FAIRway Danube. a milestone for the realization of the Masterplan of the Danube and its navigable tributaries , Katja Rosner / viadonau

Similar documents
Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated )

Centre Albert Borschette, 36 Rue Froissart - Room CCAB-0B, 1040 Brussels

Status quo of FAIRway Danube

Conclusions. on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries. Danube Ministers Meeting

15 th Meeting of the Steering Group for Priority Area 1a of the EUSDR Vienna, Austria 09 October 2018

National Action Plans

Waterway management projects co-funded by CEF Programme rkm Danube section in Hungary -

SPEECH. by Deputy Director-General of the Danube Commission s Secretariat. Mr. Pjotr Suvorov. (Linz, April 2013)

Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries

Monitoring system on implementation of waterway maintenance declaration & short-term measures

Infrastructure measures

Integrated Waterway Management of the Danube in Austria

Table of. contents. Photos: viadonau, NEWADA duo, Haslinger, Zinner Layout: viadonau

7th meeting of Steering Group Priority Area 1a of the Danube Region Strategy on Inland Waterways

Innovative approaches on the Danube and its navigable tributaries

FEASIBILITY STUDY FOR A WATERWAY MAINTENANCE MANAGEMENT SYSTEM (WMMS) FOR THE DANUBE

The Pan-European Masterplan for Cycling Promotion - A framework for starter, climber and champion countries

Caltrain Bicycle Parking Management Plan

Economic and Social Council

COMMON DANUBE REPORT 2016

Paper Environmental friendly solutions to improve the navigation fairway of the Danube in Serbia

Fairway Rehabilitation and Maintenance Master Plan


Implementation of CEVNI Rev 5. Reinhard Vorderwinkler Austria

Public Procurement Indicators 2014

Fibre to the Home: Taking your life to new horizons!

Inland AIS in the Netherlands

Risk and Safety Assessment on Road Infrastructure. Olivera Djordjevic

2017 IIHF BID REGULATIONS

Beer statistics edition. The Brewers of Europe

Risk Assessment on Danube Area Roads: RADAR project

Architect: Dekleva Gregoric Architects Project: Compact Karst House Photo: James Maroti Place: Vrhovlje, Slovenia

Advisory Services for the Golf Industry

Outline of the Position Duties and Responsibilities

Public Procurement Indicators 2015

Working Group 1 Waterway Infrastructure & Management

ERSTE GROUP BANK AG. Growth outlook for the region

Work Package 4: Infrastructure

POINTS = SINGLE POINTS OF CONTACT SPORTS INTEGRITY

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

A Government Service to State Owned Enterprise.

ROSEE Road safety in Sout East European regions: Safe Road Infrastructure

Road Safety Pledge. Route to vision zero 2050 in Europe The Hague, June 14th, Malta. Luxembourg Lithuania Latvia Italy

Study Proposal for the Batu Berhenti Light Buoy

Outcome of the discussion with other HSSC WG on contribution to the MSP MSP development work

Case Study. PayPal s Sparkline Case Study. About Sparkline

Nord Pool Power trading in 1991, in 2017 and in Embracing Changes and Developing the European Power Markets

Progress with the Road Investment Strategy

TRAFFIC MANAGEMENT, RELIABILITY AND ECONOMIC TRANSPORT ON THE INLAND WATERWAY DANUBE by

InnoAquaTech. An Opportunity for Aquaculture in South Baltic

Architecture - the Market

The future of the Euro Area and Its Enlargement. André Sapir

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

Parks Canada + Boating = A Beautiful Thing! Darlene Upton Parks Canada

2014/15 UEFA European Under-17 and Under-19 Championships Elite round draws. 3 December 2014, Nyon, Switzerland

READER THE DANUBE WATERWAY ECONOMIC GEOGRAPHY

EuroVelo13. Iron Curtain Trail. A Trans-national Action Plan for its implementation

Golf Participation Report for Europe 2018

FTTH Council Europe Panorama & Forecast Market at September 2018 & Forecast by 2020 & 2025

Good Navigation Status

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam

Questions and answers

Members of the Board of Directors. Wendy Knowles, Clerk of the Board

FIP/SC.11/3 October 3, Meeting of the FIP Sub-Committee Washington, D.C. October 30, Agenda Item 3 FIP SEMI-ANNUAL OPERATIONAL REPORT

CITY COUNCIL AGENDA REPORT

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

ROMANIA REPORT ON THE IMPLEMENTATION OF THE AGREEMENT ON CETACEANS OF THE BLAC K AND MEDITERRANEAN SEAS AND CONTIGUOUS ATLANTIC AREA (ACCOBAMS)

Offshore Wind Energy Stringent quality assurance and quality control. Coastal and Freshwater Fast responding and flexible organisation

Education and Training 2020: progress being made?

Bringing Pressure Under Control: Harnessing Control Valves for Intelligent Water Networks. A Report on Best Practice from TALIS

Paper for Consideration by HSSC8 Development of an Additional Bathymetry Layer standard based on S-57/S-52

2026 Olympic and Paralympic Winter Games Bid Book Overview

MDB Road Safety Initiative: A Development Priority

CYCLING FOR GROWTH: USING EUROPEAN FUNDS FOR CYCLING

The FA Chairman s The FA Chairman s England Commission

Intra-EU trade in live wild boar. PAFF April 2018

Shared Resource Conservation Manager Program Report Washington State University Energy Program, March 2013

Boating Safety Account Continuation Review

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

Lecture 3 The Lisbon Strategy

HydroCOM: High energy savings and excellent controllability

Selection statistics

LIST OF CORRECTIONS. 02 / January /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

Wind farm zone Borssele Project and Site Description 15 th December 2014

Technical Working Group November 15, 2017

OCTOBER 2018 EXECUTIVE SUMMARY

STATUS QUO REPORT FOR WATERWAY MAINTENANCE IN SERBIA

BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS

Sunday, February 28, 2016

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

Report of the third meeting of THE PEP Partnership on Cycling Promotion

Map of the Iron Curtain Trail. About the project. 3 About the project 5 Project activities 8 ICT Project Partners. History

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

Bluetongue in the region

Capacity of transport infrastructure networks

Excellence in Road Safety Awards 2017

This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Project Central MeetBike (3CE343P2)

Economic and Social Council

Still on the road to recovery

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

Transcription:

FAIRway Danube a milestone for the realization of the Masterplan of the Danube and its navigable tributaries 15.11.2016, Katja Rosner / viadonau

Agenda FAIRway Danube in a nutshell Developments in selected Danube countries Agenda 2

Agenda FAIRway Danube in a nutshell Developments in selected Danube countries Agenda 3

Activity breakdown FAIRway Danube project 4

Procurement of equipment for hydrological services Data gathering Data processing and analysis Respond to data 5 Surveying vessels & 39 gauging stations 1 transnational and 5 national Waterway management systems Water level forecast in HU, HR, BG, RO 4 Marking vessels Activity breakdown and expected results 5

Pilot operation over 3 years Systematic decision support through improved data analysis. Exploit full potential of navigation conditions through dynamic marking Optimized surveys & denser intervals at critical locations. Strategically placed water level gauges deliver basic data. Matchable water level forecasts displayed in a harmonized way. to gain experience for the full deployment of the Master Plan Activity breakdown and expected results 6

Documentation for selected future measures Address other issues that hamper navigation at the Danube and its navigable tributaries. Pre-feasibility study to upgrade the Gabčíkovo lock Feasibility study to upgrade the Lower Váh Activity breakdown and expected results 7

Stakeholder involvement FAIRway Advisory Board twice per year (Q1 and Q3) National User Fora once per year in each country, first half of the year Reflect recent trends Discuss planned activities Contribute to technical specifications and operational concepts Stakeholder involvement 8

Coordinated approach give insight on national circumstances and coordinate planned actions Expected impact of FAIRway Danube: improved fairway conditions Collect, analyze and publish basic data Use available depths: relocate the fairway Test innovative approaches, Preparatory studies for Váh and Gabčíkovo Updated national action plans twice a year 5 surveying vessels and 39 gauges, 3 years pilot operation, improved water level forecasts 4 marking vessels, 3 years pilot operation no dredging AIS AtoNs, drones for monitoring, etc. Studies on the navigability of the Váh and the upgrade of Gabčíkovo Expected impact 9

Agenda FAIRway Danube in a nutshell Developments in selected Danube countries Agenda 10

Selected developments in Germany Under preparation / in progress: Upgrade of the Danube between Straubing and Vilshofen: Pursuing Variant A Rehabilitation and/or reconstruction of locks on the Danube and the Main Deepening of the fairway of the Upper Main Deepening of the fairway of the Lower Main Developments in selected Danube countries 11

Selected developments in Austria In progress: Developments in selected Danube countries 12

Selected developments in Slovakia Financing ensured: Upgrade of Gabčíkovo locks (145 Mil., 85% CEF) Váh feasibility study tendered in 10/2016 1 surveying vessel as of 09/2017 1 marking vessel as of 06/2018 Developments in selected Danube countries 13

Selected developments in Hungary In progress: Upgrade of 25 gauging stations until 03/2018 Publication of new Electronic Navigational Charts in 2Q2017 Financing ensured: Danube development study (planning and EIA) 1 surveying vessel as of 09/2017 3 fairway marking vessels, 3 high-speed patrol boats, 115 Inland AIS light buoys, 210 new unlighted buoys, etc. until 06/2020 Developments in selected Danube countries 14

Selected developments in Croatia In progress: 1 surveying vessel as of 06/2017 4 new gauging stations and upgrade of 5 gauging stations until 06/2017 Monitoring of sandbar in the Apatin area Financing ensured: 1 marking vessel as of 06/2018 Development of waterlevel forecast Developments in selected Danube countries 15

Selected developments in Serbia Financing ensured: Tender for river training and dredging works on critical sectors on the Danube (submission deadline: 12/2016) Tender for supervision and environmental monitoring of the works (submission deadline: 01/2015) Developments in selected Danube countries 16

Selected developments in Bulgaria In progress: 1 surveying vessel as of 03/2017 Financing ensured: 1 surveying vessel as of 09/2017 Upgrade of 10 gauging stations until 12/2017 1 marking vessel as of 06/2018 Upgrade of water-level forecast Developments in selected Danube countries 17

Selected developments in Romania In progress: Frame contract for maintenance dredging started in 09/2016 Rehabilitation of locks on the Danube-Black Sea Canal (228 Mil. for Phase 1) Financing assured: 1 surveying vessel as of 09/2017 Upgrade of 18 gauging stations until 12/2017 1 marking vessel as of 06/2018 Upgrade of water-level forecast Developments in selected Danube countries 18

Summary and conclusions FAIRway Danube serves as implementation platform for the Master Plan FAIRway Danube prepared the pre-feasibility study on lock of Gabčíkovo finalized basis for CEF-financed investment project Progress is made in the area of monitoring the fairway, river engineering/dredging works a few countries are already ongoing Co-Funding of the European Union is a crucial enabler Summary and Conclusions 19

Thank you for your attention. Andreas BÄCK via donau - Österreichische Wasserstraßen-Gesellschaft mbh T +43 50 4321-1609 M +43 664 80842 1609 andreas.baeck@viadonau.org