Delaware Basin Stream Management Program

Similar documents
Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Geomorphic Stream Classification A Classification of Natural Rivers, Rosgen, D.L.

MCCAW REACH RESTORATION

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Conserving the Forests, Lakes and Streams of Northeast Michigan

Hydraulic Modeling of Stream Enhancement Methods

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Management of headwater streams in the White Mountain National Forest

RESTORING THE CONNECTION BETWEEN CREEK AND LAKE: FRESH WATER ESTUARINE CREATION IN MISSISSAUGA

APPENDIX J HYDROLOGY AND WATER QUALITY

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Hydrologic, Hydraulic and Geomorphic Technical Memorandum

Presented by Fred Halterman, URS Jennie Agerton, URS

The Spey Catchment Initiative

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Report prepared for: Prepared by: January 2002 BEAK Ref

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Stream Assessment. Date. Data Collected by. Location. Name of Stream and River Basin. Stream Order. Streambank Materials. Streambank Vegetation

CATSKILL WATERSHED CORPORATION Board of Directors Meeting MINUTES May 1, 1 p.m.

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Building Coastal Resiliency at Plymouth Long Beach

Fish Friendly Crossings- Examples from Nash Stream

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Stevens Creek Corridor

Incorporating Geomorphic Processes and Sediment Dynamics into Salmonid Habitat Restoration Design

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Simulating Streams Through Culverts in Mat-Su, Alaska

Habitat Conditions, Design Strategies,

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

Advancing Fish Passage in the Menomonee River Watershed

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

What is a River Basin Restoration Priority? 1. Criteria for Selecting a Targeted Local Watershed (TLW) 2. Hiwassee River Basin Overview 3

TREATING RIVERS RIGHT & EXAMPLES OF BEST USE OF WOOD IN RESTORATION

Table VI-Proj SITE-SPECIFIC MANAGEMENT MEASURES FOR THE ROOT RIVER WATERSHED

Added Introduction: Comparing highway design and stream design

Great Lakes Stream Crossing Inventory Instructions

OPPORTUNITIES & CONSTRAINTS

Restoring the Iconicc Lower Cache River

COLUMBIA LAKE DAM REMOVAL PROJECT

Cornwell brook Cornwell Manor

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Introduction to Check Dams

HARRY AND LAURA NOHR CHAPTER OF TROUT UNLIMITED

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011

Little Traverse Bay Watershed Road/Stream Crossing Inventory

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

USDI Bureau of Land Management Roseburg, Oregon District. Larry Standley Hydrologist Cory Sipher Fisheries Biologist Rick Shockey District Engineer

Salmon Run G.C. Hole 3: Tributary & Wetland Restoration

Saugus River Watershed Smelt Spawning Habitat Assessment

CATSKILL WATERSHED CORPORATION Board of Directors Meeting MINUTES February 6, 1:00 p.m.

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

LONGITUDINAL FIELD METHODOLOGY FOR THE ASSESSMENT OF TMDL SEDIMENT AND HABITAT IMPAIRMENTS

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Three Mile Creek 2011

Follow this and additional works at:

Ecology - when it comes to river restoration design, so what? Field Trip Guide to Dunham Creek, Blackfoot River Watershed

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS

Chadbourne Dam Repair and Fish Barrier

DRAFT. Stonybrook Creek Watershed

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek.

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

Fish Passage Assessment of Private Stream Crossings on Lower Stonybrook Creek

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

The Calawah River System

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

South Fork Chehalis Watershed Culvert Assessment

Northwest Michigan Stream Connectivity

1.Mill Creek Watershed Summary Description and Land Use

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

STEELHEAD SURVEYS IN OMAK CREEK

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Massachusetts Stream Crossing Case Studies

Environmental Review and Permitting for Wild Trout

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

Columbia Lake Dam Removal Project

COA-F17-F-1343 YEAR END REPORT

River Medway Upper Medway Fly Fishers

Appendix J: Q1-Highway 35 Route Construction Plan

Shovelnose Creek Off-Channel Complex Berm Repair

Site Tour, August 24, Fish Science - Big Lake Coho Salmon Migration and Habitat Use

Waseca SWCD Newsletter

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Fish Habitat Design, Operation and Reclamation Worksheets for

P.O. Box 65 Hancock, Michigan USA fax

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

Lake Merwin and Swift Creek Reservoir Tributaries. Bull Trout Limiting Factors Analysis

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT

Climate Change Adaptation and Stream Restoration. Jack Williams;

Mill Creek/Rose Valley Watershed General Information Presented by Dr. Mel Zimmerman Lycoming College CWI

Transcription:

Delaware Basin Stream Management Program A partnership between NYCDEP and Delaware County Soil & Water Conservation District 2015 Update

Delaware Basin - Topics 2015 Project Updates Restoration Projects SMIP Projects CSBI Projects 2016 Project Updates Restoration Projects CSBI Projects CREP Projects Local Flood Analysis (LFA) Updates 2

Third Brook Third Brook stream bed instability and hill slope failures Third Brook hill slope failures were identified in the Third Brook Watershed Management Plan ACOE WRDA funded ($510 K) through the Department of Watershed Affairs matched with DEP funds ($170 K) to stabilize slopes contributing sediment and woody debris to Third Brook above the Village of Walton Goal was to reduce stress on slope toe, halt head cuts and bed degradation upstream, and reduce sediment deposition downstream in the village Originally projected costs to address all slopes (1-9) exceeded WRDA funding so project was segmented

Third Brook Sites 8 & 9 Original work took place in 2014 Spring 2015 rains resulted in flanking of EWP structure and stream bank failure Some ACOE funds remained from 2014 construction and were available for emergency repair work on these slopes DCSWCD also requested additional funds from DEP to facilitate the emergency work

Third Brook - Sites 8 & 9 Design DCSWCD requested design assistance from Milone & MacBroom through DEP The project was in part an emergency repair with additional funds provided to install boulder riffle structures and revetment (rip-rap) along the toe of slope Total length: 1,145.5 ft Total Cost: $807,638 (2014 & 2015)

Third Brook Sites 8 & 9 Construction

Gulf Brook Streambank SMIP Located in the Town of Andes Bank erosion along a town road due to channel incision caused by the 2007 flood The project was awarded a SMIP grant in 2011, design postponed to 2014 due to Hurricane Irene in 2011 and EWP projects Project designed by DCSWCD 7

Gulf Brook Streambank SMIP Installation of pinned, stacked rock wall on right bank Installation of grade control structures downstream of wall Project completed in September 2015 at a cost of $71,102 8

Holiday Brook Restoration SMIP Located in the Town of Andes Stream bank instability exacerbated by unstable stream bed 9

Holiday Brook Restoration SMIP Installation of rip-rap to stabilize right Installation bank, of up grade stream control of culvert Installation structures (hardened of hardened riffles riffles) upstream and for grade control upstream and downstream of culvert downstream of culvert Project completed in September 2015 at a cost of $39,110

Delhi River Walk Hoyt Park SMIP grant for River Walk Design - $39,750 SMIP grant for completion of River Walk - $60,537 Improve stream riparian buffer Stabilize stream bank Remove invasive Japanese Knotweed 11

Delhi Boat Launch Hoyt Park SMIP grant for boat launch $61,200 Improve access for recreational activities: Boating Tubing Kayaking Fishing Village of Delhi was also awarded funding by: CWC Stormwater Retrofit Program $94,000 DOS Local Waterfront Revitalization Program $107,666 OPRHP Recreational Trails Grant Program $163,862 12

Walton Green Space Project Located f at the site of the former Walton Reporter building Goal is to allow conveyance of flood waters from Delaware Street back to West Branch Delaware River Walton Senator Bonacic grant ($100 K) and local contributions from the Town of Walton ($20,678), Village of Walton($33,295), and Delaware County ($17,685) for purchase and removal of Walton Reporter building Stream Management Program contributed $20,000 for floodplain grading and installation of stormwater infiltration trench Walton Greene Space $20,000 to complete final grading

Walton Gravel Study SMIP Walton High School Environmental Science students completed crosssectional surveys and pebble counts at eight stream sites in the Village of Walton from 2013-2015 Determine if stream channel is aggrading, degrading, or in equilibrium Presented results to Walton Flood Commission on November 5, 2015 Elevation 102 100 98 96 94 92 90 88 86 84 82 BRANDOW'S & BREAKEY'S 11/21/2013 5/21/2013 6/3/2013 10/5/2015 Feet on the Cam Line

2015 CSBI Projects Project f Bank Length (feet) Amount Hamden: Terry Clove Native Planting 460 $5,690 Andes: Beech Hill Knotweed Control (year 3) 2600 $2,414 Walton Greene Space $20,000 to complete final grading Walton Delhi: Little Delaware Trib Post IS Control Native Planting 650 $4,762 New Kingston: Thomson Hollow IS Control 600 $730 New Kingston: Thomson Hollow Native Planting 680 $2,987 Walton: County Route 22 East Brook Native Planting 1420 $15,200 SUNY Delhi Outdoor Education Center Planting 375 $375 Roxbury Elementary School Planting 60 $43 Walton Third Brook Student Planting 720 $357 Walton Knotweed pull Delaware Avenue 4H 90 - Delhi Hoyt Park Knotweed pull and clean-up 325 -

2015 CSBI Projects Terry Clove Town of Hamden Total length: 460 feet Buffer width: 25 feet Acres: 0.32 Potted plants: 300 Herbaceous plugs: 428 Live stakes: 220 Little Delaware Tributary Town of Delhi Total length: 650 feet Buffer width: 15 feet (both sides) Acres: 0.21 Potted plants: 175 Herbaceous plugs: 448 Live stakes: 300

2015 SMIP Grants Awarded 2015 SMIP Grant Awards - approved by PAC on September 10, 2015 Recipient Type Project Stream Amount Village of Delhi River Walk West Branch $60,534 Delaware County DPW Streambank stabilization East Brook $285,522 Village of Walton Streambank stabilization West Branch $398,545 Town of Bovina Culvert replacement Little Delaware trib $268,188 Town of Tompkins Culvert design Carrol Hollow $30,000 Town of Hamden Streambank stabilization East Brook $66,366 Town of Walton Stream bed stabilization Beers Brook $31,645 Town of Middletown Culvert design Platte Kill trib $30,000 Town of Stamford Streambank stabilization Town Brook $31,527 Village of Hobart Streambank stabilization Grant Brook $22,910 Total $1,225,239 Delaware County SWCD also leveraged matching funds from the DEC WQIP for: Miller Avenue Culvert Replacement in Bovina $182,856 South Street Streambank Stabilization in Walton $763,732

Total SMIP Grants Awarded Project Type Number of Projects Streambank Restoration 10 Stormwater 3 Recreation 8 Education 1 Infrastructure 9 Flood Hazard Mitigation 4 Total Number of Projects 35 Total SMIP Funding Awarded $2,809,384.96

More Restoration Project Located in the Town of Hamden Site identified in WBDR Stream Management Plan as lacking adequate riparian buffer Gradual bar formation and down valley meander migration has resulted in over widened condition Project goals: Project site establish stable stream channel that maintains proper sediment transport establish riparian buffer for long term stability of reach 19

More Restoration Project - Tasks Determined hydrology and verified using multiple sources Identified bankfull indicators in April 2015 event and calibrated hydraulic model of bankfull to indicators Calculated cross-sectional area Calculated range for alignment geometry Determined potential alignments Obtained landowner agreements Working on cropland CREP facilitation Coordinating with the Farm Easement Program Planned to be constructed in 2016 20

Other Projects 2016 SCMP Project # Projects Status 1 More Project in Hamden In Design 2 Little Delaware in Bovina 60% Design - SHPO archeology 3 Hamden Boat Launch Redesign for avoidance on archeology sensitive area 4 Walton Boat Launch Redesign for avoidance on archeology sensitive area 5 Walton Water St Floodplain Concept Design 6 Fleischmanns Site 4 Floodplain Designed (Buy-out on hold) 2016 CSBI Projects # Projects Status 1 Oliver Farm in Meredith Designed 2 Depot Street in Fleischmanns Designed 3 Willow Drive in Middletown In Design 2016 Ag Projects # Projects Status 1 Steve Boyd in Walton 60% Design 2 Laura Phoenix in Hamden 30% Design 3 Willard Frisbee in Delhi Concept Design

LFA Updates Delaware Basin Local Flood Analysis (LFA) Updates

Walton LFA Status of Implementation LFA completed for West Branch Delaware River in April 2015 Village of Walton has applied to CWC for funding to complete two feasibility studies that are associated with Water Street floodplain restoration: 1. CWC has approved funding for feasibility study for relocation of cell tower 2. CWC is reviewing funding application to complete feasibility study for relocation of underground infrastructure The Walton Flood Commission meets monthly to continue work on implementation of projects and review tributary analyses

Water Street Floodplain Restoration

Walton Tributary Analyses

East Brook Analysis

Status of Other LFAs Walton Flood Commission WBDR complete, tributaries underway (East Brook, West Brook, Third Brook) East Branch Flood Commission Fleischmanns & Clovesville nearing completion, awaiting draft report Arkville consultant evaluating alternatives Delhi Flood Commission Delhi & Fraser consultant completing hydraulic analysis Andes Flood Commission contract executed with consultant Hamden Flood Commission entering contract with consultant

Contact Information Nate Hendricks Project Manager NYCDEP Stream Management Program 71 Smith Avenue Kingston, NY 12401 (845) 340-7876 Graydon Dutcher Stream Program Coordinator DCSWCD 44 West Street, Suite 1 Walton, NY 13856 (607) 865-5223 www.catskillstreams.org/lfa