Urban Design Issues and Proposals for City College of San Francisco s Ocean Campus

Similar documents
Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Pedestrian and Bicycle Improvements in Balboa Park Station Area

COMPLETE STREETS PLANNER S PORTFOLIO

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Polk Streetscape Project

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Pedestrian and Bicycle Conditions

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Station 1: Street & Sidewalk Upgrades

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

ABOUT THIS STUDY The Tenderloin-Little Saigon Community-Based Transportation Plan

Freeway ramp intersection study

5. RUNNINGWAY GUIDELINES

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

ABOUT THIS OPEN HOUSE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

RE: Park Plaza Walgreens (P12-016)

Welcome! San Jose Avenue Open House August 25, 2015

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Prince George s County plans, policies, and projects

Borough of Danville, PA Traffic Calming Program Guidelines

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Bicycle Master Plan Goals, Strategies, and Policies

Existing Pedestrian Conditions. PSAC February 8, 2011

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

WELCOME Mission-Geneva Transportation Study

5 CIRCULATION AND STREET DESIGN

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

IMPLEMENTATION CHAPTER Identifying Priorities 7.2 Maintenance 7.3 Funding 7.4 Education and Enforcement IMPLEMENTATION

Better Market Street Project Update. Urban Forestry Council September 17, 2014

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

City of Seattle Edward B. Murray, Mayor

SFMTA PROJECT TIMELINE

Central Freeway and Octavia Circulation Study

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Better Market Street Project. Project Update January 15, 2015

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Presentation Starts at 5:30 PM

San Jose Transportation Policy

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

See Figure 38, Existing Nonmotorized Connections.

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

BIKE PLAN CONTENTS GATEWAY

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

Water Street Promenade Engineering and Design Services

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Living Streets Policy

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Broad Street Bicycle Boulevard Design Guidelines

9/21/2016 VIA . RE: The Knot (DR16-270)

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

City of San Diego Vision Zero Draft Strategic Plan FY 2017

C C C

Non-Motorized Transportation 7-1

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

11/28/2016 VIA

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

PRESS RELEASE San Joaquin Council of Governments

NEWMARKET UPHAM S CORNER

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Simulation Analysis of Intersection Treatments for Cycle Tracks

Active Transportation Facility Glossary

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

Streetscape: Core Shopping District

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

F L E T C H E R A V E N U E

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

What Is a Complete Street?

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Governance and Priorities Committee Report For the July 2, 2015 Meeting

MASTER BICYCLE AND PEDESTRIAN PLAN

San Rafael School District. Task Force Meeting Notes. November 5, 2012

How to Develop a Pedestrian Safety Action Plan

Multimodal Through Corridors and Placemaking Corridors

The Wiggle Route in Context

EXECUTIVE SUMMARY. Vision

Transcription:

Prepared by the Ocean Avenue Association s Street Life Committee Approved by the Balboa Park Station Community Advisory Committee in April 2016 Urban Design Issues and Proposals for City College of San Francisco s Ocean Campus Rendering of Ocean Campus entrance at Howth Street from 2004 Facilities Master Plan Corridor improvements from Phelan Avenue to I 280 Freeway from March 2015 Ocean Avenue Corridor Design Study 1

RAMPANT JAYWALKING During the week, thousands of pedestrians illegally cross the four vehicle lanes and two streetcar lanes back and forth from Ocean Campus and to the Balboa Park Station. Mainly they are students seeking quick access to and from City College of San Francisco s Ocean Campus. Ever since BART opened the Ocean Avenue entrance in 2011, this has increasingly occurred without being addressed. The San Francisco Community College District Police Department officers should educate, warn and possibly cite jaywalkers even if only during the beginning of each semester. CCSF staff should engage the San Francisco Municipal Transportation Agency in investigating the installation of a median barrier between the outbound and inbound streetcar tracks to prevent jaywalking like on 19 th Avenue for the M Ocean View streetcar line. GENEVA PHELAN OCEAN INTERSECTION This intersection is frequently congested to the point of gridlock and does not adequately serve all modes of transit. Pedestrians and bicyclists are ill served and can often be put in danger. The right turn lane often backs up all the way to the I 280 off ramp. The Ocean Avenue Corridor Study s long term plan addresses this. CCSF should urge SFMTA should investigate installing a pedestrian traffic scramble. These offer a modern solution to the problem of jaywalking across short thoroughfares, incorporating expected patterns of pedestrian behavior to reduce the likelihood of pedestrian vehicle collisions. CCSF should urge SFMTA to beautify crosswalks, landscaping, and creative art including mosaics or unique painted designs. PHELAN AVENUE CROSSWALKS The Phelan Avenue crosswalks should be more user friendly and safe. Many pedestrians jaywalk because the timing is off and they have to wait for a long time. PROPOSAL CCSF should consult with the SFMTA about the light timing and putting continental crosswalks to make pedestrians more visible. Additional pedestrian lighting should be installed. 2

OCEAN AVENUE COMPLETE STREET In 2014, San Francisco s Planning Department, the Ocean Avenue Association and BART Director Tom Radulovich met with CCSF Vice Chancellor of Finance and Administration Ron Gerhard and Director of Facilities Fred Sturner about improving Ocean Avenue. It was determined that moving the streetcar stop to Howth Street as suggested in the Balboa Park Station Area Plan was the best way to create a Complete Street, which is defined as a street that gives equal and effective access to all modes of transportation. As it stands, Ocean Avenue does not offer enough space to pedestrians and bicyclists on this block to meet the Complete Street criteria. City College Streetcar Stop: The existing non ADA compliant streetcar stop narrows the intersection causing increased traffic, preventing the aforementioned Complete Street. The stop would be much more useable if moved to Howth Street where CCSF and Lick Wilmerding High School students could use it to better effect. CCSF should urge the the appropriate city agencies to pursue this. Pedestrian Bridge: After two Lick Wilmerding High School students were injured by a speeding car on Ocean Avenue in the 1970s, the remedy was to put in an expensive pedestrian bridge instead of managing traffic at the street level. The bridge has been poorly maintained. It is not ADA accessible. It has not been upgraded so its stairs do not meet code. Moreover, the actual convenience of this bridge is deceptive. It gets a fraction of the number of pedestrians since the Ocean Avenue BART entrance opened in 2011. Land Swap for Complete Street from Phelan Geneva to San Jose Avenues: In order to create a complete street, CCSF must give up some land to accommodate all traffic lanes, a two way dedicated bicycle lane, an exclusive right turn lane to Phelan Avenue and sidewalk widening. PROPOSAL CCSF should urge the appropriate city agencies to immediately begin planning on moving the streetcar stop to the Health and Wellness Center and LWHS at Howth Street in order to provide a more useable/ada facility for the eastern side of Ocean Campus. 3

CITY COLLEGE OF SAN FRANCISCO FACILITIES MASTER PLAN For too long has the Ocean Campus turned its back on its budding urban neighborhood to the detriment of both entities. Modern higher education institutions, like the exemplary University California Berkeley for example, integrate with the neighborhoods they surround to great effect. The Facilities Master Plan should include building along the Ocean Avenue sidewalk to create an urban and pedestrian friendly environment. This would entail removing the extant retaining wall. CCSF should urge the SFMTA to enhance the crosswalks at Howth Street to give the impression of an entrance like the 2004 Facilities Master Plan rendering shows. (See Page 1) Lighting around the edges of the campus should be enhanced for safety. Landscaping the West Ocean Campus building(s) is needed. The Multi Use Building and former Bookstore Annex lack the trees and landscaping as detailed in the 2004 Facilities Master Plan. With so many students driving to campus and buildable land at a premium, a parking structure on campus is an inevitability. The entrance should be located as close to the freeway on and off ramps as possible, but should not allow a parking structure to define and dominate the campus. CCSF should encourage public transit use by faculty, staff and students perhaps with some sort of an incentive program. CCSF should encourage pedestrians and bicyclists by providing better facilities and protection from motor vehicles for them. The Facilities Master Plan should prepare for the eventuality of the I 280 off ramp straightening project which will install a traffic light allowing vehicles to turn left or right onto Ocean Avenue from the 280 freeway. There is a yield sign and crosswalk at the off ramp currently. The college should actively pursue making its Ocean Avenue frontage a walkable landscaped and properly lighted pedestrian area. The college should use its extensive art collection. There should be a sculpture garden created in an easily accessible street facing location where art can be shown. The Facilities Master Plan should take more input from neighbors. Students stay for a few years. Neighbors are there for the duration. 4