EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Similar documents
SACOG 2016 MTP/SCS Project List (MTP/SCS Appendix A) Excerpt (El Dorado County) A B C D E F G H I

TECHNICAL MEMORANDUM

El Dorado County / Tahoe Roadwork Schedule

2014 Capital Improvement Program Current Year Projects for:

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

3.0 PROJECT DESCRIPTION

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Bluffdale/ UDOT South High-T Intersection Project Type Operations

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

APPENDIX D COST SUMMARY TABLES

4.1 Evaluation Criteria

1 of :59 AM

San Tomas Expressway

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

State Route 160 (Blue Diamond Highway)

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX L: COST ESTIMATING TOOLS

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

COMMITTEE RECOMMENDATIONS. That Council approve:

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Multi-Modal Traffic Analysis. Parisi and Associates

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

TRASBURG RANSPORTATION

Foothill Expressway Improvements Between El Monte and San Antonio

INDEX. Geometric Design Guide for Canadian Roads INDEX

US Route 30 Master Plan Optimal Corridor Conceptual Plan

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

1. Provide a dedicated westbound approach bus lane at the intersection;

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

County of Fairfax, Virginia. Department of Transportation

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

Project Description Form 8EE

CITY OF LANCASTER PROPOSED NEW PROJECTS

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Route 29 Solutions Projects

Design Criteria. Design Criteria

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Public Meeting #1 Comment Summary

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

4.0 Recommended Transportation Plan

4.12 TRANSPORTATION Executive Summary. Setting

Transportation Committee Project Priority List

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Bay to Bay Boulevard Complete Streets Project

INTERSTATE 540 IMPROVEMENT STUDY

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Mandan Commission Meeting August 2, 2016 Mandan City Hall

FDOT Treasure Coast Traffic Report

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

2012 PRIORITY TRANSPORTATION PROJECTS

PRESS RELEASE San Joaquin Council of Governments

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

4.0 Recommended Transportation Plan

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Regional Goals. Goal 1: Reduce congestion and impact of incidents on I-81 and I-64.

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

FY 2005 TRANSPORTATION CAPITAL PROGRAM

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

7.0 Preferred Alternative with Service Road Concept

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Chapter 4 Traffic Analysis

Clay Street Realignment Project Traffic Study

Station 1: Street & Sidewalk Upgrades

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

Access Routes from US 101 to the Richmond San Rafael Bridge

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Project Fact Sheet. August 1,

Santa Clara I-280 CORRIDOR STUDY

FY 2006 TRANSPORTATION CAPITAL PROGRAM

2040 Long Range Plan Projects Draft October 2011

Harrah s Station Square Casino

General References Definitions. (1) Design Guidance. (2) Supporting Information

Welcome to the Quebec Alternatives Analysis Public Meeting

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

DUNBOW ROAD FUNCTIONAL PLANNING

Circulation and Mobility

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Queensgate Drive Corridor Traffic Study

CITY OF SPOKANE VALLEY Request for Council Action

Terwillegar Drive Expressway Draft Concept Plan

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

Diamond Springs Parkway Project

Transcription:

Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south of EDH Business Park, to US 50 US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $5.3 100% US 50 to Widen 2 lane roadway to a 4 lane divided roadway. Improvements include $15.4 100% Hollow Oak Rd to Bass Lake Hills Specific Plan north boundary 2 Lanes with 8 foot unimproved median and 4 foot paved shoulders. $5.3 100% Bass Lake Hills Specific Plan north boundary to 2 Lanes with 8 foot unimproved median and 4 foot paved shoulders. $2.1 100% Cameron Park Dr Durock Rd to Coach Ln Widen 3 lane divided roadway to a modified 4 lane divided roadway. Improvements include curb, gutter, and sidewalk. $7.4 100% Cameron Park Dr Palmer Dr to Oxford Rd Widen 2 lane roadway to a 4 lane divided roadway. Project does not include $12.5 100% West Bass Lake Hills Specific Plan Boundary to Silver Dove Rd 2 lanes with 6-foot paved shoulders. Includes construction of new intersection at. $5.7 100% Silver Dove Rd to 2 lanes with 6-foot paved shoulders. Includes construction of new intersection at. $1.2 100% to east Bass Lake Hills Specific Plan Boundary Realign existing - 2 lanes with 6-foot paved shoulders. $5.4 100% / Cameron Park Dr Left turn lane for eastbound traffic on and right turn for southbound Cameron Park Dr and signal modification. $2.5 100% Diamond Springs Pkwy Missouri Flat Rd to SR 49 and SR 49 to Pleasant Valley Rd New 4 lane road. No curb, gutter or sidewalk. $29.0 100% Durock Rd Robin Ln to South Shingle Rd Widen to add two-way left turn lane. No curb, gutter or sidewalk. $7.5 100% Durock Rd Business Dr / Durock Rd Signalization and intersection improvements / turn lanes on Durock Rd. $2.1 100% El Dorado Hills Blvd Park Dr to Serrano Pkwy / Lassen Ln Add 3rd southbound lane. Improvements include $1.1 100% El Dorado Hills Blvd Wilson Blvd / El Dorado Hills Blvd Signalization and intersection improvements. $0.5 100% El Dorado Hills Blvd Olson Ln / El Dorado Hills Blvd Signalization and intersection improvements. $0.6 100% T:\2010 Fee Program and Prev Years\2011 Fee Cost Update\Exhibit B 1-5-12 v25.xls 1 of 5 08-1466.9B.1

Fee Program Project List - 2004 General Plan Cost Estimate 2004 El Dorado Hills Blvd Francisco Dr / El Dorado Hills Realign El Dorado Hills Blvd and Francisco Dr intersection & extend 4 lanes on Francisco Dr to. Add $9.5 100% Forni Rd City Limits to City Limits Preliminary planning, engineering and environmental analysis for future widening to a standard 2 lane road. North side of from Francisco Dr to 780 feet easterly North half of ultimate 4 lane road section with curb, gutter, sidewalk and median. Salmon Falls Rd to Deer Valley Rd (West) Widen 2 lane roadway to a 4 lane undivided roadway. Project does not include $12.6 100% County Line to Francisco Dr Complete four lane widening from west of Sophia Pkwy to Francisco Dr. $9.3 100% Francisco Dr to Salmon Falls Rd Widen 2 lane roadway to a 4 lane undivided roadway. Improvements include $1.9 100% Cambridge Rd / Signalization and intersection improvements. $0.6 100% Deer Valley Rd (East) to Lotus Rd Upgrade to wider lanes and wider paved shoulders. Add 6 turn pockets. $4.8 100% Headington Rd Extension Missouri Flat Rd to El Dorado Rd New 2 lane arterial with median. Does not include $10.3 100% Investment Blvd to Golden Foothill Pkwy (South) Widen to 4 lane divided roadway. Add $3.5 100% Golden Foothill Pkwy (South) to Suncast Ln Widen to 4 lane divided roadway and signalization at and Golden Foothill Pkwy. $11.6 100% Carson Creek (Suncast Ln) to White Rock Rd Widen from 4 to 6 lane divided roadway with four-foot shoulders. $9.0 100% / White Rock Rd Included in White Rock Rd, Manchester Dr to, and, White Rock Rd to US 50. White Rock Rd to Towncenter Blvd 1 lane northbound, included in White Rock Rd, Manchester Dr to, and, White Rock Rd to US50. White Rock Rd to US 50 Widening and restriping to 6 lane roadway; includes intersection improvements at White Rock Rd. $3.5 100% / White Rock Rd Connector to White Rock / US 50 New road connecting to White Rock Rd - possibly to US 50. The connection to is in the vicinity of the south half of El Dorado Hills Business Park. $19.4 100% Missouri Flat Rd Golden Center Dr Signalization at the intersection of Missouri Flat Rd and Golden Center Dr. $0.4 100% T:\2010 Fee Program and Prev Years\2011 Fee Cost Update\Exhibit B 1-5-12 v25.xls 2 of 5 08-1466.9B.2

Fee Program Project List - 2004 General Plan Cost Estimate 2004 Missouri Flat Rd El Dorado Rd to Headington Rd Add two-way left turn lane. No curb, gutter or sidewalk. $1.2 100% Missouri Flat Rd Golden Center Dr to China Garden Rd Widen from 2-lane undivided roadway to a 4-lane divided roadway. Included in Diamond Springs Pkwy. Mother Lode Dr South Shingle Rd to French Creek Rd Add left turn pockets/two-way left turn lane and some shoulder work. No curb, gutter or sidewalk. $2.3 100% Mother Lode Dr Greenstone Rd to Pleasant Valley Rd Add two-way left turn lane. No curb, gutter or sidewalk. $3.9 100% Mother Lode Dr El Dorado Rd and Mother Lode Dr intersection Signalization and intersection improvements. $0.6 100% Pleasant Valley Rd El Dorado Rd to SR 49 (in El Dorado) Add two-way left turn lane for 0.25 miles on west end and widen shoulders. No curb, gutter or sidewalk. $1.1 100% Pleasant Valley Rd SR 49 (in Diamond Springs) to Big Cut Rd Add 3 left turn pockets, 0.5 miles of two-way left turn lane and widen shoulders along route segment. No curb, gutter or sidewalk. $5.0 100% Pleasant Valley Rd Big Cut Rd to Cedar Ravine Rd Add 7 left turn pockets. $2.3 100% Ponderosa Rd North Shingle Rd to Meder Rd Add 4 left turn pockets and 0.3 miles of two-way left turn lane and shoulders. $2.8 100% Ray Lawyer Dr Extension Forni Rd to SR 49 Preliminary planning, engineering and environmental analysis for future construction of a new 2 lane road. Runnymeade Dr Runnymeade Dr at El Dorado Rd Realign approximately 1,000 feet of Runnymeade Drive to move the road intersection to the south. $1.9 100% Saratoga Wy County Line to El Dorado Hills Blvd Extend existing Saratoga Way to connect to Iron Point Road and widen to 4 lanes with curb, guttter and sidewalk. $16.1 100% Silva Valley Pkwy Silva Valley Pkwy / Serrano Pkwy Signalization and intersection improvements. Silva Valley Pkwy Silva Valley Pkwy / Harvard Wy Signalization and intersection improvements. $0.2 100% Silva Valley Pkwy US 50 to Serrano Pkwy Widen 2 lane to 4 lane divided roadway. Add $1.3 100% Existing to South end of Silver Springs Subdivision Two lane standard divided with shoulders. $5.2 100% South end of Silver Springs Subdivision to Two lane standard divided with shoulders. $5.8 100% T:\2010 Fee Program and Prev Years\2011 Fee Cost Update\Exhibit B 1-5-12 v25.xls 3 of 5 08-1466.9B.3

Fee Program Project List - 2004 General Plan Cost Estimate 2004 / intersection Signalization and intersection improvements (Included in, South end of Silver Springs Subdivision to ). Sophia Pkwy Alexandra Dr to Construct 4 lane divided roadway. $3.2 100% State Route 49 SR 193 (in Cool) to County Line (north) Add 2 passing lanes/climbing lanes. $3.5 100% State Route 49 Pleasant Valley Rd (in El Dorado) to Missouri Flat Rd Add two-way left turn lane/shoulders. $7.9 100% State Route 49 at Missouri Flat of SR 49 and Missouri Flat Rd frontage improvements. $0.2 100% Rd US Highway 50 Through Camino Preliminary planning, engineering and environmental analysis for conversion of expressway to freeway and future construction of a new interchange. $2.0 100% US Highway 50 HOV Lanes County Line to Cameron Park Dr Add 1 westbound HOV and 1 eastbound HOV lane. $44.4 100% US Highway 50 Auxiliary Lanes Empire Ranch to Silva Valley westbound Add auxiliary lane between major interchanges. $5.0 100% White Rock Rd Latrobe to US 50 Upgrade White Rock Road to a two lane - County standard roadway with no median. $2.4 100% White Rock Rd to US 50 (SVP I/C) Widen 2 lane to 6 lane divided roadway. Includes curb, gutter, and sidewalk. $28.6 100% White Rock Rd County line to Manchester Dr Widen 2 to 4 lanes divided roadway. $8.6 100% White Rock Rd Manchester Dr to Realign and widen 2 lane to 4 lane divided roadway and intersection improvements. $7.0 100% T:\2010 Fee Program and Prev Years\2011 Fee Cost Update\Exhibit B 1-5-12 v25.xls 4 of 5 08-1466.9B.4

Fee Program Project List - 2004 General Plan Cost Estimate 2004 Interchange Projects: Interchange with US 50 Cambridge Rd Interchange with US 50 Cameron Park Dr Interchange with US 50 Modify existing interchange by widening off-ramps to provide turn lanes, widen on-ramps for ramp metering and HOV bypass lanes, install traffic signals, add eastbound aux lane Bass Lake to Cambridge and lengthen bridges. Modify existing interchange by installing traffic signals, construct w/b slip onramp, widen off-ramps to provide turn lanes, widen on-ramps for ramp metering and HOV bypass lane, add westbound aux lane Bass Lake to Cambridge and widen bridge. Modify existing interchange by widening off-ramps for turn lanes, widen onramps for ramp metering and HOV bypass lanes, add eastbount aux lanes Cambridge to Ponderosa and lengthen bridges. $36.0 25% 25% 50% $21.2 50% 50% $59.5 50% 50% El Dorado Hills Blvd Interchange with US 50 El Dorado Hills Blvd Interchange with US 50 El Dorado Rd Interchange with US 50 Phase 1.2B - Enhancements to existing ramps. Lengthen bridge (This work and cost thereof have been incorporated in "El Dorado Hills Blvd. Interchange with US 50", "Phase 2 Ultimate"). Phase 1.3 and Phase 2 Ultimate. Add new westbound ramps, widen and extend eastbound ramps, widen to 6 lanes and add turn lanes. Includes pedestrian overcrossing. Modify existing interchange to ultimate improvements: add traffic signals to the ramps, widen ramps for turn lanes, and widen bridge. $28.7 100% $8.7 50% 50% Missouri Flat Rd Interchange with US 50 Modify existing interchange to tight diamond configuration (Phase 1A and 1B). $72.7 50% 50% Ponderosa Rd Interchange with US 50 Silva Valley Pkwy Interchange with US 50 Other Projects Modify existing interchange by widening ramps and priority turn lanes, relocate N Shingle Rd and Durock Rd and widen bridge. Construct new interchange with overcrossing and ramps. Add aux lanes eastbound El Dorado Hills to existing truck climbing lane and west bound El Dorado Hills to Silva Valley. $28.5 50% 50% $70.5 100% Bridge Replacement and Rehabilitation $8.1 100.00% Fee Program Development and Updates Various Locations Includes annual update and five year major review. $8.4 37.06% 40.29% 22.65% Traffic Signals, operational and safety Improvements Example Projects: Construct new or upgrade existing Traffic Signals, seed funding Intellegent Transportation Systems (ITS) projects, local match funding for safety improvements proportional to new development's impacts. $89.3 66.67% 33.33% Transit Service Improvements Example Projects: New bus fleet expansion and park and ride lots. $10.5 100.00% PROGRAM TOTAL $804.3 T:\2010 Fee Program and Prev Years\2011 Fee Cost Update\Exhibit B 1-5-12 v25.xls 5 of 5 08-1466.9B.5