BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION

Similar documents
HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

Maine Department of Environmental Protection (MEDEP) Stone Farm, Arundel Sample Collection - Data Report Summary Report Date: June 15, 2017

APPENDIX H. Risk-Based Disposal Application. Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area

Business Risk Management

Hunters Point Naval Shipyard Environmental Remediation Program Overview

Write a hypothesis for your experiment (which factor increases cricket chirping) in the If then format.

Hunters Point Naval Shipyard

Survey Technique for Underwater Digital Photography with Integrated GPS Location Data

GLOSSARY. Contaminated Debris Disposal - the ability to directly dispose of contaminated material and/or contract for its disposal

Exhibit 2 Preliminary Conceptual Site Model

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER)

INDUSTRIAL HYGIENE GROUP Standard Operating Procedure. TVA-1000 PID/FID Portable Toxic Vapor analyzer. 1 of 9. Contents

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

b. Graphs provide a means of quickly comparing data sets. Concepts: a. A graph can be used to identify statistical trends

POLICE DIGITAL FORENSIC SPECIALIST

Keller Canyon Landfill Soil Disposal Discussion. Contra Costa County Department of Environmental Health Community Meeting.

QUALIFICATIONS OF GRADUATES

HAZARDOUS MATERIALS TECHNICIAN

DEPARTMENT OF CHEMISTY, PHYSICS AND GEOLOGY RADIATION SAFETY PLAN

STANDARD OPERATING PROCEDURES

HAZARDOUS MATERIALS TECHNICIAN NFPA 472, 2008 Edition

GRADE LEVEL(S): Grade 4, Grade 5

STANDARD OPERATING PROCEDURE GEOTECHNICAL LOGBOOK/ TRIP REPORT PREPARATION

STANDARD OPERATING PROCEDURES

Blood Spatter Inquiry

Top Tips to Mitigate. Food Fraud COPYRIGHT ALL RIGHTS RESERVED.

Hazardous Material Emergency Spill Response Protocol WAC

SITE TESTING STANDARDS FOR METHANE

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

Excavations and Trenches

Revised Corrective Action Plan Part B

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

UNIVERSITY OF RICHMOND

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

Ohio EPA. Division of Air Pollution Control. Engineering Guide #78. (also known as DSIWM Guidance Document #1001 and #1002)

Air Force Calibration Interval Analysis of Test, Measurement and Diagnostic Equipment (TMDE) Based on Maintenance Data Collection (MDC)

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Investigation of failures

Hazardous Waste Operations / Emergency Response HAZWOPER Hazardous waste operations and emergency response

ASTM WK Standard Test Method for Dissolved Gases. Anne Jurek Applications Chemist

Guidance on room integrity testing and its interpretation

Spirit Lesson 3 Robot Wheelies Lesson Outline Content: Context: Activity Description:

HAZARDOUS INCIDENT SITE SAFETY PLAN

Adjustable Depth Air Sparging for

RADON SCREENING SURVEY FOLLOW-UP MONTGOMERY VILLAGE MIDDLE SCHOOL Watkins Mill Road, Montgomery Village, Maryland 20886

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Rope Rescue. Approved by MCERS on 2/18/2016. These SOGs are based on FEMA guidelines FA-197

KWA. Evaluation of the MassTech 001 Tank Integrity Test System. EPA Forms Obtained From

Using Darts to Simulate the Distribution of Electrons in a 1s Orbital

OPERATING PROCEDURE. Number: V2. Authors. Approvals

Engineering Response to. Workplace Accidents. Oregon Governor s Occupational Safety and Health Conference. Introduction

HAZWOPER. A planning guide for the perplexed. The Oregon Occupational Safety & Health Division

Delaware Geological Survey Open File Report No. 51

A New Leak Detection System for Long-Distance Pipelines Utilizing Soil-Gas Techniques

NSW Rugby League Limited Privacy Policy

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

CCR Fugitive Dust Control Plan

Cordova Harbor Page 2 of 9

Laboratory Safety Training. Environmental Health and Safety

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

CALIBRATION SYSTEM REQUIREMENTS. ESCC Basic Specification No

Quick run through of the four projects

RADON SCREENING SURVEY FOLLOW-UP RADNOR CENTER Radnor Road, Bethesda, Maryland 20817

Hazardous Materials Management Guidelines

HAZARDOUS MATERIALS AND WASTE

Storage and Pre-planning Considerations

Hazardous Materials Management. Presented by. James E. Roughton, MS, CSP, CRSP, CHMM.

Mobile Training Unit (MTU)

The Maine Healthy (Coastal) Beaches Program: Training Plan for Collecting Water Samples and Recording Environmental Data

B&B Gas Well Services, LLC HEALTH, SAFETY AND ENVRONMENTAL MANUAL HAZARD COMMUNICATION PROGRAM

The FLUX-METER: implementation of a portable integrated instrumentation for the measurement of CO 2 and CH 4 diffuse flux from landfill soil cover.

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

NEED FOR SUPPLEMENTAL BATHYMETRIC SURVEY DATA COLLECTION

Standard 3.1 The student will plan and conduct investigations in which

MICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS

Additional Reading General, Organic and Biological Chemistry, by Timberlake, chapter 8.

RISK ENGINEERING TECHNICAL GUIDE

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION

When Bad Things Happen to Good Property

DEALING WITH HAZARDOUS SPILLS

Section 33 TABLE OF CONTENTS Hazardous Waste Operations and Emergency Response (HAZWOPER) 33.A General

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Educational Innovations

Traffic Accident Data Processing

Gas Absorption Column CAG

CORRECTIVE ACTION PLAN (COST PROPOSAL NO. 11)

A New Approach! Analyzing and Preventing Slips in the Workplace

Evaluation of the Mass Technology Precision Mass Measurement System on Bulk Field-Constructed Tanks (120,000 Gallon Vertical Tank Evaluation)

Infrared Thermography Inspection Guidelines. Date Issued:

Custodian of. 3.4 Hazardous Waste Facility Inspections 22 CCR (d) (CSUF) 3 years

Introduction to Emergency Response & Contingency Planning

Depleted Uranium Recovery. Sandia National Laboratory. Long Sled Track

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

Introduction This section includes suggestions on how to use this guide, an overview of course philosophy and goals.

Tracking Juvenile Summer Flounder

Introduction This section includes suggestions on how to use this guide, an overview of course philosophy and goals.

School Bicycling and Walking Policies: Addressing Policies that Hinder and Implementing Policies that Help

Confined Space Entry Program 8 CCR 5157

Transcription:

BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION 1

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 1 Standard 1 Sunshine State Standards: SS.A.1.4.4, SS.C.1.4 The students will practice interview techniques, gather information, interpret and generalize information gathered. Historical files at City Hall. Background After completing this activity the student will understand that the purpose of Phase I is to identify and document current and historical environmental conditions of a site. Discover the presence of substances that indicate an existing, past or potential adverse impact to the air, soil, ground water or surface water as a result of operations on the site and adjacent and surrounding properties. Determine if further investigation may be necessary to evaluate the potential environmental liabilities associated with the subject site. In the investigation, the students will follow standard testing procedures to evaluate the site. Procedure Students will take a field trip to City Hall to investigate records of the site. : 1. Upon arrival at City Hall, students will meet with the city official in charge of records and interview him/her. After discussion with that person, 2. Students will search records and record any instances of possible hazardous waste on site or on nearby sites. 3. Summarize findings in a report. Discuss findings during following class period and determine the next step in Phase I procedure. 2

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 2 Standard 1 Sunshine State Standards: SC.H.1.4.1 Students will develop and use a survey instrument, practice analysis skills and practice interview techniques. Survey Background See 1 Standard 1 Procedures Students will discuss possible survey questions, how to write them, and to whom to administer the questions. Part A 1. Students, through discussion, will develop a set of site appropriate survey questions. 2. In small groups, student teams will come up with five good critical thinking questions for the survey. Part B 1. Once developed, students will administer the survey to all appropriate people both on and off site. 2. Upon completion, students will compile statistical information. Teacher evaluation of survey and results. 3

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 3 Standard 1 Sunshine State Standards: SS.B.1.4.1, SS.B.2.4.1 Students will learn how to do a site survey and practice graphing skills. Clipboards, graph paper, pencils, tools to measure distances (ruler, yardstick, tape measure, etc.) Background See 1 Standard 1 1. Students will work in teams to draw and label a site plan of the site being studied. 2. After teams have finished their individual drawings, a plan of the entire site can be put together by joining individual team plans together. 3. Complete site plan will be titled, labeled with legend, compass, etc. and mounted on poster board to display in room. Grade individual team site plans and completed site plan. 4

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 1 Standard 2 Sunshine State Standards: SS.B.2.4.7 Students will determine past history of site through review of historical records. Information collected from field trip to City Hall. Background During this procedure, the student understands the consequences of NOT following set standards (ASTM E 1527-00), the importance of quality assurance in tasks performed, and documentation necessary to support their findings. 1. Class will be divided into four teams to review the information collected previously at City Hall regarding the site being studied. Team A will review historical aerial photos and current aerial photos of site. Team B will review historical records of site usage from City Hall. Team C will review historical Sandborn maps of site. Team D will survey and interview information for on-site historical information. 2. As a whole, class will compile acquired data into book. Discussion of reviewed information and how it may impact on study. 5

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 2 Standard 2 Sunshine State Standards: SS.B.2.4.7 Students will gather and compile adjacent property information. Clipboards, graph paper, camera and survey questions for each team. Background See 1 Standard 2 1. Students, working in teams, will visually observe and record properties to the North, South, East and West of site being studied. 2. Teams will take photographs documenting observations. 3. Teams will interview available property owners to determine: a. Length of time in area. b. Any historical information the homeowner might have of local area. Compile adjacent area information and add to site book. 6

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 3 Standard 2 Sunshine State Standards: LA.C.1.4.1 Students will practice listening skills and analyze what they learned. Guest speaker (Brownfields attorney or paralegal) Background See activity 1 Standard 2 Procedure Students will listen to and ask pertinent questions of the guest speaker who will speak on laws relating to Brownfields. 1. Students will listen to guest speaker and take notes. 2. Students will ask pertinent questions. 3. General discussion will follow, and students will learn the need for conducting a thorough regulatory review as required by ASTM Standards. Participation of students in discussion. 7

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 4 Standard 2 Sunshine State Standards: LA.B.2.4.4 Students will determine if site is on any environmental database of State, Federal, City or Local origin. Background See 1 Standard 2 Procedures Student will go to computer lab and research Environmental Data Bases. Because the students must do a thorough regulatory review as required to the ASTM Standard, they will, by searching various databases, determine: 1. If the site is on any environmental database of any State, City, Federal organization. 2. If there are any UST sites identified within a 1/8-mile radius of the site. 3. If there are any LUST sites identified within a 1/8-mile radius of the site. 4. If there are any RCRIS small quantity generator sites identified within a 1/8-mile radius of the site. 5. If there are any RCRA TSD sites identified within a 1-mile radius of the site. 6. If there are any NPL sites identified within a 1-mile radius of the site. 7. If there are any CERCLA sites identified within a ½ mile radius of the site. 8. If there are any HWS sites identified within a ½ mile radius of the site. 9. If there are nay mappable SWF/LS facilities within a ½ mile radius of the site. Then compile data and add to book. Review findings in a general discussion. 8

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 5 Standard 2 Sunshine State Standards: SC.H.3.4.1, SC.H.3.4.2 SC.H.3.4.3, SC.D.1.4.5 SC.G.1.4.2 Students will practice sampling techniques and learn how to do a site reconnaissance survey. Test equipment provided by a Brownfields company and supervised by professional. Under guidance of a Brownfields professional, class will conduct experiments to determine presence of: 1. Hazardous waste and hazardous substances 2. Air emissions 3. Asbestos 4. Water and wastewater 5. Water wells 6. Geology and lithology 7. Hydrogeology 8. Underground and above ground storage tanks Evaluate experimental data obtained by students. 9

HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 6 Standard 2 Sunshine State Standards: LA.C.1.4.1, LA.C.3.4.2 LA.D.2.4.4 Students will practice listening skills and practice speaking strategies. Background See 1 Standard 2 Procedure Students will listen and discuss site survey results with a professional attorney, insurance person, etc. As a terminating activity for Phase I, students will: 1. Listen to guest speaker talk about the following important subjects: a. Is the compiled report to be legally relied upon by concerned entities (property owners, bankers, purchasers, regulators, etc.)? b. How do insurance providers review this information to assess premiums? c. Why do the public, schools, citizens, and/or property owners, generally have an interest in any issues discovered? 2. Discussion will follow. Participation in discussion. 10

HOW ENVIRONMENTAL SURFACE AND SUBSURFACE INVESTIGATIONS (PHASE II) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY Standard 1 Sunshine State Standards: SC.H.3.4.1 Students will practice standard testing techniques like soil borings and grab samplings. Test equipment provided by a Brownfields professional and used under professional supervision. Background The student will understand that the purpose of the investigation is to delineate the nature and extent of any likely contamination at a site and to determine what remedial steps would be necessary in order to redevelop, sell or finance the site. Procedure Following the direction of Brownfields professionals, students will perform standard tests to determine quality of a site that might affect future purchase or transfer of property. Teams of students will perform: 1. Soil sampling, grab sampling and soil borings in areas of potential hot spots or waste piles. 2. Tests for presence of metals, diesel and gasoline, VOC s, mercury and PCB s to determine if present in soil. 3. Visual screening and use of a photo ionization detector to determine the presence of total petroleum hydrocarbons present. 4. Prepare reports of findings. Students will compare results to acceptable standards and determine if samples fall within those standard limits. 11

HOW ENVIRONMENTAL SURFACE AND SUBSURFACE INVESTIGATIONS (PHASE II) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 1, Standard 2 Sunshine State Standards: SC.H.3.4.1 Students will conduct a complete field investigation under close supervision of professionals. Test equipment provided by a Brownfields professional. Procedure Under supervision of a Brownfields professional, students will conduct a field investigation of the site. In teams, student will perform: 1. A ferromagnetic survey. 2. Grab samples. 3. Hand auger borings. 4. Determine site geology and hydrogeology. Students will then compare their results to an acceptable standard. 12

HOW ENVIRONMENTAL SURFACE AND SUBSURFACE INVESTIGATIONS (PHASE II) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 2, Standard 2 Sunshine State Standards: SC.H.3.4.1 Students will learn the importance of insuring that samples are not contaminated. Material Log books, site map, and graph paper. Procedure Students will take a field visit to a local laboratory to view how scientific analysis is done. 1. Discuss the importance of decontamination and chain-of-custody procedures during the sampling process and the analysis of samples in the laboratory. 2. Observe procedures followed at the laboratory during the guided tour. Discussion of observations from the field visit. 13

HOW ENVIRONMENTAL SURFACE AND SUBSURFACE INVESTIGATIONS (PHASE II) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 3, Standard 2 Sunshine State Standards: SC.H.3.4.1 Students will be able to create and use probe, sampling maps and logs as well as be able to generate summaries of obtained data. Material Log books, site map, and graph paper. Using information gathered in previous activities, students will: 1. Prepare a probe and sampling location map using site map provided. 2. Prepare probing logs. 3. Generate analytical summaries for each boring. Grade finished logs. 14

HOW ENVIRONMENTAL SURFACE AND SUBSURFACE INVESTIGATIONS (PHASE II) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 4, Standard 2 Sunshine State Standards: SC.H.3.4.1 Students will prepare sampling findings in proper format with an accurate analysis. All sample data collected in Phase II. Students will, under supervision, prepare a report on findings, so that the following people will be apprised of findings appropriately. 1. Legal (attorneys, banks, etc.) 2. Insurance. 3. General public. Discussion of completed report with professional Brownfields attorney. 15

REMEDIATION OF A SITE THAT LEADS TO REGULATORY CLOSURE (PHASE III) 1 (one class period) Sunshine State Standards: SC.H.3.4.1 The student will learn the various alternatives to clean-up depending upon the type, extent, and many other factors including cost/benefit analysis. Expert Guest Speaker will be invited to talk with the class and describe clean up options, including, but not limited to: 1. Dual phase vapor extraction wells 2. Air Sparging 3. Biofiltration 4. Natural attenuation 5. Physical Removal 6. Land Farming Students will ask guest speaker previously prepared questions. 16

REMEDIATION OF A SITE THAT LEADS TO REGULATORY CLOSURE (PHASE III) 2 (two class periods) Sunshine State Standards: SC.H.3.4.1 The student will complete an Initial Site Characterization based on the Phase I and Phase II information. Previously prepared Phase I and Phase II reports. Using the reports previously developed during the site investigation, students will: 1. Pull together Phase I and Phase II information 2. Write an encompassing report on the tested site Report will be handed in. 17

REMEDIATION OF A SITE THAT LEADS TO REGULATORY CLOSURE (PHASE III) 3 (two or three class periods) Sunshine State Standards: SC.H.3.4.1 The students will create a Corrective Action Plan (CAP) that meets the test of the State agency and US EPA. Under guidance from a Brownfields professional, students will: 1. Determine the type of remediation to be used 2. Use the standards for soil and water removal required by the State and US EPA 3. Follow sampling and monitoring requirements 4. Develop an Operations and Maintenance Plan 5. Determine cost of the clean-up operation Grade the Plan and Cost sheet developed. 18

REMEDIATION OF A SITE THAT LEADS TO REGULATORY CLOSURE (PHASE III) 4 (two class periods) Sunshine State Standards: SC.H.3.4.1 The student will prepare the necessary reports required by the various agencies that demonstrate progress and accountability of the system that is selected. Upon achieving the necessary goal, the student will also learn further demonstration and proof that the site is completely clean according to the use of the site. Students, using information from 3 of Phase III will prepare final agency reports, which should include: 1. A No Further Action letter issued by the State 2. The ability to transfer a clean property from one owner to the next 3. Appropriate information for any environmental insurance carrier 4. Comfort to the buyer and seller of the property 5. Comfort to the lending institution 6. Completion of the project Completed work. 19