RE: 2007 NPA Text (Clean Version)

Similar documents
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

FREEWAY AND SERVICE ROAD CONNECTIONS

CHAPTER 1 STANDARD PRACTICES

SECTION 12 ROAD MARKINGS AND DELINEATION

FOR LOOP RAMPS-TAPERED DECELERATION LANE

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

Minnesota Manual on Uniform Traffic Control Devices

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

SECTION 12 ROAD MARKINGS AND DELINEATION

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

JCE 4600 Transportation Engineering. Traffic Control

Edge Wedge 150 lb/ft 3

Appendix Work Zone Traffic Control

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

2009 Manual on Uniform Traffic Control Devices

MUTCD Part 6: Temporary Traffic Control

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation

CHAPTER 6H. TYPICAL APPLICATIONS

Session 1 23 CFR 772: Type I Project Definitions

Meeting Agenda Marking Technical Committee National Committee on Uniform Traffic Control Devices January 19-20, 2011 Arlington, VA

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

Grade Separated Intersection

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA

2017 Changes to the 2011 MMUTCD January 2017

INTERSECTIONS AT GRADE INTERSECTIONS


MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

The first lift, mainline, shall be placed using a spray paver.

Technical Memorandum. Subject: Interchange Ramp Terminal Configuration. Expiration. Implementation. Introduction

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones.

Pavement Markings (1 of 3)

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

Traffic Control Devices

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

An Overview of the 2009 MUTCD

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

Access Location, Spacing, Turn Lanes, and Medians

CHAPTER 6H. TYPICAL APPLICATIONS

Chapter 33. Grade Separated Intersection Overview Classification of Intersection Grade Separated Intersection

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

Edison Electric Institute. Work Zone Safety October 4-7, 2009

KDOT Access Management Policy (AMP)

(This page left intentionally blank)

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook?

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

Attachment No. 4 Approved by National Committee Council

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Driveway Design Criteria

Roadway Design Manual

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing

NCHRP Task 350. U.S. Bicycle Route Signing

WORK ZONE TRAFFIC CONTROL PROCEDURES

Guide for Law Enforcement Personnel in Work Zones

2003 Edition Page 2B-1

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

Appendix C. Bicycle Route Signage

Appendix 9.A - Interchanges Figure 9-A-1 Four-leg Interchanges between Expressways

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

November 2012: The following Traffic and Safety Notes were revised:

CHAPTER 2B. REGULATORY SIGNS, BARRICADES, AND GATES Section 2B.01 Application of Regulatory Signs Standard:

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

Freeway System Considerations

General References Definitions. (1) Design Guidance. (2) Supporting Information

Shortening or omitting a pedestrian change interval when transitioning into preemption

TRAFFIC CONTROL DEVICES

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY

Ohio Department of Transportation Edition of the OMUTCD It s Here!

2003 Edition Page 2C-1

Chapter 2B. REGULATORY SIGNS

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

2C-3 Placement of Warning Signs

Concise Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations

Tract or Parcel Project Name PCN Checked By Date

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

"Emul Asph (SS-1HP) Tack".

Defining Purpose and Need

FARS Acc_Aux Analytical Users Manual. The Tables in this Manual Contain Fatal Crash Counts

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

Innovative Intersections

Background on the Revisions to VDOT s Access Management Spacing Standards

RAMP CROSSWALK TREATMENT FOR SAN DIEGO AIRPORT, TERMINAL ONE

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Transcription:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 20 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RE: 2007 NPA Text (Clean Version) P. 230, Lines 29-30 SECTION 3B.04 White Lane Line Pavement Markings and Warrants P. 232, Lines 6-16 SECTION 3B.05 Other White Longitudinal Pavement Markings FIGURE 3B-9 (B) COMMENTS: This recommendation will modify past action of the MTC and the NCUTCD. Add an OPTION Statement and MODIFY another OPTION Statement to allow agencies to continue to mark tapered acceleration lanes for safe merge operations. The NCHRP Pavement Marking Synthesis 356 actually shows the NPA language to be the minority report. Modify the OPTION Statement on P. 230, Lines 29-30 to read as follows: For entrance ramps with a tapered acceleration lane, a dotted white line extension may be installed from the downstream end of the through lane channelizing line to the downstream end of the acceleration taper. Add an OPTION Statement beginning on P. 232, Line 13 to read as follows: For entrance ramps with a tapered acceleration lane, the channelizing lines may be terminated upstream of the theoretical gore, but no more than one-half the distance from the theoretical gore to the physical gore. Modify Figure 3B-9 (B) in conformance to the above-proposed OPTIONS. REASON: The 2008 NPA language, a change from the 2003 MUTCD, is also contrary to the results of the NCHRP Synthesis 356, Pavement Markings-Design and Typical Layout Details. I marked up Figure 3B-9 to show where states are marking the end of these channelization lines (Note blue arrowheads). The drawing is titled Marking Synthesis Representation of End of Channelizing Line for a Tapered Acceleration Lane. 76% of responding agencies terminate the channelizing lines upstream of the theoretical gore point. This would be prohibitive based on the NPA language. Only 6 of 25 terminate the lines where they join, at the theoretical gore. Why is an OPTION not allowed? Are the majority of states experiencing operational problems with their current marking methods? Safe merges from tapered acceleration lanes are a function of gap acceptance length, initial ramp speed, speed differentials, ramp geometrics, through lane/taper ratio, etc. The abilty of the engineer to lengthen or shorten this opening to the through lane is removed with the NPA language. The proposed change is needed to allow agencies the flexibility to adjust the limits of the markings to promote safe merge operations for each location. NCUTCD-MTC Review of 2008NPA TTaylor -Task 1

For entrance ramps with a parallel acceleration lane, a lane line should be extended from the end of the channelizing line for a distance of one-half the length of the full-width acceleration lane dotted white line shall be installed from the theoretical gore or from the downstream end of a solid white lane line, if used, that extends downstream from the theoretical gore, to a point at least one-half the distance from the theoretical gore to the downstream end of the acceleration taper, as shown in Drawing A of Figure 3B-9. For entrance ramps with a parallel acceleration lane, a dotted white line extension may be installed from the downstream end of the dotted white lane line to the downstream end of the acceleration taper. For entrance ramps with a tapered acceleration lane, lane line markings may be placed to extend the channelizing line, but not beyond a point where the tapered lane meets the near side of the through traffic lane a dotted white line extension may be installed from the downstream end of the through lane channelizing line to the downstream end of the acceleration taper. A wide dotted white line (see Drawings A and B of Figure 3B-10) shall be used as a lane drop markings as shown in Figure 3B-10 may be used in advance of lane drops at exit ramps to distinguish a lane drop from a normal exit ramp or from an auxiliary lane. A wide dotted white line (see Drawing C of Figure 3B-8) shall be used to separate a through lane that continues beyond an interchange from an adjacent auxiliary lane between an entrance ramp and an exit ramp. A normal or wide dotted white line (see Drawing C of Figure 3B-10) shall be used as a lane drop marking in advance of lane drops at intersections to distinguish a lane drop from an intersection through lane. A normal or wide dotted white line (see Drawing D of Figure 3B-10) shall be used to separate a through lane that continues beyond an intersection from an adjacent auxiliary lane between two or more intersections. Guidance: A normal dotted white line should be used as a lane drop marking for lane reduction transitions (see Section 3B.09 and Figure 3B-13). If used, Lane drop markings used in advance of lane drops at freeway and expressway exit ramps should begin at least added to be consistent with Figure 3B-10, which shows a solid line of variable length after 0.5 miles of lane drop markings 800 m (0.5 mi) in advance of the theoretical gore point. On the approach to a multi-lane exit ramp having an optional exit lane that also carries through traffic, lane line markings should be used as illustrated in drawing B of Figure 3B-10. In this case, if the right-most exit lane is an added lane such as a parallel deceleration lane, the lane drop marking should begin at the upstream end of the full-width deceleration lane. Lane drop markings used in advance of lane drops at intersections should begin a distance in advance of the intersection that is determined by engineering judgment as suitable to enable drivers who do not Combined Fed Reg notes with Part 3 mark-up Page 1 of 1

markings at exit ramp and entrance ramps for enhanced nighttime visibility, to reflect recommendations from the Older Driver handbook.] A channelizing line shall be a wide or double solid white line. Channelizing lines may be used to form channelizing islands where traffic traveling in the same direction is permitted on both sides of the island. Other pavement markings in the channelizing island area shall be white. Support: Examples of channelizing line applications are shown in Figures 3B-8, 3B-9, 3B-10, and 3B-11. Channelizing lines at exit ramps as shown in Figure 3B-8 define the neutral area, direct exiting traffic at the proper angle for smooth divergence from the main lanes into the ramp, and reduce the probability of colliding with objects adjacent to the roadway. Channelizing lines at entrance ramps as shown in Figure 3B-9 promote reasonably safe orderly and efficient merging with the through traffic. For exit and entrance ramps, channelizing lines shall be placed along the on both sides of the neutral area adjacent to the through traffic lane and the ramp lane. For exit ramps, the channelizing lines for the ramp and through lanes shall begin at the theoretical gore and extend downstream on each side of the neutral area to the physical gore. For entrance ramps, the channelizing lines for the ramp and through lanes shall begin at the physical gore and extend downstream on each side of the neutral area to the theoretical gore. For entrance ramps with a tapered acceleration lane the channelizing lines may be terminated upstream of the theoretical gore up to one-half the distance from the theoretical gore to the physical gore. White chevron markings may be placed in the neutral area of exit ramp and entrance ramp gores for special emphasis as shown in Figure 3B-8. The channelizing lines and the optional chevron markings at exit ramp and entrance ramp gores may be supplemented with white retroreflective or internally illuminated raised pavement markers (see Sections 3B.11 and 3B.13) for enhanced nighttime visibility. Guidance: For entrance ramps, a channelizing line should be placed along the side of the neutral area adjacent to the ramp lane. Section 3B.06 Edge Line Pavement Markings If used, edge line pavement markings shall delineate the right or left edges of a roadway. Except for dotted edge line extensions (see Section 3B.08), edge line markings shall not be continued through intersections or major driveways. If used on the roadways of divided highways or one-way streets, or on any ramp in the direction of travel, left edge line pavement markings shall consist of a normal solid yellow line to delineate the lefthand edited to increase clarity edge of a roadway or to indicate driving or passing restrictions left of these markings.

Marking Synthesis Representation of End of Channelizing Line for a Tapered Acceleration Lane IN, OK, PA,VT, WI, PR at theoretical gore (NPA Standard) UT- 3ft Separation IA-4ft. AZ, NH 5ft. CA, CO,GA, HI, IL, MN, MT, NY, OH, TN, WA 6ft ND- 195ft downstream of physical gore WY- width of mainline shoulder (6-10 ft.?) WV-midpt of paved gore NC

B = Limit of Channelization lines