Project Description Form 8AA

Similar documents
Public Information Meeting

Project Description Form 8EE

Project Description Form 6V

Solana Beach Comprehensive Active Transportation Strategy (CATS)

C C C

City of Fairfax, Virginia City Council Work Session

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Multimodal Through Corridors and Placemaking Corridors

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Sliding Hill Road - Widening (UPC )

Sixth Line Development - Transit Facilities Plan

5. RUNNINGWAY GUIDELINES

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Broadway Complete Streets Project

Viewing SMART SCALE Application

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

City of Wilsonville 5 th Street to Kinsman Road Extension Project

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

LANE ELIMINATION PROJECTS

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

Capital Metro Downtown Multimodal Station

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Giles Run Connector Road

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Emerging Methods for Evaluating Transportation Systems Multimodal LOS and Highway Safety Manual

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Perryville TOD and Greenway Plan

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Executive Summary Route 30 Corridor Master Plan

Rio Mills Rd/Berkmar Dr Extended Connection

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

ITEM 3 ATTACHMENT A RESOLUTION NO

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Welcome. If you have any questions or comments on the project, please contact:

Columbia Pike Implementation Team (CPIT) Meeting

CONNECTING PEOPLE TO PLACES

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Classification Criteria

Access Management Regulations and Standards

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Fairfax County Parkway Widening Fairfax County

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

11/28/2016 VIA

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

ACTIVE TRANSPORTATION

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Chapter 5 Future Transportation

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Planning Guidance in the 2012 AASHTO Bike Guide

This page intentionally left blank.

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

Road Diets FDOT Process

Route 29 Solutions Projects

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Omaha s Complete Streets Policy

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

ELEMENT 11 TRANSPORTATION ELEMENT

Comments EXECUTIVE SUMMARY

El Paso County 2040 Major Transportation Corridors Plan

Southcote Road Improvements Class Environmental Assessment Study

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Highway Project Scoring Worksheet Project Name: Ike Brooks Rd/Rives Chapel Church Rd Improvements (SPOT ID: H090571)

Presentation Starts at 5:30 PM

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

North Shore Transportation Improvement Strategy

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Hampton Roads Pedestrian and Bicycle Advisory Committee

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Chapter 2: Standards for Access, Non-Motorized, and Transit

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2732 SUMMARY

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

PennDOT Access Management Model Ordinances Training

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Long Island Rail Road Expansion Project Floral Park to Hicksville

Regional Transportation Needs Within Southeastern Wisconsin

EXECUTIVE SUMMARY. Vision

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Basalt Creek Transportation Refinement Plan Recommendations

Huntington Station Metro Zone / North Kings Highway Concept Plan

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Hale iwa Improvement District Project

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Transcription:

Project Description Form 8AA Basic Project Information Submitting Jurisdiction/Agency: Fairfax County Project Title: Route 1 Widening: Mount Vernon Memorial Highway to Napper Road Project Location: US 1 Richmond Highway (from Mt. Vernon Memorial Highway to Napper Road) Project Description: Richmond Highway widening project is 2.9 miles in length and is located between Mt. Vernon Memorial Highway and Napper Road. Richmond Highway is an Urban Principal Arterial with an AADT of 35,000. Richmond Highway is also a Corridor of Statewide Significance, as identified in VTrans2040. This project will provide a 6-lane facility complementing the existing Richmond Highway project currently under construction from Telegraph Road to Mt. Vernon Memorial Highway. This project will also complement the section of Richmond Highway north of Napper Road which is also a 6-lane facility, resulting in a 6-lane facility from Ft. Belvoir to I-95/I-495 in Alexandria. This project includes both pedestrian and bicycle facilities and provisions for future transit. It will also consolidate driveway entrances, thereby limiting the number of potential points of conflict and improving safety. This project is currently in procurement for a Project Management Consultant. Project Milestones Project Milestones by Project Phase: Engineering: July 2015 July 2019 Environmental Work: Design: Right of Way Acquisition: August 2018 August 2020 Construction: January 2023 January 2025 Capital Asset Acquisitions: Other: Project Analysis Summary* NVTA Quantitative Score Rank Congestion Reduction Relative to Cost Ratio (NVTA Share) 0.03 hours saved/$ Rank Congestion Reduction Relative to Cost Ratio (Total Cost) 0.03 hours saved/$ Rank 20 *Detailed scoring information can be found at: http://www.thenovaauthority.org/planning-programming/fy2017-program/ 47.46 14 20

Project Cost Requested NVTA FY2017 Funds: $5,000,000 Total Cost to Complete Project: $215,000,000 Project Phases Requested NVTA FY2017 Funds Other Sources of Funding Engineering $4,250,000 (FY2019) $1,000,000 (NVTA FY2015-16 Program) $4,250,000 (State Revenue Sharing) 9,000,000 (RSTP) Environmental Work Design Right of Way Acquisition Construction Capital Asset Acquisitions Other $750,000 (FY2020) $750,000 (State Revenue Sharing) $70,000,000 (HB 2 FY2017-22) $49,100,000 (HB 2 and/or NVTA future request) $75,900,000 (HB 2 and/or NVTA future request) Total Cost by Phase $18,500,000 (FY2016-FY2020) $120,600,000 (FY2019-FY2023) $75,900,000 (FY2023-FY2025) TOTAL $5,000,000 $210,000,000 $215,000,000 2

Project Impacts What regional benefit(s) does this project offer? US 1 is a Corridor of Statewide Significance, according to VTrans2040. Widening this section of US 1 will eliminate a choke point between Napper Road and the intersection of Mt. Vernon Memorial Highway/Jeff Todd Way. With the completion of the current construction project on US 1, through Ft. Belvoir, the sections of US 1 which are adjacent to this 4 lane section will have 6 lanes. This project facilitates the economic development of the US 1 corridor and provides a consistent 6 lane facility between Ft. Belvoir and I-95/I-495 in Alexandria. This project also will include facilities for pedestrians and bicyclist and provisions for transit, including potential BRT connecting to Prince William County, which was described in the recently completed Department of Rail and Public Transportation s Route 1 Multimodal Alternatives Analysis (2014). This project will facilitate the movement of employees, and goods into and out of Ft. Belvoir and recently constructed hospital at Ft. Belvoir. It will also consolidate driveway entrances, thereby limiting the number of potential points of conflict and improving pedestrian safety. How will the project reduce congestion? This project will reduce congestion by providing additional capacity, creating a consistent 6 lane facility for the length of US 1 between Pohick Road and I-95/I-495 in Alexandria. Currently this section of US 1 is 4 lanes wide. The project will also provide capacity improvements at existing intersections, signalization and turn lanes at critical intersections as well as including bicycle and pedestrian facilities and improvements in the corridor. The US 1 corridor is the most heavily used transit corridor in Fairfax County. These improvements will enable even more transit ridership. How will the project increase capacity? This project will increase capacity by adding two additional lanes to nearly 3 miles of roadway on Richmond Highway. How will the project improve auto and pedestrian safety? This project will widen this section of US 1, and provide consistent lane widths, which will help regulate traffic. The project also will correct missing pedestrian linkages along the corridor and include buffered bicycle lanes, thus providing safe pedestrian and bicycle facilities. The project will also consolidate driveway entrances limiting the number of potential conflict points along the corridor. How will the project improve regional connectivity? This project improves regional connectivity by connecting activity centers along Richmond Highway. In conjunction with other improvements to Richmond Highway, this project also helps connect travelers coming from Prince William County seeking activity centers in Fairfax County. For example, this project will improve access to and from Fort Belvoir and the new Fort Belvoir Hospital. In fact, the US Department of Defense, through Fort Belvoir, is funding a portion of the cost to complete Preliminary Engineering to support this project. The project goals and recommendations are included in Fairfax County s Comprehensive Plan, Lower Potomac Planning District, as amended in 2013. How will the project improve bicycle and pedestrian travel options? This project will provide both bicycle and pedestrian facilities along its length, including on-road, buffered bike lanes, shared-use pathways on one side of the road, and sidewalks on the other side. 3

How will the project improve the management and operation of existing facilities through technology applications? The project includes signal pre-emption at all signalized intersections for emergency vehicles. Furthermore, each signalized intersection will incorporate countdown signals for pedestrians. Additional Information in Support of This Project Route 1 Multimodal Alternatives Analysis Final Report (February 2015): http://www.drpt.virginia.gov/media/1591/route-1-final-report-with-appendices-february-2015.pdf 4

5