FACILITIES GUIDANCE NOTE 2 GRASS PITCHES FOR RUGBY

Similar documents
GRASS PITCHES FOR RUGBY

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

MAINTENANCE OF GRASS PITCHES FOR RUGBY

Guide to indoor areas for small sided football and disability football

ROTHERHAM PHOENIX RUFC DEVELOPMENT OF FACILITIES ON HERRINGTHORPE PLAYING FIELDS PROJECT OVERVIEW

The Ground is the total area shown on the plan. The Ground includes:

REGULATION 22. STANDARD RELATING TO THE USE OF ARTIFICIAL RUGBY TURF

Code of Practice and Technical Requirements for the Design and Installation of Non-Turf Cricket Facilities

BUCS CONFERENCE 2016 FACILITY DEVELOPMENT THE RISE/ROLE OF ARTIFICIAL PITCHES THURSDAY, 14 JULY 2016

Frequently asked questions on the use of rubber crumb in 3G artificial grass pitches

EXTRACTS FROM THE BRITISH HORSERACING AUTHORITY RACECOURSE MANUAL

FIFA$Under$17$World$Cup$India$2017$

PONTELAND RUGBY FOOTBALL CLUB

Selecting the Right Artificial Surface. for Hockey, Football, Rugby League and Rugby Union

TOUCHRUGBY A GUIDE TO PLAYING & EVENT MANAGEMENT

PITCH IMPROVEMENT PROGRAMME

mini tag & tag rugby A BRIEF SUMMARY OF THE GAME AND ITS RULES

build a winning club

Health & Safety Policy & Plan. Rightway Roofing.

HEAD GROUNDSMAN Bready Cricket Club

MARKET RASEN & LOUTH RUFC REFEREE - A PATHWAY FOR DEVELOPMENT. Development. Sustainability. Participation. Aspiration. Inclusion

2 Rugby League Turf Care Managers. 3 Maintenance Summary for Rugby League Pitches. 6 Setting & Marking Out: Pitch Sizes

JOINT GROUND CRITERIA. Version 1.13 June 2016

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

Guidance on the Legal Obligations for Importers, Retailers and Distributors of Category 1 Fireworks

Epping Forest Council Playing Pitch Strategy. PROJECT DETAILS Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES

Introduction to the NRA Design Manual for Roads and Bridges

REGULATION 15 AGE GRADE RUGBY

Job Description HEAD GROUNDSMAN Bready Cricket Club, North West Cricket Union

Role Description. 30,000 35,000 dependant on experience and qualifications (on a self-employed basis and reviewed after a trial period)

IRFU Age Grade Rugby

Introduction 2 Orange 10 Designing Mini Tennis facilities 2 Green and Red 12 Dedicated Kids Zone Design 3 What is it made of? 12

IRFU Age Grade Mini Rugby

Shropshire Cricket Board Cricket Policy

A2:1 The Facility Standards are focused on ensuring appropriate standards for the benefit of the Game including:

2002 RUTGERS Turfgrass Proceedings

Fire Safety Hot Work Permit Policy/ Procedures

NATIONAL GROUND GRADING - CATEGORY H

HAMPSHIRE RUGBY FOOTBALL UNION LIMITED

The FA Cup, The FA Trophy, The FA Vase and The FA Youth Cup Competitions

Strategic Plan for Sevens Rugby. September 2006

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

Invitation to Express Interest (ITEI) Heavy Machinery Services

MILTON ROAD LLF PROJECT UPDATE

PROJECT EXAMPLES NATURAL GRASS DEVELOPMENTS

FACILITY NAME: ASBA SINGLE FIELD FACILITY AWARDS APPLICATION. New Construction Upgrade of Existing Facility. Date of completed project:

RFU REGULATION 15 AGE GRADE RUGBY

RFU REFEREE BECOMING AN. Published in 2006 by Rugby Football Development Limited Copyright Rugby Football Union

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

Process for managing parking on verges, footways and footpaths

Report Date: February 20, 2018 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: March 14, 2018

For such purposes, UEFA intends to organise a tendering process ( Tender ).

UEFA EURO Technical Services & Overlay / Tender Process. Supplier for Temporary TV Broadcasting Power Phase 1 - Invitation to Express Interest

Easington Sports and Social Club, Addison Road, Banbury, OXON OX169DH

WOMEN S COUNTY CHAMPIONSHIPS ( )

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Support Infrastructure

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

Invitation to express interest UEFA Club Competitions Accommodation Agency - Cycle

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

Chester RUFC Delivering for future generations

What Geologists Need to Know about Drilling

Fact sheet. Badgers A Guide for Developers. January Page 1 of 8

BCGA GUIDANCE NOTE 17

ARTIFICIAL GRASS PITCHES FOR RUGBY AND ASSOCIATION FOOTBALL PERFORMANCE STANDARDS AND DESIGN GUIDES FOR COMMUNITY USE PITCHES AND TRAINING AREAS

Horizontal Directional Drilling and Impact Moling

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

ARTIFICIAL GRASS PITCHES FOR RUGBY performance standards and design guides for community use pitches and training areas

Traffic Calming Regulations

Telfer Reserve Facility Audit

NATIONAL GROUND GRADING - CATEGORY F

PROCEDURES FOR STANDBY

VOLUNTEER HANDBOOK YOUR COMPLETE GUIDE TO VOLUNTEERING WITH BRITISH EVENTING A GUIDE FOR BRITISH EVENTING CROSS COUNTRY COURSE DESIGNERS AND BUILDERS

Trends and advances in tennis courts. Tim Freeman BA Dip Arch RIBA SAPCA Director and Vice Chairman of Tennis, Projects Director at Trevor May

Gourock Golf Club. Report on Proposed Course Improvement Works. 11th April 2016

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

FIRMNESS FIRST. by Richard Windows & Henry Bechelet With a little help from Dr Christian Spring & Jay Dobson

APPOINTMENT OF AUDIT SERVICES PROVIDER INVITATION TO TENDER

Goals are crucial pieces of equipment. They should be good quality in terms of both playing performance and durability.

Phase 1 Invitation to Express Interest

Hampstead Hill School Health and Safety Policy: Play Equipment

Creston Golf Club Development Plan

British Showjumping Course Designers Education System COMPETENCIES REQUIRED

GAS PIPELINE SAFETY GUIDE.

Procurement for the Tokyo 2020 Organising Committee

;0iii] C*Iq'FgRHI{CE --::-- ;: -.. !: t,' li l:j. :t. ti?-. tlr. . *,, :;. :slill I iii-: .ir,::ri:}.:f :aei*l$ljai:!r. ; i:r ;: i:- ; i I!

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Cutting frequency: Normal frequency during the winter period, if mild, would be

Contractor / Exhibitor Handbook

Chapter 2.7 Bylaw sport governance and management

B. LENGTH OF SEASON The normal season for this sport is from September to May. C. REVIEW AND PUBLISHING FINAL ENDORSEMENT REQUIREMENTS

Pressure Systems Safety Regulation

Report to COUNCIL for decision

MEMORANDUM OF UNDERSTANDING

ECB WOMEN S CRICKET SUPER LEAGUE ( WCSL ) HOST MINIMUM QUALITY STANDARDS

Cricket Ireland Active Clubs Coordinator

Sport Labs Combining design

Transcription:

FACILITIES GUIDANCE NOTE 2 GRASS PITCHES FOR RUGBY

INTRODUCTION An essential part of the RFU and RFUW sports development programme and objectives is the provision of well constructed and maintained grass pitches, either through improvement and upgrading or new installations. The purpose of this Guidance Note is to assist rugby clubs in carrying out this type of project. It identifies the process and key issues. This includes the initial feasibility study, performance and playing standards, design and construction. The maintenance and upkeep of grass pitches is covered in Facilities Guidance Note 3. THE CLIENT BRIEF It is recommended that, except for the smallest projects, qualified, experienced and independent professionals are appointed to carry out your project. There are a number of agencies and organisations that can provide lists of suitably experienced consultants (refer to page 8 for further details). Prior to the selection and appointment of your professional advisors, a steering group of club or committee members should be brought together to provide an initial client brief and point of contact for the professional advisors, throughout the various project stages. The terms of engagement and scope of their services should be formally agreed at the time of the appointment. The initial client brief should include: the likely programme of use (number of games to be played) and types of usage, e.g. matches, training and mini rugby floodlighting possible phasing and long term development plan other sports use, e.g. summer season usage and events maintenance arrangements and current maintenance budget funding sources and initial capital cost budget other new facilities, e.g. spectator accommodation, changing rooms and clubhouse. Site information and background information should also be assembled if applicable and available, including: a site plan showing the club s land ownership and any additional land that may be purchased, legal agreements, way leaves, covenants and rights of way location and layout of existing buildings, main services, irrigation, water storage, existing pitch layouts and orientation, land surveys including levels, trees, hedgerows and any special features local knowledge of ground conditions and site factors, e.g. history of the site, especially any knowledge of tipping and existing water courses any initial consultations with the Local Planning Authority, including land designation and permitted use. FEASIBILITY STUDY Your appointed consultants or specialist advisors should undertake a feasibility study. Each project will have different issues, site factors, constraints and opportunities. The following lists, whilst not exhaustive, identify key areas and considerations that may need to be addressed. Site information Information assembled by the client steering group Site history, in particular any knowledge of tipping on, or adjacent to, the site Levels, trees, adjacent buildings and adjoining owners Ground conditions, soil surveys and hydraulic conductivity (rate at which water permeates through the soil) 2

Existing services Existing watercourses Town planning issues and consultations Consultations with other agencies, e.g. the Environment Agency and Local Authority regarding floodplain and surface water drainage proposals Access for construction and future maintenance. Pitch layouts Critical site factors Possible locations, pitch layouts and safety margins (options appraisal) Pitch size, levels and any adjustments required Orientation Surface water drainage proposals Existing trees and shrubs New tree planting and landscaping Ecological and environmental issues Relationships with clubhouse, including viewing Access for spectators and people with disabilities Safety, possible fencing, etc Other sports users activities Player and spectator shelters Irrigation proposals and water storage Capital costs Programme of works Maintenance access routes/machinery and equipment storage Upon completion of the feasibility study, your steering group should be able to make informed decisions before proceeding to the next stages of your project. ORIENTATION AND SITING Wherever possible, the pitch should be laid out (end to end) within the orientation limits shown in Diagram 1. Diagram 1 285º W Reciprocal bearings shown as dotted lines True North 0º 360º 20º Rugby Football 200º PITCH DIMENSIONS S 105º IRB Law 1 - The Ground Definitions The ground is the total area shown on the plan. The ground includes the following: The field of play is the area (as shown in Diagram 2) between the goal lines and the touchlines. These lines are not part of the field of play. The playing area is the field of play and the in-goal areas. The touchlines, touch ingoal lines and dead ball lines are not part of the playing area. The playing enclosure is the playing area and a space around it, not less than 5 metres where practicable, which is known as the perimeter area. The in-goal is the area between the goal line and the dead ball line, and between the touch in-goal areas. It includes the goal line but it does not include the dead ball line or the touch in-goal lines. E 3

Diagram 2: The playing area TOUCH-IN TOUCHLINE GOAL TOUCH The 22 is the area between the goal line and the 22-metre line, including the 22- metre line but excluding the goal line. The plan, including all the words and figures on it, is part of the Laws. The dimensions for a 15-a-side pitch are shown in Diagram 2. These exclude line markings, which should not exceed 100mm. Mini/Midi rugby Under 7 and Under 8 Mini rugby - 60m x 30m maximum. Under 9 and Under 10 Mini rugby - 60m x 35m maximum. Under 11 and Under 12 Midi rugby - 60m x 43m maximum + 5m for each ingoal. Touch-in- Goal Line 5m 15m DEAD BALL LINE Not exceeding 70m 5m IN-GOAL GOAL LINE 22-METRE LINE 10-METRE LINE 10-METRE LINE 22-METRE LINE 22m 10m HALFWAY LINE 10m 22m Not exceeding 22m Not exceeding 100m PERIMETER AREA Minimum end and side recommended safety areas (perimeter area) should be not less than 5m where practicable. Where floodlighting columns have been erected on the side(s) of the pitch within the recommended safety area, clubs should carry out a risk assessment and take the appropriate action. The perimeter area is defined as within the playing enclosure. GOAL POSTS Minimum sizes are shown in Diagram 3. The supply and installation of goal posts, sockets and post protectors should only be arranged through a reputable and recognised firm. Protection, maintenance and inspections should be carried out in accordance with the supplier s instruction. (Refer also to Facilities Guidance Note 3). TOUCH-IN GOAL Touch-in- Goal Line GOAL LINE DEAD BALL LINE Not exceeding 22m Diagram 3 Red dots are the goal posts and the red line is the crossbar Minimum height 3.4 metres 5.6 metres 3 metres to top edge of bar PERFORMANCE AND PLAYING STANDARDS Your appointed consultant will provide detailed advice and information on the design, construction and maintenance of playing surfaces. All of these aspects will be reflected and taken into account in the tender specifications and documentation that is sent out to contractors. 4

PITCH CONSTRUCTION Generally, depending upon the standard of facility required, the playing surface should be no steeper than 1:80-100 along the line of play and 1:40-50 across the line of play. PITCH DRAINAGE Most grass pitches will require an effective drainage system to allow regular use throughout the playing season. The lateral drain spacing for each pitch should be calculated using the hydraulic conductivity findings from the soil surveys. Sport England s publication Natural Turf for Sport identifies four types of pitch drainage. Undrained - unlikely to be adequate for regular usage unless the subsoil is naturally well drained. Pipe drained pitches (see Diagram 4) - most common system, using perforated plastic pipes at 1:200 minimum fall laid approximately 600mm below the surface in lateral gravel filled trenches. The pipes must connect to a surface water drainage system or watercourse. This system requires aeration and appropriate sand dressing to maintain its performance. Diagram 4: Pipe-drainage construction 50mm blinding layer Surface requires aeration and repeated applications of sand top dressing Porous backfill material ensures high percolation rates brought to within 150-200mm of the surface Generally 450-600mm below ground level Pipe-drains at 5-10m centres Minimum fall 1:200 Pipe and slit drained pitches (see Diagram 5) - uses the pipe drained system with additional slit drains laid across the top of the pipes. The slits are commonly 200mm to 300mm deep, filled with gravel and dressed with minimum 75mm sand. This system requires regular maintenance with frequent sand dressing to maintain the safety and quality of the surface. The surface may be uneven during the first season and may be susceptible to shrinkage in summer. Diagram 5: Pipe-and-slit-drainage construction Surface requires aeration and repeated applications of sand top dressing 50mm blinding layer Pipe-drains at 5-10m centres Gravel 75mm sand Slit-drain normally 250-300mm deep Connection between slit-drain and backfill above pipe-drain is essential Suspended water table (see Diagram 6) - the entire playing surface is constructed over a gravel base with a lateral piped drainage system. Water is held in the sand/soil root zone and this moisture helps to sustain the grass during dry weather. A fully automatic irrigation system is needed and some form of reinforcement is likely to be incorporated in the root zone. This type of construction is advisable where the subsoil is unsuitable and where a very high standard of pitch performance (including high levels of play) is required, for example at professional clubs. A suspended water table form of construction will be demanding of both management and grounds maintenance staff. 5

Diagram 6: Suspended water table construction High standards of pitch performance require high levels of reliable maintenance. Sand/soil rootzone mix 250-300mm Aggregate drainage layer 100mm IRRIGATION Well-drained pitches will require intensive irrigation to prevent drying out during periods of dry weather and to enable rapid grass establishment. Consideration should be given to a pumped water supply and hydrant points located near the pitches. Automatic pop-up irrigation systems are recommended for higher levels of play. Wherever possible and feasible, clubs should investigate and provide water storage arrangements and recycling surface water collection. EQUIPMENT AND MACHINERY Facilities Guidance Note 3 lists equipment that is fundamental to successful maintenance. STORAGE AND GROUND COMPOUND 50mm blinding layer Lateral drain Depending upon the scale and extent of a club s sports ground, equipment and facilities, both secure storage and support facilities may be required. PROCUREMENT AND TENDERS This process should include: Pre-tender shortlist of contractors visits to similar completed installations financial standing and liability of the contractor references. Tenders Tender documents should include the following: role and responsibility of client consultants outline scheme drawings planning permission and conditions (if applicable) contractual preliminaries, form of contract, defects maintenance period detailed specification of works, performance and playing standards requirement for as constructed drawings and layouts programme maintenance requirements/schedule equipment and machinery schedule supply and installation of goal posts, protectors, sockets and flexible corner flags fencing details other associated works. 6

PUBLICATIONS An Introduction to IOG Performance Quality Standards Institute of Groundmanship 28 Stratford Office Village Walker Avenue Wolverton Mill East Milton Keynes MK12 5TW Tel: 01908 312511 www.iog.org Performance Quality Standards - Rugby Institute of Groundmanship (as above) Pitch Dimensions International Rugby Board Huguenot House 35-38 St Stephen's Green Dublin 2 Ireland Tel: 00 353 1 240 9200 www.irb.com Natural Turf for Sport - Design Guidance Note Sport England Publications PO Box 255 Wetherby LS23 7LZ www.sportengland.org USEFUL CONTACTS Institute of Groundmanship (IOG) (as above) Sports and Play Construction Association (SAPCA) Federation House Stoneleigh Park Warwickshire CV8 2RF Tel: 024 7641 6316 www.sapca.org.uk National Playing Fields Association (NPFA) Stanley House St Chad's Place London WC1X 9HH Tel: 020 7833 5360 www.npfa.co.uk Pitchcare.com Limited The Technology Centre Wolverhampton Science Park Wolverhampton West Midlands WV10 9RU Tel: 01902 824 392 www.pitchcare.com International Rugby Board (IRB) Huguenot House 35-38 St Stephen's Green Dublin 2 Ireland Tel: 00 353 1 240 9200 www.irb.com Rugby Football Union (RFU) Rugby House Rugby Road Twickenham TW1 1DS Tel: 0208 892 2000 www.rfu.com Sport England 3rd Floor Victoria House Bloomsbury Square London WC1B 4SE Tel: 08458 508 508 www.sportengland.org 7

This Guidance Note is part of a series published by the Rugby Football Union (RFU) and Rugby Football Foundation (RFF). Whilst every effort has been made by the RFU/RFF to ensure that the contents are accurate, the RFU/RFF disclaims all warranties, express or implied, as to the accuracy of the information contained in this Guidance Note. The information is intended solely as a guide and should be augmented where necessary by professional advice. The RFU/RFF shall not be liable for any loss or damage whatsoever arising from the use of or reliance on the information contained in this Guidance Note. The RFU/RFF reserves the right to amend or withdraw the information contained in this Guidance Note at any time. Published in March 2006 by Rugby Football Development Limited Rugby Football Development Limited Rugby House, Rugby Road, Twickenham TW1 1DS Tel: 0870 405 2000 Fax: 0870 405 2009 Email: communityrugbyinfo@rfu.com Web: www.rfu.com