates directly in the activities that produce the end result, but rather strives to maintain the progress and productive mutual interaction of various parties in such a way that overall risk of failure is reduced 9/24/2008 6

Client Project Interface Client Reactor operator Regulator Environmental Protection Project Sponsor Regulator Nuclear Inspectorate Project Manager Reactor Decommissioning 9/24/2008 7

Project Organisation Project Manager Safety Advisor Project controls Conventional Safety Radiological Protection Planning Cost Engineer Deputy Project Manager Technical Authors Ois; MIs;ARIs Health Physics Quality Assurance Site Supervisor Safety Case Author Design Characterisation Routine Surveys Clearance Monitoring Final clearance Installation Subcontracts Decommissioning Ventilation Civil Monitoring Mechanical Handling Containment Specialist Metal cutting Concrete Cutting Decontamination of Ancillary Equipment Ventilation Monitoring Existing expertise within client organisatoin Either exists or petential to develope within client organisation Scaffolding Specialist contract services 9/24/2008 8

Suitably Qualified and Experienced Existing expertise within the Client organisation. Health Physics Characterisation Surveys Decontamination Maintenance of monitoring equipment Quality Assurance Procurement 9/24/2008 9

Suitably Qualified and Experienced Existing Expertise continued Radiological protection Safety Advisor? Technical authors Safety Report? 9/24/2008 10

Development Needs Project Management Techniques Project Reporting Earned value analysis Schedule monitoring/ update KPIs Contract Management (procurement) Risk management 9/24/2008 11

Training Requirements Decommissioning culture change Finite start / end point. Different use of skills in decommissioning. Characterisation Taking Samples Analysis procedures. Access /egress in Reactor Hall During dismantling operations potential to spread contamination. 9/24/2008 12

Training Requirements Contd Decontamination Processes Operation of decontamination facility. Principles of decontamination. Waste minimisation. Waste Management Strategy Waste characterisation Waste packaging Disposal Routes 9/24/2008 13

Training Requirements Contd Maintenance of decommissioning facilities Ventilation Systems / Monitoring Systems Safety Mechanism DP guage on extract systems Filter change. Beta in air / gamma monitors Functional checks / proof tests/ calibration Alarm responses Ventilation DP Ventilation Low flow Gamma and Beta in air alarms. 9/24/2008 14

Training Requirements Contd Operation of decommissioning facilities Daily Start up procedure Extract system Monitoring system Survey of containment Shutdown procedure Emergency procedures Industrial accident Fire 9/24/2008 15

Quality Assurance Develop Manual of Project Specific Procedures Quality Assurance programme Quality Plans Installation Operations Waste Management 9/24/2008 16

Quality Assurance Procedures Method statements Install containment Ventilation systems Monitoring system? Commissioning (System performance) Ventilation Monitoring Decommissioning tools? 9/24/2008 17

Quality Assurance Procedures Maintenance Procedures Ventilation / extract system Filter changes Monitoring system Functional checks (monthly) Calibration (annual) Dismantling equipment Brokk - daily/ weekly / routine maintenance Operating instructions Decommissioning operations Free release waste removal/ packaging Low level waste removal/ packaging Intermediate waste removal/ packaging Start up / shut down procedure 9/24/2008 18

Quality Assurance Procedures Health Physics Procedures Sampling and analysis Routine surveys Waste sentencing Clearance monitoring 9/24/2008 19

Quality Assurance Competency Based QA system Train people to do the role Keep training records Produce Role proficiency graph for personnel (RPG) Reduces need for abundance of procedures. 9/24/2008 20

Project Schedule Project management Tool Used to develop estimate Multi level enables project monitoring Cost- Cost performance index Time -schedule performance index Forecasting Tool Forecast budget requirements Resource requirements Tracking Demonstrates impacts of any changes to activity either time or cost. 9/24/2008 21

QuickTime and a TIFF (LZW) decompressor are needed to see this picture. 9/24/2008 22

QuickTime and a TIFF (LZW) decompressor are needed to see this picture. 9/24/2008 23

QuickTime and a TIFF (LZW) decompressor are needed to see this picture. 9/24/2008 24

QuickTime and a TIFF (LZW) decompressor are needed to see this picture. 9/24/2008 25

9/24/2008 26

Questions 9/24/2008 27