A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Similar documents
Public Consultation on A127 / A130 Fairglen Interchange Improvement Scheme. Consultation open from 6 February to 20 March 2018 HAVE YOUR SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

CUERDEN TRANSPORT PROPOSALS

Chelmsford City Growth Package

M6 Junction 10 Public Consultation

CAMBRIDGE SOUTH WEST PARK & RIDE

M25 junction 28 improvement scheme. Have your say

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

SH3 Waitara to Bell Block

Chelmsford City Growth Package

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

SCHEME DESIGN AND ENGINEERING

HADLEIGH FARM FEEL PART OF IT LONDON 2012 OLYMPIC GAMES MOUNTAIN BIKE EVENT. Newsletter March Working in partnership with

ENFIELD TOWN THE REVISED DESIGN

Nottingham Cycle City Frequently Asked Questions

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

LET US KNOW WHAT YOU THINK

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

EB1413. West Essex and East Hertfordshire Local Plans Modelling. Essex County Council Technical Note 5: East Harlow Corridor VISSIM Study (Sept 2016)

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

MARKHOUSE ROAD IMPROVEMENTS

Broom Hill/Blackberry Hill Walking and Cycling Improvements

Mill Hill Broadway Capacity Improvement

MILTON ROAD LLF PROJECT UPDATE

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

HISTON ROAD Have your say on better public transport, cycling and walking journeys

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Technical note. 1. Introduction

9. Parking Supporting Statement

The Consultation has now ended.

Design Workshops Summary of all Feedback January 2017

Community engagement guide May 2018

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WHANGAREI IMPROVEMENTS

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

London s Bus Priority

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Guildford Borough (Draft)

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Public Works and Infrastructure Committee. General Manager, Transportation Services

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

10 SHERFORD Town Code

Public Consultation Report December M6 Junction 10 Improvements

Public Information Centre

Re. RACQ s Comments on the Miles Platting, Padstow and Logan Road intersection and Padstow and Warrigal Road intersection Planning Study (MPPL)

CAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge.

keeping Essex informed Your guide to byways byways and motor vehicles

2. Context. Existing framework. The context. The challenge. Transport Strategy

Local Highway Panels Members Guide. 5 Crossing Facilities

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

WEST YORKSHIRE LTP CYCLE PROSPECTUS

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

London Cycle Network Annual Report 2000

OPTIONS APPRAISAL. Project Code

Transportation Master Plan Advisory Task Force

Welcome to the McKenzie Interchange Project Open House!

Chelmsford City Growth Package

Terwillegar Drive Expressway Draft Concept Plan

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

National Transport Awards Cambridge Park & Ride

The Wincheap Society

Cork to Limerick Route Pre-Feasibility Study Update

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

University of Leeds Travel Plan

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

TRAFFIC ADVISORY LEAFLET

Principles. 4biii. Good Urban Design

ABERDEEN: CITY OF THE FUTURE

Living Streets response to the Draft London Plan

Launceston's Transport Futures. Greater travel options for the people of Launceston

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Part 3: Active travel and public transport planning in new housing developments

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

Tonight is for you. Learn everything you can. Share all your ideas.

Draft North Industrial Area-Wide Traffic Plan

WELCOME Public Information Centre

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

Cycle Superhighway 4 from Tower Bridge to Greenwich

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transcription:

A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1

2

Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place to live and work. Managing and supporting this growth is Essex County Council s top priority. Investment in transport infrastructure plays a vital part in our plans to enable growth across the County. There is clear evidence that a comprehensive and efficient transport system is an important enabler of sustained economic prosperity. Partners are working together to meet this challenge. A 1bn pipeline of infrastructure-enabling investment is in progress, within our four strategic growth corridors (the A120, A12, M11 and A13/A127). We know that the A127 is in need of improvement, particularly the A127/A130 Fairglen Interchange which is operating close to its capacity. We need to start making improvements to relieve congestion at this busy interchange and reduce the significant delays our road users are experiencing, particularly at peak times. I am pleased to say that Essex County Council is working hard to determine options for improving the Fairglen Interchange as quickly as possible, while at the same time looking at longer term solutions for this interchange and to the A127 itself. We feel it is essential that you, our road users and communities, are kept updated and have the opportunity to have your say as the project progresses. This leaflet will explain the short-term and long-term options that we are considering for the A127/A130 Fairglen Interchange, which we will continue to develop following your feedback in February 2017, with a view to going to public consultation on further-developed options in autumn-winter 2017/18. Councillor Kevin Bentley Deputy Leader and Cabinet Member for Economic Growth, Infrastructure and Partnerships 3

A127/A130 Fairglen Interchange Improvement Schemes Today, road users are experiencing unacceptable delays at this key interchange. The A127/A130 Fairglen Interchange is operating very close to its traffic capacity and in 5 to 10 years, capacity will be exceeded. This is why we have identified funding for improvements and have investigated a range of solutions. It is not an easy fix, especially with the predicted economic growth over the next 10 years and beyond, that will naturally lead to an increase in traffic on all roads in Essex. Where is the interchange? The A127/A130 Fairglen Interchange lies towards the southern part of Essex, within the administrative areas of Basildon Borough Council, Castle Point Borough Council and Rochford District Council. Having examined the causes of congestion and safety issues, we are now ready to share two proposed layout options for improvements to the A127/A130 Fairglen Interchange. At this point we have identified an improved road layout for the shortterm that can be operational by 2022 this is known as the funded scheme option. This design will tackle traffic issues for approximately 10 years after opening. If the region continues to grow, our technical assessments have shown that a much larger scheme will be needed by around 2031. To make the best long-term use of the current funding available, we have developed a long-term scheme option as well, which builds on the short-term scheme. The County Council is at present (February 2017) releasing indicative scheme layout options for both the short-term funded option and long-term option. This is so that local communities and road users can start to understand the future traffic demands on the A127/A130 Fairglen Interchange and connecting roads. We are showing our approach for solving these issues, before they become a reality and before our road network stops working effectively. This is not the formal consultation for these improvements, but we want to hear your views now at an early stage. We intend to progress feasibility design and assessment for the short-term funded scheme option over the next two years, while we continue to look at identifying funding options for the long-term solution. The interchange is a key link in the strategic highway network for South Essex as shown opposite. The interchange is made up of two main elements - Fairglen Roundabout and Rayleigh Spur Roundabout. The A1245 intersects the A127 at Fairglen Roundabout while the A130 intersects the A1245 at Rayleigh Spur Roundabout. Both of the roundabouts are connected via the A1245/A130 link. 4

Where is the interchange? Wickford M25 Fairglen Interchange A130 A1245 A127 Carpenters Arms Fairglen Roundabout Rayleigh M25 Basildon A130 A13 Sadlers Farm Rayleigh Spur Southend This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 5

Who uses the interchange and how are they using it? The Interchange is mainly used by traffic heading to/from the east, Southend and London Southend Airport, in addition to other traffic from Canvey Island, Basildon, Rochford, Thurrock and Brentwood. Regular road users travel through the junction for many reasons such as commuting, leisure, business and retail trips, and there are also seasonal trips made to and from Southend for tourism. The Interchange currently experiences significant congestion and delays on a daily basis. The Local Authorities across the South Essex area each have significant plans for growth in housing and jobs - estimated to be more than 25,000 houses and 25,500 jobs up to the year 2031. This will add to the number of people using the Interchange, increasing the overall congestion level. Current traffic flow data shows that the A130 arm from the north has reached its maximum capacity while all other arms on the Rayleigh Spur and Fairglen roundabouts are nearing their maximum capacity. The highest traffic flows are experienced on the A127 westbound towards London during the morning peak period (7am to 8am) and A127 eastbound during the afternoon peak. High flows are also noticed on the A130 travelling towards Southend. This results in higher congestion along the A1245/A130 link, which connects the two roundabouts at the A127/ A130 Fairglen Interchange. Rayleigh Spur What are the problems? There are a number of problems identified at the Interchange by previous studies undertaken in the surrounding area. The problems identified are listed below: High level of congestion Three major roads joining at one location which creates traffic conflicts Due to the high volume of road users, slower speeds are experienced with unreliable journey times Routes for cyclists, pedestrians and horse riders are severed by the major roads A high proportion of rear end collisions have occurred at the Fairglen Roundabout on approaches and slip roads, potentially due to poor lane discipline, side swipe collisions and collisions in darkness Evidence of vehicle collisions at Rayleigh Spur caused by loss of control, possibly as a result of poor visual alignment on approaches The Interchange is affected by incidents on the wider road network. Solution From the initial assessment, the best performing option was selected and this is shown in the Figure Short-Term Option opposite. This is the highest performing option that can be delivered within the short-term and available budget. This option is an indicative design and includes the following features: New Southend Link Road north of railway from A130 southbound with a new junction on the A1245 Widened slip roads on all Fairglen Roundabout arms Auxiliary lanes on both A127 on-slips Improvements at Rayleigh Spur Roundabout, including signal control. This option is subject to further development, which will affect the overall layout and cost. 6

SHORT-TERM OPTION A130 Chelmsford New link road - direct access from A130 to A127 via A1245 Key Retained existing carriageway 2 lanes on approach to stop line Traffic lights. Northbound carriageway widened to 3 lanes through the junction New / amended carriageway at existing level 2 lane on-slip Longer slip lane from on-slip Off-slip expanded from 2 lanes to 4 lanes (A127/A1245) Dedicated left turn lane onto A127 and longer slip lane 2 lane on-slip. (1 lane existing, 1 lane new) A127 Basildon & London Longer slip lane 3 lanes 5 lanes. Signalised arm. 3 lanes straight ahead. 2 lanes left only (at signals or free-flow lanes)* 3 lane off-slip. (2 lanes existing, 1 lane new) Additional lane leading to new RAYLEIGH SPUR Widens to 4 lanes bypass lane at Rayleigh Spur 3 lanes. Signalised arm 2 lanes. Non-signalised arm 3 lanes 1 lane plus hard shoulder A13 London *Design subject to further development A130 Canvey Island Roundabout exit merges from 3 lanes down to 2 lanes. Left-slip runs alongside to form third lane A127 Southend This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 Road alignment is indicative and is subject to further design development 7

Existing Layout 2036 Morning Peak How the scheme will reduce congestion Congestion at the A127/ A130 Fairglen Interchange is already significant in the morning peak; with predicted growth, this will only get worse. The following images show the average length of stop-start queues that are forecast for 2036 in the morning peak hours, and the predicted average length of queues once the funded scheme option is operational. Stop-Start Queues This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 8

Short-Term Option with Southend Link Road. 2036 Morning Peak Stop-Start Queues This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 Road alignment is indicative and is subject to further design development 9

Existing Layout 2036 Evening Peak How the scheme will reduce congestion Congestion at the A127/ A130 Fairglen Interchange is already significant in the evening peak; with predicted growth, this will only get worse. The following images show the average length of stop-start queues that are forecast for 2036 in the evening peak hours, and the predicted average length of queues once the funded scheme option is operational. This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 Stop-Start Queues 10

Short-Term Option with Southend Link Road. 2036 Evening Peak Stop-Start Queues This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 Road alignment is indicative and is subject to further design development 11

Scheme objectives Based on the problems identified, we have set a number of scheme specific objectives to enable us to assess the options and help us to select the best performing option to progress. The objectives set for the A127/A130 Fairglen Interchange are: Connectivity Accommodate/manage future travel demands to facilitate proposed growth in South Essex Ensure good connectivity to South Essex via key transport corridors. Sustainability Improve connectivity for nonmotorised users* at the A127/A130 Fairglen Interchange. Safety Improve safety at A127/A130 Fairglen Interchange through appropriate geometric design, signage, speed limits and visibility. Resilience Manage congestion at peak times to ensure reliable journey times through the A127/A130 Fairglen Interchange Ensure Essex County Council assets are appropriate for the future highway network Keep the A127/A130 Fairglen Interchange operational through improved maintenance provision and incident management. Environment Improve opportunities for residents and employees in South Essex to access alternative sustainable modes and encourage their use Protect and enhance the natural, built and historic environment. *Non-motorised users: pedestrians, cyclists and horse riders 12

LONG-TERM OPTION A130 Chelmsford Key Retained existing carriageway 2 lanes on approach to stop line New link road - direct access from A130 to A127 via A1245 Traffic lights. Northbound carriageway widened to 3 lanes through the junction New / amended carriageway at existing level New / amended carriageway above existing level (overpass) New / amended carriageway beneath existing level (underpass) A127 Basildon & London Off-slip expanded from 2 lanes to 4 lanes (A127/A1245) Dedicated left turn lane onto A127 and longer slip lane Flyover merges with on-slip to form 2 lanes 2 lane on-slip Longer slip lane RAYLEIGH SPUR 2 lane on-slip 3 lane off-slip Slip lane becomes additional third lane to Rayleigh Weir 3 lanes in both directions Overpass (A130 North to A127 East) A127/A130 dedicated left turn slip A130 underpass to A130 South Enlarged non-signalised roundabout 3rd lane becomes off-slip for Rayleigh Weir A13 London A130 Canvey Island Underpass and bypass merge to form 3 lanes 2 lanes on A127 become 3 lanes from Rayleigh Weir A127 Southend This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 Road alignment is indicative and is subject to further design development 13

Why is the short-term option being progressed? The preferred funded scheme option was chosen based on the following reasons: Improved reliability over other options by reducing the level of conflicting movements at the interchange Very high value for money Satisfies majority of the scheme objectives Has the ability to accommodate growth at this key location in South Essex to around 2031. Future-proofing and need for a long-term solution With the forecast growth of over 25,000 homes and 25,500 jobs up to 2031, and proposed developments such as the Lower Thames Crossing, we need to be prepared. In order to make sure that this scheme has a lasting legacy and will not obstruct future improvements to the highway network at this key interchange, we have looked at a long-term solution. There is extensive design work to be undertaken, but we wanted to share the current indicative long-term scheme layout to show what might be needed in the future. The indicative long-term solution is shown in the Figure Long-Term Option on page 13. The recommended long-term solution has greater value for money and a lower cost in comparison to other assessed long-term options. It also enhances and builds on the Short-Term Option. Next steps This is the start of our engagement on this scheme and over the coming months we will continue to speak with local councillors, community representatives and property owners. Once the next stage of technical development feasibility design is progressed, we plan to hold a public consultation in autumn-winter 2017/18 to share more detail on the short-term funded scheme. Timeline of Short-Term Option UNTIL SUMMER 2017 Progression of environmental assessment, scheme design and refinement AUTUMN-WINTER 2017/18 Public Consultation on the next stage of scheme design 2019 Planning application 2021/22 Construction works If you have any questions about the scheme now or in the future you can contact us at Fairglen.Interchange@jacobs.com 14

15

DS16_5430 This information is issued by Essex County Council Contact us: Fairglen.Interchange@jacobs.com www.essex.gov.uk/fairglen Essex County Council County Hall Chelmsford Essex CM1 1QH Sign up to Keep Me Posted email updates: essex.gov.uk/keepmeposted Essex_CC facebook.com/essexcountycouncil The information contained in this document can be translated, and/or made available in alternative formats, on request. Published February 2017 16