Improving Melbourne for wheels, paws and feet

Similar documents
BANYULE BICYCLE STRATEGY

Introduction... 1 User Perspectives... 2

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

Devonport City Cycling Network Strategy

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Route 29 Solutions Projects

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Terwillegar Drive Expressway Draft Concept Plan

Frome Street Bicycle Route

Acknowledgments Doncaster Hill Pedestrian and Cycling Plan

CHIEF PEGUIS TRAIL EXTENSION WEST

Cycle Superhighway 4 from Tower Bridge to Greenwich

4 Goals, Objectives & Actions

What Is a Complete Street?

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

2012 Capital Budget Capital Improvement Program

ACTION TRANSMITTAL No

General Design Factors

Transport Priorities

Chapter 5 Future Transportation

Community engagement guide May 2018

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

Engineering - Bicycle and Pedestrian

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

City of Perth Cycle Plan 2029

Speed Limits in the Hoddle Grid

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

Bulwell Cycling Consultation

Design Manual For A Bicycle Friendly Infrastructure

Chapter 3 DESIGN SPECIFICATIONS

WHANGAREI IMPROVEMENTS

Tonight is for you. Learn everything you can. Share all your ideas.

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

About AMETI. Features and benefits. Stage One Panmure complete

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

The Box Hill to Ringwood Rail Trail. A proposal by Whitehorse Cyclists Incorporated July 2010

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Viaducts, Eastern Core and False Creek Flats Cycling Improvements HUB Vancouver/UBC committee 2013/05/13

Casablanca Boulevard & GO Station Access

Highway 1 Kamloops to Alberta Four-Laning Program

Shifting Gears for a Healthier City.

City of Davis East Covell Corridor Plan

City Road draft Master Plan

section 4 Existing Conditions, Issues, and Options

Creating Walkable Communities: January 19, FMW SHIP: Encouraging Healthy Lifestyles in Diverse, Rural Communities!

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

West Tamar Highway Priority Upgrades

WDA response to O'Brien summary of recommendations dated 4 September 2017

Welcome to the McKenzie Interchange Project Open House!

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Duwamish Way-finding and CTR Report

West Village Mobility & Integration

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

York Region Population and Employment Growth

Pedestrian Access Strategy

Dowling/Beaty Cycling Route

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Guide to travelling to and around Panmure April 2013

Building a Toronto that Moves

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Bay to Bay Boulevard Complete Streets Project

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

SH3 Waitara to Bell Block

Submission Cover Sheet Mordialloc Bypass Project EES IAC

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Transportation Corridor Studies: Summary of Recommendations

Bicycle Master Plan Goals, Strategies, and Policies

Prince George s County plans, policies, and projects

Boroondara Bicycle Users Group Response to: Monash Alliance M1 update plans 5 May 2008

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Comprehensive Collection of Stakeholder Alternatives by Mode

Public Feedback Comments Appendix G. Appendix G. Public Feedback Comments. Virginia Beach Bikeways and Trails Plan 2011 Page G-1

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

STONY PLAIN ROAD STREETSCAPE

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Transport Discussion Paper

PEDESTRIAN ACTION PLAN

Keeping you connected

Morgans Creek to Padstow

Foreword Executive summary A cycling city Introduction Vision Goals Targets Summary of achievements...

Active Transportation Facility Glossary

Response Road Safety Strategy for New South Wales

Works Approval Application. G.2 Traffic

Non-Motorized Transportation 7-1

Route 7 Corridor Study

TRANSPORTATION & MOBILITY

Chapter 6 Transportation Plan

City of Greater Dandenong Bicycle Strategy October 2002

Transcription:

Improving Melbourne for wheels, paws and feet September 208 Authorised and published by the Victorian Government, Treasury Place, Melbourne

Greensborough Road walking and cycling paths. Artist impression only. Subject to change. Connecting communities by foot and bike Constructing an eastern bike corridor, two new Yarra River crossings and completing missing walking and bike riding links play a key role in improving all forms of transport for Melbourne. Our team of engineers, who also happen to be passionate bike riders, have been working hard with riders, walkers and runners to plan for around 2 kilometres of new and improved paths and trails for riders and pedestrians (as well as their furry friends). We ve put together a draft design for walking and bike riding for, including: Completing the long awaited eastern bike corridor - a new commuter bike riding route to the inner city along the Eastern between Chandler Highway and Merri Creek Two new crossings of the Yarra River (at Yarra Street, Heidelberg and next to the Eastern, Kew/ Fairfield) Completing the missing link in the Greensborough bypass path between Grimshaw Street and Yallambie Road New paths along Bulleen Road to improve access to schools and sporting facilities Improved bike riding connections to access places where people work, shop and spend time in the northeast. These new connections link to existing walking and bike riding paths improving access to the Watsonia and Heidelberg town centres, as well as the community facilities along Bulleen The eastern bike corridor would provide a more direct route between the inner city and the eastern suburbs, and avoid steep and narrow sections of the existing Main Yarra Trail. will also significantly expand the Strategic Cycling Corridor network in the north-east, with new routes to Greensborough, Watsonia, Heidelberg and La Trobe University, connecting people to local shops, attractions like Heide Gallery, and jobs. These improvements also deliver on the long-term strategic plan for cyclists in our city this will accelerate the rollout of the Strategic Cycling Corridor, which was a recommendation as part of Infrastructure Victoria s 30 year plan. We have held workshops on walking and bike riding in person and online, which gave us some great insight from locals as well as keen bike riders and walkers from across Melbourne. We continue to work with walkers and riders in the community to help to shape the look and feel of s walking and cycling links. Cover: Artist impression of new Yarra Rier bridge by Eastern. Artist impression only. Subject to change.

Eastern : new bike corridor As part of the Eastern overhaul, a new walking and bike riding path would be constructed between Merri Creek and Chandler Highway. The eastern bike corridor is a new cycling link providing a fast and direct connection between the inner city and the eastern suburbs for those who ride. It bypasses a meandering section of the Main Yarra Trail, steep grades approaching and along Yarra Boulevard and avoids the narrow Fairfield Pipe Bridge. From Merri Creek to the east side of Chandler Highway, it follows the Eastern, including a new bridge across the Yarra River and underpasses at Chandler Highway and Yarra Boulevard. Further upgrades to the Eastern corridor include: A new bicycle path near the Burke Road interchange, to short-cut the existing trail which currently detours around the Burke Road Billabong Reserve. Path upgrades to the existing Main Yarra Trail between Belford Road and Burke Road, which is generally PRESTON in poor condition, narrow and steep in some sections (including bypassing the steep section of Belford Road). Replacing all existing footbridges between Bulleen Road and Springvale Road with shared use bridges and a new walking and bike riding bridge at Bulleen New underpasses at Bulleen Road and Doncaster Road to bypass traffic lights. St Georges Rd Bell St COTE Plenty Rd Banksia St Grimshaw St Rosanna Rd Lower Heidelberg Rd Bulleen Rd Greensborough Hwy Watsonia Rd 4 Bulleen and Heidelberg: Art, sport and education links 2 Walking and bike riding links in this area provide better connections for WATSONIA schools and sports fields, clubs and grounds as well as Heide Gallery. Lower Plenty Rd Elder St These upgrades include:. A new walking and bike riding bridge across the Yarra connecting Yarra Street and Banksia Park. MACLEOD 2. A new walking path at the YALLAMBIE Manningham Road interchange. 8 This path connects Banksia Park to Bulleen 3 4 3. A new walking and bike riding path along the eastern side of Bulleen 9 To Eastern ROSANNA Proposed Road new and between the Manningham Road upgraded cycle paths 0 via Banyule interchange and Thompsons Existing cycle paths 4. A new footpath along the western VIEWBANK side of Bulleen Road between Manningham Road and the Eastern.. Three new signalised crossings across Bulleen Road for pedestrians to safely cross, at the ramps, the Veneto Club and the To Banyule HEIDELBERG Marcellin College access road. IVANHOE and M80 EAST. A new walking and bike riding path along Thompsons Road, between Bulleen Road and the Koonung Creek Trail.. A new walking and bike riding bridge on the eastern side of the Bulleen 2 Road overpass at the Eastern. This will mean safer and easier crossing of the freeway, linking the new Bulleen Road path with the residential areas south of the freeway. Yallambie Rd Templestowe Rd Manningham Rd BULLEEN 3 Banksia St Lower Heidelberg Rd Proposed new and upgraded cycle paths Existing cycle paths Eastern To City via Main Yarra Trail and North Easy Bicycle corridor Yarra River Bulleen Rd 2 4 3 To Banyule and M80 Templestowe Rd Manningham Rd BULLEEN To eastern suburbs via Koonung Creek Trail BALWYN Fitzsimons Ln Reynolds Rd Yarr New walking and cycling paths at Bullen Road Artist impression only. Subject to change. IVANHOE EAST Aerial view of eastern bike corridor at Yarra Boulevard, Kew Artist impression only. Subject to change. Eastern DONCASTER Hoddle St To inner city Chandler Hwy Princess St Burke Rd BALWYN Doncaster Rd Station St Middleborough Rd BOX HILL To Ringwood and beyond via East Trail Springvale Rd

Greensborough Road corridor: Green bridges and fixing missing links This walking and cycling path would be parallel to the above ground sections of, completing the missing link in the Greensborough Road corridor. The upgrades along this corridor include new paths and crossings over, including: M80 Ring Road BUNDOORA Grimshaw St To Metropolitan Ring Road path 2 3 To Greensborough via Greensborough Bypass path. An upgraded walking and bike riding bridge over the M80 Ring Road near Macorna Street, linking into the existing Metropolitan Ring Road path. 2. A new walking and bike riding path between Macorna Street and Grimshaw Street. 3. A new, accessible bridge over Yando Street. 4. Grade separated crossings on both sides of under Grimshaw Street.. New walking and bike riding paths on the western and eastern sides of between Grimshaw Street and Watsonia. A new walking and bike riding connection from Elder Street to Watsonia Station.. A new walking and bike riding path between Watsonia Road and Yallambie Road and widening of the existing path between Yallambie Road and Lower Plenty 8. Three new signalised pedestrian crossings across Greensborough Road, at Drysdale Street, Strathallan Road and Wattle Drive. 9. A new east-west walking and bike riding path in the reserve north of Drysdale Street - between Greensborough Road and Lower Plenty 0. A grade separated crossing of Lower Plenty Road to the River Gum Walk trail, removing cyclists from the Lower Plenty Road interchange. Plenty Rd MACLEOD WATSONIA 3 We are also connecting these new paths to local communities with:. A new bike riding route on Nell Street. 2. A new walking and bike riding path at Morwell Avenue. 0 Greensborough Hwy Watsonia Rd 8 2 9 Lower Plenty Rd VIEWBANK Elder St Yallambie Rd YALLAMBIE 4 4 To Eastern via Banyule 3. A new Greensborough Road to La Trobe University on-road bike riding route. 4. A new bike riding route along Lower Plenty Grade separated crossing of Lower Plenty Artist impression only. Subject to change.

New bridge across the Eastern and boardwalk, linking to Koonung Creek walking and cycling paths. Artist impression only. Subject to change. No more huffing and puffing up to Belford Road One of the top issues we heard from people during our community sessions was that you need to almost be an athlete to pedal up to Belford Road in Kew. After assessing a number of options, our design now includes a new 00-metre bicycle path on the north side of the Eastern at freeway level (separated by a crash barrier and screen) and under the Belford Road bridge. This addresses these grade issues at Belford Road so you can cycle more comfortably. A quicker, more direct route under Burke Road While we were investigating Belford Road, we also identified an opportunity for a more direct route for riders travelling between the east and west by extending the path next to the Doncaster Busway under Burke This new path would be approximately 00 metres shorter than the existing route around Burke Road Billabong, saving bike riders two to three minutes in travel time. Keeping paths and trails connected People have told us how important existing walking and cycling paths are to them, especially Koonung Creek walking and cycling paths and bridges across the Eastern. While some paths would need to be moved, we will maintain and improve connectivity for pedestrians and bike riders. We would replace five pedestrian bridges along the Eastern, turning them into walking and cycling bridges that are accessible for people with disabilities. The image above shows the replacement bridge connecting Heyington Avenue in Doncaster to the Koonung Creek reserve. Contact us 800 0 0 community@northeastlink.vic.gov.au Authority GPO Box 409, Melbourne VIC 300 Translation service for languages other than English, please call 99 989. Please contact us if you would like this information in an accessible format. Authorised and published by the Victorian Government, Treasury Place, Melbourne