ISO DownForce Valve Block Tee (Kinze 4000)

Similar documents
Ag Leader Technology Proportional Valve

Schroeder Check Test Point System

General Information. Installation Instructions. CP1000 & FCP1000 Folding Markers. Used with: CP1000 FCP1000

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

Air Intake Snorkel Kit

1. SAFETY 2. PREPARATION 3. FRAME 4. TRANSMISSION 5. DRIVE 6. ROW UNIT 7. OPTIONAL EQUIPMENT

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

Instruction & Parts Manual

This section provides general information and recommendations required prior to installing, operating or maintaining your KAT Master Hitch.

Electro-hydraulic control valve - Calibrate - Remote valve calibration

Storage Systems and Accessories

Pressure Dump Valve Service Kit for Series 3000 Units

Technical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6

30T A/Manual Hydraulic Shop Press

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

PDY TON HYDRAULIC CRIMPING TOOL WARNING

Pressure Dump Valve Service Kit for Series 2300 Units

Skid Steer Rotary Cutters

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL

WBM Installation Manual KAT Master Hitch

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

Operating Instructions Model and Hydrostatic Test Pump

ACCESSORY KIT INSTALLATION INSTRUCTIONS

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

SATURNSERIES INTERCHANGE > ISO (for the couplings)

corporation For Technical Support... To Order Parts... Call: Fax: Call: Fax:

TRADITIONAL HIGH VIBRATION HOSE SYSTEM THE STANDARD FOR MANY AUTOMOTIVE APPLICATIONS

H4802, H4802-1, H , and Pole Tampers

HANDBOOK. Squeeze Off Unit SOU 250. Please refer any queries to:

Common Components for: (Procenter / Elevance / Elevance Continental-Style / International (Whip) Delivery Systems)

Operating Instructions Models and Hydrostatic Test Pumps

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

Technical Techniques. How To Install Surf Package for X2, X10, X25, X30, X35, X46 and X55 (Pre-Plumbed) Surf Package Kit. (See DealerLink.

49004 Relief Pressure Check Kit for H8508 Series and HW1 Series Impact Wrenches

CO2 Tank Conversion Kit P.N , P.N , and P.N

CaseIH 30&40 foot (12R30 & 16R30) Front Fold Planters Hitch Mount Tank Instructions. Planter Manufacturer:

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

screw fittings - nickel plated brass series SC

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Root Grapple AP-RG3068, AP-RG3074, & AP-RG PK Parts Manual. Copyright 2017 Printed 12/20/17

PAPR Flow Tester. instructions. part no WARNING

Cartridge Valves Technical Information. Pilot operated check valves. Quick reference

STREAMLINE SHOP SERIES MODEL OPERATION & PARTS MANUAL

Features. Model DDX-LP Dry Pipe Valve System 4 (100mm), 6 (150mm) & 165mm Sizes

INSTALLATION INSTRUCTIONS MANUAL ON/OFF SAFETY VALVE/PILOT KIT MODEL GA9050A-1 (F0235)

HPB25 Hydraulic Paving Breaker

COOPER POWER SERIES. 600 A 15, 25, and 35 kv class PUSH-OP bushing adapter cap installation instructions. Deadbreak Apparatus Connectors MN650050EN

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

Pilot Operated Check Valves Catalog Quick Reference

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

TOYOTA TACOMA 2005 TOW HITCH Preparation. Part Number: PT

MESP-202H INSTALLATION INSTRUCTIONS AND OWNER S MANUAL. HF and HF FEATURES VALVE FUNCTIONS ADJUSTMENTS SCHEMATICS

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

Technical Techniques. How To Install Surf Package for X2, X10, X25, X30, and X46 (Not Plumbed) Surf Package Kit. (See DealerLink.)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

Operating Instructions Models 36200, , 46200, Hydrostatic Test Pumps

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

INSTRUCTION MANUAL MST AFTERCOOLER SYSTEM MODEL

35 TON HYDRAULIC PUNCH WARNING

Discharge Relief Valve Operation & Maint.

Installation Procedure for your Disco Double Kit, by Airgun Lab, LLC.

Effective March 2015 Supersedes S August 2002

Our technical information is based on Tip: calls attention to special information.

Tentec. Instruction Document. Mini Air Driven Pump Unit Model: HTT.627X Series. Part Identifier

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

Portable Oil Lube Air Compressors

Pressure-limiting valve and pre-load valve type MVG, MVE and MVP

LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE

Detroit Speed, Inc. A-body Rear Coilover Conversion Kit A-body (Moser Rear Axle) P/N: , , , , ,

10 DRIP NOZZLE WATERING DRIP KIT Model / Model 46095

RG3100 and RG3100Ice Regulator System

GAS CONVERSION KIT Installation Instructions Range/Rangetop

MANUAL: IN-LINE PIVOT GAUGE IN-LINE GAUGE

OPERATION MANUAL NTF-15

PRESSURE COMPENSATORS TECNORD

NDE2 / NDH2 MOTORISED FURLERS. Comfort > Power > Reliability For boats from 9 to 22 m

Advanced Fluid Handling Cart Owner s Manual

ExtendAire TM II. Intermediate Pressure Accessory Kit USER INSTRUCTIONS

PRODUCT SERIES: A-SF-3000BD

Catalog No. C09118A. Nitrogen Gas Spring Linked System Components

Installation Instructions

Section 4: Sequence valve adjustments

VMC - Hydraulic Counterbalance - Pressure Switch - Replacement

ROUGHNECK II Pumpless Drain

HYDRAULIC WINCH FOR AUGERS UP TO WR10 X 71 / W130 X 41 ASSEMBLY & OPERATION MANUAL

Directional Control Valves Technical Information Model 1500

SERVICE MANUAL. Technical Bulletin No GEOPROBE GH40 HYDRAULIC HAMMER. PREPARED: February, REVISED: April, 2002 A DIVISION OF KEJR, INC.

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

MANUAL BE SERIES Test Benches

ASE SOLVENT CONTROLLER INSTALLATION INSTRUCTIONS Dionex Corporation

Model DDX-LP Dry Pipe Valve System 8 (200mm) Features. Differential latching clapper-type, lighweight, dependable construction.

Data Sheet... RUDOLPH, inc. HANS RUDOLPH,

PORTABLE AFTERCOOLER MODEL CA-700 PORTABLE AFTERCOOLER/FILTER AFTERCOOLER OPERATION MANUAL ORIGINAL INSTRUCTIONS

Transcription:

NOTE: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number Quantity Hydraulic Kit ISO DF Frame Valve Block Tee (Kinze 4000) 4101301 1 Hydraulic hose -08 FJIC to -08 FJIC 72 in. 2003120-72 2 Hydraulic hose -06 FJIC to -06 FJIC 72 in. 2003129-72 1 Installation instructions 2006248 1 Hydraulic fitting kit 4004432 1 Run tee -08 MJIC to -08 MJIC to -08 FJIC 2003114-080808 1 Run tee -10 MJIC to -10 MJIC to -10 FJIC 2003114-080808 1 Run tee -12 MJIC to -12 MJIC to -12 FJIC 2003114-080808 1 Adapter -06 MJIC to -10 FJIC 2003117-0610 1 Adapter -08 MJIC to -12 FJIC 2003117-0812 1 Hydraulic Kit ISO DF Hitch Valve Block (Kinze 4000) 4101302 1 Hydraulic hose -10 FJIC to SCV quick connect 98 in. 2003147-98 1 Hydraulic hose -12 FJIC to SCV quick connect 98 in. 2003148-98 1 PN: 2006248 April 2015 Rev B 1

Ag Leader Technology Important Notices Please carefully follow these step-by-step instructions. If you have questions, contact Ag Leader Technology at 515-232-5363 x 1. Direction words (LEFT and RIGHT) are commonly used when describing an installation procedure. Interpret direction words as if standing behind equipment facing forward. Signal words (DANGER, WARNING, CAUTION and NOTE) are provided to draw attention to information that is important for the safe/correct installation and operation of this product. Indicates an imminently hazardous situation that, if not avoided, is likely to result in serious injury or even death. Indicates a potentially hazardous situation that, if not avoided, could result in serious injury or even death. Indicates a potentially hazardous situation that, if not avoided, may result in minor or moderate injury. CAUTION Indicates practices that may result in property damage, but do not involve personal injury. NOTE The preferred signal word to address practices not involving property damage, or personal injury. 2 April 2015 Rev B

NOTE: On Kinze 4000 series planters, it is possible to tee into an existing hydraulic valve at the rear of the planter in order to eliminate the need for routing long hydraulic hoses from the down force valve to the tractor. The following steps detail that procedure. 1. Locate H-Frame valve block near center of toolbar as shown in Figures 1 & 2. Return Pressure Figure 1. H-frame valve block (photo taken while standing on right side of tongue) PN: 2006248 April 2015 Rev B 3

Ag Leader Technology Tank (case drain) Figure 2. H-frame valve block (photo taken while standing on left side of tongue) 2. Tee hydraulic hoses of down force valve block into the appropriate fittings of Kinze valve block as described in steps A through C. For electric drive planters, circuits described will be connected to power pack (alternator). For ground drive planters, circuits described will be capped and therefore run tees will not be required. a. Return circuit (labeled E1 on valve block) Install a -12 JIC run tee at the fitting shown in Figure 1. Then install a -12 to -08 JIC reducer to match the return hose from the down force valve block. b. Pressure circuit (labeled F1 on valve block) Install a -10 JIC run tee at the fitting shown in Figure 1. Then install -10 to -06 JIC reducer to match the pressure hose from the down force valve block. c. Tank (case drain) circuit (labeled D8 on valve block) Intall a -08 JIC run tee at the fitting shown in Figure 2. No reducer is required to match the tank hose from the down force valve block. NOTE: If installing on an electric drive planter, installation is complete. If installing on a ground drive planter, proceed to step 3. 3. Locate hitch valve block as shown in Figures 3 & 4. 4 April 2015 Rev B

Hitch valve block Figure 3. Hitch valve block PN: 2006248 April 2015 Rev B 5

Ag Leader Technology Tank (case drain) Return Pressure Figure 4. Hitch valve block (close-up) 4. On a ground drive planter, A2 and A3 port fittings will be capped from the factory. Remove caps, so that provided pressure and return hoses can be connected to valve block. A1 is the tank (case drain) port and should already have a hose connected from the factory on all models. 5. Locate return hose (larger diameter than pressure hose) with an SCV quick-connect on one end and a -12 FJIC swivel connector on the other end. Connect FJIC fitting to port A2 as shown in Figure 4. 6. Locate pressure hose with an SCV quick-connect on one end and a -10 FJIC swivel connector on the other end. Connect FJIC fitting to port A3 as shown in Figure 4. 7. Connect pressure and return quick-connect fittings to an SCV on tractor. SVC must be configured for continuous flow. 6 April 2015 Rev B

Revision History Date Revision Initials Changes Mar 2015 A SLH - Initial release Apr 2015 B SLH - Changed tank port from E9 to D8 on H-Frame valve block PN: 2006248 April 2015 Rev B 7