July 25 28, 2017 South Lake Tahoe, CA

Similar documents
U.S. Highway 50 Road Safety Audit South Tahoe Y to Trout Creek, City of South Lake Tahoe, CA Final Report. January 29, 2018

Broad Street Bicycle Boulevard Design Guidelines

Cycle Track Design Best Practices Cycle Track Sections

Transportation Planning Division

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

5. RUNNINGWAY GUIDELINES

Everyone is a Pedestrian

Active Transportation Facility Glossary

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Omaha s Complete Streets Policy

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Bicycle Facilities Planning

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

City of San Diego Vision Zero Draft Strategic Plan FY 2017

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

Public Information Centre

10.0 CURB EXTENSIONS GUIDELINE

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

What Is a Complete Street?

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Chapter 2: Standards for Access, Non-Motorized, and Transit

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Off-road Trails. Guidance

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Bicycle Boulevards and Neighborhood Greenways

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

C C C

Closing Plenary Session

City of Vallejo Traffic Calming Toolbox

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

INTERSECTION CRASH COUNTERMEASURES

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

Pedestrian & Bicycle Safety Innovations & Applications

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

GLOSSARY CROSSWALK. CROSSING TYPES

LANCASTER CITY BICYCLE NETWORK

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

LANE ELIMINATION PROJECTS

Draft North Industrial Area-Wide Traffic Plan

CONNECTING PEOPLE TO PLACES

RIVERSIDE DRIVE: 21st to 41st

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

INDOT Complete Streets Guideline & Policy

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Who is Toole Design Group?

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

Appendix D: Planning Level Cost Calculator

DRAFT Montgomery County Bicycle Master Plan Design Toolkit

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

6.4 RECOMMENDED IMPROVEMENTS

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Bike Planning: A New Day

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

CURBSIDE ACTIVITY DESIGN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Hennepin County Pedestrian Plan Public Comment Report

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Planning Guidance in the 2012 AASHTO Bike Guide

Transportation Planning Division

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

Roadways. Roadways III.

Richmond-Adelaide Cycle Tracks

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

From Mile Zero to Target Zero the Dawson Creek Case Study

Pedestrian Safety Guide for Transit Agencies

Designing for Bicyclist Safety at Crossings and Intersections

PART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS

Appendix A: Crosswalk Policy

2.0 LANE WIDTHS GUIDELINE

DRAFT FOR DISCUSSION PURPOSED ONLY, 10/26/13 MOBILITY PLAN UPDATE DESIGN TOOLBOX

Broadway Complete Streets Project

THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Chapter 7: Six-Step Implementation Process

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Duwamish Way-finding and CTR Report

WELCOME Public Information Centre

Welcome! San Jose Avenue Open House August 25, 2015

State Route 28 Shared Use Path & Safety/Stormwater Enhancements Public Information Meeting

Hennepin County Bicycle and Pedestrian Planning

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

On Road Bikeways Part 1: Bicycle Lane Design

Appendix 3 Roadway and Bike/Ped Design Standards

Transcription:

July 25 28, 2017 South Lake Tahoe, CA

What is a Road Safety Assessment? A road safety assessment is a formal safety performance examination of a future or existing road or intersection by an independent team.

What is a Road Safety Assessment? The team considers the safety of all road users and qualitatively estimates and reports on road safety issues and opportunities for road safety improvements.

Project History and Context Current projects were scoped in 1990 s Shift from multi threshold to single threshold projects Community values, best practices, and agency missions have evolved to Complete Streets Example of Hwy 50 Trout Creek to Ski Run Complexity of land use and access Pedestrian and bicyclist demand with limited accessibility Missing connectivity

How Did We Get Here? Conversations between TRPA, Caltrans, and CSLT Support for proceeding with RSA Openness to incorporate changes based on recommendations Understanding of constraints of current construction projects (Hwy 50 Y to Trout Creek) Urgency to mitigate known risks not addressed in current construction projects Responding to community desire

Goals of Pedestrian/Bicycle RSA Balance need for pedestrian and bicyclist safety and access with need for vehicular movements Assess value and need for speed management strategies Coordinate and leverage current and planned projects on Hwy 50 Enhance pedestrian and bicyclist crossings through implementation of proven strategies and countermeasures Enhance bicycle safety along highway Balance recommendations with maintenance needs

RSA Team Ray Jarvis Jim Marino Jeff Gartner Clark Peri Scott Waksdal Mikaela Hiatt Steve Pyburn Craig Allred Hillary Isebrands Brooke Struve CSLT Public Works CSLT Public Works CHP Caltrans Caltrans TRPA (Intern) FHWA CA Division FHWA FHWA FHWA

What s Working Multiagency coordination and support for projects $26 million construction project ($41 million total project cost) Continuous sidewalk Continuous bike lanes with markings Drainage Signal interconnection Good faith effort to address work zone concerns Center turn lane (TWLTL) Snow removal Connectivity planning

Opportunities for Improvement Missing and inconsistent crash data Lack of data on minor injury and property damageonly crashes Data sharing and accessibility Lake Tahoe Region Safety Plan development a potential for addressing data

Opportunities for Improvement Speed Management

Speed Management Speed management is necessary within many highways to achieve an optimal multimodal transportation environment that will support the land use and transportation contexts.

Target Speed Design Controls The objective of the target speed approach is to establish the design speed at the desired operating speed. Context Operation Speed The design speed selection is derived from all other design controls, as well as transportation and land use context characteristics.

Opportunities for Improvement Speed Management Intermittent raised landscaped median Reduced speed limit Buffered bike lanes Contrasting pavement colors or materials Speed feedback dynamic signs

Opportunities for Improvement Lighting Roadway and pedestrian Conduit for future installation of pedestrian lighting

Lighting

Opportunities for Improvement Cross section Narrow or eliminate TWLTL where no left turns needed One lane snow removal operation? Intermittent Raised median Vegetation for BMP Low profile vegetation for pedestrian visibility Plow to roadside where no driveways Aesthetics Landscape lighting or highway safety lighting to make visible to motorists

Multiple Threat

Opportunities for Improvement Access management Reduce or combine driveways Aligning offset driveways Improve connectivity to intersecting trails Improve access to transit network Streamline permitting process through collaboration between CSLT and Caltrans

Opportunities for Improvement Signing and Striping Wayfinding to intersecting trails and alternate routes Advance signs Street names Warning for pedestrian and bicyclist crossings Bike lane marking Symbol rather than text Interval Directional arrow Buffers Bike lane signs Durable striping materials

Illuminated Street Signs

Bike Lane Marking

Bikeway Signing

Opportunities for Improvement Signals & Intersections Bike detection, especially for intersecting bike routes Timing signals for slower speed progression Enhance pedestrian lighting at intersections to draw pedestrians to signalized crossing Improve pedestrian lighting at intersection crosswalks Crosswalks for all legs at signalized intersections Pavement marking for bicycle conflict points Leading Bicycle Interval with Bike Signal

Crosswalk Lighting

Conflict Zones

Opportunities for Improvement Transit stops Location of stops relative to crossing locations Consolidating bus stops at enhanced location Partial turnouts with insufficient space for bus

Bus Pull Out

Bike Lanes & Bus Stops

Opportunities for Improvement Work Zones Accessible sidewalk closures and detours Maintenance of pedestrian way Maintenance of bicyclist way Accessibility of temporary pedestrian buttons Surfaces are firm, stable, and slip resistant

Opportunities for Improvement Maintenance Facilitating maintenance operations Pavement markings through winter and refresh Timing of fog line/bike lane striping refresh Recessed thermoplastic for bike lane markings Pavement marking test section Scheduling paint crews early in season Sidewalk snow removal and sweeping Reinforce highway code with adjacent property owners Proactive approach

Opportunities for Improvement Education Encourage helmet usage Bicycle LED head & tail lights community grant Encourage Reflective/light colored clothing Discourage wrong way riding Broaden TRPA Safe Routes to Schools program through multi agency support (TTD, Hospital, CSLT, El Dorado County, Caltrans, School District, Chamber of Commerce)

Opportunities for Improvement Enhance partnership and communication between TRPA, Caltrans, and CSLT

Motel 6/Grocery Outlet Positive? Issues Crossing demand Lack of lighting Long distance to next crossing Bus stop Inadequate bus pullout Wide street Speed

Motel 6/Grocery Outlet Recommendations Study location for mid block crossing Alternatives Single stage PHB Two stage, offset PHB Relocate Motel 6 driveway across from Grocery Outlet driveway and add signal Relocate Grocery outlet driveway to west property boundary Relocate bus stops closer to crossing Consolidate four bus stops to two at the crossing

Motel 6/Grocery Outlet Project Features Lighting Raised Median Snow plowing Mountable curbs to reduce damage High strength concrete

Pedestrian Hybrid Beacon Hawk

Pedestrian Hybrid Beacon Hawk

Meadows Positive No driveways Space available because of TWLTL and bridge Issues Minimum bike lane Minimum sidewalk Lighting Lack of crosswalks

Meadows Recommendations Roadway reconfiguration Narrow or eliminate TWLTL Add width to bike lanes Add width to sidewalks Pull out for trailhead or scenic locations Replace TWLTL with intermittent landscaped median Lighting

Recommendations for Immediate Action Explore opportunity to install conduit in current project phases for future pedestrian lighting Barriers: ROW encroachment for city, cost of change order Possible concessions: City encroach w/out being responsible for roadside ROW, Cost sharing As a minimum, add enhanced pedestrian lighting at intersections in current project phases Follow up with Senator Gaines

Recommendations for Immediate Action Evaluate current plan for signing and striping Narrowing or eliminating TWLTL at Meadows Crosswalks at Sierra, Carson, & 3rd Bike lane marking increase interval choice of symbol Bike lane signing

Recommendations for Immediate Action Evaluate current plan for signing and striping (continued) Bike lane conflict zones at intersections & transit stops Turning Vehicles Yield to Bikes Way finding to off highway alternate bikeways Reroute bikeway on River Ave to Lodi Ave (CSLT) Stop or Yield sign on O Malley approaching Carson (CSLT)

Recommendations for Immediate Action Signal preemption for emergency vehicles at 3 rd in current project Evaluate current plan for removal of partial turn outs for transit Evaluate current plan at Whiskey Dick s for control of pedestrians on sidewalk and pedestrian lighting Evaluate the work zones for accessibility Study for mid block crossing at Motel 6 /Grocery Outlet

Recommendations for Mid Term Action Study for slower speed limit (beyond 85% methodology) Alternate curb detail with modified curb pan Full bus turn outs at high volume transit stops Pedestrian lighting along corridor Automated traffic signal performance measures when signal interconnect is complete

Recommendations for Long Term Action Roadway reconfiguration to reallocate cross section Transit lanes, buffered or separated bike lane Contrasting pavement to visually narrow roadway

Other Issues Study for mid block crossing on Hwy 89/50 (South of the Y) between B and D Streets Signal preemption for emergency vehicles at Al Tahoe & Hwy 89/50 Close passing lanes on corridors exiting the basin during high congestion periods

Other Issues Study congestion management strategies Mode shift Shifting peak times through collaboration with business Priority transit lane

Other Issues Traveler information Coordinate with Google/Waze on avalanche and rockfall closures of highway Information distributed through hotels Alerts for avalanche, rockfall incidents that close highways CHP checkpoints for ill prepared winter drivers, potentially funding off duty officers

Funding Opportunities SP&R Grant SB1 Funds HSIP Funds Local mitigation funds ATP OTS (402) Tahoe Fund

Next Steps Webinar presentation Immediate action items for current project with assigned follow up Follow up on going coordination (meetings? calls?) Final report Response from decision makers

Thank You