Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

Similar documents
COMMENT SUMMARY REPORT

Chapter 5 Future Transportation

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

San Jose Transportation Policy

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Fitting Light Rail through Well-established Communities

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Community Task Force November 15, 2017

STONY PLAIN ROAD STREETSCAPE

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Technical Working Group November 15, 2017

Memorandum. Sunday, July 13, Saturday, July 19, 2014

ELEMENT 11 TRANSPORTATION ELEMENT

The Northern Avenue Bridge is being replaced, and the city is debating just who will be allowed to use it

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5. RUNNINGWAY GUIDELINES

What are the transportation needs in the

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Everyone is a Pedestrian

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

section 4 Existing Conditions, Issues, and Options

42nd Ave N Reconstruction

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Active Transportation Facility Glossary

Table #6 VISION CHARACTERISTICS

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

GRANDFORKS MILSPURFEASIBILITYSTUDY. GrandForksandEastGrandForksMPO. FINALReport. August2010

STANLEY STREET December 19, 2017

Ottawa Beach Road Study

Decision on North Waterloo Routing

Duwamish Way-finding and CTR Report

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

C C C

Route 29 Solutions Projects

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Existing Transportation System

Borough of Danville, PA Traffic Calming Program Guidelines

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

University of Illinois. University of Illinois Champaign-Urbana. 3rd St. 6th St. ransportation. Prepared for: Loredo Taft Dr. Stadium Dr.

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Non-Motorized Transportation 7-1

Route 7 Corridor Study

See Figure 38, Existing Nonmotorized Connections.

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Bus Rapid Transit Plans

Front and Myrtle Improvement Project

1 st and 2 nd Street Couplet FAQ s

State Highway 44/State Street High Capacity Corridor

Mission Bay Loop (MBL) Public Meeting

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Bay to Bay Boulevard Complete Streets Project

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

North Shore Transportation Improvement Strategy

Hennepin County Transportation Department

I-20 East Transit Initiative

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

5 Circulation & Parking

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

Thank you for attending

SANTA MONICA BOULEVARD CORRIDOR

Metropolitan Council Transportation Committee

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Project Description Form 6V

Berkeley Strategic Transportation Plan A-76

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Public Information Meeting

City of Moorhead Committee of the Whole Meeting

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

MAKE YOUR PLACE IN CHANNELSIDE

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

9/21/2016 VIA . RE: The Knot (DR16-270)

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Rightsizing Streets: The Seattle Experience

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Community Task Force March 14, 2018

FHWA Resources for Pedestrian and Bicycle Professionals

PISMO BEACH COUNCIL AGENDA REPORT

2045 Long Range Transportation Plan. Summary of Draft

Transcription:

Rail-Volution 2010 Weaving Transit into Existing Communities Norfolk Tide LRT System Weaving Transit in Downtown Norfolk Dan Meyers, AICP URS, Planning Manager Minneapolis, Minnesota

Norfolk Tide LRT Alignment

Norfolk Tide LRT Alignment Key issues Pre-Revolutionary War city with narrow roadways Limited opportunity for transportation expansion Traffic congestion in downtown Limited areas for development City not wanting to take land for parking Engineering challenges Environmental challenges Historical challenges

Norfolk Tide LRT System Characteristics 7.4 mile corridor with 11 stations $338 million capital cost 9 low-floor ADA compliant LRT vehicle Mostly at-grade operation Downtown Norfolk (3 miles) Abandoned Norfolk Southern freight line (4.4 miles)

Norfolk Tide LRT Project History 1994 Began work with MIS on 18 mile alignment through Virginia Beach to Atlantic Ocean 2000 Minimal Operable Segment 2003 Supplemental DEIS completed October 2005 and April 2006 Final EIS completed and ROD October 1, 2007 Full Funding Grant Agreement January 2008 Construction started March 2011 Planned revenue operation

Norfolk Tide LRT City Planning and Traffic Coordination LRT alignment in downtown constructed on lowest ADT roadways Early and often coordination with City of Norfolk staff Much of the success was due to no turnover of Norfolk planning and transportation staff City planned for implementation of the LRT project early Frequent meetings during planning and design resulted in a plan that was built around consensus

Norfolk Tide LRT City Planning and Traffic Coordination Utilized multiple tools to define impacts to the downtown Norfolk street and parking system as well as development activities Tools became more robust as the project went from planning to PE to final design to construction Sponsored trips to other LRT system cities Similar LRT characteristics Discuss LRT operation with transit agency and city staff Baltimore, Denver, Salt Lake City, Portland

Norfolk Tide LRT City Planning and Traffic Coordination City wanted to maintain as much access to parking and developments as possible while keeping the area safe for all users Fully documented all assumptions and decisions within meeting reports, field reviews, technical memoranda, and reports used during preliminary engineering, final design, and construction

Norfolk Tide LRT Diagnostic Grade Crossing Safety Review Conducted grade crossing safety diagnostic review with city, state, and federal agencies Recommended by FHWA as the preferred methodology but the process needed to be developed Safety review initiated during Final Design Office and field review of each crossing over a 6 month period Preliminary design changed with review

Norfolk Tide LRT Diagnostic Grade Crossing Safety Review Goals of the grade crossing safety diagnostic review Provide all agencies and stakeholders with an opportunity to discuss potential grade crossing treatments and develop consensus on the design and protection recommendations Provide recommendations to incorporate into the final design for each LRT grade crossing Safety diagnostic team continues to meet as the project is built and safety concerns arise

Norfolk Tide LRT Downtown Norfolk Alignment

Medical Center Area Brambleton Ave. - 35,000 ADT EVMC - 20,000 employees Fort Norfolk - 700,000 sf commercial / 2,000 residential units

Medical Center Area Direct skywalk connection to EVMC Safe pedestrian / bus connection with walkway to station Reconfiguration of intersection for safer pedestrian crossings and vehicular movement efficiency

Medical Center Area

York Street Area New developments being built around future LRT station means increased pedestrian activities Walk-on station with no bus facilities adjacent to historic district with bike path parallel to the LRT tracks

York Street Area Close off through street and make more pedestrian friendly while still allowing access to residential and commercial land uses with backage streets Active warning devices for pedestrians installed along sidewalks and near station and street crossings

York Street Area

York Street Area

York Street Area

Monticello Avenue Area Front entrance to MacArthur Regional Mall with significant pedestrian crossing Monticello Avenue Monticello Avenue also has theaters, arena, federal courthouse, community college, and new developments along the length of the street Monticello Avenue ADT approximately 4,500 per day

Monticello Avenue Area Station designed to push transit riders to the nearest intersection and cross at designated crossings along with active warning devices

Monticello Avenue Area Need to allow vehicles to cross tracks to access parking garages and adjacent land uses

Monticello Avenue Area

Plume Street Area LRT to cross through Norfolk s busiest intersection

Need to make transit riders follow walkways to the nearest intersection and cross at designated crossings along with active warning devices Plume Street Area

Plume Street Area

Plume Street Area

Plume Street Area Plume Street ADT is about 3,000 vehicles per day Need to allow vehicles to cross tracks to access parking garages and adjacent land uses

Plume Street Area

Government Center Area LRT to cross Government Center Plaza

Government Center Area Low clearance issue with OCS wire needed to be resolved with no trucks allowed and warning device Crossing of St. Pauls Boulevard must be atgrade while still allowing LRVs to cross and other vehicles not be caught on LRT tracks Plaza area designed to push transit riders to designated crossing areas along with active warning devices

Harbor Park Area AAA Orioles stadium seating about 14,000 persons Active warning devices and police enforcement during game times Major park-and-ride facility for the city with about 1,100 spaces

Harbor Park Area

Norfolk State University Area NSU 7,000 students Brambleton Ave. - 40,000 ADT

Norfolk State University Area Pedestrian connection to NSU and surrounding neighborhoods on east side of Brambleton Avenue Grade separation recommended Access to LRT Yard and Shop Facility

Norfolk State University Area

Norfolk State University Area

Ingleside Area Ingleside Avenue ADT about 500 vehicles per day Walk-on station with no bus facilities adjacent to residential neighborhood

Ingleside Area Gated crossings and active warning devices added after meetings with neighborhood representatives

Ingleside Area

Norfolk Tide LRT Steps Completed During Construction Continue to work with the City of Norfolk staff to implement traffic engineering plans Manage traffic impacts in downtown during construction Testing of traffic and safety system before and after revenue operation Work on extensions to the Norfolk Tide LRT system Virginia Beach Norfolk Navy Base