A New Lane-Based Model for Platoon Patterns at Closely-Spaced Signalised Intersections

Similar documents
ROUNDABOUT MODEL COMPARISON TABLE

ROUNDABOUT MODEL COMPARISON TABLE

Issues in Performance Assessment of Sign-Controlled Intersections

Roundabouts in Australia: the state of the art on models and applications

Gap Acceptance Cycles for Modelling Roundabout Capacity and Performance

SIDRA INTERSECTION 6.1 UPDATE HISTORY

Evaluating Roundabout Capacity, Level of Service and Performance

AN ASSESSMENT OF THE HIGHWAY CAPACITY MANUAL EDITION 6 ROUNDABOUT CAPACITY MODEL

Capacity and Performance Analysis of Roundabout Metering Signals

aasidra for Roundabouts INTRODUCTION

Toronto SimCap Toronto, ON, Canada, July 2014 SIDRA INTERSECTION 6. sidrasolutions.com sidrasolutions.com/forums youtube.

Alternative Intersection Analysis Using SIDRA INTERSECTION

Alternative Intersection Analysis Using SIDRA INTERSECTION

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Roundabout Model Calibration Issues and a Case Study

Measuring and Assessing Traffic Congestion: a Case Study

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report

On the estimation of lane flows for intersection analysis

Capacity and Performance Analysis of Roundabout Metering Signals Rahmi Akçelik

Roundabout Model Calibration Issues and a Case Study Rahmi Akçelik

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

Manual 2010 roundabout capacity model

Acland Street, St Kilda

Lane changing and merging under congested conditions in traffic simulation models

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Public Opinion, Traffic Performance, the Environment, and Safety After Construction of Double-Lane Roundabouts

Roundabouts along Rural Arterials in South Africa

REDEVELOPMENT TRAFFIC IMPACT STUDY

DERIVATION OF A SIGNAL TIMING SCHEME FOR AN EXTERNALLY SIGNALIZED ROUNDABOUT

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Roundabout Design 101: Roundabout Capacity Issues

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

NO BUILD TRAFFIC OPERATIONS

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

1 Introduction. COPY John Denney FROM Chris Morahan DATE 2 November 2015 FILE 6-XT177.62/305DC SUBJECT Stanley Street Network Traffic Modelling

URBAN STREET CONCEPTS

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign,

TRB Webinar: Tools for Analysis of Capacity and Efficient Flow for Roundabout Design: PART I. May 6, :00 PM 3:00 PM ET

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

Operational Comparison of Transit Signal Priority Strategies

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Introduction to Roundabout Analysis Using ARCADY

Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Analysis of Signalized Intersections

ROUNDABOUTS IN AUSTRALIA Views of Australian Professionals

Self-Organizing Signals: A Better Framework for Transit Signal Priority

INTERCHANGE RAMP TERMINALS

ANALYSIS OF SATURATION FLOW RATE FLUCTUATION FOR SHARED LEFT-TURN LANE AT SIGNALIZD INTERSECTIONS *

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

TECHNICAL MEMORANDUM Central Region Traffic Engineering On Call (Task Order ) Mini Roundabout Assessment Braddock Road & Pleasant Valley Road

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000)

SPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII

EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Exploring Pedestrian Scramble Options in a Single-Lane Roundabout: Experimental Delay Analysis

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation

Low Level Road Improvements Traffic Analysis. Report

EVALUATION OF GROUP-BASED SIGNAL CONTROL THROUGH FIELD OPERATIONAL TESTS *

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

RESPONSIVE ROUNDABOUTS MYTH OR REALITY

Rural Highway Overtaking Lanes

QUEUE DISCHARGE BEHAVIOR AT SIGNALIZED INTERSECTION: A COMPARISON BETWEEN FIELD MEASUREMENTS WITH ANALYTICAL AND MICRO-

I-95/Temple Avenue Interchange

Traffic Modelling Report

Synchro Studio 8. Overview. By Ioannis Psarros

TRAFFIC STUDY GUIDELINES Clarksville Street Department

COMPARISON OF STOPPED DELAY BETWEEN FIELD MEASUREMENTS AND HCM 2010 ESTIMATIONS AT ACTUATED SIGNALIZED INTERSECTIONS BY MOHAMMED ABDUL RAWOOF SHAIK

Updated Roundabout Analysis Methodology

An Evaluation of Signalized Intersection System Analysis Techniques Walter J. Freeman, P.E., Kien Y. Ho, P.E., Elizabeth A. McChesney, E.I.T.

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

Arterial Performance Evaluation on an Adaptive Traffic Signal Control System

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Modeling vehicle delays at signalized junctions: Artificial neural networks approach

Influence of Vehicular Composition and Lane Discipline on Delays at Signalised Intersections under Heterogeneous Traffic Conditions

Demonstration of Possibilities to Introduce Semi-actuated Traffic Control System at Dhanmondi Satmasjid Road by Using CORSIM Simulation Software

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections

Simulation of Arterial Traffic Using Cell Transmission Model

MEASURING PASSENGER CAR EQUIVALENTS (PCE) FOR LARGE VEHICLES AT SIGNALIZED INTERSECTIONS

Simulation Analysis of Intersection Treatments for Cycle Tracks

Traffic and Transport Assessment

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E.

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

A REAL-TIME SIGNAL CONTROL STRATEGY FOR MITIGATING THE IMPACT OF BUS STOPS ON URBAN ARTERIALS

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Transcription:

Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA info@sidrasolutions.com Management Systems Registered to ISO 9001 ABN 79 088 889 687 REPRINT A New Lane-Based Model for Platoon Patterns at Closely-Spaced Signalised Intersections R. AKÇELIK REFERENCE: AKÇELIK, R. (2014). A New Lane-Based Model for Platoon Patterns at Closely- Spaced Signalised Intersections. Paper presented at the 26th ARRB Conference, Sydney. NOTE: This paper is related to the intersection analysis methodology used in the SIDRA INTERSECTION software. Since the publication of this paper, many related aspects of the traffic model have been further developed in later versions of SIDRA INTERSECTION. Though some aspects of this paper may be outdated, this reprint is provided as a record of important aspects of the SIDRA INTERSECTION software, and in order to promote software assessment and further research. Akcelik and Associates Pty Ltd / www.sidrasolutions.com PO Box 1075G, Greythorn Victoria 3104, Australia Email: info@sidrasolutions.com

A NEW LANE-BASED MODEL FOR PLATOON PATTERNS AT CLOSELY-SPACED SIGNALISED INTERSECTIONS Rahmi Akçelik, Akcelik & Associates Pty Ltd, Australia ABSTRACT This paper discusses a new analytical lane-based method for determining platoon patterns at closely-spaced signalised intersections. The method has been developed for the SIDRA INTERSECTION software. Traditional network models using "links" (or lane groups) based on aggregation of individual lane conditions cannot provide sufficient information about departure and arrival patterns, queue lengths, lane blockage probabilities, backward spread of queues, and so on at a lane level. These are important in modelling signal platoon patterns for estimating performance measures (delay, back of queue, stop rate). This is particularly important in evaluating closely-spaced intersections with high demand flows where vehicles have limited opportunities for lane changing between intersections. The new lane-based method derives second-by-second downstream arrival patterns in accordance with above requirements. Modelling of departure patterns at upstream lanes takes into account (i) probabilities of blockage by downstream queues and the resulting capacity reductions at blocked upstream lanes, (ii) capacity constraint at oversaturated upstream lanes resulting in reduced downstream arrival flows, and (iii) lane choices of movements from approach lanes to exit lanes at the upstream intersection (lane movements). The modelling of arrival patterns at downstream approach lanes takes into account implied midblock lane changes. The model is expected to improve assessment of signal coordination quality and optimisation of signal offsets. A detailed example is presented using various analysis scenarios to demonstrate important implications of the lane-based model. INTRODUCTION Traditional analytical network models using "links" (or lane groups) based on aggregation of individual lane conditions cannot provide sufficient information about upstream departure and downstream arrival patterns, queue lengths, lane blockage probabilities, backward spread of queues, proportions of traffic arriving during green, and so on at an individual lane level. These requirements are important in modelling the forward movements of platoons at signalised intersections for estimating performance measures (delay, back of queue, stop rate). In particular, estimation of lane queues is problematic with link-based models. These issues are even more important in evaluating closely-spaced intersections with high demand flows where vehicles have limited opportunities for lane changes between intersections. At the same time, traditional network models have been concerned more about modelling forward movement of vehicle platoons than backward spread of queues between intersections (queue spillback) and capacity constraint (demand starvation) related to oversaturated intersection conditions (Taylor and Abdel-Rahim 1998). Although all these elements are important, the lack of modelling of the capacity-reducing effect of blockage of departures by downstream queues and capacity constraint for oversaturated conditions cannot provide a satisfactory network model for high traffic demand conditions experienced in more recent times. Discussion of the lane-based model used in the SIDRA INTERSECTION software in relation to modelling of lane blockage (queue spillback) effects has been presented in previous papers by the author (Akçelik 2013, 2014). This paper discusses the implications of using a lane-based method for the modelling of signal platoons. While estimation of individual lane capacities, lane flows and lane queues is important in assessing performance of a single intersection (Akçelik 1980, 1981, 1984, 1989, 1997), this becomes even more important in network modelling. The use of a lane-based model is essential since saturation levels of individual lanes at upstream and downstream locations may differ significantly due to unequal lane utilisation, different levels of lane blockage, and so on. The backward spread of congestion and upstream capacity constraint makes downstream and ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 2

upstream lane departure and arrival patterns, lane capacities, lane flows and lane queues highly interdependent especially in the case of closely-spaced intersections. A lane-based model is needed to take these interactions into account for reliable modelling of network performance. The model is expected to produce better results in assessing signal coordination quality and optimising signal offsets. The basic aspects of the lane-based network model are described briefly in the next section followed by a brief discussion of concepts related to modelling of vehicle platoons at signalised intersections and an example using various analysis scenarios to demonstrate important implications of the lane-based model. A NEW LANE-BASED NETWORK MODEL The fundamental elements of the lane-based traffic network model developed for, and implemented in, the SIDRA INTERSECTION software Version 6 are: (i) (ii) (iii) determination of the backward spread of congestion as queues on downstream lanes block upstream lanes, application of capacity constraint to oversaturated upstream lanes for determining exit flow rates, thus limiting the flows entering downstream lanes, and modelling second-by-second departure and arrival (platoon) patterns at signals taking into account arrival flow and saturation flow rates of individual lanes at both upstream and downstream intersections. The first two elements are highly interactive with opposing effects. A network-wide iterative process is used to find a solution that balances these opposing effects. This process is implemented as follows: Intersection turning volumes specified as input and adjusted for Unit Time for Volumes, Peak Flow Factor, Flow Scale and Growth Rate parameters are treated as demand flow rates. Differences between upstream and downstream demand flow rates of internal approaches (resulting from differences in input volumes) are treated as midblock inflows (volume gains) and outflows (volume losses). Capacity constraint is applied to departures from oversaturated lanes in determining exit (departure) flow rates. Accordingly, the exit flow rate is determined as the smaller of arrival flow rate and capacity. For each internal approach, upstream lane flow rates are determined from exit flow rates according to origin-destination characteristics of traffic departing from all upstream lanes. For each internal approach, arrival flow rates at downstream (stop line) locations are determined according to upstream exit flow rates and net inflow rates (midblock inflows and outflows). Flow Proportions specified as input for Lane Movements (i.e. movements linking each approach lane to each exit lane available) are used for assigning origin - destination (turning) flows departing from each approach lane to their exit lanes as well as for determining the queue blockage effect of each exit lane on each approach lane at an intersection. Lane Movement Flow Proportions reflect lane choices of drivers from approach lanes to exit lanes (possibly to minimise lane changing between intersections). Queue blockage probabilities are used to adjust (reduce) capacities at upstream intersection lanes according to lane-by-lane queue blockage effects, thus emulating the backward spread of congestion. Reduced capacities at upstream lanes may cause oversaturation and result in lower exit flows. This will lead to reduced arrival flows at downstream intersection lanes, and queue blockage probabilities will be lower as a result. This would mean less capacity reduction during the next iteration. An equilibrium solution is sought subject to various parameters that control iterations. ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 3

The reasons why a lane-based network model is needed to identify backward spread of congestion for closely-spaced intersections include the following: (i) (ii) (iii) (iv) upstream lanes will be affected by downstream (exit) lane queues according to the destinations of movements using upstream lanes, saturation levels (v/c ratios) and therefore queue blockage probabilities of individual lanes on an approach can differ significantly, lane under-utilisation can exist due to various reasons including differences in the number of lanes available to particular movements on upstream and downstream approaches, and the balance of upstream and downstream lane flow rates on an internal approach considering midblock lane change implications within a short distance where long queues exist is also an important consideration. For signalised intersections, second-by-second departure flow patterns derived for upstream lanes are used to derive platooned arrival patterns for downstream lanes taking into account arrival flow and saturation flow rates of individual lanes at both upstream and downstream intersections. The modelling of departure patterns at upstream lanes takes into account the saturated and unsaturated parts of each green period (two green periods are allowed) for each upstream lane. Conditions of slip lanes, opposed turns and shared lanes are taken into account. The model used for platoon patterns is discussed further in the next section. SIGNAL PLATOON MODEL The modelling of arrival patterns at downstream lanes takes into account lane changes due to exit short lanes at upstream locations and approach short lanes at downstream locations, as well as midblock lane changes based on matching of upstream and downstream lane flow rates. The second-by-second upstream departure flow patterns are moved forward towards the downstream lane stop lines at the approach cruise speed by applying the required lane changes. Any midblock inflow and outflow rates are also taken into account. The method is applied by Movement Class (Light vehicles, Heavy Vehicles, Buses, Large Trucks, etc.) since each class can have a different approach cruise speed and different lane use. The term platoon pattern is used as a general term to refer to second-by-second arrival or departure flow rate (veh/s) for a signal cycle. The related parameters are discussed in the next section. The second-by-second platoon patterns determined by the program are used to calculate the following parameters for each approach lane for use in performance calculations: Percent Arriving During Green, Platoon Ratio, and Delay and Queue Progression Factors. The method has its origin in the US Highway Capacity Manual (TRB 2010) for delay calculations (using the Delay Progression Factor), and its extension by the author (Akcelik 1995, 1996) for back of queue, queue clearance time, proportion queued, queue move-up rate and effective stop rate calculations (using the Queue Progression Factor). For the example given in the next two sections, Percent Arriving During Green and Platoon Ratio parameters are given as determined for individual lanes and movements (lane groups) for three analysis scenarios. For this reason, these parameters are described below. The Percent Arriving During Green, PG is given by (see the example shown in Figure 1): PG = NG / NC = NG / (NG + NR) (1) where NG is the number of vehicles arriving during green period, NR is the number of vehicles arriving during red period, and NC = NG + NR is the number of vehicles arriving during the signal cycle. The Platoon Ratio, PA is given by: PA = PG / u = PG / (g / c) (2) where PG is from Equation (1) and u = g / c is the green time ratio (g = effective green time, c = cycle time). ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 4

The Platoon Ratio is greater than one when more vehicles arrive during green. For non-platooned (uniform) arrivals as relevant to isolated intersections, PG = u = g / c and PA = 1.0 apply. The average arrival flow rates (veh/h) during the signal cycle, green and red periods are given by: qac = 3600 NC / c (3a) qag = 3600 NG / g (3b) qar = 3600 NR / r (3c) Therefore, the following relationship applies to Percent Arriving During Green: PG = qag g / qac c = PA g / c (4) Number of arrivals during red, N R = 5 veh Number of arrivals during green, N G = 20 veh red time, r = 40 s green time, g = 60 s cycle time, c = 100 s N c = N G + N R = 20 + 5 = 25 veh P G = N G / N C = 20 / 25 = 0.80 q a = 3600 N c / c = 900 veh/h u = g / c = 0.40 P A = P G / u = 0.80 / 0.40 = 2.00 Figure 1 - Definition of Percent Arriving During Green ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 5

EXAMPLE A case of signalised staggered T intersections with 180 m distance between them is considered as an example to investigate basic aspects of the lane-based network model in relation to signal platooning. The intersection geometry, signal phasing and related parameter values are shown in Figure 2. Site Origin - Destination (OD) flows (intersection turning volumes) and Network Origin - Destination (OD) flows are shown in Figure 3. The Site OD flows between the two intersections have been matched perfectly for the purpose of this analysis. If the Site OD flows at the two intersections result in upstream and downstream flows which do not match, midblock inflow and outflow values determined by the model are included in the analysis. This does not apply in this example. The Network OD flows that match the Site OD flows are also provided for analysing differences between analysis scenarios with and without knowledge of Network OD flows. Three analysis scenarios are considered to investigate the differences between signal platooning and the resulting performance estimates according to the assumptions about approach lane use and exit lanes chosen in departing from an intersection. The differences between the analysis scenarios can be identified according to differences in midblock lane change implications for internal approach lanes. Lane Utilisation Ratios and Lane Movement Flow Proportions are the parameters that can be specified as input to the model according to these assumptions. The analysis scenarios are summarised in Table 1. Analysis Scenario (i) assumes that only the Site OD flows (intersection turning volumes) are known at each intersection, and the Network OD flows are not known. Scenarios (ii) and (iii) assume that the Network OD flows are known in addition to the Site OD flows as shown in Figure 3. These assumptions form the basis of other assumptions in setting the analysis scenarios. Approach and Exit lanes are numbered from left to right in the direction of movement. For all lanes, Analysis Scenario (i) uses default Lane Movement Flow Proportions based on 100% flow to the most direct exit lane. In Scenarios (ii) and (iii), defaults are used for Site 1 North and Site 2 South Through movements, and the values shown in Table 1 are specified for Site 1 West Right and Site 2 East Right movements based on known Network OD flows. Analysis scenario Table 1: Three analysis scenarios for the example of staggered T intersections Lane Movement Flow Proportions External approach Through lanes (Site 1 North and Site 2 South) Internal approach Through lanes (Site 1 South and Site 2 North) (i) Default (100% for all) Equal lane use Equal lane use Yes (ii) Site 1 West Right: 40% - 60% Site 2 East Right: 70% - 30% (to Exit Lanes 1 and 2)* (iii) As in Scenario (ii) Unequal lane use Site 1 North, Lane 2, LUR = 18.3% Site 2 South, Lane 2, LUR = 53.0% Equal lane use Equal lane use Yes Equal lane use Midblock lane changes on internal approaches * For Site 1 North and Site 2 South Through movements in Scenarios (ii) and (iii), default Lane Movement Flow Proportions (100% to the most direct exit lane) are used. No ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 6

Analysis Scenarios (i) and (ii) assume equal lane use for all Through approach lanes. Equal lane use for approach lanes means that lane degrees of saturation are equal (Akcelik 1984, 1989, 1997). In this example, through lanes have equal capacity values, therefore equal lane use means equal lane flows. Assumption of equal lane use for all approaches results in implied midblock lane changes. These are identified by comparing the upstream lane flows (flows at entry to an internal approach) with downstream approach (stop line) lane flows. Analysis Scenario (iii) assumes that there are no implied midblock lane changes. This is achieved my matching upstream and downstream lane flows for internal approaches. For this purpose, equal lane use is assumed for Through movements at the downstream internal approach and unequal lane use is assumed for Through movements at the upstream external approach. Lane Utilisation Ratios are determined for external approach Through lanes in such a way that there are no implied midblock lane changes. This scenario assumes that drivers select their lanes correctly at the first intersection according to destinations at the next intersection. All scenarios were analysed using a Network cycle Time of 100 s. Phase Times were calculated applying "green split priority" to internal approach movements (Akçelik 1981, 1990). Phase Times were the same for Scenarios (i) and (ii) but varied for Scenario (iii) due to unequal lane use. For signal coordination purposes, Site 2 is the Reference Site (Offset = 0), and Phase A is the Reference Phase for both Sites. For all scenarios, Offset = 16 s was specified for Site 2. This is the travel time offset for the Northbound Through movement. This means that the green time for the Site 2 Through phase starts at 0 seconds and the green time for the Site 1 Through phase starts at 16 seconds. Movement timing diagrams for the Northbound movements for Scenarios (i) and (ii) are shown in Figure 4. They are similar for Scenario (iii). Many other analysis scenarios are possible considering different lane use patterns and Lane Movement Flow Proportions. This is discussed further in the section titled Analysis Results. For the purpose of this paper, the presentation was limited to three analysis scenarios. For all scenarios, the network model iterations were carried out until the difference in any lane degree of saturation is less than 1 per cent (Stopping dx = 1%). ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 7

2-East 1-West 26 th ARRB Conference Research driving efficiency, Sydney, New South Wales 2014 1-North Site 1 1-South Internal No Pedestrians No HVs Lane Width = 3.3 m (all). Basic Satn Flow: 1900 tcu/h (all) Cruise speed for internal approaches: 45 km/h (12.5 m/s) All external approaches are treated as isolated (no coordination). 180 m 2-North Internal Network Cycle Time = 100 s Yellow Time = 3 s (all) All-Red Time = 2 s (all) Green split priority applied to internal approach movements Reference Phase: A (both Sites) Separate controllers used for Sites 1 and 2 (different phase times apply. Site 2 2-South Reference Site Site 1 A B C Site2 A B C Figure 2 - Example: signalised staggered-t intersections ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 8

SITE OD MOVEMENT VOLUMES 1-North 1130 690 290 400 130 1000 No midblock inflow or outflow 1-West 630 1-South Internal 1270 1 1400 790 610 Peaking parameters: T = 60 min Tp = 30 min PFF = 100 % No HVs 1900 2-North Internal 2 2-East 1400 150 320 820 1550 2-South NETWORK OD MOVEMENT VOLUMES Northbound Movements 1120 Southbound Movements 150 550 55% 45% 450 1000 350 280 1 40% 60% 160 240 1 630 1270 400 610 790 150 350 30% 70% 450 160 2 2 1400 280 1120 20% 80% This example assumes perfect knowledge of Network OD volumes 240 550 Figure 3 - Site and Network Origin - Destination flows for the example shown in Figure 2 ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 9

Displayed Phase Times Site 1 Site 2 Effective Green and Red Times for Movements Site 1 Site 2 Most Site 2 South Through vehicles going Through at Site 1 arrive during green signal. All Site 2 East Right-turn vehicles going Through at Site 1 arrive during red signal. Signal Offsets apply to Phase Change Times (end of previous phase green). In this example, Site 2 is the Reference Site (Offset = 0), and Offset = 16 s is specified for Site 1 (travel time offset for the Northbound movement). Effective green and red times for movements are derived from displayed phase times using start loss and end gain values of 3 s (default). Figure 4 - Movement timing diagram for Northbound movements in Scenarios (i) and (ii) ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 10

ANALYSIS RESULTS The upstream and approach lane flows and any implied midblock lane changes for Analysis Scenarios (i) to (iii) are shown in Figures 5 to 7. Note that the same lane change values for entry into short lanes are included in all analysis scenarios. These are different from "midblock lane changes" based on matching of upstream and downstream lane flow rates. Comparisons of results for Scenarios (i) to (iii) for Through movement lanes on external and internal approaches are presented in Table 2. Comparisons of results for Scenarios (i) to (iii) for internal Left and Through (platooned) movements are presented in Table3. The following can be observed from the results given in these tables: There are significant differences in platoon characteristics (percent arriving during green and platoon ratio) modelled per lane and per movement. As a result, there can be significant differences in performance statistics estimated on a per lane and per movement (lane group) basis. The results given in Tables 2 and 3 are obtained from the SIDRA INTERSECTION software which models capacities and performance measures for individual lanes rather than movements. The value for movements are derived from lane values considering the lanes used by the movement. Although the performance estimates for different analysis scenarios look close generally, the differences in individual lane values can be significant especially for the back of queue estimates, especially when the approach (midblock) distance between intersections is low and lane blockage effects are likely to come in, and when sensitivities are higher at higher degrees of saturation. Average delay values per movement can hide larger values of lane delay when there is significant unequal lane use. Scenario (iii) demonstrates the relevance of unequal lane use often observed at closely spaced intersections due to the network origin - destination effects. Signal timings get affected by unequal lane use, and these in turn affect platooning, delay and queue length results. Scenario (iii) requires extra analysis effort to achieve matching of upstream and downstream (approach) lane flows by determining Lane Utilisation Ratios and Lane Movement Flow Proportions. Network OD flow information is needed for the latter. The use of default lane flows (assuming equal lane use) and default Lane Movement Flow Proportions (exit to most direct lane) may be adequate for large-scale network analyses. However, more detailed analysis as demonstrated for Scenario (iii) is justified for important projects involving design of small-sized networks as in this example. Many other analysis scenarios are possible considering different lane use patterns and Lane Movement Flow Proportions. For example, Lane Movement Flow Proportions for Site 1 West and Site 2 East Right movements could be specified as 50% - 50% (to Exit Lanes 1 and 2) when the Network OD flow information is not available. Another possible scenario is to assume unequal lane use for internal approach Through lanes and equal lane use for external approach Through lanes. For this example, this scenario resulted in lane blockage of upstream lanes when no midblock lane change was assumed. This scenario becomes unrealistic as drivers would be likely to avoid blocking lanes and use underutilised internal approach lanes where queue lengths are much shorter. Assuming unequal lane use but with more balanced lane flows for internal approach Through lanes so that lane blockage did not occur, this scenario indicated implied significant midblock lane changes. This is also unrealistic considering platooned movements between closely-spaced intersections. Refer to previous papers by the author for detailed discussion of lane blockage (queue spillback) modelling (Akçelik 2103, 2014). ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 11

Scenario (i): Equal lane use of external and internal approach Through lanes (Site 1 North & South and Site 2 North & South). Default Lane Movement Flow proportions are used for all lanes (shown for Site 1 West and Site 2 East Right movements). Midblock lane changes on internal approaches are implied. 3 2 1 1000 Equal lane use for Through lanes 400 for Site 1 Stop-line arrival flows Equal lane use for Through lanes 630 635 635 630 Site 1 1 2 3 400 00 900 0 505 for Site 1 Upstream flows for Site 2 North approach Midblock lane change 1265 1265 635 395 1005 1005 565 Midblock lane change Upstream flows for Site 1 South approach 700 1200 for Site 2 3 2 1 Site 2 610 395 395 610 Equal lane use for Through lanes Stop-line arrival flows for Site 2 North approach for Site 2 700 700 Equal lane use for Through lanes 1400 1 2 3 Figure 5 - Scenario (i):- Equal lane use of external and internal approach Through lanes, and default Lane Movement Flow Proportions ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 12

Scenario (ii): Equal lane use of external and internal approach Through lanes (Site 1 North & South and Site 2 North & South). Midblock lane changes on internal approaches are implied. Lane Movement Flow Proportions specified for Site 1 West Right (40% - 60%) Defaults used for other lanes. 3 2 1 1000 Equal lane use for Through lanes 400 for Site 1 Stop-line arrival flows Equal lane use for Through lanes 630 635 635 630 Site 1 1 2 3 240 0 740 0 160 660 345 for Site 1 Upstream flows for Site 2 North approach Midblock lane change 1265 1265 635 395 1005 1005 215 Midblock lane change Upstream flows for Site 1 South approach 1050 850 for Site 2 350 150 3 2 1 Site 2 610 395 395 610 Equal lane use for Through lanes Stop-line arrival flows for Site 2 North approach Equal lane use for Through lanes for Site 2 1400 700 700 1 2 3 Lane Movement Flow Proportions specified for Site 2 East Right (70% - 30%). Defaults used for other lanes. Figure 6 - Scenario (ii):- Equal lane use of external and internal approach Through lanes ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 13

Scenario (iii): Unequal lane use of external approach Through lanes (Site 1 North and Site 2 South) and equal lane use of internal approach Through lanes (Site 1 South and Site 2 North), No midblock lane changes on internal approaches. Lane Movement Flow Proportions specified for Site 1 West Right (40% - 60%) Defaults used for other lanes. 3 2 1 1000 Unequal lane use for Through lanes 400 155 845 for Site 1 Stop-line arrival flows Equal lane use for Through lanes Site 1 630 635 635 1 2 3 630 240 0 160 395 1005 for Site 1 Upstream flows for Site 2 North approach No midblock lane change 1265 1265 635 395 1005 1005 No midblock lane change Upstream flows for Site 1 South approach 1265 635 for Site 2 350 150 3 2 1 Site 2 610 395 395 610 Equal lane use for Through lanes Stop-line arrival flows for Site 2 North approach Unequal lane use for Through lanes for Site 2 1400 915 485 1 2 3 Lane Movement Flow Proportions specified for Site 2 East Right (70% - 30%). Defaults used for other lanes. Figure 7 - Scenario (iii):- Unequal lane use of external approach Through lanes and equal lane use of internal approach Through lanes ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 14

Table 2: Comparison of results for Analysis Scenarios (i) to (iii) described in Table 1 (Through movement lanes on external and internal approaches only) Approach Lane Arrival Flow (veh/h) Analysis Scenario (i) Capacity (veh/h) Deg. of Satn (v / c) Percent Arriving During Green (%) SITE 1 Cycle Time = 100, Phase Times: 57, 13, 30 Platoon Ratio Aver. Delay (s) 95th %ile Back of Queue South Lane 2 635 988 0.643 80.3% 1.544 9.8 88 Lane 3 635 988 0.643 58.3% 1.122 20.7 144 North Lane 1 1235 0.405 65.0% 1.000 10.6 80 Lane 2 1235 0.405 65.0% 1.000 10.6 80 (m) Total Operating Cost ($/h) Total CO2 Emission Intersection 3720 0.898 19.8 157 1646.6 531.0 SITE 2 Cycle Time = 100, Phase Times: 14, 42, 44 South Lane 1 700 969 0.722 51.0% 1.000 22.1 184 Lane 2 700 969 0.722 51.0% 1.000 22.1 184 North Lane 2 395 703 0.562 50.9% 1.375 26.4 93 Lane 3 395 703 0.562 51.8% 1.399 26.0 92 Intersection 3770 0.921 23.7 184 1860.8 542.3 Analysis Scenario (ii) SITE 1 Cycle Time = 100, Phase Times: 57, 13, 30 South Lane 2 635 988 0.643 68.6% 1.320 16.1 121 Lane 3 635 988 0.643 81.5% 1.568 9.3 84 North Lane 1 1235 0.405 65.0% 1.000 10.6 80 Lane 2 1235 0.405 65.0% 1.000 10.6 80 Intersection 3720 0.898 19.6 157 1617.3 526.1 SITE 2 Cycle Time = 100, Phase Times: 14, 42, 44 South Lane 1 700 969 0.722 51.0% 1.000 22.1 184 Lane 2 700 969 0.722 51.0% 1.000 22.1 184 North Lane 2 395 703 0.562 52.7% 1.426 25.5 91 Lane 3 395 703 0.562 52.9% 1.430 25.8 91 Intersection 3770 0.921 23.5 184 1854.0 541.3 Analysis Scenario (iii) SITE 1 Cycle Time = 100, Phase Times: 57, 13, 30 South Lane 2 635 988 0.643 68.0% 1.308 16.4 122 Lane 3 635 988 0.643 69.5% 1.337 15.7 119 North Lane 1 845 1235 0.684 65.0% 1.000 13.5 180 Lane 2 155 1235 0.125 65.0% 1.000 8.8 20 Intersection 3720 0.898 20.7 180 1684.4 539.0 SITE 2 Cycle Time = 100, Phase Times: 14, 48 38 South Lane 1 915 1083 0.845 57.0% 1.000 24.7 279 Lane 2 485 1083 0.448 57.0% 1.000 15.0 95 North Lane 2 395 817 0.483 53.4% 1.241 22.9 84 Lane 3 395 817 0.483 63.1% 1.467 18.6 71 Intersection 3770 0.921 24.0 279 1873.3 541.6 Site 1 South (Northbound) and Site 2 North (Southbound) are internal approaches (platooned arrivals apply) (kg/h) ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 15

Table 3: Comparison of results for Analysis Scenarios (i) to (iii) described in Table 1 for internal Left and Through (platooned) movements Movement Analysis Scenario (i) SITE 1 - South Internal (NB) Arrival Flow (veh/h) Deg. of Satn (v / c) Percent Arriving During Green (%) Platoon Ratio Aver. Delay (s) 95th %ile Back of Queue Left 630 0.425 90.1% 1.099 5.7 34 Thru 1270 0.643 69.3% 1.333 15.3 144 SITE 2 - North Internal (SB) Left 610 0.416 85.1% 1.050 6.6 47 Thru 790 0.562 51.3% 1.387 26.2 93 Analysis Scenario (ii) SITE 1 - South Internal (NB) Left 630 0.425 86.0% 1.049 6.1 47 Thru 1270 0.643 75.1% 1.444 12.7 121 SITE 2 - North Internal (SB) Left 610 0.416 84.8% 1.047 6.3 48 Thru 790 0.562 52.8% 1.428 25.5 91 Analysis Scenario (iii) SITE 1 - South Internal (NB) Left 630 0.425 88.7% 1.081 5.9 38 Thru 1270 0.643 68.7% 1.322 16.1 122 SITE 2 - North Internal (SB) Left 610 0.416 89.6% 1.106 5.8 34 Thru 790 0.483 58.2% 1.354 20.8 84 (m) CONCLUSIONS A lane-based analytical network model that derives second-by-second platoon patterns for signalised intersections is discussed. The importance of modelling individual lane departure and arrival patterns, and consideration of implied midblock lane changes have been emphasised. This method coupled with a lane-based model allowing for the backward spread of congestion and upstream capacity constraint is expected to produce better results in assessing signal coordination quality and optimising signal offsets. A detailed example is presented using various analysis scenarios to investigate the differences in signal platooning and the resulting performance estimates according to the assumptions about approach lane use and exit lanes chosen in departing from an intersection. The differences between the analysis scenarios are identified according to differences in midblock lane change implications for internal approach lanes. The analysis results show that there are significant differences in platoon characteristics modelled per lane and per movement. As a result, there can be significant differences in performance statistics estimated on a per lane and per movement (lane group / link) basis. ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 16

One of the analysis scenarios specified unequal lane use on external approaches so that there are no implied midblock lane changes (i.e. assumed that drivers select their lanes correctly at the first intersection according to destinations at the next intersection). This demonstrated the relevance of unequal lane use often observed at closely spaced intersections due to the network origin - destination effects. This analysis requires extra effort to achieve matching of upstream and downstream (approach) lane flows by determining Lane Utilisation Ratios and Lane Movement Flow Proportions. Network OD flow information is needed for the latter. The use of default lane flows (assuming equal lane use) and default Lane Movement Flow Proportions (exit to most direct lane) may be adequate for large-scale network analyses. However, more detailed analysis is justified for important projects involving design of small-sized networks as in this example. After the writing of this paper, an enhancement was introduced to the analysis of closely-spaced intersections. When the Network OD flows are known, external approach movements that continue as turning movements on internal approaches (left turns for the example given in this paper) are specified as Special Movement Classes using the User Movement Class facility of SIDRA INTERSECTION. These movements can then be assigned to upstream and downstream lanes according to their downstream destinations. This was found to improve the lane-based modelling of second-by-second platoon patterns further. Further analyses of different lane use scenarios are recommended for their effects on signal platoon patterns and resulting performance estimates. Real-life surveys of lane use at closelyspaced intersections and analyses using micro-simulation to compare results with those from analytical models are recommended. REFERENCES AKCELIK AND ASSOCIATES (2014). SIDRA INTERSECTION User Guide for Version 6. Akcelik and Associates Pty Ltd, Melbourne, Australia. AKÇELIK, R. (1980). Lane utilisation and saturation flows. Traffic Engineering and Control, 21(10), pp 482-484. AKÇELIK, R. (1981). Traffic Signals: Capacity and Timing Analysis. Research Report ARR No. 123. ARRB Transport Research Ltd, Vermont South, Australia. (6th reprint: 1995). AKÇELIK, R. (1984). SIDRA-2 does it lane by lane. Proc. 12th ARRB Conf. 12 (4), pp 137-149. AKÇELIK, R. (1989). On the estimation of lane flows for intersection analysis. Aust. Rd Res. 19(1), pp 51-57. AKÇELIK, R. (1990). Green splits with priority to selected movements. Traffic Engineering and Control, 31 (7/8), pp 402-405. JOHNSON, B. and AKÇELIK, R. (1992). Review of Analytical Software for Applicability to Paired Intersections. Proc. 16th ARRB Conf. 16 (5), pp 347-367. AKÇELIK, R. (1995). Extension of the Highway Capacity Manual Progression Factor Method for Platooned Arrivals. Research Report ARR No. 276. ARRB Transport Research Ltd, Vermont South, Australia. AKÇELIK, R. (1996). Progression factor for queue length and other queue-related statistics. Transportation Research Record 1555, pp 99-104. AKÇELIK, R. (1997). Lane-by-lane modelling of unequal lane use and flares at roundabouts and signalised intersections: the SIDRA solution. Traffic Engineering and Control, 38 (7/8), pp 388-399. HANSLIP, R. and AKÇELIK, R. (2003). Traffic Signals: Design and Analysis. In: Traffic Engineering and Management (Ed. W. Young). Monash University. AKÇELIK, R. (2013). Lane-based micro-analytical model of a roundabout corridor. CITE 2013 Annual Meeting, Calgary, AB, Canada. ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 17

AKÇELIK, R. (2014). Modelling Queue Spillback and Upstream Signal Effects in a Roundabout Corridor. TRB 4th International Roundabout Conference, Seattle, WA, USA. AUSTROADS - AGTM09-09 (2009). Guide to Traffic Management Part 9: Traffic Operations. Association of Australian State Road and Transport Authorities, Sydney. TAYLOR, W.C. and ABDEL-RAHIM, A.S. (1998). Analysis of Corridor Delay under SCATS Control (Orchard Lake Road Corridor). Final report. Department of Civil and Environmental Engineering, Michigan State University, East Lansig, Michigan, USA. TRB (2010). Highway Capacity Manual. Transportation Research Board, National Research Council, Washington, DC, USA. ACKNOWLDGEMENTS The author acknowledges the contributions of Mark Besley, Sabine Boukamp, Harry Cai, Tony Phan and Ben Greene to the implementation of the model discussed in this paper in the SIDRA INTERSECTION software. AUTHOR BIOGRAPHY Dr Rahmi Akçelik is a leading scientist and software developer with 40 years of practical, research and training experience in the area of traffic engineering, management and control. He is Director of Akcelik and Associates Pty Ltd (trading as SIDRA SOLUTIONS). Dr Akçelik has over 300 technical publications in his area of expertise. He is the author of the SIDRA INTERSECTION and SIDRA TRIP software packages. Dr Akçelik served as member of the US Transportation Research Board Committees on Highway Capacity and Quality of Service, and Traffic Signal Systems. He has contributed to various Austroads Guides and the US Highway Capacity Manual. He has trained several thousand professionals in more than 250 workshops, courses and seminars. Awards received by Dr Akçelik include the 1999 Clunies Ross National Science and Technology award for outstanding contribution to the application of science and technology, the ITE (USA) 1986 Transportation Energy Conservation Award, and the ITE (Australia & New Zealand) 2008 Contribution to the Transportation Profession Award. Email: rahmi.akcelik@sidrasolutions.com Mail: P O Box 1075G, Greythorn Vic 3104, Australia Copyright Licence Agreement The Author allows ARRB Group Ltd to publish the work/s submitted for the 26th ARRB Conference, granting ARRB the non-exclusive right to: publish the work in printed format publish the work in electronic format publish the work online. The Author retains the right to use their work, illustrations (line art, photographs, figures, plates) and research data in their own future works. The Author warrants that they are entitled to deal with the Intellectual Property Rights in the works submitted, including clearing all third party intellectual property rights and obtaining formal permission from their respective institutions or employers before submission, where necessary. ARRB Group Ltd and Akcelik & Associates Pty Ltd 2014 18