MBTA Key Bus Route. Community Meeting Route 66 - Boston

Similar documents
MBTA Key Bus Route Improvement Program. Community Meeting Route 66 - Brookline

MBTA Key Bus Route Improvement Program. Community Meeting Route 1 - Boston

MBTA Key Bus Route. Community Meeting Route 1 - Cambridge

MBTA Key Bus Route Improvement Program. Community Meeting Route 28

MBTA Route 39 Key Bus Route Improvement Program

CURBSIDE ACTIVITY DESIGN

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

TRANSPORT CHICAGO: STRATEGIC PUBLIC TRANSIT BUS RELIABILITY IMPROVEMENTS

MEMORANDUM. The primary tasks documented in this memorandum are:

Transit Priority. Peter G Furth

Wilshire Boulevard Bus Rapid Transit Project

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Chapter 3 BUS IMPROVEMENT CONCEPTS

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Transportation Planning Division

M14A/D Select Bus Service

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Roadways. Roadways III.

Indiana University Campus Bus Service. Bus Stop Consolidation

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

9. TRANSIT ACCOMMODATIONS

Southside Pilot Proposal

Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66

ALTERNATIVES TO BE CONSIDERED

C Line Rapid Bus Preliminary Station Design

Service Analysis INTRODUCTION

Everett Transit Action Plan. Community Open House November 16, 2015

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Greater Cleveland Regional Transit Authority

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

9. TRANSIT ACCOMMODATIONS

GENERAL. 1. Description

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Geary Corridor Bus Rapid Transit

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Improvements within the Route 107 study area were developed in accordance with the MassDOT Project Development and Design Guide of 2006.

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

Better Buses: Getting Boston On Board

Station Plan: Penn & 43rd Avenue

Calgary Transit Route 302 Southeast BRT Year One Review June

NEWMARKET UPHAM S CORNER

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

Columbia Pike Implementation Team (CPIT) Meeting

Arterial Transitway Corridors Study. Ave

Traffic Engineering for Transit Operations

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Community Task Force November 15, 2017

Transportation Impact Assessment

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

NJDOT Complete Streets Checklist

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Cincinnati Dayton Rd Widening

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Project Goals Project Limits Boston Bikes Data Existing Conditions Proposed Options Discussion

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Bicycle + Pedestrian Connectivity Gap Analysis

Active Transportation Facility Glossary

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15

MEMORANDUM. TO: Transportation Planning and Programming Committee December 4, 2008 of the Boston Region Metropolitan Planning Organization

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Working Group Meeting

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Station 1: Street & Sidewalk Upgrades

ROUTE 18B AVALON-SHADELAND EXPRESS

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Eliminate on-street parking where it will allow for a dedicated bus only lane %

41st Avenue B-Line Kerrisdale Village Street Improvements

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida

Freeway ramp intersection study

North Turnaround. Option 3: Best facilitates transfers from local to rapid transit services. High cost

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Sloat Blvd. Pedestrian Safety Improvement Project

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Service Development 1600 Franklin Street, Oakland CA 94612

Arterial Transitway Corridors Study

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

S T A T I O N A R E A P L A N

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Rhode Island Bus Stop Design Guide

Technical Working Group November 15, 2017

Henderson Ave. Complete Streets Project

Better Market Street Project. Project Update January 15, 2015

Transcription:

MBTA Key Bus Route Improvement Program Community Meeting Route 66 - Boston Jackson Mann Community Center Agenda Welcome and introductions Safety briefing/accommodations Key Bus Route Program overview Existing conditions Recommendations Next Steps Discussion 2 1

Introduction 15 Key Bus Routes $10 million funding Project Schedule Bus Route 66 Develop Concept Jan/ Feb Mar Apr Jun Oct Finalize Plan Engineering Implementation Public Process 1/19 3/8 1/20 2/2 March 21, 2011 4 Leading the Nation in Transportation Excellence www.mass.gov/massdot 2

Key Bus Route Goals Reliability less bus bunching Faster service fewer delays, less stops, shorter trip times Improved accessibility for seniors and persons with disabilities Passenger amenities shelters, benches, signage, trash barrels Key Bus Routes 3

Typical Conditions Bus stop too short Signage issues Poorly located boarding area Bus stops too close Improved Accessibility Legal Mandate All bus doors must open at curb Deter cars from parking in stops Providing accessible curb access requires longer bus stops Bus Stops must meet Current Guidelines for 40 buses Leading the Nation in Transportation Excellence www.mass.gov/massdot 8 4

Farside 60ft Nearside 80ft Required Bus Stop Lengths Midblock (or after left hand turn) 100ft Reliability Issues 5

Good bus stop locations: Sufficient length to pull to the curb Clear boarding/alighting area Not blocking crosswalks or driveways Proper Spacing Considerate of adjacent traffic Factors for Improving Stop Locations Ridership customer boardings and alightings Proximity to schools, medical centers etc Distance to adjacent stops Reducing traffic congestion Parking impacts Potential to add amenities shelters, benches etc. 6

Bus Stop Spacing Ideal spacing is 4-7 stops per mile (every 750-1,320 ft) (4-6 minutes walking distance) Route 66 has stops as close as 310 ft 2556 1191 Bus Stop Consolidation Benefits Shortens bus trip times Improves service reliability Minimizes stop & go experience Provides additional parking spaces Ability to provide better stop amenities 7

Traffic Signal Improvements Improved Amenities Schedule tubes Trash receptacles Shelters Benches Pavement markings 8

Improving Customer Information Route 66: Overview Harvard Sq to Dudley Station Via Union Square, Coolidge Corner, Brookline Village, and Brigham Circle Harvard University, Brigham & Women s Hospital, Reggie Lewis Center 6.2 miles long Schedule time varies by time of day (28-47 min.) Connects to: Red, Green, Orange & Silver Lines 26 bus routes, including: KBR 1, 15, 22, 23, 28, 57, 71, 73, 77 18 1/19/2011 9

Route 66: Overview MBTA s 2 nd busiest route- Over 14,500 avg. daily boardings Peak Hour Headways Every 8-9 minutes On-time performance 66% Weekday Source: MBTA s 2008 Biennial Service Plan 84 Stops 43 Inbound (to Dudley Square) 41 Outbound (to Harvard Square) 19 Revised Preliminary Recommendations 10

21 1/19/2011 175 N. Harvard St Remove IB & OB stops Ridership, Spacing 2562 9584 11

N. Harvard St at Western Ave OB Add pavement markings, lengthen stop 2561 N. Harvard St at Western Ave Relocate IB stop; investigate shared lanes; add pavement markings. Existing Proposed 12

N. Harvard St Add Amenities March 21, 2011 25 N. Harvard St at Oxford St Lengthen bus stop; add trash receptacle and pavement markings; investigate crosswalk. 2559 March 21, 2011 26 13

Cambridge Street @ N. Harvard/Lincoln Consolidate to nearside Lincoln St; add amenities. 1191 Proposed 27 March 21, 2011 1192 Cambridge Street OB @ Lincoln Street Investigate adding new stop. March 21, 2011 14

Cambridge St @ Franklin St Relocate to farside and add amenities 1193 March 21, 2011 29 Union Square Loop 1,406 boardings 10% ridership Overall time savings 15

Brighton Ave Brighton Ave @ Craftsman Remove stop, and relocate shelter 1111 964 965 16

Brighton Ave @ Allston Retain stop. Investigate bench, trash receptacle, and sidewalk improvements. Brighton Ave @ Harvard Ave Lengthen bus stop, add bench and trash receptacle, investigate shared lane. 928 34 March 21, 2011 34 17

Harvard Ave @ Brighton Ave Relocate bus stop; investigate signal improvements Harvard Ave @ Brighton Ave Relocate bus stop and investigate signal improvements 1379 18

Harvard Ave @ Brighton Ave Relocate bus stop; investigate signal improvements Potential Stop locations Harvard Ave @ Comm Ave (Inbound) Relocate stop away from intersection. Add pavement markings. Investigate signal improvements 1302 ` 19

Harvard St @ Verndale St Relocate IB and OB farside. Add shelter at inbound stop. 11302 1376 Proposed Proposed 39 3/21/2011 Harvard St @ Beals St Consolidate with Babcock St to nearside of Stedman St 1374 Proposed 40 3/21/2011 1373 20

Harvard St at Williams St Consolidate with Harvard St opp Babcock St to farside Shailer St. 1306 Proposed 41 3/21/2011 1307 Harvard St @ Beacon St Shift inbound and relocate outbound to farside. Add amenities. 1308 Proposed 1372 Proposed 42 3/21/2011 Leading the Nation in Transportation Excellence www.mass.gov/massdot 21

Harvard St @ Sewall Ave Add new stop to reduce distance between stops*. Add bench and trash receptacle. Proposed * Only if Beacon St stop moves to farside. 43 3/21/2011 Leading the Nation in Transportation Excellence www.mass.gov/massdot Harvard St @ Marion St Consolidate with Harris St to nearside Foster St, only if shelter can be accommodated at new location. 1309 Proposed 44 3/21/2011 1310 22

Harvard St opp Vernon St Signal: Investigate TSP and OB shared bus lane/right turn lane 1371 Harvard St @ Auburn St Remove stop to improve bus stop spacing and due to low ridership. 1370 47 3/21/2011 Leading the Nation in Transportation Excellence www.mass.gov/massdot 23

Harvard St @ Aspinwall St Rearrange furniture to improve accessibility and add shelter. 1369 48 3/21/2011 Leading the Nation in Transportation Excellence www.mass.gov/massdot Harvard St @ Linden St/Pierce St Remove inbound and outbound stops to improve spacing and low ridership. 1368 49 3/21/2011 1312 24

Huntington Ave at Jamaicaway Relocate stop near S. Huntington. Add bench, trash receptacle, pavement markings. 1366 51 Huntington Ave Recommendations consistent with Rte 39 Process 52 25

Tremont St @ Huntington Ave. Relocate stop back from intersection. Add pavement markings and amenities 1362 Proposed 53 January 11, 2011 53 Tremont St @ Huntington Ave Outbound: Investigate signal improvements to create 2 approach lanes 1362 Proposed 26

Tremont St @ Whitney St and @ Carmel St. Consolidate stops. New stop farside of St Alphonsus St. 1320 Add Amenities 55 March 21, 2011 55 11320 Tremont St @ St Alphonsus Inbound: Investigate shared bus lane/ right turn lane 27

Tremont St @ Worthington St and @ Mission Church. Consolidate stops. New stop nearside of St. Alphonsus St. Add shelter, hlt trash receptacle and pavement markings, investigate signal improvements. 1361 Proposed 57 January 11, 2011 57 1360 Tremont St @ Burney St Remove stop and relocate shelter. 21320 58 28

Tremont St @ Parker St and @ Tobin Community Center Consolidate stops. New stop farside of Faxton St. Add trash 1359 receptacle, pavement markings, look into shelter. Proposed 59 59 13590 Tremont St @ Parker St Relocate stop far side of Sewall St Add trash receptacle and pavement markings. Proposed Existing 60 January 11, 2011 60 29

Tremont St at Columbus Ave Shorten IB stop to 80 ; add pavement markings; investigate signal improvements Tremont St opp Roxbury Crossing Add trash receptacle and pavement markings, shorten stop to 100 ; investigate ped and signal improvements. 62 March 21, 2011 62 30

Malcolm X Blvd. Recommendations per RDM Study 63 Summary of Preliminary Recommendations Add shelters, benches, trash receptacles Stops lengthened for accessibility Stops relocated Stops Consolidated Current Stop Plan 42 IB/41OB Proposed Stop Plan 34 IB/35 OB Investigating traffic signal improvements Sidewalk Improvements/Curb Extensions 64 3/08/2011 31

Project Schedule Bus Route 66 Develop Concept Jan/ Feb Mar Apr Jun Oct Finalize Plan Engineering Implementation Public Process 1/19 Today 1/20 2/2 March 21, 2011 65 Leading the Nation in Transportation Excellence www.mass.gov/massdot Public Outreach 32

Overall Project Schedule 33

Comments and Next Steps Project Updates at www.mbta.com/keybusroutes Mail to Operations and Service Development, 45 High St, Boston, MA 02110 Email to keybusroutes@mbta.com Next community meeting Route 57: March 14, 2011 @ 6:30 PM St. Elizabeth s Hospital Discussion Discussion We want to hear from you! 34