First Team Sports, Inc. Blast Recreational Volleyball System

Similar documents
First Team Sports, Inc. Stellar Recreational Volleyball System

BALL STOP INSTALLTION GUIDE

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

-- SGP (NOVA TEAM SQUARE)

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Installation Guide Wall Mounted Angled Flagpole

Portable Soccer Goal Safety Program

No ' Long No ' Long

Troyer s Gourd Rack 8 unit F R H O P

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

American Flagpole & Flag Co. 1(800)

Tripod Setup Guide (M-TPx)

THOR 10 HAMMER CAGE INSTRUCTIONS

Installation Instructions

Model: 7200 Collegiate Volleyball System

Beach Dolly with cradle & keel pad Assembly Instructions

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

DE8410 FIVB Official Beach Volleyball Net

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

SAMPLE PAGE. Section 2... Wire Rope

Rudder Kit Assembly Instructions for Quest 13

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Side-of-Pole Mount for 1 Modules (SPM1) For Module Types E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Boat Boat Loader Fitting Instructions

Shade Sails - Installation Tips

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Instructions. Follow All Instructions Before Assembling Or Using This Product

NEXT GENERATION FLEX FENCE

E. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.

Model: 5100 OmniSteel Volleyball System

GATE INSTALLATION INSTRUCTIONS

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

Instructions. Follow All Instructions Before Assembling Or Using This Product

Assembly Instructions. -Cantilever Boat Lifts

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

2010 International Snow Science Workshop

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

MODEL TRIPEX PULLEY SYSTEM

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

INSTALLATION INSTRUCTIONS

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

MODEL #7100X A-FRAME LADDER

STRAIGHT POLE TENSIONED BATTING TUNNEL POLE LAYOUT

ASSEMBLY MANUAL HOBIE CATSY

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

INSTALLATION INSTRUCTIONS

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

Before you start! Is iwalk 2.0 right for you?

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Low Wind High Yields Series

TRI-POD SETUP. Guidelines for Typical Field Setup. Site Selection

T-016 ASSEMBLY MANUAL MODEL ROCK AND ROLL Main Street NE Minneapolis, MN

400/488 Rotating Davit Installation Instructions

Backboard and Rim Owners Manual

MATCHLESS BULKY PLYER FLYER HEAD

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

Soma Wind Generators

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

Retrofitting Green SkiErg Handles

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

BR-2444 ROWING MACHINE

2 X 4 PORTABLE ALUMINUM SOCCER GOALS

MAGNETIC INDOOR CYCLING BIKE

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

foldable/adjustable sawhorse

Cable Replacement Instructions for R-Series Roust-A-Bout 100/150/250

Bike Rack and Spare Tire Carrier 1-1/4" Receiver

MODEL CHEST PULLEY SYSTEM

Zip-Line Kit Instructions

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

CAUTION - PUT SAFETY FIRST

Trampoline Installation Instructions

Assembly Guide ST200 FUNCTIONAL TRAINER

Steel Spring Driven Reel Instruction Manual

PULLTARP INSTALLATION & OPERATORS MANUAL

600 / 600FC OWNER'S MANUAL

Final Assembly Instructions Bikes with 16 Wheel Size

ESOCCI RIGGING MANUAL

Anchor Harness Instruction Manual

Kayaking Bob s Tandem Island SpraySkirt Kit Installation Instructions

Konza District Pinewood Derby Track Parts And Assembly Instructions

Pico rigging manual 2007.doc Page 1 of 28

VERSA BIKE RACK INSTRUCTIONS

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 13 Ropes Equipment Aloft Revised

Transcription:

First Team Sports, Inc. Blast Recreational Volleyball System BILL OF MATERIALS A 2 Volleyball Vertical Post K 1 ½ Centerlock Nut B 3 Net Clamp L 2 Carabiner Clip C 1 Pulley Clamp M 1 ½ x 2 Hex Bolt D 4 Tensioning Knob N 2 Post Padding (if applicable) E 1 Large Rope Ratchet O 2 Height Labels F 1 Small Rope Ratchet G 1 Net Pulley H 1 Volleyball Net I 2 Post Cap J 1 ½ Centerlock Nut Inspect all contents prior to installation. Report any missing parts to First Team customer service immediately, 1-888-884-6677. READ ALL INSTRUCTIONS BEFORE PROCEEDING! ------------------------------------------------------------------------------------------------------------ 1. Remove Volleyball Posts from packing. It is important at this point to determine the nature of your installation. If you are installing the units directly into a concrete footing OR using First Team s FT16 ground sleeves (used for sand volleyball applications where post removal is desired) If you have questions, call First Team toll free 1-888-884-6677. 2. Using the Court Diagram provided, locate the proper location for both volleyball posts. ATTENTION!! ATTENTION!! ATTENTION!! If your installation involves the installation of ground sleeves, YOU MUST FIRST UNPACK AND FOLLOW THE INSTALLATION INSTRUCTIONS FOR THOSE PARTS. DO NOT PROCEED UNTIL GROUND SLEEVES ARE PROPERLY INSTALLED. Once complete you may skip to step #9 to complete set up. All others continue with step 3 below. 3. Dig a 36 deep by 20 diameter hole at both post locations. Be sure to bell out the bottom 12 of the footing for added stability.

4. In the next few steps you will need a Level. The 36 x 20 footing will require approximately 1/3 yard of 3000 psi concrete (18-20 60# sacks of premix concrete). More will be needed if you dig a larger hole. Make certain you have enough to finish the job. Allowing a portion of the footing to dry while you purchase more concrete will weaken the footing. 5. Mix the concrete according to the instructions on the bag. It is better to mix it slightly too wet than too dry. Fill ONE of the holes full to ground level with as little time between batches as possible. 6. Insert VOLLEYBALL POST into wet concrete and vibrate up and down several times to ensure concrete is adequately surrounding the post. 7. Use your level to make certain the vertical post is straight and plumb. Brace post if necessary until concrete begins to set up. 8. REPEAT STEPS 6 THROUGH 9 FOR OTHER POST. STOP HERE! Allow both footings to cure for seven days before proceeding. It is advisable to temporarily place the (2) post caps provided on top of both vertical posts to prevent rain for collecting inside the posts during cure time. 9. Next, attach Net Pulley to Pulley Clamp using (1) ½ x 2 Hex bolt and centerlock nut provided. 10. Remove post caps from vertical posts (if necessary) and first slide one Net Clamp and then one Pulley Clamp onto one of the vertical posts. On the other vertical post, slide two Net Clamps. See Figure A. Place Post Caps back on top of posts. 11. Screw the (4) Tensioning Knobs into the threaded hole located at the back of each Net Clamp and Pulley Clamp. Tensioning Knobs are used to hold clamps in position while net tension is loose. 12. Position the top Pulley Clamp and top Net Clamp at the approximate net height you desire. Tighten tensioning knobs to secure clamps in place. See Court Diagram for Men s and Women s net heights. 13. Unpack Volleyball Net. Lay net out flat on the floor. Notice that the ropes are different lengths. The TOP of the net is the side with the SHORTER rope, called the TOP ROPE. Your TOP ROPE should have a loop at each end. The BOTTOM ROPE should be longer than the top and should have only one loop. Slide dowels into side tape pouches. 14. Attach (2) Carabiner Clips to the end of the net that has a loop at the top and at the bottom.

15. Next, using the Carabiner Clip, attach the TOP ROPE to the top Net Clamp at the top of the Post as shown in Figure A. 16. Drape the other end of the TOP ROPE over the Net Pulley at the top of the other post. 17. Slide each Lower Net Clamp to a height approximately 3 below bottom of net and clamp tight with tensioning knob. 18. Connect TOP ROPE to Lower Net Clamp using the LARGE rope ratchet as shown in Figure A. (You may need to attach provided S hook to one end of the rope. Follow instructions on rope ratchet casing to feed rope through rope ratchet.) 19. Attach looped end of the BOTTOM ROPE to the Lower Net Clamp using the Carabiner Clip. 20. Locate the Small Rope Tensioner. Thread BOTTOM ROPE through Rope Tensioner as indicated on the tensioner s plastic casing, or see Figure B. 21. Connect SMALL rope tensioner to lower Net Clamp. 22. Tension TOP ROPE by tensioning the LARGE ROPE RATCHET. When tension is sufficient, tighten the SMALL ROPE RATCHET as well. NOTE: The SMALL rope ratchet need NOT be tensioned to the same degree as the LARGE. (About ½ - ¾ tension is adequate) 23. Next, measure net height in the middle of the net. Remove tension from net and adjust all four clamps as necessary until proper net height is achieved. 24. Peel and apply the Net Height Labels to the OUTSIDE of both posts lining up the appropriate height increment with the bottom edge of the upper Net Clamp or Pulley Clamp. 25. Attach Post Pads if provided.