First Team Sports, Inc. Stellar Recreational Volleyball System

Similar documents
First Team Sports, Inc. Blast Recreational Volleyball System

BALL STOP INSTALLTION GUIDE

-- SGP (NOVA TEAM SQUARE)

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

Troyer s Gourd Rack 8 unit F R H O P

Model: 7200 Collegiate Volleyball System

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

DE8410 FIVB Official Beach Volleyball Net

American Flagpole & Flag Co. 1(800)

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Model: 5100 OmniSteel Volleyball System

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

THOR 10 HAMMER CAGE INSTRUCTIONS

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

Portable Soccer Goal Safety Program

Installation Guide Wall Mounted Angled Flagpole

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

INSTALLATION INSTRUCTIONS

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

2010 International Snow Science Workshop

Tripod Setup Guide (M-TPx)

INSTALLATION INSTRUCTIONS

Assembly Instructions. -Cantilever Boat Lifts

GATE INSTALLATION INSTRUCTIONS

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Shade Sails - Installation Tips

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Boat Boat Loader Fitting Instructions

Installation Instructions

No ' Long No ' Long

E. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.

SAMPLE PAGE. Section 2... Wire Rope

Side-of-Pole Mount for 1 Modules (SPM1) For Module Types E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

MAGNETIC INDOOR CYCLING BIKE

Halsey Taylor Owners Manual STOP!

Before you start! Is iwalk 2.0 right for you?

Bladerider X8 Assembly Help Notes

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

SPINNER RIDE GETTING STARTED GUIDE. Welcome to a personalized fitness experience for your members

MODEL TRIPEX PULLEY SYSTEM

Magnetic Bike. Model No: AENERGISER BODY WORX. Retain this owner s manual for future reference Read and follow all instructions in this owner s manual

Trampoline Installation Instructions

HOME ASSEMBLY INSTRUCTIONS

Retrofitting Green SkiErg Handles

MODEL CHEST PULLEY SYSTEM

NEXT GENERATION FLEX FENCE

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

MODEL #7100X A-FRAME LADDER

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

RehabPro Standard Pulley (M30, M50, M70, M30F, M50F, M70F)

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

INSTALLATION INSTRUCTIONS. Parts List. Tools Required. Before You Begin. Installation. Customer Information BICYCLE ATTACHMENT JUL.

RehabPro Speed Pulley (M100S & M100FS) User Manual

LEGACY II TM STARTING PLATFORMS

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

Bike Rack and Spare Tire Carrier 1-1/4" Receiver

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

Low Wind High Yields Series

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

A-FRAME RESIN IN & OUT FLIP UP LADDER

MODEL / SINGLE and DUPLEX PULLEY SYSTEMS

Traditional Basketball Set. Assembly & Installation Instructions

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

2 X 4 PORTABLE ALUMINUM SOCCER GOALS

ELECTRIC TOOL PARTS LIST

Beach Dolly with cradle & keel pad Assembly Instructions

VERSA BIKE RACK INSTRUCTIONS

RS Important Notes. Contact. Bicycle Maintenance Stand instructions manual. Warranty Period : 1 year (from the date of your purchase)

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

TRAILMATE METEOR ASSEMBLY MANUAL

3. Align ratchet drive with female insert on assembly, and raise ratchet handle until the ratchet drive is firmly seated into the assembly.

CENTER-STRUT HEIGHT ADJUSTMENT UNITS MANUAL OPERATION

Dual Electronic Basketball System Owners Manual

STRAIGHT POLE TENSIONED BATTING TUNNEL POLE LAYOUT

ASSEMBLY MANUAL HOBIE CATSY

Pole & Tree Climbers. Pole & Tree Climbers. 1972AR Series. Pole Climbers with 1-1/2" Gaffs Complete Set

CLASS CYCLE P8000 OWNER'S MANUAL JOHNSON HEALTH TECH. CO., LTD.

VOLLEYBALL SPIKE TRAINER. Assembly Instructions. Owner s Manual. Model # VST-100. Club Volleyball Gear WARNING

PART NUMBER: E361SXA200 DESCRIPTION: KAYAK CARRIER

Array Solutions 350 Gloria Rd Sunnyvale, TX Phone FAX

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

PRO1030 Bi-Directional Assembly Replacement

TRI-POD SETUP. Guidelines for Typical Field Setup. Site Selection

2019 MADONE ASSEMBLY MANUAL

SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER OCEAN BLUE ABOVE GROUND POOL LADDERS

Transcription:

First Team Sports, Inc. Stellar Recreational Volleyball System BILL OF MATERIALS A 2 Volleyball Vertical Post K 1 ½ Centerlock Nut B 2 Height Labels L 2 Carabiner Clip C 3 Net Clamp M 1 ½ x 2 Hex Bolt D 1 Pulley Clamp E 4 Tensioning Knob F 1 Net Tensioning Crank G 1 Small Rope Ratchet H 1 Net Pulley I 1 Volleyball Net J 4 Post Plug NOTE: The above bill of materials applies to the volleyball system itself. Additional components may be included with your order such as floor sockets, antennas, padding or judges stand. Bill of materials and installation instructions are included with any additional products provided with your order. Inspect all contents prior to installation. Report any missing parts to First Team customer service immediately, 1-888-884-6677. READ ALL INSTRUCTIONS BEFORE PROCEEDING! ------------------------------------------------------------------------------------------------------------ 1. Remove Volleyball Posts from packing. 2. Locate and identify the Vertical Posts. Measure 10 from either end of each Vertical Post and make a mark using a marker. This will serve as a depth gauge to bury post in concrete. Also, using a rubber mallet, pound (1) POST PLUG into top and bottom of both VERTICAL POST. 3. Using the Court Diagram provided, locate the proper location for both volleyball posts. ATTENTION!! ATTENTION!! ATTENTION!! If your installation involves the installation of either floor sockets or ground sleeves, YOU MUST FIRST UNPACK AND FOLLOW THE INSTALLATION INSTRUCTIONS FOR THOSE PARTS. DO NOT PROCEED UNTIL FLOOR SOCKETS ARE PROPERLY INSTALLED. Once complete you may skip to step #10 to complete set up. All others continue with step 4 below. 4. Dig a 36 deep by 20 diameter hole at both post locations. Be sure to bell out the bottom 12 of the footing for added stability. 5. In the next few steps you will need a Level. The 36 x 20 footing will require approximately 1/3 yard of 3000 psi concrete (18-20 60# sacks of premix concrete). More will be needed if you dig a

larger hole. Make certain you have enough to finish the job. Allowing a portion of the footing to dry while you purchase more concrete will weaken the footing. 6. Mix the concrete according to the instructions on the bag. It is better to mix it slightly too wet than too dry. Fill ONE of the holes full to ground level with as little time between batches as possible. 7. Insert VERTICAL POST into wet concrete until 10 mark on post is even with top of footing concrete. 8. Use your level to make certain the vertical post is straight and plumb. Brace post if necessary until concrete begins to set up. 9. REPEAT STEPS 6 THROUGH 9 FOR OTHER POST. STOP HERE! Allow both footings to cure for seven days before proceeding. It is advisable to temporarily place the (2) post caps provided on top of both vertical posts to prevent rain for collecting inside the posts during cure time. 10. Next, attach Net Pulley to Pulley Clamp using (1) ½ x 2 Hex bolt and centerlock nut provided. 11. First slide one Net Clamp and then one Pulley Clamp onto one of the vertical posts. On the other vertical post, slide two Net Clamps. See Figure A. 12. Screw the (4) Tensioning Knobs into the threaded hole located at the side of each Net Clamp and Pulley Clamp. Tensioning Knobs are used to hold clamps in position while net tension is loose. 13. Position the top PULLEY CLAMP and top NET CLAMP at the approximate net height you desire. Tighten tensioning knobs to secure clamps in place. See Court Diagram for Men s and Women s net heights. Then position the lower Net Clamps approximately 42 below the Pulley Clamp and top Net Clamp, tighten knobs. 14. Next, attach NET TENSIONING CRANK to the vertical post that has the NET PULLEY at the top. Position the crank so it faces to the inside as shown in Fig. A. Use attachment hardware provided with the NET TENSIONING CRANK. NOTE: The NET TENSIONING CRANK should be installed approximately 2 above the lower NET CLAMP 15. Unpack Volleyball Net. Lay net out flat on the floor. Notice that the ropes are different lengths. The TOP of the net is the side with the SHORTER rope, called the TOP ROPE. Your TOP ROPE should have a loop at each end. The BOTTOM ROPE should be longer than the top and should have only one loop. Slide dowels into side tape pouches. 16. Attach (2) Carabiner Clips to the end of the net that has a loop at the top and at the bottom. 17. Next, using the Carabiner Clip, attach the TOP ROPE to the top Net Clamp at the top of the Post as shown in Figure A. 18. Drape the other end of the TOP ROPE over the Net Pulley at the top of the other post and connect it to the hook at the end of the strap on the NET TENSIONER CRANK. 19. Attach looped end of the BOTTOM ROPE to the Lower Net Clamp using the Carabiner Clip.

20. Locate the Small Rope Tensioner. Thread BOTTOM ROPE through Rope Tensioner as indicated on the tensioner s plastic casing, or see Figure B. 21. Connect SMALL rope tensioner to lower Net Clamp. 22. Tension TOP ROPE by turning crank handle on NET TENSIONER. When tension is sufficient, tighten the SMALL ROPE RATCHET as well. NOTE: The SMALL rope ratchet need NOT be tensioned to the same degree as the LARGE. (About ½ - ¾ tension is adequate) 23. Next, measure net height in the middle of the net. Remove tension from net and adjust all four clamps as necessary until proper net height is achieved. 24. Peel and apply the Net Height Labels to the OUTSIDE of both posts lining up the appropriate height increment with the bottom edge of the upper Net Clamp or Pulley Clamp. 25. Attach Post Pads, Rope Covers and Net Antennas if provided.