G F T German Formwork Technology. Climbing Bracket CB 240. Assembly and Application Guide

Similar documents
SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

PRODUCT BROCHURE. RMD Kwikform USA. Ascent-F

TRAVSMART permanent single-cable horizontal lifeline system

GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

MSA Latchways Ladder System

Safety System Installation Guide for ARE Wind Poles

HELM Hinging facility according to EN 795:2012 Typ D. Sliding hardware

Floor Mount Socket. T: +44 (0) F: +44 (0)

PHOENIX, ARIZONA USA

It allows you to. is the Best Option. More information at

GUARDIAN FALL PROTECTION

Technical Briefing Note

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

CHAINLESS ANCHORING SYSTEM USER MANUAL

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections

Operating instructions. Bolt-on Bar Joist Anchorage

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

User Instructions. Installing Fall Protection Void Formers. Please read carefully before fixing anchorage components into formwork

MSA Confined Space Entry Equipment

RATCHET RELEASE SHACKLE

ATS430 turbidity sensor Retractable insertion assembly

GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

User Instructions 1790 Rail Anchor

Assembly Instructions. -Cantilever Boat Lifts

Advantage Lockers & Bike

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

MEVA Guided Climbing MGC Technical Instruction Manual

Installation and Training Manual

ROCKSOLID DUAL POST ANCHOR

User Instruction Manual Fixed Beam Anchor

WIRE ROPE PULLING MACHINE


User Instruction Manual

30T A/Manual Hydraulic Shop Press

Quattrocycle BV. Quattrocycle. User Manual. Last update February Quattrocycle BV Bremkant EJ Middelbeers. User Manual Quattrocycle 1

User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor

600 / 600FC OWNER'S MANUAL

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

WINSAFE CORP. OPERATING AND MAINTENANCE INSTRUCTIONS GM184 TOP ACCESS END LOCK ANCHOR WAND

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing

Instruction Manual for ZY-021 Height adjustable Acrylic Backboard with Chain net

602 STRINGING MACHINE OWNER'S MANUAL

TRAILMATE METEOR ASSEMBLY MANUAL

Containment Solutions

Price List January SECUROPE Life Line

User Instruction Manual Fixed Beam Anchor

FIX ROAD & FIX STRAP cargo securing systems Operating Instruction Manual

PFC Lightweight Composite Push Up Mast. Operating Manual

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Miller DuraHoist Safety Systems

CAISSON SHAFT SYSTEM

PERSONAL FALL PROTECTION

Backboard and Rim Owners Manual

LEGACY II TM STARTING PLATFORMS

hockey hockey Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

Boat Boat Loader Fitting Instructions

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

CHAPTER 5 REWIND STARTERS

PRODUCT BROCHURE. RMD Kwikform United Kingdom. Ascent-F

Fall Arrest Anchor Solutions

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

THOR 10 HAMMER CAGE INSTRUCTIONS

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

OPERATOR'S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER Model 10D

Ground Release Shackle

The All New DIAMOND & DIAMOND BT

6000SLX HYDRAULIC CRAWLER CRANE

BEAMGUARD SAFETY POST TM INSTRUCTIONS

Certified in 3 & 4 leg configurations to CEN/TS 16415:2013 for maximum 2 persons and EN 795:2012 for single person use. total edge management system

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

Security and confidence at height.

Hoisting Equipment Cable puller & Accessories

DE8410 FIVB Official Beach Volleyball Net

MSA Confined Space Entry Equipment

ASSEMBLY MANUAL HOBIE CATSY

The most versatile Fall Protection EVER

Fall arrest. 180

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

XTS-Impact. XTS-Terminal (hold)

Model: 5100 OmniSteel Volleyball System

REV0709. Parts List. Hydraulic Cylinder Model MODEL C SINGLE-ACTING, SPRING RETURN HYDRAULIC CYLINDER. Max. Capacity: 55.2 Tons at 10,000 PSI

Technical information for hinges

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

CATALOG INDEX. Removable Anchors. Toggle Anchors. I-Beam Anchors. Steel Slings. MegaSwivel Family. Swivel Kits. Mining Anchors.

DYWIDAG Form Tie Systems

DBI SALA Advanced Hoist Systems

USER INSTRUCTIONS. Complies with ANSI Z359.1, ANSI Z359.4 standards and OSHA 29 CFR 1910 and 1926 regulations.

Operating manual Mobile Man Anchor IM-200 Reference No. IM 200

User Instructions 1789 Parapet Wall Anchor

Ramp Hand-railing System. Complies with Building Regulations. Lockinex. ea i, ea u i

Transcription:

German Formwork Technology F o r m w o r k S u p p o r t S y s t e m s S e r v i c e s Climbing Bracket CB 240 Assembly and Application Guide

Product Information & Features Contents Product Information & Features...2 Product Overview...3 Components...4-6 Erection Procedure...8-9 Working Platform System...10 Alignment...11 Anchoring Details...12 Operation...13 Anchoring Details...14 Engineering, Design & Drawing...15 Product Features GFT Climbing Bracket CB 240 is an economic, durable and easy to use system that provides a safe and versatile solution to climbing vertical shuttering support and protected working area that is ideal for high structures with successive lifts. Due to its high level of fl exibility and adaptability, the CB 240 system can be used in almost any situation where a vertical formwork or edge protection system is required. It can be used in conjunction with a self-climbing system or anchored directly to the existing structure. It is compatible with a wide variety of different formwork shuttering systems and can also be used as a standalone external climbing edge protection system. The system has a high load capacity of 50kn per bracket and up to 6m shuttering capability, providing a safe working area during all stages of operation. The main platform has a large 2.4m wide working area and allows for shutter retraction of up to 75cm from the concrete surface. Important Remarks The succeeding instructions for assembly and application have to be carefully read as it contains detailed information regarding the proper application and handling of the GFT climbing Bracket CB 240 System. All instructions concerning technical operation and function have to be observed carefully. Please note that exceptional use of the GFT Aluminium Table Form Slab System requires a separate design calculation. In order to ensure a technical and safe use of our product, all relevant national safety rules and regulations and safety instructions of national institutes and/or local authorities have to be observed. In general, only undamaged material and components which are in proper condition must be used. It is important that damaged components are sorted out and removed from the construction site. In case of repairs, only original spare parts of GFT must be used. The use of GFT formwork systems combined with other supplier s materials may involve certain dangers and require an additional inspection and quality check by our formwork specialist. Due to technical development of our system, we would like to emphasize that GFT reserves the right to revise, change, or modify any of the product s components at any time without prior notice. The system is optimal for multiple swift work-cycles, with its low maintenance and reduced manpower required for shuttering and de-shuttering, the simplifi ed erection procedure greatly reduces the possibility of human error and subsequently increases structural accuracy and overall safety. The CB 240 can be easily erected, adjusted and struck without the use of crane and can be shifted vertically individually or as a joint system comprised of multiple units. With its capability of variable angle, the degree of incline can easily be adjusted and/or fixed to whatever the structural requirements are. The Climbing Bracket CB 240 is designed and manufactured in accordance with BS EN 12812 : 2008, code of practice for Falsework 2

Product Overview Wing nut w/ Tierod H20 Timber Beam Steel Waler CU Vertical Waler CU Aligning Strut CU Rack Unit M Horizontal Beam M Vertical member 205 M Small Diagonal Member M Big Diagonal Member Lower Platform Waler Lower Platform Bracket 3

Components Art. No Weight Kg/pc. Climbing Bracket CB 240 1.) M Horizontal Beam (L=251cm, H=155cm) 2.) M Vertical member 205 (H=213cm) 3.) M Small Diagonal Member 4.) M Big Diagonal Member 803CB24 803HB240 803VM205 803BD253 803SD183 172.10 88.09 39.95 24.75 16.31 1 2 3 4 3 CU Carriage Unit 803CU260 135.75 1.) CU Rack Unit (L=128cm, H=22cm) 2.) CU Aligning Strut (L=166 to 229 cm) 3.) CU Vertical Waler (H=260cm) 803RU128 803AS226 803VW260 32.35 26.55 76.85 2 1 Suspended Platform Bracket 1 1.) Lower Platform Waler (H=368 cm) 2.) M Platform Bracket (L=133cm,H=152 cm) 3.) Platform Waler Spacer (L=71cm) 803PW340 803PB114 803PS700 50.80 19.05 7.28 2 3 Wind Tension Bar 1.) Wind Tension Bar 2.) Wind Anchorage Upper Element 3.) Wind Anchorage Lower Element 803TB570 803UWA40 803LWA30 3.95 3.50 7.15 3 1 2 4

Components Art. No Weight Kg/pc. Waler Holder Hook Clamps Horizontal walers on shutter to CU Vertical Waler. 101FH014 2.50 Passage 60x60 (L=134cm, W=72cm) Provides safe access to platforms and closes penetrations. 803PP660 40.00 Starting Element (L=143 cm, W=19 cm) Enables carriage unit to be launched directly from slab level. 803SE143 23.15 M Swivel Plate (L=29 cm, H=20 cm) Performs variable angle adjustment of M Platform Bracket when used at any degree of inclination. 208MSP30 4.50 Handrail Clamps S (H=123 cm to 171 cm) Clamp-on edge protection, typically used for stop-ends and areas not accessible for the M Handrail Post. 201HS116 11.40 1 Screw On Coupler Fixes bracing tube directly to CU Vertical Waler & Vertical Profile 205. 301SOC90 0.76 301SOC40 0.67 2 Swivel Coupler 48 Fixes 48mm tube to tube at any angle. 301DSC48 1.20 5

Components Art. No Weight Kg/pc. Anchor Plate 140 Cast into the concrete and provides the anchoring point from which the Climbing bracket CB 240 is suspended. 315AP40D 1.02 Climbing cone 30/M24 Serves as the main suspension point for the Climbing Bracket and is also used to maintain position of the Anchor Plate whilst casting in place. 803CC324 0.60 PVC Sleeve Enables the Climbing Cone to be easily removed after casting in concrete. 803PCS30 0.016 Cone Bolt 80 Used to Secure the Climbing Bracket to the Climbing cone 30/M24. It is also used to maintain position of the Anchor Plate whilst casting in place in conjunction with the Climbing Cone 30/ M24. 803BH248 0.375 Nailable Fixing Disc Used to fix the Climbing Cone directly to the forms surface in instances where a penetration cannot be made through which to fi x the Cone Bolt. 803NFD60 0.108 Mounting Ring M24 Safety mechanism which retains climbing bracket in place at anchoring point. 803MR375 0.308 UNI Cone Square Spanner Used to remove the Climbing Cone 30/M24. 803UCS18 0.85 Plate Washer Nut 15 315PW119 1.4 Tie Rod 15 Safety Warning: Never weld or heat tie-rods (risk of fracture)! 315TR100 1.4 6

Components Art. No Weight Kg/pc. M Vertical Member 160 (H=208cm) 803VM160 90.50 CU Vertical Waler Extension (H=144cm) 803VWE14 41.50 M Preassure Strut (H = 166cm to 226cm) 803PS225 26.00 M Big Diagonal Member 803BD253 24.75 M Small Diagonal Member 803SD183 16.31 Reversable Ratchet 50 306RRS50 1.41 Hex Socket M36 Hex Socket M24 306HSS36 306HSS24 0.486 0.217 7

Erection Procedure The standard Climbing Bracket CB 240 is comprised of five main components. Variation of these components makes it possible to customize the setup to whatever the site requirement. In standard configuration, the Climbing Bracket CB 240 is set at a 90 degree angle to the walls surface for climbing vertically. For a particular angle of inclination, the Big and Small Diagonal members length can be substituted to suit the site requirement. Should the requirement be for a varied or changing degree of inclination, these Diagonal members can be substituted for the M Pressure strut which can be adjusted to suit the degree of incline as required. M Horizontal Beam M Horizontal Beam M Big Diagonal Member M Small Diagonal Member M Vertical Member 205 M Pressure Strut Vertical Wall Fixed Incline Variable Incline 8

Erection Procedure The Carriage Unit, used in conjunction with the Climbing Bracket CB 240 forms the main element used to support the formwork and to aid shuttering and de-shuttering procedures without the use of the crane. It is composed of 3 main components that form the complete shifting unit. The CU Gear travels back and forth along the Climbing Bracket CB 240 M Horizontal Beam and shifts the CU Vertical Waler to and from the concrete surface by turning of the CU Gear. This procedure allows for swift alignment of the bottom of the form to the concrete surface. The CU Alignment Strut then performs any required adjustment for plumbing the panel vertically against the casting surface. This procedure is reversed when striking the form and allows workers to do so unaided. CU Vertical Waler CU Alignment Strut CU Gear The walers of the formwork shutter panel rest on Height Adjusting Unit on the CU Vertical Waler which easily perform any required adjustment of the panel parallel to the casting surface. Waler Holder Hook Height Adjusting Unit Fixing Wedge 9

Working Platform System The CB 240 Climbing System is not only used as shuttering support, but also provides a complete and comfortable safety system during all stages of use. The M Platform Bracket is fixed as a pouring platform at the form top of the shutter on the CU Vertical Waler providing safe access for pouring work. The M Handrail Post fi xes to the Climbing Bracket CB 240 to form the edge protection barrier. The main platform of the Climbing Bracket CB 240 features a wide 2.4 meters of working area and allows for 750mm of shutter retraction, enabling ease of access for steel work, fi xing the climbing cones and other pre/post-cast processes. The Lower Platform Waler is used to suspend the M Platform Bracket below the CB 240 allowing for fi xing/removal of the Wind Tension Belt and Climbing Cone. M Swivel Plate allows for levelling of the M Platform Bracket when using on an inclined surface. 10

Alignment The Climbing Bracket CB 240 system has a built in adjustment system that allows for swift and precise adjustability at the swing of a hammer. Simply by releasing the Fixing Wedge and Waler Holder Hooks, the form can be easily manipulated and aligned as required. By adjusting the Height Adjusting Unit up or down at either end of the panel, the form can be tilted left or right or moved up and down respectively. As the weight of the shutter rests on these adjusters by the steel waler, friction between the two is greatly reduced enabling side to side movement with little effort. After fi nal adjustments have been made, tighten the Waler Holder Hook and engage the Fixing Wedge to establish a firm connection to the support system and lock the shutter in place ready for concrete placing. Any fi nal plumbing of the panel can be easily done via the CU Alignment Strut. Waler Holder Hook Height Adjusting Unit Fixing Wedge 11

Anchoring Details The same components are used for both suspending the Climbing Bracket and positioning the anchors while casting. Cone Bolt 80 Used to Secure the Climbing Bracket to the Universal Climbing cone. It is also used to maintain position of the Anchor Plate whilst casting in place in conjunction with Climbing Cone 30/M24. Mounting Ring Safety mechanism which retains climbing bracket in place at anchoring point. Safety Pin Must be inserted after suspending the Climbing Bracket to prevent it from being lifted out. Climbing Cone 30/M24 Serves as the main suspension point for the Climbing Bracket and is also used to maintain position of the Anchor Plate, whilst casting in place PVC Sleeve Enables the Climbing Cone to be easily removed after casting in concrete. Nailable Fixing Disk is used to fix the Climbing Cone directly to the forms surface in instances where a penetration cannot be made through which to fix the Cone Bolt. Anchor Plate Is cast into the concrete and provides the anchoring point from which the Climbing Bracket CB 240 is suspended. 12

Operation Launching Procedure To cast the first wall section, the carriage unit must be launched at ground level from the Starting Element, anchored to the slab. The first set of anchor plates are cast into the wall at this level, allowing the climbing brackets to be suspended from the climbing cones at this anchor point during the 2nd stage. Stage-2 Stage-1 Wind Tension Bar Starting Element Stage-3 By the 3r pouring stage the suspended platform is added below the Climbing Bracket to complete the climbing system. 13

Anchoring Details Stage-1 Release the fixing wedge and pressing wedge and remove the Cone Bolt 80 to release the climbing cone 30/M24 from the shutter surface. The shutter can now be struck from the concrete and retracted with the carriage unit by turning the CU Gear. Prepare the next suspension point by fi xing the Cone Bolt 80 and Mounting Ring M24 to the climbing cone 30/M24 (still fi xed to the cast-in Anchor Plate). Stage-3 Lift the unit with the crane to the next prepared suspension point and replace the safety pin and Wind Tension Bar. Move the Carriage Unit into position by turning the CU Gear using a ¾ 2-Way Ratchet. Secure the Carriage Unit to the Climbing Bracket by striking the Fixing Wedge. This must be also be secured before leaving unattended or lifting by crane. Tighten the shutter against the existing wall section by striking the pressing wedge. This locks the shutter in position and ensures a tight seal at the base of the shutter. Fit anchor components to be cast in and plumb the shutter by turning of the CU Aligning Strut. Fit form ties and pour concrete. Stage-1 Stage-2 Remove the Wind Tension Bar and retrieve any anchoring components, working from the suspended platform. Fix the Carriage Unit as close to the centre of gravity point as possible. Remove the safety Pins and attach the crane sling to the CU Vertical Waler Stage-3 Stage-2 14

Engineering, Design & Drawing A. B. C. All the Shop drawing, Technical data & the Statical calculation will be Submitted by GFT in accordance with the structural drawing project requirement The site erection should be done as per GFT s shop drawing and shall be supervised and inspected by GFT s formwork specialist The spacing and positioning of the Formwork material are arranged based on the statical requirements and as shown in the GFT s execution drawing & Calculation Formwork Layout of Corewall using CB240 15

GFTGerman Formwork Technology L.L.C. (Dubai) Al Quoz Industrial Area 4 P.O. Box : 33885, Dubai, U.A.E. Tel. No. : +971 - (0)4 34 04 320 Fax No. : +971 - (0)4 34 78 425 E-Mail : Info@gf-tech.ae Web : www.gf-tech.ae GFT(Qatar) Aziziya Commercial Complex Aziziya Commercial Street - 424 P.O. Box : 16502 Doha, Qatar Tel. No. : +974-4465 9766 Fax. No. : +974-4456 7250 E-Mail : Info@gf-tech.ae Web : www.gf-tech.ae GFT(Syria) Damascus, Syria, Mazah P.O. Box : 9710 Tel. No. : +963-11 - 611 6601 Fax No. : +963-11 - 611 6605 E-Mail : Info@gf-tech.ae Web : www.gf-tech.ae