PRE- PROPOSAL FORM - Lewis River Aquatic Fund

Similar documents
PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Sub-watershed Summaries

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed

1. Project Title. Rush Creek Instream Pilot Project Habitat Restoration

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016

2012 Bring Back the Natives Awarded Projects

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting November 8, 2007 Ariel, WA

4.4 ASSESSMENT OF POTENTIAL ANADROMOUS FISH HABITAT UPSTREAM OF MERWIN DAM (AQU 4)

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

Searsville Dam Removal

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Executive Summary. Map 1. The Santa Clara River watershed with topography.

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

MCCAW REACH RESTORATION

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

Yakima River Basin Coho Reintroduction Feasibility Study

Fish and Wildlife Compensation Program Trevor Oussoren, program manager, Columbia region. CRT Workshop, Fauquier, June 15, 2013

Ned Currence, Nooksack Indian Tribe

Salmon Biology Station

Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting March 8, 2012 Meeting at Merwin

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

Okanagan Sockeye Reintroduction

Western native Trout Status report

STEELHEAD SURVEYS IN OMAK CREEK

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Summary of HSRG Findings for Chum Populations in the Lower Columbia River and Gorge

COA-F17-F-1343 YEAR END REPORT

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Yakima/Klickitat Fisheries Project

Strategies for mitigating ecological effects of hatchery programs

Mountain Columbia Province

Newaukum Watershed Culvert Assessment

The Blue Heron Slough Conservation Bank

Lewis River Bull Trout Habitat Restoration Project Identification Assessment

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

Conserving the Forests, Lakes and Streams of Northeast Michigan

Hatchery Reform and our Pacific Region National Fish Hatcheries. Presented by Doug Olson

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

South Fork Chehalis Watershed Culvert Assessment

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report

A.23 RIVER LAMPREY (LAMPETRA

10 is bounded by wetlands between RM 1.8 and 3.1 on the south shore and more are scattered

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Southern Oregon Coastal Cutthroat Trout

Riparian Planting Projects Completed within Asotin Creek Watershed. Final Report

State of TU in the West 2017

Mountain Snake Province

1.Warm Springs Creek (Anaconda) Watershed Description and Land Use

Table xxx: Listed and Suspected Impairments for Willow Creek 2010 Reach Impairment Pollutant Impaired Uses

Lake Merwin and Swift Creek Reservoir Tributaries. Bull Trout Limiting Factors Analysis

July 24, Kalispel Tribe of Indians Update on Efforts to Suppress Northern Pike and Policy Implications

Of the Salmon and For the Salmon

FWCP External Projects Delivered by Stakeholders and First Nations

Columbia Lake Dam Removal Project

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

REVIEW OF USDA FOREST SERVICE COMMUNITY-BASED WATERSHED RESTORATION PARTNERSHIPS APPENDIX J

8 Cowlitz Subbasin Toutle

Rebirth of the Pigeon River: Song of the Morning Dam Removal Project

Fisheries Analysis Report for Categorical Exclusion. Erin Black, South Zone Planning Team Leader

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

APPENDIX D: LEWIS RIVER HATCHERY REVIEW

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

middle deschutes progress in restoration

Flowering Rush An Invasive Aquatic Macrophyte Infesting the Columbia River Basin

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened

Columbia River Salmon Harvest Sport and Commercial Sharing Facts and Relationships

COLUMBIA LAKE DAM REMOVAL PROJECT

Stronghold Investment Partnership Basin Liaisons 2009

Volume II, Chapter 7 Cowlitz Subbasin Toutle

POLITICS A MONUMENTAL TASK FOR STREAM RESTORATION: AN EXAMPLE FROM TRAPPER CREEK OREGON

Refined Designated Uses for the Chesapeake Bay and Tidal Tributaries

Backgrounder and Frequently Asked Questions

Nechako white sturgeon are an Endangered Species

The Calawah River System

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Eastern Brook Trout Joint Venture. Update

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

UPPER GALLATIN TMDL PLANNING AREA BIOLOGICAL MONITORING

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

2013 WHITE SALMON CHINOOK SALMON VSP MONITORING. Jeremy Wilson Washington Department of Fish and Wildlife

UNIT 4E. SALMON SUPPLEMENTAL INFORMATION

Outstanding Iowa Waters, Trout Streams & Value to Northeast Iowa

LIFE HISTORY DIVERSITY AND RESILIENCE

Transcription:

PRE- PROPOSAL FORM - Lewis River Aquatic Fund 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest 2. Organization purpose Resource management agency 3. Project manager (name, address, telephone, email, fax). Adam Haspiel Mount St. Helens National Volcanic Monument 42218 NE Yale Bridge Road Amboy, WA 98601 360-449-7833 360-449-7801-FAX ahaspiel@fs.fed.us- e-mail Fishery Biologist 20+ years experience with fish habitat restoration projects 4. Project Title 2011 Pine Creek Nutrient Enhancement by Snowcats and Snowmobiles 5. Summary of Project proposal The proposal is to use snowmobiles, snow cats and pick-up trucks to distribute Salmon carcasses in the Pine Creek Watershed. A total of six miles in Pine Creek, and two miles in P8 are available to be treated depending upon partnership funding and access. Dams built in the 1930 s prevent anadromous fish from returning to spawn in the Upper Lewis River System, including Pine Creek. This greatly decreases the nutrient levels in affected streams over time by eliminating contributions of carcasses and eggs. Pine Creek was further effected by the eruption of Mount St. Helens in 1980 when a lahar scoured the length of it, eventually depositing sediment into Swift Reservoir. As a result of the eruption, nutrient levels decreased due to loss of allochthanous materials and decreased primary production (Lower Lewis River Watershed Analysis 1995). Additionally, the floods of 1996 removed much of the river s young riparian vegetation. Nutrients added to Pine Creek and P8 in the form of carcasses would increase primary and secondary production, leading to increased feeding opportunities for bull trout. The project will benefit bull trout and all species of introduced anadromous fish.

This project compliments the 2006 and 2008, and 2009 Nutrient Enhancement projects funded by the ACC. This project addresses the following Aquatic Fund priorities. Priority 1: Benefit fish recovery throughout the North Fork Lewis River, with priority to federal ESA-listed species. Bull trout are listed as a threatened species under the ESA. Steelhead trout are listed as a threatened species under the ESA. Coho salmon are listed as a threatened species under the ESA. The Lower Columbia Fish Recovery Plan rated restoration reach potential for Pine Creek 1- Pine Creek 5 as High for Steelhead. The ACC Synthesis Group matrix ranked these reaches as Medium restoration potential for Bull Trout and Steelhead and ranked P8 tributary as High restoration potential for Bull Trout and Steelhead. Priority 2: Support the reintroduction of anadromous fish throughout the basin. Nutrients will enhance the growth and production of anadromous fish. Priority 3: Enhance fish habitat in the Lewis River Basin-, with priority given to the North Fork Lewis River. WDFW has produced a report titled, Pacific Salmon and Wildlife Ecological Contexts, Relationships, and Implications for Management. Coho size increases 50% in streams enriched with salmon carcasses. The assumption is made that bull trout and steelhead juveniles will respond in similar fashion. 6. Project location Pine Creek- RM 2.0 to RM 8. T. 7N, R.6E, Sections. 4, 5, 9, 15, 16, and 24. Pine Creek Work Center will be used as a staging area for the project. 7. Expected products and results Increased nutrients in Pine Creek and Pine Creek riparian areas have been documented with aquatic macroinvertebrate monitoring since 2006. Nutrient additions from this project are expected to produce similar results. 8. Benefits of proposed Project The project will benefit Bull trout and anadromous fish by increasing aquatic productivity, food resources, and riparian vegetation growth. 9. Project partners and roles. Snowmobile club They will use their snowmobiles to pull sleds and distribute carcasses Pope and Talbot Timber Company- They will write permits and let us past gated roads to distribute nutrients. 10. Community involvement (to date and planned).

The Forest Service maintains active community involvement by scheduling regular events with legislators, scientists, members, and key individuals for continual program and project development along with cultivating strong ties with agencies, academia, and local citizen groups. 11. Procedure for monitoring and reporting on results. Aquatic Benthic Macro-invertebrate communities will be assessed prior to and following carcass seeding. Monitoring will build on the efforts from 2006-2009. Macroinvertebrate samples will be collected in select locations in Pine Creek basin and analyzed by Aquatic Biology Associates. 12. Project schedule (anticipated start date, major milestones, completion date). The project would take place in October, November or December of 2011. The December time period mimics natural coho spawning periods. 13. Funding requested (estimated cost for project design, permitting (including necessary resource surveys), construction, and monitoring). Total ACC Funds-$7,500 14. Type and source of other contributions (Identify cash (C) and/or in-kind (IK), and status, pending (P) or confirmed (Co)). Gifford Pinchot National Forest- $4,500 Snowmobile Club- $5,000 (P) Pope and Talbot Timber Company- $1,000 15. If you have technical assistance needs for this project, please briefly describe such needs. None Needed

Pine Creek Nutrient Enhancement CARCASS Total NEPA Final designs Project Mgmt. Construction Monitoring/Labor /Reporting Personnel Costs FS - Zone Team or Contract FS Fish Bio and Hydrologist FS - Fish Bio and Hydrologist $2,000(IK) $2,000 (ACC) $2,000 (ACC) $1,500 (IK) FS - Contract administrator - FS - Contract Specialist Snowmobile club $5,000 (IK) Pope & Talbot Timber (ORM) $1,000 (IK) Mt. St. Helens Institute Other Travel $1,000 (ACC) $1,000 (IK) Equipment $2,000 (ACC) Supplies $ 500 (ACC) Administrative Overhead Total ACC Funds $7,500 $2,000 $3,500 $ 2,000 Total FS Funds $4,500 $2,000 $1,000 $1,500 Total other Partner Funds $6,000 $6,000 Project Total $18,000