QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Similar documents
Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Assembly Instructions. -Cantilever Boat Lifts

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Page 1. Single Scull Car Rack Assembly and User s Manual " "

3K SINGLE TRACK OWNERS MANUAL

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Troyer s Gourd Rack 8 unit F R H O P

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Bike Rack and Tire Carrier

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Backboard and Rim Owners Manual

WEIGHT STACK ATTACHMENT. Assembly Manual (888) FOR YOUR SAFETY READ ALL INSTRUCTIONS CAREFULLY

VISIT THE LIFETIME WEB SITE: **U.S. and Canada customers ONLY** IF ASSISTANCE IS NEEDED, COPY

LITERIDER 2&3 IMPORTANT WARNING. 2Bike (1x) Bolt (1x) Nut (1x) Small Hex Wrench (1x)

VERSA BIKE RACK INSTRUCTIONS

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

VL SHEAVES/CABLE UPGRADE KIT INSTRUCTIONS

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

Assembly Guide ST200 FUNCTIONAL TRAINER

To address this issue, Ariens Company has developed two cradle plates kits:

Peinert ZEPHYR. Assembly. The Zephyr is easily rigged; there are only three removable parts - the seat, the foot stretcher, and the rigger arm.


Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

PRO1030 Bi-Directional Assembly Replacement

InstallatIon and owner s InstrUCtIons

ASSEMBLY MANUAL HOBIE CATSY

TRAILMATE METEOR ASSEMBLY MANUAL

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

REPLACING THE AFT RUDDER CABLES

OPERATION and MAINTENANCE Guide

CAUTION - PUT SAFETY FIRST

Bike Rack and Spare Tire Carrier 1-1/4" Receiver

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

RUDDER KIT INSTRUCTIONS

3000 WAVEX SERIES ASSEMBLY AND MAINTENANCE MANUAL

Vertical Lift: Frame Assembly Instructions. Model: ft Wide 7000lb Capacity - Part #:

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Boat Boat Loader Fitting Instructions

RUDDER KIT INSTRUCTIONS

Notes for preparing MRC boats for transport to/from Regattas

Installation and Training Manual

Peinert Dolphin. Assembly

Tripod Setup Guide (M-TPx)

OPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions

BICYCLE TO MOTORCYCLE BICYCLE RACK

THOR 10 HAMMER CAGE INSTRUCTIONS

Vanguard Sailboats 300 Highpoint Avenue Portsmouth, RI For the dealer nearest you call SAIL

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

This document to be used with Hurley traditional Davits

OWNER'S MANUAL LOCK-N-LOAD BULLET FEEDER (PISTOL)

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

LIFT 1200 SERIES ASSEMBLY AND MAINTENANCE MANUAL

Rhino-Rack 570, 580. Important Information

Dinghy Racers Parts List

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

Soma Wind Generators

For ANCHOR WINCH Model: T Big Water 45 T sw Salt Water Series Big Water 45

Rudder Kit Assembly Instructions for Quest 13

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH.

USER MANUAL Do not throw away these instructions. Read and understand these instructions prior to use of the Lad Grab Safety System.

A-FRAME RESIN IN & OUT FLIP UP LADDER

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

Gurney Flap for WRX and STI w/low Profile Trunk Spoiler

STERN MOTOR FOOT CONTROL KIT For use with the Torqeedo 403 Ultralight

INSTALLING YOUR CLC RUDDER

INSTALLATION INSTRUCTIONS FOR ROLLOVER PROTECTION SYSTEM (ROPS)

Wildcat LB Winch Kit. Operator s Manual Installation Instructions Replacement Parts List. With Wireless Control System.

E-trike Li Assembly Guide

CANTILEVER BOAT LIFT INSTRUCTIONS

DM-FD (English) Dealer's Manual. Front derailleur FD-M9000 FD-M9020 FD-M9025 FD-M8000 FD-M8020 FD-M8025 FD-M612 FD-M617 FD-M618 FD-M672

Thank you for purchasing a WIKE BOX BIKE!

Before you start! Is iwalk 2.0 right for you?

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M)

E Manual Self tacking system 30

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

OPERATIONS/PARTS MANUAL FOR PATTERSON'S MODEL # WWP40M-LPS-6 LOW-PROFILE BARGE CONNECTOR WINCH

MSA Confined Space Entry Equipment

Hose Reel Instruction Manual

BEAMGUARD SAFETY POST TM INSTRUCTIONS

INSTALLATION INSTRUCTIONS

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

INSTALLATION AND OWNER S INSTRUCTIONS

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

Rhino-Rack 571, 581. Important Information

PHOENIX, ARIZONA USA

PRO-III & IV (916) (800) Parts: 80000, 80020, & G Trade Center Drive Rancho Cordova, CA 95742

Instruction Manual for ZY-021 Height adjustable Acrylic Backboard with Chain net

SEADUCER BOATS GAS SPORT HYDRO

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M)

Nautique Triton Clamping Board Rack V2

Assembly Instructions And User Guide

C - SERIES. Height Adjustable Portable Goal Supports. Installation & Owner s Instructions C1000 C2000. Made in the USA

Transcription:

INSTRUCTIONS Dominator Lake Lift PHONE:251-986-3882 * FAX:251-986-3136 QABLDOMINATORINST.2014

P a g e 1 Quality Aluminum Boat Lifts, INC. Installation Instructions: Dominator Lake Lift Thank you for your recent Boat Lift purchase, the installation of this lift is easier than others because of its lightweight aluminum design and simple operation. In the pages that follow we will take you step-by-step through the entire installation sequence, including the lifting of the boat. We encourage you to read this manual entirely before attempting the installation. Failure to do so could result in serious injury or death. STEP ONE (1): SETTING OF LIFTS LEG(s) ASSEMBLY 1. Stand all FOUR (4) legs in the shape of a square. 2. Attach the K bracket to TWO (2) legs with drilled holes facing towards each other.(figure 1 & 2)

P a g e 2 3. Attach the straight leg brace to side of the legs in the third hold up from the bottom. (FIGURE 3 & 4) 4. Attach the rack brace. (FIGURE 5 & 6)

P a g e 3 5. Carry the leg assembly to final location of install. This will allow the unit to be placed for leg adjustment and to check to assure that its level. 6. Place the top carrier units. The top carrier units will be placed in the same directions as the straight leg brace. (FIGURE 7 & 8)

P a g e 4 STEP TWO (2): ATTACHING ALUMINUM CRADLE BEAMS 1. Locate the four (4) stainless steel cables pre-cut with swage and thimbles on one (1) end each of them that are located in the rigging kit. 2. Insert the taped end of the cable and thread through the return hole on top of the top carrier beam. 3. Pull cable through until the swage makes contact with carrier beam. Allow the cable to hang straight down into the water. 4. Bolt the thimble end of the cable using 1 ½ x ½ bolt, 1/2 flat washer, 5/8 flat washer, and lock nut. 5. Place lifter beams into position onto ladder scaffold at 90 angle to the carrier beams.

P a g e 5 6. Pull cable through lifter beam, starting on inside and returning to the outside the cable travel. (FIGURE 9). FIGURE 9 7. Thread the taped end of cable up between carrier beams and cable winder. Push taped end of cable through hole in the cable winder until cable comes out of pipe. 8. Clamp ends of cable with four (4) cable clamps provided in kit. The cable winder sleeve bolt closest to the end of the cable winder must be removed temporarily for cable clamp clearance. NOTE: 1. The total length of the cable should allow for three full wraps of cable on the cable winder before carrier beam is carrying any load. 2. In order to assure good drainage from boat deck during storage of boat on lift. Clamp the bow cables 4 shorter than the stern cables. This will give you 2 of pitch for deck drainage. 3. After tightening clamps on cable you must now pull able clamp back through pipe until you hear or feel clamp pull tightly against inside of pipe. At this point, you can push loose ends back into cable winder.

P a g e 6 NOTE: TOP MOUNT LIFTS DO NO USE ½ Spacer; Cables are a straight drop off of the cable winder. Clamp bow cables 2 Shorter than the stern cables for deck drainage. STEP THREE (3): WINCH INSTALLATION 1. Slide the P.V.C adapter sleeve onto the drive shaft, place winch plate on shaft. 2. Fasten the winch to drive shaft with ½ x 3 ½ bolt and locknut included with the winch plate. 3. Fasten the winch plate to the top carrier beams using the ½ x 1 ½ bolts, spacer P.V.C., and hardware. (FIGURE 10) FIGURE 10

P a g e 7 4. Attach the motor to the winch plate using the hardware included with the winch for the two (2) top mounting holes. 5. The two (2) lower mounting holes use 5/16 x 1 ½ bolt, two (2) flat washers, one (1) lock washer and one (1) ½ nut. (FIGURE 10) 6. Install gear cover mounting plate together with two (2) flat washers and one (1) wing nut. 7. Install pulleys and v-belt; tension belt to obtain ¼ free play. 8. Tighten motor bolts. STEP FOUR (4): ATTACHMENT OF WOOD BUNKS TO CRADLE BEAMS 1. With wiring complete, start winding cables on cable winder (FIGURE 9). NOTE: It is important to keep tension on lifter cable until weight of cradle beam keeps tension on cable for you. Allowing the beam to be placed in the water will tension the cables if the water is deep enough doing this will allow the cables to wind neat and tight. 2. Continue to wind the cables until cradle beams are at desired height for attaching bunk brackets and bunks. 3. Attach the aluminum angle brackets eight (8) four [4 sets], to the cradle beam with two (2) long stainless steel bolts. One (1) bolt sits on top of cradle beam, the other bolt rides under the cradle beam. (FIGURE 11) FIGURE 11

P a g e 8 NOTE: Confirm cradle beams are hanging freely and cable windings on cable winder are neat, tight to each other on the cable winder itself. Confirm beams are hanging freely, measure outside distance of cradle beams flanges (FIGURE 11) and transfer to inside bunk allowing for equal overhang past the beams. Confirm that the cradle beams do not shift when doing this operation. With bunk brackets attached to the cradle beams, lay bunk in position with mark at edge of beam flange. Drill four (4) 3/8 holes and install bunk bolts. Repeat this procedure for opposite end of bunk. 4. Attach wood bunks to the bunk brackets using proper length nuts, bolts and lock washers supplied. (FIGURE 11) 5. Guide post brackets; Slide galvanized weight pipes inside the guide post bracket. The 2 white P.V.C. Pipes slide over outside of guide post bracket and weight pipe. 6. Attach cobers to lift by fitting the cover over mounting pins and tightening the wing nuts. Lubricate drive plate and motor housings with a rust preventative lubricating such as corrosion block. FITTING BOAT TO LIFT: 1. Bunk Adjustment: loosen the eight (8) bunk brackets (FIGURE 12). Mark center line port to starboard on both cradle beams. The bunk spread varies; for boats up to 9,000lbs. (26 to 28 range). Spread bunks 32 apart; 16 from center lines on cradle beams. 2. Adjust guide post brackets (FIGURE 12) to beam of boat and tighten. Use same centerline on cradle beam as before. 3. Place boat into position for lifting. Guide poles will keep boat centered over bunks. Very seldom is there more than three (3) feet of boat hanging beyond the stern lift pilings. You need to get the center boat balance as close as possible to center of lift (Bow to Stern). This will evenly distribute the load over the two (2) cradle beams. The Bow and Stern Cable Tension will be equal with a balanced load. 4. Lifting of the Boat Adjustment: Start lifting the boat, if the boat starts listing as you pick it up you will have to readjust the pickup bunks and lift the boat again. If the boat does not list, lift boat do a visual inspection of Hull and Bunk contact. The following are necessary for proper

P a g e 9 FIGURE 12 HELPFUL NOTES: 1. We suggest too place a reference mark on a Guide Pole to indicate that the Lift Cradle is deep enough for the Boat Hull to clear the Cradle. This will assure clearance entering and leaving the Cradle as the tide changes. 2. Shallow Water Installations; Reference mark should be placed on a cable to indicate that the cradle has contacted bottom. Turning the lift off at this point will prevent the cable winds from being tangled. 3. Caution: Boat Lifts Are Not Made For Lifting Humans. 4. Place A Rubber Mat Between Top of Piling And Aluminum To Prevent Electrolysis. 5. Installer is responsible for determining if piling are square and adequate to carry the lift and the lifts payload.

P a g e 10 6. Warning: Any modification to lift voids Warranty of Quality Aluminum Boat Lifts, INC. Any questions regarding the installation of your lift our technical experts are happy to assist you @ our email: Attention: Technical Support. To quicken the process please add the pictures of the part or lift area you have questions about send to our staff also. Thank you, Quality Aluminum Boat Lifts, INC