McLEAN CITIZENS ASSOCIATION

Similar documents
MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Important Lane Closures for Jan , 2012

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

3.9 Recreational Trails and Natural Areas

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

County of Fairfax, Virginia. Department of Transportation

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Non-Motorized Transportation 7-1

City of Fairfax, Virginia City Council Work Session

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Public Information and Participation Comments

EXHIBIT U THE SCOPE DOCUMENT

APPENDIX D COST SUMMARY TABLES

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Route 29 Solutions Projects

Comments EXECUTIVE SUMMARY

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Duwamish Way-finding and CTR Report

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Prince George s County plans, policies, and projects

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Fairfax County Bicycle Program

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Solana Beach Comprehensive Active Transportation Strategy (CATS)

TRASBURG RANSPORTATION

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Washington DC Section of ITE Project Briefing

CITY MANUALS AND STANDARDS REVIEW

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Fitting Light Rail through Well-established Communities

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

See Figure 38, Existing Nonmotorized Connections.

TRAFFIC IMPACT ANALYSIS

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

Project Description Form 8EE

Crystal City Citizen Review Council Meeting. July 10, 2013

Meadow Woods Elementary School

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Giles Run Connector Road

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Planned Improvements from Sector & Area Plans that have been added to the MTP

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Wiehle Avenue/Reston Parkway Station Access Management Plans

Develop a Multi-Modal Transportation Strategy (Theme 6)

Welcome to the Sellwood Bridge Project Open House!

5 CIRCULATION AND STREET DESIGN

Route 7 Corridor Study

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

TYSONS CORNER BICYCLE MASTER PLAN

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

C C C

RECOMMENDATION: Approve traffic calming projects as recommended by the Neighborhood Traffic Calming Committee (NTCC) on the following streets:

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

This chapter describes the proposed circulation system and transportation alternatives associated with

7 June 2018 OUR REF:

West Circle Drive (CSAH 22) Traffic Operations Study

3.0 Future Conditions

Final Sidewalk Feasibility Study

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

City of Fairfax, Virginia City Council Work Session

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Transportation Corridor Studies: Summary of Recommendations

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

San Jose Transportation Policy

Chapter 5 Future Transportation

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Chapter 7 Nonmotorized Facilities

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

St. Francis Drive through the City of Santa Fe Corridor Study

RE: Park Plaza Walgreens (P12-016)

Arlington s Master Transportation Plan

Windy Ridge Elementary School

Huntington Station Metro Zone / North Kings Highway Concept Plan

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

North Shore Transportation Improvement Strategy

Public Opinion about Transportation Issues in Northern Virginia

Managing Dulles Rail Construction in Tysons Corner

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

PenPlace SPRC #6. September 27, DRAFT

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Transcription:

McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by the MCA Board 12/3/03 Whereas, the Board of Directors of the McLean Citizens Association submitted resolutions on August 14, 2002 expressing the MCA s strong support of the proposal to the extension of Metrorail through the Dulles corridor; and Whereas, in its August 14, 2002 resolutions, the MCA also pointed out a number of issues of concern to the McLean community that need to be addressed; and Whereas, U.S. Department OF Transportation, the Federal Transit Administration, the Virginia Department of Rail and Public Transportation, and the Washington Metropolitan Area Transit Authority issued a Supplemental Draft Environmental Impact Statement in October, 2003; and Whereas, the Supplemental Draft EIS explicitly recognizes that it will be necessary to undertake coordination with local communities to address outstanding issues related to facility design, potential effects, and mitigation; Therefore be it resolved that the McLean Citizens Association endorses the proposed plan to establish rail service through the Dulles corridor, re-adopts its previous resolution and asks that the public agencies coordinate with MCA with respect to local issues identified by the MCA; Be it further resolved that, among other matters, careful consideration be given to improving pedestrian and bicycle access to the proposed Metrorail stations in the Tysons area and that all the issues detailed by the MCA in Attachment A hereto be carefully addressed and resolved in a way that promotes increased public access; Be it further resolved more specifically, that: (1) consideration be given to adding second entrances to the two proposed stations along Route 7;

(2) failing that, there should be at the very least provision in the initial construction of those stations for additional mezzanines or supporting piers and other structural elements that would avoid undue expense and operational interference if second entrances are added at later dates; (3) if there is to be only a single entrance at the Tysons Central 7 station, it be located at the middle or west end; and (4) at the Tysons West station, the platform be extended over Spring Hill Road and Tyco Road to reduce the need for pedestrians to cross those busy streets. And be it further resolved that, with the increase in storage tracks in the West Falls Church S&I Yard from the 26 storage tracks proposed previously to 42 to accommodate the lack of storage at Dulles during the first phase, and given increased maintenance operations, and given the conjunction of this yard with aerial rail track and a ninetydegree turn near residences as well as a new multi-story parking structure at the West Falls Church station, there is an increased need to take strong efforts to mitigate noise that impacts the surrounding residential neighborhoods and analyze traffic effects.

PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER McLean Citizens Association 3 December 2003 TYSONS EAST STATION (inside the Beltway on Rt. 123) General Issues Barrier to access from Magarity Rd. through private property, Westgate Elementary School, and Westgate Park. Barrier to access created by Dulles Toll Road. Missing trail and sidewalk segments. Missing crosswalks. Provide direst access from Magarity Rd. Complete Scotts Run Stream Valley Trail between Old Meadow Road and station kiss-and-ride area. Construct trail between Margarity Rd. and the Scotts Run Stream Valley Trail through Westgate Elementary School and Westgate Park. Provide direct access from Lewinsville Rd. Complete Scotts Run Stream Valley Trail between Rt 123 and Lewinsville Rd. Provide direct access from Tysons/McLean Office Park on Lewinsville Rd. Construct pedestrian (and vehicle) bridge across Toll Rd at Colshire Dr. and/or Spring Gate Rd. This crossing could also serve the Scotts Run Stream Valley Trail. Complete missing trail and sidewalk segments Rt. 123 - southbound side between Lewinsville Road and Toll Road offramp. Old Chain Bridge Rd. west side between Toll Rd. and Anderson Rd. Add crosswalks Rt 123/Lewinsville Rd/Great Falls St intersection. Old Chain Bridge Rd./Anderson Rd. intersection. a Item on the Fairfax County Countywide Plan is indicated by.

TYSONS CENTRAL 123 (Rt. 123 and Tysons Blvd.) Barrier created by Beltway. Crossing International Drive. Access through Tysons Corner Center property to eastern station entrance. Direct access to the Galleria shopping center. Provide access across the Beltway Investigate best location for crossing. Some possibilities: Construct pedestrian bridge on southbound side of Rt. 123. Take advantage of Metrorail superstructure. Take advantage of height of land on northwest portion of interchange. Construct pedestrian bridge in the vicinity of the Hilton Hotel. Improve ability to cross International Dr. between Chain Bridge Rd. and Greensboro Dr. Need to improve ability to cross at the Courtyard by Marriott and the Holiday Inn. Need crosswalk at Chain Bridge Rd. intersection. Need ability to cross at Galleria Dr. intersection. Provide access through Tysons Corner Center property from Tower Cresent Drive and west side of International Dr. Construct sidewalk along unnamed road between International Dr. and station entrance. Complete sidewalk along shopping center Ring Road. Improve direct access between station entrance and the Galleria shopping center. Improve and spruce up the current shopping center sidewalk access from Galleria Drive along service road to lower-level entrance to Neiman-Marcus. Consider adding cover to this walkway. a Item on the Fairfax County Countywide Plan is indicated by.

TYSONS CENTRAL 7 (underground station on Rt. 7) Barrier to access from Greensboro Dr. and Pinnacle Dr. through private property. Barrier to access from Old Courthouse Rd. and Gosnell Rd. through private property. Barrier to access created by Chain Bridge Road (Rt. 123). Provide direct access from Greensboro Dr. and Pinnacle Dr. to north station entrance. Assure public access from Technology Dr. cul-de-sac. (Alternative: move north station entrance to Technology Dr. cul-de-sac.) Complete sidewalk along Chain Bridge Rd. (frontage road) between Rt. 7 and Pinnacle Dr. Provide direct access from Old Courthouse Rd. and Gosnell Rd. to south station entrance. Obtain public access rights-of-way or easements through private property as part of property redevelopment plans. Construct trail in Raglon Rd. Park between Raglon Rd. and Key West Lane. Break the barrier to station access from the east created by the elevated portion of Chain Bridge Rd (Rt. 123) over Rt. 7. Eastbound side of Rt. 7 complete trail under Chain Bridge Road overpass. Westbound side of Rt. 7 Obtain a solution or contributions toward a solution as proffers from property redevelopment. Provide pedestrian access as part of new road planned between Rt. 7 and Old Courthouse Rd. Provide a pedestrian bridge in the vicinity of Boone Blvd. intersection. Station design issues Station should have entrances at both ends. Single-entrance station should have the entrances in the middle or west end. Single entrance only at east end very undesirable. a Item on the Fairfax County Countywide Plan is indicated by.

TYSONS WEST STATION (on Rt. 7 near Dulles Toll Rd. Interchange) Barrier to direct station access created by Spring Branch stream valley. Barrier to station access on Rt. 7 overpass over the Dulles Toll Rd. Pedestrian issues created by proximity of intersections at both ends of station. Incomplete area sidewalk system. Provide crossings over Spring Branch stream valley Construct trail and bridge along Virginia Dominion Power right of way between Rt. 7 and Higdon Dr. Assure public access to existing crossing on Ashgrove Lane. Extend to Rt. 7. Connect to existing trail along stream valley. Complete Spring Branch Stream Valley trail to Gosnell Rd. Provide station access from the west. Complete trails on both sides of Rt. 7 across the Dulles Toll Rd. Improve pedestrian access at Rt. 7 intersections with Tyco Rd./Westwood Center Dr. and with Spring Hill Rd. Design station to help overcome pedestrian issues at these intersections. Complete area sidewalk system. Westwood Center Dr. Sheraton Hotel area Ashgrove Lane/Ashgrove townhouses area. Station design issues Station should have entrances at both ends. Extend platform over roadways at each end to minimize the need to cross streets to reach station entrances. a Item on the Fairfax County Countywide Plan is indicated by.

OTHER NEEDS IN TYSONS CORNER VICINITY Along Rt. 123. Complete trails along both sides between Town of Vienna at Follin Lane and Old Courthouse Rd. Along Spring Hill Rd north of the Dulles Toll Rd. Complete trail on west side of Spring Hill Road to Lewinsville Rd. Complete trail to Georgetown Pike. Along Lewinsville Rd. Complete trail between Windy Hill Rd. and Elsinore Ave. Construct trail on south side between Spring Hill Rd. and Gordon Lane. Complete missing segments between Altamira Ct. and Rt. 7. Construct trail from Lewinsville Rd. to Rt. 7 along Little Rocky Run stream valley. a Item on the Fairfax County Countywide Plan is indicated by.

WEST FALLS CHURCH STATION AND RAIL YARD Barrier to access to station from north because of I-66 and rail yard. Barrier to station access to the east because of Dulles Toll Road. Provide station access from the north through rail yard property. Make secure to prevent access to rail yard. Construct trail from Idylwood Rd. at Dulles Toll Rd. overpass along east side of yard and north side of bus access road to bus area on north side of station. Provide access to trail from Mackay St. and Norwalk St. An alternative: construct bridge across I-66 between north station mezzanine and trail on east side of rail yard adjacent to Dulles Toll Rd. Construct trail adjacent to Dulles Toll Rd between Idylwood Rd. and the Pimmit Run Stream Valley Trail. Construct trail from rail yard employee entrance on Idylwood Rd. along west side of rail yard and north side of I-66 to bus area on north side of station. Construct branch trail to Rt. 7 along north side of I-66. Complete trails on both sides of Idylwood Rd. between Great Falls St. and Gallows Rd. Improve sidewalk system in residential area north of Idylwood Rd. Improve station access from the east Provide access from Idylwood Rd. through east side of rail yard (see above). Improve sidewalk system in residential area east of Dulles Toll Rd. and north of Haycock Rd. a Item on the Fairfax County Countywide Plan is indicated by.

BICYCLE ACCESS NEEDS Need for secure, covered bicycle parking and bicycle lockers at all stations. Need for access to Tysons stations from W&OD trail. Need for multiuse trail along Dulles Toll Road and Rt. 7 similar to Custis Trail along I-66. Evaluate comprehensive plan to determine needed changes based on current rail station locations. Ensure that immediate station access to bicycle parking and other onsite facilities is well designed. Avoid conflicts with buses, other vehicles, and pedestrians. Tyson Stations General Issues Ensure a connection to the W&OD trail Ensure a connection to the "Bicycle Beltway" along Gallows Rd. Paint bicycle lanes along service roads. Tysons West Station Provide a direct connection to the residential communities to the south. Connect major paved trail to Old Courthouse Spring Branch trail. Complete major paved trails on both sides of Rt. 7 across the Dulles Toll Road interchange. Upgrade existing concrete sidewalks along Rt. 7 to major paved trail. Over time waivers have been granted to propagate the existing network. Build trail to Tyson-West Park Transit Station on Jones Branch Rd. a Item on the Fairfax County Countywide Plan is indicated by.