Traffic Control & Road Closures for Special Events

Similar documents
CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

2017 Temporary traffic control guidelines for pedestrians. v.2

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Accommodating Pedestrians in the Work Zone

Appendix Work Zone Traffic Control

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

ADA on Construction. Guidance for Section C Plan Preparers

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

TRAFFIC ACCOMMODATION IN WORK AREAS

TRAFFIC CONTROL DEVICES

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

SECTION TRAFFIC REGULATIONS

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

MINNESOTA FLAGGING HANDBOOK

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

CHAPTER 6H. TYPICAL APPLICATIONS

Temporary Traffic Control for Highway Work Zones

Traffic Control Inspection Checklist Segment:

COMPLETE STREETS DURING CONSTRUCTION

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

CHAPTER 6H. TYPICAL APPLICATIONS

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

TYPE OF ORDER NUMBER/SERIES ISSUE DATE EFFECTIVE DATE General Order /12/2015 6/14/2015

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

WORKSITE TRAFFIC MANAGEMENT

Draft North Industrial Area-Wide Traffic Plan

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

WORK ZONE TRAFFIC CONTROL PROCEDURES

WORK ZONE TRAFFIC CONTROL & SAFETY

0 CITY OF SANTA ANA 0

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

Hospital Link Project Project Update September 2017

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING

Guide for Law Enforcement Personnel in Work Zones

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Inspecting Aerodrome Construction

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Temporary Traffic Control Manual

MUTCD Part 6: Temporary Traffic Control

CHAPTER 1 STANDARD PRACTICES

COVINGTON POLICE DEPARTMENT STANDARD OPERATING PROCEDURE

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Table of Contents. I. Introduction 1. II. Elements of the School Crossing Program 1

Concise Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations

City of Margate, Florida. Neighborhood Traffic Management Manual

Borough of Danville, PA Traffic Calming Program Guidelines

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18

Safe Working On Roads Standard Operating Procedures

Application for Temporary Street/Sidewalk Closure Permit

Speed Control & Limits

Road Usage Permit Application Form

NO LATER THAN ONE WEEK BEFORE YOUR PROPOSED CLOSURE START DATE

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Welcome and Purpose of Meeting

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

Traffic Control Awareness By: Contra Costa Water District

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

Chapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0

Right of Way Construction Activity Manual Activity Manual

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA

MUTCD Part 6D: Pedestrian and Worker Safety

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

PART 7. TRAFFIC CONTROLS FOR SCHOOL AREAS CHAPTER 7A. GENERAL

Traffic Calming & Cyclists

2009 Manual on Uniform Traffic Control Devices

Approvals Approvals for the conduct of a triathlon or other multi-sport event sanctioned by Triathlon ACT must be obtained from:

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

Signs. signs, signals and road markings. in this chapter

Beginning School Bus Driver Curriculum UNIT IX. FIELD TRIPS and TRAFFIC CONTROL DEVICES. Revised 09/2011 Revised 10/2013 (Instructional Content)

SPECIAL EVENT & RIGHT-OF-WAY PERMIT APPLICATION (Not for Block Parties) JANUARY 2015

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

Global EHS Powered Industrial Truck and Pedestrian Safety

Oregon Temporary Traffic Control Handbook FOR OPERATIONS OF THREE DAYS OR LESS May Prepared by the Oregon Department of Transportation

Work Area Traffic Control Policies and Procedures

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

ANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America

2017 Changes to the 2011 MMUTCD January 2017

Safety Policy and Procedure

Roadway Safety S.O.G. and Training Outline. Captain Rodney J. Palmer. Oak Creek Fire Department

Work Zone Pedestrian & Cyclist Accommodation in Washington, DC

Video Review: Signs, Signals and Markings Video Review 4.1

Transcription:

Traffic Control & Road Closures for Special Events Application for Road Closures: Street closures and/or detours may be required for special events/parades. Approval shall be obtained from the Roads Operations Division a minimum of (10) ten working days in advance of expected event date. The following must be completed and submitted to the County during the application process of the event: 1. Mapping of the event area and proposed road closures 2. Time frames for the setup of barricades for road closures, the actual event(s) and the removal of barricades 3. A proposed traffic control plan to be reviewed & approved by the Roads Operations division (forms to be supplied by the County) The Roads Operations division will review the plan, and approve / deny or alter the plans as required to ensure public safety. It is at the discretion of the Manager of Roads Operations whether the traffic control plan will be approved, and/or additional measures may be required to ensure public safety. Additional measures may include the requirement of a police presence, or a professional traffic control company, of which all costs shall be paid through the Event. A material list will be provided by the Roads Operations Division based on the approved traffic control plan. Materials will be available for pickup at a local roads yards within 24 hours prior to setup times at no cost, and must be returned on the next business day following the event. Materials will be inventoried prior to release and at return, and any materials not returned shall be billed back to the event. Mapping: **See attached example Map A detailed map must be submitted identifying 1. Parade or cycling routes if applicable 2. The event area 3. All roads proposed to be closed during the event. 4. All sidewalks proposed to be closed during the event. 5. Any specific areas which may require access to traffic during the closure (i.e hospitals, Fire stations, Ambulance, police, heavy truck areas, etc.) 6. On site parking areas Traffic Control Plan: A detailed traffic control plan (blank copies available) shall be submitted with the application for approval for the control of traffic during the special event on a roadway. The plan must include the proposed traffic control devices, and the layout of the road closure(s). It must also identify the personnel responsible for setting up, taking down and supervising the traffic control process, ensuring they are trained to perform this work in a safe manner, and must be wearing appropriate protective and safety gear. The traffic control plan must take into account all traffic that may be affected including vehicles, pedestrian, cyclists, heavy trucks, etc.. and must plan and implement appropriate controls to accommodate all levels of traffic. In high volume traffic areas the OPP may be required to be onsite during events. The plan should also include event exit policies and procedures to ensure safe and fluid departure from site, maintaining adequate sightlines for vehicles. Traffic Control Setup: It is the responsibility of the Event Organizer to notify affected residents/businesses of road closures, parking restrictions and other work that impacts normal traffic flow. A copy of the letter (if applicable) that will be sent to residences / businesses in the affected area shall be submitted to Haldimand County. The Event Organizer should also follow the general guidelines outlined below: 1. The site must be secured to protect to protect the public from potential hazardous conditions within the road closure zone 2. Place barricades and/or cones around any equipment or event materials that are stored on the road or the shoulder. These locations should be noted on the submitted map. 3. Arrange to have sidewalks and multi-use pathways within the traffic control zone cleared of snow, ice and debris. If required, sand during periods of icy conditions. 4. Record keeping is an important component of temporary traffic control to document and ensure the appropriate measures are in place at all times. The event organizer is responsible for maintaining a record of the temporary traffic control used and taking the necessary steps to correct any deficiencies. Inspect the event area as required and keep record of inspection. 5. Plan set up and take-down in advance. 6. Consider the use of rolling closures to control the speed of vehicles upstream of the event area.

7. Ensure that any Traffic Control Persons deployed are given written instructions and trained by a qualified person, and properly equipped/clothed as per the OHSA. Set up 8. Assemble and disassemble traffic control devices away from the roadway. 9. When placing a traffic control device, ensure that it is not obscured by other objects, that it is legible, properly positioned and secured 10. Cover, turn, or remove signs and devices at times when they are not required. Remove the cover immediately before event begins. 11. Ensure that the layout is implemented as approved, record this information, and keep a copy available on site, as part of the traffic control plan and/or the traffic protection plan 12. Once secured, drive and walk the event area to ensure that the traffic control set-up provides motorists, cyclists and pedestrians with adequate advance warning and provides positive guidance around the event site. Ensure that safe, convenient and accessible pedestrian, vehicle and cyclist movement is maintained. Removal 13. Drive through the event area before removal of traffic control devices to ensure that all pedestrians are off the road, and that there are no gaps in the closure. 14. Remove traffic control devices in the opposite order from which they were installed. Advance signs are an exception, remove advanced signs on the left and right shoulders in a downstream direction, in the same order they were installed. Road Closure using Barricades TC-53A or TC-53B light barricades must be used for short term road closures for special events to prevent vehicular traffic from accessing the event areas. Light barricades may be used for road, street, lane or shoulder closures of less than 8 hours. Light barricades should be stabilized using sandbags placed on the lower section of the frame. Under no circumstances shall they be placed over the rail of the barricade One (1) TC-53A or TC-53B should be used for each roadway lane to be closed, and should be placed in the center of each lane. Night Closures: Additional measures shall be required when road closures are requested after daylight hours. A TC-7 with a TC-7tA including a flashing 360⁰ yellow light must be placed in advance of all Road Closures. Sidewalk Closures Sidewalk Closed signs direct pedestrians to alternative sidewalk when sidewalks need to be closed for any reason. Signs must be placed at preceding intersections to provide pedestrians with an opportunity to find an alternate route if required.

Street "A" EXAMPLE MAP Street "B" Finish Start

Traffic Control Plan - Special Event Check the Applicable Hazards Moving Vehicles Pedestrians Cyclists Other: Date: Event: TRAFFIC CONTROL / PROTECTION PLAN Time Start: Time Finish: Location: (be specific) EVENT DESCRIPTION: Traffic Control Supervisor: Person(s) setting up Traffic Control: Person(s) directing Traffic: Note: if additional traffic control personnel are planned / scheduled - please provide a list and confirmatino that they are trained to do the work EMERGENCY SERVICES NOTIFIED FOR ROAD CLOSURE: Police Ambulance Fire Conditions Used to Determine Traffic Control Plan (check / fill out all that apply) Speed Limit km / hr Road Closure Two Lane Sidewalk Closure Daylight Hours Traffic Control Person(s) Night Road Closure Single Lane Closure Traffic Protection Requirements (check all that apply) Long Duration over 8 hrs Barricades (TC-53) Short Duration between 30 mins - 8 hrs Cones (TC-54 or TC-51) Very Short Duration under 30 mins Blocker Vehicles Moving Operation under 30 mins Other Signs (specify) Police On Site Traffic Volumes: High Volume over 3000 cars/day Appropriate PPE must be work by all traffic control Low Volume under 3000 cars/day personell (i.e; reflective garments) Notes: (Weather, special considerations, approach site distances, other site hazards, etc.) Event Organizer Signature Date

Mapping with written or illustrated details regarding locations and traffic control devices to be attached Setting Up and Removal of Traffic Control Devices Plan your setup Place your vehicles upstream for protection Assemble devices away from road Minimize exposure to traffic Ensure workers are visible and conspicuous Start setting up, upstream Always face traffic Plan escape route Be careful of curves Do not back up Cover signs that are installed before they are needed Remove in opposite order of setup on closed side (move upstream) Remove in same order as installed on open side (move downstream) In Case of an Emergency - Call 911. Police, fire or ambulance emergency vehicles must be allowed to pass through traffic control zones as quickly as possible Road / Lane Closure is: Approved To be Filled out by the Roads Operations Staff Approved with Changes Denied Changes: Reason Traffic Control Device Quantity Required Quanitity Returned TC-53A TC-53B TC-54 TC-51 TC-7 TC-7tA TC-40 TC-41T Other Traffic control Person? Police Required Special Notes The Roads Operations Division has reviewed the above plan, and corresponding map, and provided approval/denial of the request for road closure. Traffic control shall be setup in accordance with the approved plan. The Event organizer is responsible for ensuring the protection of the public, and traffic flow during the event. Original Copies to be held by Haldimand County, and copies provided back to the Event organizer. Traffic control devices may be borrowed from and returned to the County Roads yards, however any additional costs associated with the setup of the traffic control shall be borne by the Event. Roads Operations Supervisor Signature Date