Projects, Grouped by MPO Investment Category

Similar documents
PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

Presented by: Presented to:

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Technical Briefing Rapid Transit

Highway Construction

Completed Project Justification Package Example

Highway Construction

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

CHAPTER 4 VISION, GOALS AND OBJECTIVES

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

Federal Way City Center Access Study Comment Log Summary

CITY OF STEVENS POINT AGENDA

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

Technical Memorandum. Introduction. Projected Traffic Volumes

POWELL BOULEVARD ROAD SAFETY AUDIT

ROAD SAFETY AUDIT. Main Street (Route 28) at Elm Street Main Street (Route 28) at William Street Town of Stoneham.

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

Appendix C. Travel Demand Forecasting Technical Memorandum

Sellwood Bridge AM Traffic Evaluation

CITY of LOMPOC 2030 General Plan

Project Advisory Team Existing Conditions Meeting Agenda

American Association of State Highway and Transportation Officials

ROAD SAFETY AUDIT. Route 28 (Main Street) at North Street. Town of Stoneham. August 29, Prepared For: MassDOT Highway Division

South Portland Public Input Meeting Summary Notes and Public Comments

Nine Elms Lane and Battersea Park Road

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

American Association of State Highway and Transportation Officials

TECHNICAL MEMORANDUM

Mission Bay Loop Project. Operations & Customer Service Committee August 9, 2016

Appendix A. Bicycle Design Guidelines

CITYCOUNCIL. CITY OF KENMORE Public Works Department PO Box Kenmore, WA David Baker, Mayor Allan VanNess, Deputy Mayor

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO

Creston Road Complete and Sustainable Streets Corridor Plan

Bikeway Classification

Technical Appendices Transportation Appendix. Transportation Contents

Community Meeting September 29, :30 7:30 p.m. Leataata Floyd Elementary School Multi-Purpose Room 401 McClatchy Way, Sacramento.

Project No.: Notes taken by:

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Transportation Project Prioritization

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

Subject: Recommended Updates to Transportation Development Parameters

Stakeholder Working Group (SWG) Meeting #2 Summary

City of Ottawa. Transit Solutions. O c t o b e r

Parking Committee Report to Commissioners AUGUST 17, 2018

2.0 VISIONING DIRECTION

Exploration of Consolidation and Opportunities: MAP-21 7/11/2012

DRAFT Active Transportation Work Plan

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

FY 2018 Transportation Alternatives Instructions

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

Technical Memorandum #18 - Transit Solutions - DRAFT

System Development Principles

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W

Transportation Border Working Group Portland March 3-4, CBSA Infrastructure Project Update

Bicycle Task Force Recommendations September 18, 2008

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

University of Montana 2013 Bike Master Plan

Stakeholder Interviews Memo

2017 Active Allegheny Grant Program Program Guidelines

Transportation Vision

VAN BUREN SCHOOL TRAVEL PLAN

Long-Term Transportation Plan

Meeting Summary Virginia Regional Transportation Safety Road Show Northern Virginia Meeting December 1, 2016

Lamorinda Action Plan

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Vista Field Redevelopment Project Transportation System Impact Evaluation Volume II Additional Analysis Completed for Mitigation Requirements

[A quorum of the City Council may attend this meeting]

SCENTRE GROUP JULY 2018 REF: 10869/1

Neighborhood Bikeway Concept Plan

Department of Transportation Project No Rehabilitation of Bridge No Towns of East Haddam and Haddam, Connecticut

Meeting 2 Workshop Summary

Roosevelt Estates Neighborhood Improvements

Quebec Street Multimodal Improvement Project Open House Summary September 27, 2017

(c) Pinellas Suncoast Transit Authority (PSTA) (Councilmember Rice)

3 ways to build a healthy future for NSW

Advisory Group Meeting Notes

STATE OF NEW HAMPSHIRE Inter-Department Communication

Hambledon State School Executive Summary

PORT MACQUARIE-HASTINGS PEDESTRIAN ACCESS AND MOBILITY PLAN

Freshman Baseball Post Season Player Evaluation

NJDOT Complete Streets Checklist

Bicycle Facilities Planning

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Design Criteria. Design Criteria

I 70 FTEIS Pre Location Meeting Summary September 2008

Long Island Rail Road Expansion Project Floral Park to Hicksville

5. RUNNINGWAY GUIDELINES

DISCLAIMER ACKNOWLEDGMENTS TRANSIT DESIGN GUIDELINES. Omnitrans 16 member agencies:

Forest Lake State School Executive Summary

Transcription:

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Prjects, Gruped by MPO Investment Categry Bicycle/Pedestrian 608006 Framingham Pedestrian Hybrid Beacn Installatin at Rute 9 and Maynard Rad Cmplete Streets 608887 Bellingham Suth Main St. (Rute 126) Duglas Drive t Mechanic St. Recnstructin (Rute 140) 608348 Beverly Rehabilitatin f Bridge St. 608007 Chasset Crridr Imprvements and Related Wrk n Justice Cushing Highway (Rute 3A), frm Beechwd Street t the Scituate Twn Line 602310 Danvers Recnstructin n Cllins St. 607899 Dedham Pedestrian imprvements alng Bussey St. 605168 Hingham Summer St./Rckland St. Radway and Streetscape Imprvements 605743 Ipswich Resurfacing and related wrk n Central and Suth Main Sts. 608275 Malden Lighting and Sidewalk Imprvements n Exchange Street 608045 Milfrd Rehabilitatin n Rute 16 (East Main St.) frm Rute 109 t Beaver St. 601704 Newtn Recnstructin and signal imprvements n Walnut St. 608933 Peabdy Rehabilitatin f Central St. 608707 Quincy Recnstructin f Sea St. 607244 Winthrp Revere St. Radway Imprvements Intersectin Imprvements 608443 Littletn/Ayer Intersectin Imprvements n Rute 2A at Willw Rad and Bruce St. 604231 Marlbrugh Intersectin and signal imprvements n Rute 20 (East Main St./ Bstn Pst Rd.) at Cncrd Rd. 607305 Reading Intersectin Signalizatin at Rute 28 and Hpkins Street 607249 Sudbury Intersectin imprvements at Rute 20 and Landham Rd. 603739 Wrentham Cnstructin f I-495/Rute 1A Ramps Prject descriptins prvided n the fllwing pages Blue fnt indicates prjects scred fr the first time in FFY 2018 1 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Framingham - Pedestrian Hybrid Beacn Installatin at Rute 9 and Maynard Rad (608006) Lcatin: Rute 9 in the vicinity f Maynard Rad and the Framingham Fire Statin MPO Investment Categry: Bicycle/Pedestrian Imprvements Imprve pedestrian safety in the prject area Prject Details: Cnstructin f a pedestrian hybrid beacn and crsswalk n the east side f the Rute 9 and Maynard Rad intersectin. Details include: Crsswalk will be at-grade Crssing will be cntrlled by a High-Intensity Activated crsswalk beacn (HAWK) munted n an 8-ft pst with a 30-ft mast arm with signal cntrl ver the eastbund and westbund travel lanes Upgrade the Rute 9 median. Cnvert this t a cncrete barrier with fencing and narrwing the median pening which allws emergency vehicle access acrss Rute 9 Recnstructin f the existing emergency signal fr the Framingham Fire Statin n Rute 9 and the CSX railrad crssing. The new traffic cntrl cabinet and fundatin will be cnstructed t allw cntinued emergency vehicle pre-emptin Initial MPO Evaluatin Scre: 27 2 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Bellingham Rehabilitatin and Related Wrk n Rute 126 (608887) Lcatin: Suth Main Street (Rute 126) frm Duglas Drive t Rute 140 (1.22 miles) MPO Investment Categry: Cmplete Streets Imprve safety fr all radway users, including students at the Bellingham Middle and High Schl Clse gaps in the sidewalk netwrk Prvide new bicycle accmmdatins Prject Details: Prpsed imprvements will include: Installatin/recnstructin f sidewalks with ADA/AAB cmpliant wheelchair ramps n bth sides f Rute 126 Bx widening t prvide minimum five-ft wide shulders thrughut the crridr fr bicycle accmmdatin. Shulders will be striped as bicycle lanes. New bicycle lane at the Rute 126/Blackstne Street intersectin New crsswalks at each stp-cntrlled minr street intersectin Resurfacing n the majrity f Suth Main Street Initial MPO Evaluatin Scre: 37 3 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Beverly Rehabilitatin f Bridge Street (608078) Lcatin: Bridge Street frm Danvers city line, crssing the Bass River t the intersectin with River Street (1.3 miles) MPO Investment Categry: Cmplete Streets Make the area safer t travel as a pedestrian r bicyclist Reduce cngestin Increase safety fr residents patrns f lcal businesses, and users f the radway Prject Details: Prpsed imprvements include: Widening and/r recnstructing all sidewalks t seven-ft width, textured crsswalks, and five-ft shulders fr bicycles New traffic signal at Kernwd Avenue and River Street Signals at Livingstne Avenue will be upgraded Three intersectins f Bridge Street (Cressy Street, Cunty Way/Bates Park Avenue, and Eastern Avenue) will be realigned t becme T-intersectins, prviding safer crssings fr bicycles and pedestrians Initial MPO Evaluatin Scre: 59 4 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Chasset - Crridr Imprvements n Justice Cushing Highway (Rute 3A), frm Beechwd Street t the Scituate Twn Line (608007) Lcatin: Rute 3A between Beechwd Street and Henry Turner Bailey Rad (0.75 miles) MPO Investment Categry: Cmplete Streets Imprve safety f this sectin f Rute 3A, in the vicinity f a cmmercial area Imprve the safety at the intersectin f Rute 3A and Beechwd Street Add bicycle and pedestrian accmmdatins thrughut the prject area Prject Details: Signalizatin and radway gemetry imprvements at the intersectins at the nrthwest (Rute 3A and Beechwd Street) and sutheast (Rute 3A and Henry Turner Bailey Rad) limits f the prject area. Including: Maintain existing traffic signal at Rute 3A and Beechwd Street New traffic signal at the intersectin f Rute 3A and Henry Turner Bailey Rad. Sme gemetric changes include: Exclusive left turn lanes n Rute 3A at Beechwd Street Shared lanes n Beechwd Street Raised median suth f Beechwd Street t restrict left turn lanes int and ut f the gas statin at this lcatin Exclusive left turn lane at the intersectin f Henry Turner Bailey Rad and Rute 3A Prvisin f a tw-way left turn lane thrugh the cmmercialized area alng Rute 3A Recnstructin f all driveways within the prject limits t include accessible pedestrian signals and ramps as well as the narrwing, cnslidatin, and clear delineatin f access pints alng Rute 3A Prvisin f a 6-ft sidewalk n each side f Rute 3A in the prject area with accessible pedestrian signals and ramps at the intersectins and driveways Prvisin f a bicycle lane alng each directin f Rute 3A with bicycle detectin at the signalized intersectins Initial MPO Evaluatin Scre: 37 5 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Danvers Recnstructin f Cllins Street (602310) Lcatin: Cllins Street frm Sylvan Street t Centre and Hlten Streets (0.92 miles) MPO Investment Categry: Cmplete Streets Make the area safer t travel as a pedestrian r bicyclist Reduce cngestin Increase safety fr residents patrns f lcal businesses, and users f the radway Prject Details: Prpsed imprvements include: Recnfiguring the Cllins Street apprach t Centre Street t create a T-intersectin and adding an exclusive right-turn lane n Centre Street New traffic signal at Cllins Street at Centre Street/Hlten Street Sidewalk and bicycle accmmdatins will be prvided alng the crridr Initial MPO Evaluatin Scre: 46 6 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Dedham Pedestrian Imprvements alng Bussey Street (607899) Lcatin: Bussey Street frm the Bstn city line t suth f Chauncey Street (0.5 miles) MPO Investment Categry: Cmplete Streets Make the area safer t travel as a pedestrian r bicyclist Rehabilitating pavement Prject Details: Prpsed imprvements will include: Unifrm radway width striped fr an 11-ft travel lane and a twft shulder in each directin nrth f Clburn Street and an 11-ft travel lane and a five-ft shulder in each directin suth f Clburn Street Minimum 5-6 paved sidewalk n bth sides f radway Bicycle accmmdatins by means f shared-lane markings r sharrws in the travel lane New ADA-cmpliant wheelchair ramps at intersectin f Bussey Street with Clburn Street and Clnial Drive/Clisby Avenue as well as crsswalks thrughut crridr Initial MPO Evaluatin Scre: 23 7 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Hingham Summer Street/Rckland Street Radway and Streetscape Imprvements (605168) Lcatin: Rute 3A (Summer Street/Rckland Street) frm Cle Rad t Gerge Washingtn Bulevard (1.6 miles). MPO Investment Categry: Cmplete Streets Imprve radway and traffic cntrl peratins Prmte multi-mdal transprtatin Imprve traffic peratins Prvide new n-street bicycle accmmdatins Prject Details: Prpsed radway imprvements include: Rad diet n Summer Street/Rckland Street east f Rute 3A rtary cnsisting f ne travel lane in each directin, prviding shulder widths adequate fr bicycle travel n bth sides f the radway Shared-use path alng the nrth side f the crridr cnnecting Bathing Beach and Gerge Washingtn Bulevard Replacement f existing Rute 3A tw-way rtary with a mdern tw-lane rundabut Extended sidewalk alng the Inner Harbr, cnnecting sidewalk netwrk t Hull Imprved traffic signal peratins Widened Rute 3A westbund apprach t add a shrt left turn lane at Rute 3A & Nrth Street Prhibitin f left turns at Water Street, making Water Street right-in and rightut. Initial MPO Evaluatin Scre: 51 8 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Ipswich Resurfacing and Related Wrk n Central and Suth Main Streets (605743) Lcatin: Central and Suth Main Streets frm the intersectin f Central Street and Mineral Street t the nrth t the intersectin f Suth Main Street and Cunty Rad t the suth thrugh the dwntwn area (0.55 miles) MPO Investment Categry: Cmplete Streets Make the area safer t travel as a pedestrian r bicyclist Increase safety fr residents, patrns f lcal businesses, and users f the radway Prject Details: Prpsed imprvements will include: Recnstructed radway t standardize radway crss-sectin t allw fr imprved traffic flw Mdify traffic islands at Suth Main Street/Pplar Street/Cunty Street fr traffic calming and t imprve traffic flw Imprve facilities fr bicyclists and pedestrians, including creating safer access t the Ipswich Cmmuter Rail Statin Clarify radway layut fr mtrists and minimize cnflicts between mtrists, pedestrians, and cyclists Prvide ADA cmpliant sidewalks and crsswalks Enhance cycling pprtunities and cyclist safety thrugh designated bicycle travel where pssible Initial MPO Evaluatin Scre: 39 9 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Malden - Pavement, Sidewalk Rehabilitatin, and Other Imprvements n Exchange Street (Lighting and Sidewalk Imprvements n Exchange Street) (608275) Lcatin: Exchange Street frm Abbtt Street t Main Street, including the cnnecting side streets f Abbtt Street, Washingtn Street, and Middlesex Street (0.31 miles) MPO Investment Categry: Cmplete Streets Imprve vehicular and pedestrian cnnectins within the dwntwn Enhance the streetscape including pedestrian safety and aesthetic imprvements Prvide dedicated n-street bicycle lane Imprve Exchange Street t accmmdate all users Prject Details: Alng Exchange Street (0.31 miles/0.62 lane miles) in the prject area, as well as alng the cnnecting side streets, the prject wuld make the fllwing imprvements: Pavement recnstructin r rehabilitatin ADA cmpliant sidewalks and pedestrian ramps Sidewalk extensins (curb bump-uts) at intersectins Dedicated pavement markings alng Exchange Street fr a bike lane New street trees ADA cmpliant tree grates LED lighting Benches Bicycle racks Trash receptacles Street signs Repair r replacement f drainage infrastructure, including the adjustment f vertical prfile grades alng the gutter lines t imprve drainage Initial MPO Evaluatin Scre: 57 10 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Milfrd Rehabilitatin n Rute 16 (608045) Lcatin: Rute 16, frm Rute 109 t Beaver Street (1.32 miles) MPO Investment Categry: Cmplete Streets Imprve safety fr all radway users Imprve traffic peratins at study area intersectins Prject Details: Prpsed imprvements will include: Gemetric imprvements t prvide pedestrian and bicycle accmmdatins and enhance vehicle safety Mdificatin f traffic flw at high-crash lcatins, including a rad diet n Rute 16 at the west and east ends f the crridr, prviding a single travel lane in each directin thrughut the crridr Installatin f six-ft designated bike lanes fr the main crridr f Rute 16 fr bth directins. Shared lanes are prpsed fr bth directins f Rute 109, and five-ft shulders are prpsed n Beaver Street and Frtune Bulevard. Rebuilding existing sidewalks and adding sidewalks where nne exist fr the entirety f the prject area. Sidewalks will have ADA-cmpliant ramps with tactile warning panels at all intersectin crssings. Initial MPO Evaluatin Scre: 49 11 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Newtn Recnstructin and Signal Imprvements n Walnut Street (601704) Lcatin: Walnut Street frm Centre Street t just suth f its intersectin with Hmer Street (1.14 miles) and Centre Street frm just east f the Rute 9 Interchange t Walnut Street (0.1 miles) MPO Investment Categry: Cmplete Streets Make the area safer t travel as a pedestrian r bicyclist Imprve traffic flw Increase safety fr residents and users f the radway Prject Details: Prpsed imprvements will include: Radway recnstructin alng the crridr Walnut and Beacn Streets eliminatin f channelized right-turn lanes will make navigatin f intersectin with fewer cnflicts, mre direct pedestrian crssings, signal upgrades Walnut and Lincln Streets and Walnut and Centre Streets new accessible ramps and shrter intersectin crssings, signal upgrades and crdinatin Initial MPO Evaluatin Scre: 43 12 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Peabdy Rehabilitatin f Central Street (608933) Lcatin: Central Street frm Wilsn Square (including the intersectins f Gardner Street and Pulaski/Andver/Endictt) t Railrad Avenue (0.7 miles). MPO Investment Categry: Cmplete Streets Imprve radway and traffic cntrl peratins Imprve pedestrian safety and ADA accessibility Prvide new n-street bicycle accmmdatins Prject Details: Prpsed radway imprvements include: Full depth recnstructin f radway Alteratin f crss-sectins t prvide a cnsistent width thrughut crridr Streetscape imprvements, where pssible Prpsed bicycle/pedestrian imprvements include: ADA cmpliant ramps Textured crsswalks On-street bicycle accmmdatins Mdernizatin f traffic signal equipment Cnstructin f curb with cnsistent reveal Relcatin f mid-blck crsswalks Prpsed intersectin and signal imprvements include: Additin f signals at Central Street at Tremnt Street with the purpse f cnnecting t the existing signals at Warren Street Prvisin f a Rectangular Rapid Flashing Beacn at the existing utdated pedestrian crsswalk n the nrthern sectin f Central Street. Crdinatin f the Wilsn Square signals with the signals at Pulaski Street at Gardner t imprve peratins and mitigate sme f the existing delays and queues. Initial MPO Evaluatin Scre: 58 13 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Quincy Recnstructin f Sea Street (608707) Lcatin: Sea Street frm eastern limit f Sea Street/Quincy Shre Drive Intersectin Imprvements Prject t a pint east f the intersectin f Sea Street and Palmer Street (0.92 miles) MPO Investment Categry: Cmplete Streets Imprve traffic peratins Imprve vehicular, pedestrian, and cyclist safety Prvide new bicycle accmmdatins Prject Details: Prpsed imprvements will include: Realignment f Narragansett Rad t create directin intersectin with Sea Street Installatin f fully actuated traffic signal at the Sea Street/Narragansett Rad/Murphy Memrial Drive intersectin Replacement f existing traffic signals where needed Tw 11-ft lanes and a 5-ft shulder t accmmdate bicycles alng Sea Street in bth directins Recnstructed existing sidewalks and added sidewalks where needed, including ADA-cmpliant wheelchair ramps and detectable warning panels Crsswalks acrss all intersecting side streets Rehabilitated pavement and full depth bx widening in varius lcatins Raised median r scred cncrete median fr the majrity f the prject crridr Initial MPO Evaluatin Scre: 31 14 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Winthrp Revere St. Radway Imprvements (607244) Lcatin: Revere Street, frm Main Street t Crest Avenue (0.6 miles) MPO Investment Categry: Cmplete Streets Recnstructing pavement Recnstructing existing sidewalks Imprving safety fr all radway users Prject Details: Prpsed imprvements will include: Pavement recnstructin thrughut the prject area Lane and shulder widths designed t meet MassDOT minimum requirements, which will imprve safety fr vehicles and bicyclists while maintaining existing n-street parking Updated signage and pavement markings, including pedestrian signage and delineatin f bicycle travel ways where feasible Imprved traffic signal perfrmance and alternatins t gemetry at the intersectin f Magee s Crner and Revere Street at Crest Avenue and Highland Avenue Recnstructed sidewalks with ADA-cmpliant wheelchair ramps n bth sides Streetscape enhancements Initial MPO Evaluatin Scre: 46 15 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Littletn-Ayer Intersectin Imprvements n Rute 2A at Willw Rad and Bruce Street (608443) Lcatin: Intersectin f Rute 2A and Willw Rad/Bruce Street MPO Investment Categry: Intersectin Imprvements Imprve traffic peratins Imprve vehicular, pedestrian, and cyclist safety Prvide new pedestrian and cyclist accmmdatins Prject Details: Prpsed imprvements will include: Creatin f tw intersectins. Willw Rad will be aligned with the eastern gas statin driveway t frm a fur-legged signalized intersectin; Bruce Street will be aligned t intersectin Rute 2A/110 at a secnd, unsignalized T-intersectin. Radway widening n Rute 2A/110 t accmmdate left-turn lanes (in bth directins) at Willw Rad and Bruce Street. Widening will als prvide an exclusive right-turn lane fr vehicles turning nt Willw Rad. Radway widening n Willw Rad t prvide tw apprach lanes, separating left-turning traffic frm right-turning traffic Additin f 5 wide shulder, striped t accmmdate bicyclists, n bth sides f Rute 2A/110 Additin f 5 wide, ADA-cmpliant sidewalks n bth sides f Rute 2A/110 Additin f crsswalks acrss all legs f the intersectin Initial MPO Evaluatin Scre: 36 16 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Marlbrugh Intersectin and Signal Imprvements n Rute 20 (East Main Street/Bstn Pst Rad at Cncrd Rad (604231) Lcatin: Rute 20 (East Main Street/Bstn Pst Rad at Cncrd Rad MPO Investment Categry: Intersectin Imprvement Make the area safer t travel as a pedestrian r bicyclist Reduce cngestin Increase safety fr residents and users f the radway Prject Details: Prpsed imprvements will include: Widen East Main Street t accmmdate tw travel lanes in each directin and ne dedicated left turn lane Reduce radius between Cncrd Rad and East Main Street westbund t slw turning traffic Cnstruct scred median n eastbund apprach t discurage left turn n t Ck Lane Install a fully actuated signal and prvide crdinatin with tw intersectins in prximity t study area Install pedestrian crsswalk n Rute 20 eastbund apprach Prvide bicycle detectin n all appraches Initial MPO Evaluatin Scre: 34 17 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Reading (MassDOT) - Intersectin Signalizatin at Rute 28 and Hpkins Street (607305) Lcatin: Intersectin f Rute 28 and Hpkins Street, nrth f the Rute 128/Rute 28 interchange. MPO Investment Categry: Intersectin Imprvements Imprve vehicular and pedestrian safety Imprve intersectin traffic peratins Rehabilitate existing sidewalks and radways Prvide greater pedestrian mbility with imprved sidewalks and AAB/ADA cmpliant wheelchair ramps Prject Details: Installatin f a fully-actuated traffic signal system which wuld include: Advance phase fr nrthbund apprach and prtected permitted peratin fr left-turn vehicles Prtected, push-buttn actuated pedestrian crssing phase Emergency vehicle preemptin fr all appraches Crdinated peratin with existing traffic signals at the tw adjacent intersectins (Main Street/Suth Street t the suth) and Main Street/Summer Street t the nrth) Gemetric imprvements which wuld include: Minr widening n Rute 28 t prvide minimum lane widths in bth directins Recnstructin f sidewalks n bth sides f Rute 28 Replacement f existing granite curb Cnstructin f new ADA/AAB cmpliant wheelchair ramps at all fur crners f the intersectin Recnfiguratin f the island n the eastbund Hpkins Street apprach t facilitate left turns New pavement markings including stp lines and crsswalks fr all fur radway appraches; new signage assciated with the prpsed imprvements; and, replacement f existing signage Initial MPO Evaluatin Scre: 38 18 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Sudbury Intersectin Imprvements at Rute 20 and Landham Rad (607249) Lcatin: Intersectin f Rute 20 (Bstn Pst Rad) and Landham Rad MPO Investment Categry: Intersectin Imprvement Make the area safer t travel as a pedestrian r bicyclist Reduce cngestin Increase safety fr residents patrns f lcal businesses, and users f the radway Prject Details: Prpsed imprvements will include: Three lane crsssectin n Rute 20 will be cnstructed and the existing channelized right turn island will be remved Easterly apprach n Rute 20 will include a dedicated left turn lane and thrugh lane, westerly apprach will cnsist f a frmalized right turn lane and thrugh lane The nrthbund apprach will cnsist f dedicated left and right turn lanes New traffic signal at Rute 20 and Landham Rad Sidewalk and wheelchair ramps will be installed Dedicated bicycle lanes will be included alng the three appraches t the intersectin Initial MPO Evaluatin Scre: 36 19 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Wrentham Cnstructin f I-495/Rute 1A Ramps (603739) Lcatin: Exit 15 f I-495 and the street system in the immediate vicinity f Exit 15 t Premium Outlets Bulevard (0.59 miles) MPO Investment Categry: Intersectin Imprvements Cnstructin f new Rute 1A nrthbund n-ramp nt I-495 suthbund Imprve traffic peratins and reduce cngestin Imprve vehicular safety Imprve bicycle and pedestrian safety Prject Details: Prpsed imprvements t the I-495/1A intersectin will include: Cnstructin f a taper-type n-ramp beginning n the eastern side f the Rute 1A and entering I-495 apprximately 1,500 feet east f the existing I-495 suthbund n-ramp Clse existing I-495 SB n-ramp and lp t I-495 SB and relcate ramp t Rute 1A NB Remval f the existing nrthbund left-turn lane and the entrance ramp fr Rute 1A nrthbund left turns at the intersectin at Rute 1A at I-495 suthbund ramps. Existing traffic signal will be mdified t eliminate the nrthbund left-turn phase. Additin f a left-turn lane t the existing ff-ramp frm I-495 SB t 1A NB Signal retiming and crdinatin adjustments at the fllwing Rute 1A intersectins: I-495 nrthbund ramps; Premium Outlet Bulevard/Mbil Driveway; and Wrentham Crssing. Bicycle actuatin at the intersectin f Rute 1A at the I-495 nrthbund ramps. Prpsed bicycle and pedestrian imprvements will include New 5 ft bike lanes New 5.5 ft sidewalks Prpsed imprvements at the Outlet shp intersectin will include Imprved access within the Outlet shps entrance in the frm f an additinal travel lane n the Outlet Blvd. WB which is a MassDOT Tp 200 crash lcatin at 1A 20 Bstn Regin MPO Staff

FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Imprved access t the Outlet shps in the frm f lane recnfiguratins which allw fr prvisin f a cntinuus dedicated right-turn lane frm I-495 SB, merging with 1A SB and extending t the Outlets entrance Initial MPO Evaluatin Scre: 55 21 Bstn Regin MPO Staff