Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01

Similar documents
COA-F17-F-1343 YEAR END REPORT

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

Squamish Estuary / Mamquam Blind Channel Restorations 2007/2008 Final Report Project Number 07.CMS.01

Lagoon Spawning Bed Rehabilitation

Council should be aware of the progress made in the Cheakamus Ecosystem and funding opportunities not fully subscribed at this time.

Shovelnose Creek Off-Channel Complex Berm Repair

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Okanagan Sockeye Reintroduction

SALMONID ACTION PLAN FINAL DRAFT

Rivers Inlet Salmon Initiative

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Lakelse Sockeye Recovery Program

Firth Creek Habitat Enhancement Project 1993

MCCAW REACH RESTORATION

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

Ned Currence, Nooksack Indian Tribe

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Proposed 2018 Fisheries Management Measures to Support Recovery of Interior Fraser River Steelhead

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Puntledge River Hatchery Summer Chinook Rearing Consolidation Project

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Sub-watershed Summaries

Coquitlam/Buntzen Project Water Use Plan

Union Pacific Railroad

Improving Summer Chinook Hatchery Broodstock Survival Lower Puntledge Hatchery Chilled Acclimation System

The Salmonid Species. The Salmonid Species. Definitions of Salmonid Clans. The Salmonid Species

Fish and Wildlife Compensation Program Trevor Oussoren, program manager, Columbia region. CRT Workshop, Fauquier, June 15, 2013

Don Pedro Project Relicensing

Prescription to Restore Stream 11 (Orphan Channel) in the Burman River Watershed, March 2007

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

RESTORING 400 ACRES OF TIDAL MARSH IN THE SNOHOMISH RIVER DELTA

Benchmark Statement Respecting the Fish, Fish Habitat and Fisheries of Fish and Little Fish Lake, within the Taseko River Watershed.

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT

Staff, Organizations Directly Affected (including but not limited to):

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

COQUITLAM RIVER WATERSHED: KWIKWETLEM SIDE-CHANNEL HABITAT RESTORATION, PUBLIC AWARENESS, AND REPORT mstory

Searsville Dam Removal

FWCP External Projects Delivered by Stakeholders and First Nations

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

The Blue Heron Slough Conservation Bank

P.O. Box 65 Hancock, Michigan USA fax

Yakima/Klickitat Fisheries Project

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

For next Thurs: Jackson et al Historical overfishing and the recent collapse of coastal ecosystems. Science 293:

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Strategies for mitigating ecological effects of hatchery programs

APPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

UNIT 4E. SALMON SUPPLEMENTAL INFORMATION

STEELHEAD SURVEYS IN OMAK CREEK

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

LIFE HISTORY DIVERSITY AND RESILIENCE

SALMONID ACTION PLAN FINAL DRAFT DRAFT

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Hydraulic Modeling of Stream Enhancement Methods

2012 Bring Back the Natives Awarded Projects

nhc northwest hydraulic consultants water environment solutions VIA VIA COURIER December 8, 2003

Managing for Diversity

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

South Fork Chehalis Watershed Culvert Assessment

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest

APPENDIX D: LEWIS RIVER HATCHERY REVIEW

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Southern Oregon Coastal Cutthroat Trout

Blue Creek Chinook Outmigration Monitoring Technical Memorandum

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018

FWCP Coastal Region Project Summary Learn more at fwcp.ca

A.23 RIVER LAMPREY (LAMPETRA

August 11 Snorkel SCC side channel network (SBA, SCC3) feet 707

Draft Central Valley Salmon and Steelhead Recovery Plan

Ecology of stream-rearing salmon and trout Part II

Highlights of Native Fish Rehabilitation Activities in the Great Lakes. Presented By: Arunas Liskauskas, Ontario Ministry of Natural Resources

Study Update Tailrace Slough Use by Anadromous Salmonids

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

10 is bounded by wetlands between RM 1.8 and 3.1 on the south shore and more are scattered

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Campbell River Elk Falls #3 Intake and Connector Channel Construction Summary

Documented impacts of barriers and wetlands on salmonids and how to solve problems

Sockeye Reintroduction program. April 12, 2014 BCWF AGA Howie Wright

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

California Steelhead: Management, Monitoring and Recovery Efforts

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

VIDEO AUDIO Slide 1. Slide 2 Old timey 18 th century map of east coast

The Salmon Circle of Life

Wild Steelhead Coalition Richard Burge Conservation VP September 11, 2006

Transcription:

Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01 Prepared by: Squamish River Watershed Society Box 1791 Squamish, B.C. V08B 0B3 With financial support of: BC Hydro Fish and Wildlife Compensation Program 6911 Southpoint Drive E16 Burnaby, B.C. V3N 4X8 March 31, 2014 1 P age

This page intentionally blank 2 P age

Executive Summary The Cheakamus IR11 Floodplain Restoration Project is the culmination of over 30 years of partnership efforts between Fisheries Oceans Canada, North Vancouver Outdoor School, Squamish Nation, and the Squamish River Watershed Society in an attempt to re-establish ground water channels and spawning habitat within the diked off sections along the former Cheakamus River floodplain. This project is intended to expand upon previous habitat restoration projects in the Dave Marshall Salmon Reserve, adjacent to the Cheakamus River. The main purpose of the Project was to create spawning and rearing habitats to be utilized by Coho, Chinook, Pink, and Chum Salmon as well as Cutthroat and Steelhead Trout. The original floodplain habitats have become degraded over the decades due to changes in river flow, sediment budgets, and installation of flood protection works that resulted from the installation of the Daisy Lake Reservoir, transmission towers, and road access works that began in 1956. New channel works were created in the Dave Marshall Reserve lands located on the property of the North Vancouver Outdoor School. The engineering and design works were provided by Fisheries and Oceans (DFO) staff who also assisted with construction supervision and technical support. Gravel for this project was provided by Squamish Nation that had been stockpiled earlier in the year as part of a gravel extraction project of the Cheakamus/Cheekye River and Mamquam River. Large woody debris and large boulders were placed at various locations in the newly constructed channels to create refugia and overwintering habitat for juvenile salmonids. The project works commenced in early August and wrapped up the last week in October (with the last of the clear weather). As soon as the channel were opened Pink Salmon immediately began to populate every square metre of new habitat. Currently in November Chum and Coho Salmon can be seen spawning in these new channels. 3 P age

This page intentionally blank 4 P age

Table of Contents, Figures & Tables Contents Executive Summary... 1 Table of Contents, Figures & Tables... 4 1.0 Introduction... 6 2.0 Goals and Objectives... 7 2.1 Limiting Factors... 7 2.2 Value added benefits... 8 3.0 Study Area... 8 4.0 Methods... 9 5.0 Results... 9 6.0 Discussion... 10 7.0 Recommendations... 10 8.0 Acknowledgement... 11 9.0 References... 11 Appendices... 11 I. Financial Statements... 11 II. Performance Measures and Outcomes... 11 III. Confirmation of FWCP Recognition... 12 IV. Photos... 13 V. Map of Site... 26 5 P age

This page intentionally blank 6 P age

1.0 Introduction The Squamish River Watershed Society has worked with BC Hydro over the years on numerous projects throughout the watershed and, in particular, in the Dave Marshall Salmon Reserve. At this time, the SRWS partnered with DFO, Squamish Nation, and the North Vancouver Outdoor School to develop a number of salmon habitat restoration projects to help reestablish spawning and rearing habitat that has become limited in the past half century. These new restoration works interconnect with the various channels and ponds that have been constructed outside of the flood control dikes to help reinvigorate the salmon stocks in the area. The intent was to address the limiting factors that affected the area including the loss of habitat. Habitat has been lost through the construction of the Daisy Reservoir and the ensuing transmission lines and road ways. The diking of the Cheakamus River further restricted important fisheries habitat. Off-channel habitat is critically important for species such as Coho, Chinook, Pink, and Chum Salmon as well as Cutthroat and Steelhead Trout, and numerous other non-sport fish as well. The footprint impacts have altered fluvial processes, reduced downstream flows, restricted gravel recruitment and large woody debris movement, as well as isolating groundwater fed channels. A second major impact has been the diversion of water at the Daisy Reservoir from the Cheakamus River through the penstocks into the Squamish River. This has resulted in a loss of nutrients from the watershed. 2.0 Goals and Objectives The goals and objectives for this project included: Construction of over 1,500 square metres of rearing habitat for Coho salmon in the Dave Marshall Salmon Reserve spawning channels. Restore and expand a portion of Moody s Channel to re-establish stable salmon spawning habitat and create over 150 square metres of habitat for Chinook, Coho, Chum, and Pink salmon. 2.1 Limiting Factors 1. The first limiting factor addressed was the loss of riverine side channel habitat that is critically important for spawning Chinook and Pink salmon and for rearing 0+ Chinook salmon. These areas are also important for Chum spawning and Coho rearing. The restoration sites are located on the historic active floodplain of the Cheakamus River that is now largely isolated from direct river flow by the BCH bridge and dike on the south bank of the Cheakamus River. Spawning surveys carried out in 1955 and 1957 confirm these areas supported important spawning populations of Pink, Chum and Coho salmon prior to hydroelectric development of the river (DFO, 1957, Ref. 1&2). D.B. Lister (2001) summarised the importance of these side-channel habitats for sustaining pink salmon populations in the Cheakamus River and suggested active restoration of these areas as the only practicable means of recovering these populations. Downstream trapping studies on the Cheakamus River in 2000 and 2001 attributed significant declines in 7 P age

Chinook smolt abundance since 1966 with loss of channel complexity and loss of side-channel habitats (McCubbing and Melville, BCH reports in prep.). 2. The second limiting factor addressed was loss of nutrients due to the effects of the Daisy Lake Reservoir and diversion of nutrients out of the basin through the power tunnel to the Squamish River. This project increases the biomass of salmon produced by the lower Cheakamus River and thereby increase the amount of marine derived nutrients that enter the ecosystem each year. All the works have been built upon previous investments by BC Hydro and others in the historic floodplain of the Cheakamus River. The constructed or restored habitats help to improve the functionality of these areas to better support present day salmon recovery efforts in this section of the Cheakamus River. This is consistent with priorities identified by the FWCP. 2.2 Value added benefits The Dave Marshall Salmon Reserve is located at the North Vancouver Outdoor School which is recognized as one of the premier outdoor education facilities in Canada. All previous restoration projects have been designed to complement the educational programs developed by the NVOS. This area provides excellent nature viewing opportunities and supports high densities of bald eagles each winter which earns this site international recognition. NVOS, DFO, BC Hydro, Squamish River Watershed Society and Squamish Nation have long collaborated on improving environmental values in this area and these works will continue and strengthen that relationship. In addition, the excavated material from the constructed channels has now provided a base for a new fishing road for the Squamish First Nation. This benefits the project by reducing costs of transporting excavated material off-site, while providing the Squamish First Nation with a value added cultural benefit. 3.0 Study Area These salmon habitat restoration sites are located adjacent to the Cheakamus River within the area known as the Dave Marshall Salmon Reserve along Paradise Valley. The project focused on two off-channel habitats along the Cheakamus River and Moody s Side Channel. Moody s Side Channel was originally constructed for the benefit of Coho and Chum Salmon and originally was fed by upwelling groundwater. The upstream section originates from the NVOS Duck Pond and has been augmented by Cheakamus River water flows through the Eagle Point intake. Water from the intake flows through the Eagle Point Connector Channel, into the Canoe Pond, through the Bighouse Connector Channel and into the Moody s System. It is from these waters that the newly constructed channels were connected across Squamish Nation owned lands at IR11 and re-enter into the Cheakamus River just upstream of the Cheekye River confluence. 8 P age

The properties on which these works were undertaken were either owned by the NVOS or by Squamish Nation and crossed the BC Hydro Transmission line R/W. Maps covering the sites are Natural Resources Canada National Topographic System 92G/14 and Geo Data British Columbia Terrain Resource Information Management 92G.085 near UTM coordinates of 5519720m N by 488750m E BC Albers coordinates. 4.0 Methods This project involved the use of a Cat 320 excavator and Cat 950 and 966 front end loader as well as a D250 Cat truck that was used to transport gravel from a distance of 1.5 km from the site. The channels were excavated with the Cat 320 unit and gravel, supplied by Squamish Nation, was moved by the D250 Cat truck. The Cat 950 and 966 front end loaders were used to place the gravel and position the culverts into place. LWD and boulders were placed using the Cat 320 excavator. An intake box was fabricated and installed along the new channels. As well, two 5 culverts were placed along the new channel allowing road access over top of the channels. The original project design and alignment was determined by several on-site walkabouts between DFO, SRWS, the NVOS and Squamish Nation well in advance of the works proceeding. A final survey of the site will be undertaken in early summer 2014 and as-built design drawings will be submitted to BC Hydro. 5.0 Results This project involved undertaking works to improve existing fish habitats and create new habitats for the benefit of Chinook, Coho, Pink and Chum Salmon. The SRWS partnered with Fisheries and Oceans Canada, the North Vancouver Outdoor School and Squamish First Nation during all phases of the design and development of the proposed salmon habitat projects. These habitat areas will now support pink and Chinook salmon and are also important for coexisting Coho and Chum Salmon. The original floodplain habitats were degraded due to changed river flow, sediment budgets and installation of flood protection works due to impacts of the Daisy Lake dam, transmission towers and access road construction in 1957. The new works have now expanded and restored restore fish habitat in and around the Lower Paradise Channel consisting of the following: 1. Lower Paradise (Moody s) Channel has now been backwatered to create a long riffle approximately 200 metres downstream of the Canoe Pond. This riffle is approximately 50m long and 3m wide and has been graded to provide 150 m² of spawning habitat for Chinook salmon, but it will also provide spawning habitat for Coho, Pink and Chum salmon. 9 P age

2. The riffle was designed to a target elevation that enables a small intake to divert a minor flow into a constructed channel, which allows flow into an isolated backchannel on the historic floodplain of Cheakamus IR 11 land. The constructed and existing backchannel are approximately 440m in length and 5m in width, providing 2200 m² of high quality rearing habitat for Coho Salmon. 3. Two new watercourses were constructed to connect the backchannel to previously constructed habitats associated with Lower Paradise Channel. These watercourses provide a further 700 m² of spawning and rearing opportunities, primarily for Coho salmon. 4. Large wood debris and rock were placed at strategic locations to improve habitat function of the channels. The slope of the gravel bed in the newly constructed channels and the riffle were set to ensure all areas provide optimum conditions for spawning salmon. The importance of this habitat was demonstrated during the flood of record in 2003, when over 90% of the surviving pink salmon fry that migrated past the BC Hydro Water Use monitoring traps the next spring, were found to have originated in this restored side channel. Increased salmon returns to the relatively stable side-channel habitat now provide improved foraging opportunities for birds such as the Bald Eagle, Great Blue Heron and Belted Kingfisher. Additional marine derived nutrients from the salmon carcasses provide an important food and nutrient source for both aquatic and terrestrial animals and plants in the Cheakamus River. 6.0 Discussion The Cheakamus IR 11 Project is a multi-year multiple phased project that involves the partnership of Squamish Nation, North Vancouver Outdoor School District #44, Fisheries and Oceans Canada, and the Squamish River Watershed Society. An important component of this project is also the support from BC Hydro and the Transmission Corporation. The overall objective is to provide off-channel habitat along the inner sections of the dyked portion of the Cheakamus River and restore the Coho populations to pre-reservoir construction numbers. This phase of the project helped to create over 2,200 square metres of high quality rearing habitat and over 700 square metres of spawning habitat for Coho Salmon. Hopefully the project will continue into Phase 2 and Phase 3 in the coming years to fully activate the entire inner channels and help to compensate for the dykes, dams, and other artificial obstructions that have been impacting populations over the past half century. 7.0 Recommendations The only recommendation is to work towards continuing on with the next phases of this project to direct flows through the Notch Channel and ultimately to help re-water Evans Creek. 10 P age

8.0 Acknowledgement We would like to thank BC Hydro and the Fish and Wildlife Compensation Program for all of their help and assistance is funding and supporting this year s project. We would also like to take this time to thank: Randall Lewis, and the support from Squamish Nation including the contribution of the gravel that was used to create spawning habitat for this project; North Vancouver Outdoor School; Steve Rochetta and other Ministry of Forests, Lands, and Natural Resource Operations staff; Matt Foy, Dave Nanson, Mike Landiak, Al Johnson and other Fisheries and Oceans Canada for all of their assistance; and John Hunter Company for their excellent work! 9.0 References Appendices 1. Department of Fisheries, Canada 1957. A report on the fisheries problems related to the power development of the Cheakamus River system. Vancouver B.C. 39p. + appendices. 2. Melville, M. and D. McCubbing. 2000. Assessment of the 2000 Juvenile Salmon Migration from the Cheakamus River, using Rotary Screw Traps (draft). Prepared for BC Hydro, Burnaby. 36 p. + appendices 3. Northwest Hydraulic Consultants. 2001. Analysis of channel morphology and sediment transport characteristics of the Cheakamus River. Prepared for BC Hydro, Burnaby. 40p. + appendices. I. Financial Statements See attached II. Performance Measures and Outcomes See attached 11 P age

III. Confirmation of FWCP Recognition Signage is being installed alongside the project (see photos below in Section IV) and a short summary of the project is being included in the Squamish River Watershed Society website (www.squamishwatershed.com). Image of signage: 12 P age

IV. Photos October 3, 2013 Facing downstream along newly constructed channel note armoured embankments 13 P age

Facing upstream from road/train/top of dike; note newly installed steel pipe intake 14 P age

Facing downstream from same location as above photo; note large river rock placement on banks 15 P age

Resurfaced road/dike 16 P age

Walking along the dike towards the southern end of the project 17 P age

Looking at the existing Moody s Channel with pink salmon swimming 18 P age

Newly installed PVC Culvert at northern end of project site (on SD#44 school property) 19 P age

Facing downstream towards the south from same location as photo above. Note LWD placement and large river rock boulders along slopes 20 P age

March 25, 2014 Facing downstream along newly constructed and newly graveled Coho Channel 21 P age

Duck Pond Intake (installed March 24, 2014) 22 P age

Intake pipe (facing downstream along newly constructed intake channel note armour and spawning riffle further downstream) 23 P age

New channel (primary rearing habitat and overwintering for Coho fry) parallel to Moody s Channel on north side of Flood Dyke 24 P age

25 P age

V. Map of Site 26 P age

backchannel Intake and new channel will introduce flow from Lower Paradise (Moody s) Channel into backchannel Construct new channel from backchannel to top of groundwater channel 2010 log jam Construct new fishing road Construct small surface channel back to Lower Paradise LOD placement Lower Paradise Channel Groundwater channel Plug with low flow culvert at road x-ing separates groundwater channel downstream and surface channel upstream 27 P age