Geotechnical Engineering Laboratory CIVIL ENGINEERING VIRTUAL LABORATORY Experiment no 8 Standard Penetration Test

Similar documents
REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

Item 404 Driving Piling

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

Dynamic Cone Penetrometer SL970. Impact Test Equipment Ltd & User Guide. User Guide

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

Method of Making and Curing Concrete Specimens in the Field for Compression and Flexural Tests

Density of Soils and/or Granular Material In-place by the Sand-Cone Method

UNIT-I SOIL EXPLORATION

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Tex-414-A, Air Content of Freshly Mixed Concrete by the Volumetric Method

MAKE YOUR SAMPLE COUNT! A PRIMER ON COLLECTING QUALITY, REPRESENTATIVE SAMPLES

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

3/4 SafeClaw Anchorage Connectors

OPERATING INSTRUCTIONS

Operating Instructions

TEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

Installation and Training Manual

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Made in the USA. For Fall Protection Only. SafeLok Part Description

1 SafeClaw Anchorage Connectors

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

Standard Test Procedures Manual

Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA , United States.


Troxler Electronic Laboratories, Inc.

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

Installation and Operating Instructions for Automotive Winch Synthetic Rope

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Standard Test Procedures Manual

Standard Test Procedures Manual

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

OP CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST

3/8" Dr. Air Butterfly Impact Wrench

CONE PENETRATION TESTS

a WOW Lab Prep Instructions

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Glasgow City Council EDUCATION SERVICES. Technician Support Service

Suction Sampler. Purpose of this document

Soils for civil engineering purposes

WHEATLEY Series 500 Swing Check Valve

Reverse Circulation Drilling Rig

HOW TO DIG A TEST PIT

SCHEDULE OF RATES FOR GEO-TECHNICAL INVESTIGATION WORKS FOR FAGMIL GRANULATED SINGLE SUPER PHOSPHATE PLANT AT CHITTORGARH, RAJASTHAN

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

Construction Dewatering

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

GILMONT ACCUCAL FLOWMETERS

Xtender30. Home Batting Cage. Assembly Instructions

HYDRAULIC MOBILE LIFTING TABLE

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

The following two sampling procedures apply to the submersible (S) and pole (P) vibrocoring systems. First:

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

OPERATION AND INSTRUCTION MANUAL Flat Roof Anchor Model: FRA250L-10X-CTS

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

WHEATLEY Series 822/820 Swing Check Valve

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

HYDROSTATIC LEAK TEST PROCEDURE

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

Steel Spring Driven Reel Instruction Manual

IMPACT RING BIT SYSTEM Care & Maintenance Instructions

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

V-24 OXYGEN LANCE VALVE

DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

Detailed Instructions for the use of Wirelock

Hydro-Mech Bridge Plug

1982 Hydrostream Viking Restoration

TECHNICAL DATA CAUTION

Et's Skeg: the full story

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

EXPERIMENTS IN GEOTECHNICAL ENGINEERING. Smt. S. R. PATEL ENGINEERING COLLEGE Dabhi, unjha Department of CIVIL engineering

OPERATIONS CHALLENGE 2017

OCEAN DRILLING PROGRAM

EcoCell Vertical Electrophoresis Unit

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

Carbo Racing Foil Instruction Manual Unit 0, 1, 2, 3

2000 lb manual winch

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Casing and Cementing Requirements

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Technical Data Sheet TI-F50 Locking Units series KFH

PC3_ and PC4_ Pipeline Connectors

CHAPTER 5 REWIND STARTERS

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

TXDOT DESIGNATION: TEX-922-K

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

Item N o.: Item N am e:southern Star 40cm Girls Cherry Bike

Vertical and Horizontal Bladder Tanks

INTENDED USE TECHNICAL SPECIFICATIONS

Transcription:

OBJECTIVE To determine the Bearing Capacity of the soils. SCOPE This method describes the standard penetration test using the split-spon sampler to obtain the resistance of soil to penetration (N-value), using a 63.5 kg hammer falling.76 m; and to obtain representative samples for identification and laboratory tests. The method is applicable to all soil types. It is most often used in granular materials but also in other materials when simple in-place bearing strengths are required. It is also used when samples cannot easily be recovered by other means. THEORY The number of blows for first 15 cm penetration are considered as seating drive and are discarded. The total blows for the next and third 15 cm penetration are recorded and termed as the penetration resistance ( N- value). If the sampler is driven less than 45 cm (total), then the blows for the last 30 cm penetration shall be termed as penetration resistance ( N-value).If less than 30 cm is penetrated, enter the number of blows and the depth penetration in the bore log. If at any time the entire sampler sinks under its own weight in case of very soft sub-soil stratum, it may not be required to give any blow to the sampler, the SPT value ( N-value) should be taken as Zero. APPARATUS USED Drilling equipment - any drilling equipment is acceptable that provides a reasonably clean hole, which is at least 5 mm larger than the sampler or sampling rods, and less than 170 mm diameter.

Sampling rods - steel A-rod is used to connect the sampler to the drive weight assembly. A-rod should be used unless otherwise directed. Split-barrel sampler - consists of 3 main parts; head, split-barrel and shoe. A core catcher should be installed to prevent loss of sample. Shoes which have been damaged should be replaced or repaired. Drive-weight assembly - consisting of a 63.5 kg weight (hammer), a driving head (anvil) and a guide permitting free fall of 0.76 m and an over lift capability of at least 100 mm.

Cathead operating at approximately 100 rpm, equipped with suitable rope and overhead sheave for lifting drive-weight. PROCEDURE Test Procedure Test Hole Drill the hole to the desired sampling depth and clean out all disturbed material. If a wet drill is used, flush out all cuttings. 2) Assembling Equipment Attach the split-barrel sampler to the A-rod and lower into the hole until it is sitting on the undisturbed material.

Attach the drive weight assembly. Lift the 63.5 kg hammer approximately 0.76 m and allow it to fall on the anvil delivering one seating blow. Mark the drill rod in 3 successive 15 m increments to observe penetration. Mark the drive weight assembly to indicate a 0.76 m hammer lift. 3) Penetration Testing Raise and drop the hammer 0.76 m successively by means of the rope and cathead, using no more than 2 1/4 wraps around the cathead. The hammer should be operated between 40 and 60 blows per minute and should drop freely. Continue the driving until either 0.45 m has been penetrated or 100 blows has been applied. Record the number of blows for each.15 m of the penetration. The first 0.15 m increment is the "seating" drive. The sum of the blows for second and third increment of 0.15 m penetration is termed "penetration resistance or "Nvalue". If the blow count exceeds 100 in total, terminate the test and record the number of blows for the last 0.30 m of penetration as the N-value. If less than 0.30 m is penetrated in 100 blows, record the depth penetrated and the blow count. If the sampler advances below the bottom of the hole under its own weight, note this condition on the log. 4) Handling Sample Bring the sampler to the surface and open it. Remove any obvious contamination from the ends or sides and drain excess water. Carefully scrape or slice along one side to expose fresh material and any stratification.

Record the length, composition, colour, stratification and condition of sample. Remove sample and wrap it or seal in a plastic bag to retain moisture. If the sample can be removed relatively intact, wrap it in several layers of plastic to strengthen it and seal ends with tape. Mark the sample "top" and "bottom" if applicable and label it with an identification number. OBSERVATIONS Blows required for each 15 cm penetration should be noted. The following information should be recorded after lowering the sampler to the bottom of the barehole,prior to the start of the test: Depth of bare-hole(test level) below the ground level Depth of bottom of casing( if used) below ground level.

Penetration of the sampler into the soil under the self-weight of sampler and A-rods. Water level in the barehole.. PRECAUTIONS 1)Care should be taken that bore-hole remains straight, perpendicular to the ground surface. 2)The samples should ;not be placed in sun.3)for depths of exploration more than 10m,care should be taken to maintain the rod vertical by using stiffer rods( N-rods).. REFERENCES ASTM D 1586-67 Catalogue #615, Mobile Drilling Inc. Soils and Engineering, R.H. Karol, Prentiss Hall Inc. 1960. QUIZ 1) Why there is a need of Standard Penetration Test? 2) What is the scope of Standard Penetration Test? 3) What is the SPT value( N-value) for a sample, if it sinks under it is own weight? 4)What does SPT value of a sample tells?