CALIBRATING THE GMA PRESSURE SENSORS AND THE ECU ENGINEERING UNIT

Similar documents
TEST OF GMA SPINUP ASSEMBLY PRESSURE SENSOR CALIBRATION

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

BLEED DOWN OF THE HIGH GMA PRESSURE

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

DESIGN VERIFICATION AND QUALIFICATION OF NEW POPPET AND BUSHING ON GMA FLIGHT SOLENOID VALVES

GMA SLEEP PROCEDURE AT VAFB

GDS OPERATING PROCEDURE

SCRUB LAUNCH RECOVERY PROCEDURE FOR THE GMA

Vibration/leak Test 2.5 and 6 Vatterfly Valves (3179 and 3223) spare units. GP-B Engineering Procedure P0761 Rev.-

PROCEDURE FOR THERMAL CYCLING IN LIQUID NITROGEN

Proton Monitor Thermal Vacuum Test Procedure GP-B P0635

BLEED DOWN OF THE GMA HIGH PRESSURE AT VAFB

GSE CAGING AND SPINUP BUFFER LINE INSTALLATION

GMA VENT EXTENSION SERVICE PROCEDURE

GMA PREPARATION FOR E28 TESTING

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

GSE CAGING BALLAST SYSTEM INSTALLATION

GMA TO SPACE VEHICLE PLUMBING HOOKUP

ASSEMBLY OF GAS FLOW HARDWARE INTO SM GMA

CLEANLINESS TEST OF PROBE SPINUP EXHAUST LINES

CHECK READOUT LOOP CONTINUITY IN PROBE C

Proto-qual Vibration Test Procedure 2.5 and 6 Vacuum Valves (3179 and 3223) Retest of Flight Spare Valves. GP-B P0735 Rev.-

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

PROCEDURE TO MEASURE READOUT LOOP RESISTANCE

PROBE-C CAGING VALVE INSTALLATION

POROUS PLUG CHARACTERIZATION TEST

(PTP) PROBE PRESSURE MEASUREMENT SYSTEM INSTALLATION AND LEAK CHECK PROCEDURE

(PTP) REMOVE PROBE SPINUP GAS/VAC. LINES (HORIZ.)

GUARD TANK PRESSURIZATION FOR TRANSPORT

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin

NGP-250/500 Nitrogen Generator Quick Start Guide

Instruction Bulletin Addendum For Pressure-Balanced In Situ Oxygen Probes

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

Maintenance of the Electronic ( EPC ) Pressure Controllers on GCs

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Air Bubbler Depth Gauge DG2200 Installation and Reference Manual

TECHNICAL MANUAL CALIBRATION PROCEDURE FOR PRESSURE GAUGE. This publication replaces T.O. 33K dated 30 January 2012.

SEMASPEC Test Method for Determination of Cycle Life of Automatic Valves for Gas Distribution System Components

Constant Pressure Inlet (CCN) Operator Manual

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

QBS Electronic Pressure Regulator

BGA244 Binary Gas Analyzer

Amplified Middle Pressure Sensors

DeFelsko PosiTector CMM IS Probe

Rejuvenation Instructions

Pneumatic high-pressure controller Model CPC7000

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

BAROMETER PRESSURE STANDARD PRESSURE CONTROLLER

TOPIC: KNOWLEDGE: K1.01 [2.5/2.7] An atmospheric pressure of 15.0 psia is equivalent to... A psig. B psig. C psig.

Document Number: 302/34000/76 SV/sv Revision: (B) 2009/02/05

DPC-30 DPC-100. Reference Manual

ISQB1 INTRINSICALLY SAFE ELECTRO-PNEUMATIC CONTROL VALVE INSTALLATION & MAINTENANCE INSTRUCTIONS HAZARDOUS AREA CLASSIFICATION

Installing a Probe. Typical Installation

USER MANUAL. Intelligent Diagnostic Controller IDC24-A IDC24-AF IDC24-AFL IDC24-F IDP24-A * IDP24-AF * IDP24-AFL * IDP24-F * 1/73

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

Additel 780 Series Pressure Controller

INSTRUCTION MANUAL MP4AR Remote Convection Gauge Range: 1 x 10-3 Torr to 1 x 10+3 Torr

KJ1000 Operating Instructions & Parts Manual NSN

FX134, FX1234, FX3030 Problem and Solutions

Additel 780 Series Pressure Controller

Evaporative Emissions (EVAP) system, checking

Cover Page for Lab Report Group Portion. Drag on Spheres

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

WIDDER TOOLS. HPICAL Calibration Station 1 (203)

Vaisala Pressure, RH & Temp. Transmitter. The instrument was operational upon receipt. The instrument was adjusted and calibrated.

Ag Leader Technology Proportional Valve

Basic Nitriding Sampling System Hydrogen Analyzer with Calculated % DA, % NH 3, and K N Values. Operations Manual

Pressure Regulators. Operating Instructions. Instrumentation

MODEL GENERA PURGE TURBINE INSTR DANGER HIGHLY TOXIC AND OR FLAMMABLE LIQUIDS OR GASES MAY BE PRESENT IN THIS MONITORING SYSTEM.

The HumiPyc ( Model 2) - Gas Pycnometer; Density, Moisture, Permeation Analyzer; Filter Integrity Tester; RH sensor Calibrator

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Installation Instructions

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Prepare Payload for Mass/CG Measurements and Condition Payload During Spin Balance Test

Installation Instructions

_ pressure transducers. User Manual

Exercise 8. Closed-Loop Pressure Control, Proportional-Plus-Integral Mode EXERCISE OBJECTIVE

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

RAM 4021-DPX Operation Manual

Methods for Measuring Groundwater Elevation and Vacuum Pressure During Soil Vapor Extraction

Model of a Standard Operating Procedure (SOP) for SO 2 measurements with a UV fluorescence analyzer

Paper Session II-C - Verification of International Space Station Component Leak Rates by Helium Accumulation Method

Maintenance Manual. Liquid Level Transmitter CT801-SI, CT801-TA

Sedan Range. Evaporative Loss System Check Clarified Procedure

Inert Air (N2) Systems Manual

AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP

MASSACHUSETTS STATE POLICE CRIME LABORATORY. Certificate of Calibration Procedure for the Alcotest 9510

3.0 Pressure Transmitter Selection

Lab 1: Pressure and surface tension. Bubblers, gravity and the mighty paper clip.

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Hazards associated with the gas system and how to mitigate them

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

Transcription:

P0807 Rev. STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 CALIBRATING THE GMA PRESSURE SENSORS AND THE ECU ENGINEERING UNIT GP-B ENGINEERING PROCEDURE P0807 Rev PREPARED R. Stephenson, GMA Engineer Date APPROVED B. Farley, Electronics Engineer Date APPROVED C. Gray, GMA REE Date APPROVED B. Bencze, Electronics Manager Date APPROVED D. Ross, Quality Assurance Date Page 1 of 11

TABLE OF CONTENTS TABLE OF CONTENTS... 2 1. SCOPE... 3 2. TEST INFORMATION... 3 2.1 Cleanliness... 3 2.2 ESD precautions... 3 2.3 Use of connector savers... 3 2.4 Personnel, QA, and Documentation... 3 2.5 Red-line Authority... 4 DOCUMENTS AND EQUIPMENT... 5 3.1 Applicable Documents... 5 3.2 Test Equipment... 5 3.3 Flight Parts... 5 4 CALIBRATION OF SPINUP ASSEMBLY SENSORS... 6 5 CALIBRATION OF REGULATOR ASSEMBLY SENSORS... 7 6 CALIBRATION OF CAGING ASSEMBLY SENSORS... 8 7 TABLE 1... 9 8 DIAGRAM 1... 10 9 PROCEDURE COMPLETION... 11 10 DATA BASE ENTRY... 11 Page 2 of 11

1. SCOPE This procedure calibrates the ECU Engineering unit for use with the GMA pressure sensors. The GMA will be first be evacuated and the zero point of the ECU EU set using trimpots loading with the sensors. Readings will then be taken at different in range pressures in order to determine the calibration coefficients for each sensor. These calibrations will be input to the ECU EU test set so that it can be used to read out actual pressures during flow testing of the GMA. Note: SP2 will not be calibrated in this procedure. A zero can be found, but data points can not be taken at this time. It will need to be calibrated off-line. Also, SP1 and CP1 CP4 will not be as accurate, as the Nitrogen regulator will be the only source of pressure measurement. All data should be recorded in Table 1. 2. TEST INFORMATION Proper care should be taken in handling components, and their cleanliness must be preserved. Temperature: Room temperature Humidity: not critical 2.1 Cleanliness 2.1.1 Normal lab environment when components are double bagged. 2.1.2 Class 1000 clean room when GMA is closed. Use the clean hood when making connections to the GMA. 2.2 ESD precautions None required. 2.3 Use of connector savers QA to be notified prior to beginning this procedure Connector savers will be used on all gas and electrical connections to the GMA flight hardware. 2.4 Personnel, QA, and Documentation Personnel Integration and Test Director The Test Director (TD) shall be Rick Stephenson or an alternate that he shall designate. The TD has overall responsibility for the implementation of this procedure and shall sign off the completed Page 3 of 11

procedure and relevant sections within it. The GMA REE shall also sign off the completed As- Built procedure. Integration Engineers and other personnel. All engineers and technicians participating in this procedure shall work under the direction of the TD who shall determine personnel that are qualified to participate in this procedure. Participants in this procedure are to be R. Stephenson and D. Vanrenen, and B. Farley. The test shall be conducted on a formal basis to approved and released procedures. The QA program office shall be notified of the start of this procedure. A Quality Assurance Representative, designated by D. Ross shall be present during the procedure (if deemed necessary) and shall review any discrepancies noted and approve their disposition. Upon completion of this procedure, the QA Manager, D. Ross, or her designate, shall certify their concurrence that the effort was performed and accomplished in accordance with the prescribed instructions by signing and dating in the designated place(s) in this document. Discrepancies will be recorded in a D-log or as a DR per Quality Plan P0108. If a re-test of any or all of the hardware is necessary, the TD will determine the appropriate changes in the procedure, with the QA Manager s approval. 2.5 Red-line Authority Authority to red-line (make minor changes during execution) this procedure is given solely to the TD or his designate, or the GMA Manager, and shall be approved by QA. Additionally, approval by the Hardware Manager shall be required, if in the judgment of the TD or QA Representative, experiment functionality may be affected. Page 4 of 11

DOCUMENTS AND EQUIPMENT 3.1 Applicable Documents Document number Rev Description 26202 B GMA Pallet Harness 8A01545 B GMA to ECU cables 25110 C GMA Assembly 3.2 Test Equipment Equipment Model and Serial Number Calibration GMA Pallet Harness Engineering Unit 26202 Rev A 1/18/00 ECU Engineering Unit 1/17/01 Potentiometer Assembly Absolute pressure gauge Alcatel Leak Detector Engineering cables from ECU to GMA Harness N/A 8A01545 1/24/00 Wiring pigtails 1/18/00 Nitrogen Gas, Filtered Clean Pressure Regulator 3.3 Flight Parts Description Model and Serial Number Comments GMA Assembly 25110 Rev C Page 5 of 11

4 CALIBRATION OF SPINUP ASSEMBLY SENSORS Started on: 4.1 Verify connector saver valves are installed on all GMA gas ports and are closed. 4.2 Connect leak detector to SD2A. 4.3 Purge nitrogen gas for 5 minutes at 10 psig. 4.4 Set regulator on nitrogen bottle to just over 0 psig. Connect filtered Nitrogen supply to SD2B. 4.5 Connect calibrated pressure sensor to Ballast Bottle assembly port. 4.6 Connect the GMA Pallet Harness to the GMA solenoid valves and pressure sensors according to drawing 25110 Rev C. Use connector savers. 4.7 Connect the Potentiometer Assembly to the GMA Pallet harness using the pigtails per diagram 1. 4.8 Connect the ECU EU to the GMA Pallet harness and initialize the ECU EU. 4.9 Open HPM3, Ballast Manual Valve, and connector saver valves at SD2A and Ballast Port. Close HPM1 and HPM2. 4.10 Close all GMA solenoid valves. 4.11 Open all SV s. 4.12 Evacuate this area of the GMA with the leak detector and check for leaks at the connections. 4.13 Adjust the potentiometers to obtain a count level between 1 and 200 counts for SP1-SP9. 4.14 Close SV1, 2, 3, 4, 5, and 6. 4.15 Introduce Nitrogen by closing the connector saver valve at SD2A and cracking the connector saver valve at SD2B open until SP5-SP9 read between 600 and 1500 counts. Allow to stabilize. 4.16 Record these values. 4.17 Continue to slowly raise the pressure until SP5-SP9 read between 2500-3500 counts. Allow to stabilize. 4.18 Record these values. 4.19 Continue to slowly raise the pressure until SP5-SP9 read between 3800-4094 counts. Allow to stabilize. 4.20 Record these values. 4.21 If necessary, evacuate the assembly and reintroduce Nitrogen until SP4 reads between 600 and 1500 counts. 4.22 Allow to stabilize and record values. Page 6 of 11

4.23 Continue to slowly raise the pressure until SP4 reads between 2500-3500 counts. Allow to stabilize. 4.24 Record these values. 4.25 Continue to slowly raise the pressure until SP4 reads between 3800-4094 counts. Allow to stabilize. 4.26 Record these values. 4.27 Close off Nitrogen supply and evacuate GMA. 4.28 Verify sensors return to 1-200 counts and close all solenoid valves. 4.29 Record the serial numbers of the sensors at each location. 5 CALIBRATION OF REGULATOR ASSEMBLY SENSORS Started on: 5.1 Open SV5, 6, 22, and 24. 5.2 Introduce Nitrogen as above until SP3A and SP3B read between 600 and 1500 counts. Allow to stabilize and record values. 5.3 Continue to raise the pressure until SP3A and SP3B read between 2500 and 3500 counts. Allow to stabilize and record values. 5.4 Continue to raise the pressure until SP3A and SP3B read between 3800 and 4094 counts. Allow to stabilize and record values. 5.5 Close off Nitrogen supply and evacuate GMA to less than 15 psia. 5.6 Open SV s 5 24. 5.7 Introduce 15 psia Nitrogen to the GMA and close all solenoid valves. 5.8 Close connector saver valve at ballast bottle port and ballast manual valve. Disconnect pressure sensor. 5.9 Disconnect Nitrogen from SD2B and connect it to SD1. 5.10 Open HMP1 and HPM2. 5.11 Introduce Nitrogen as above until SP1 reads between 600 and 1500 counts. Allow to stabilize and record values. Pressure will be read from the bottle regulator. Add barometric pressure to the gauge reading (14.7 psi). 5.12 Continue to raise the pressure until SP1 reads between 2500 and 3500 counts if able. Allow to stabilize and record values (+14.7 psi). 5.13 Continue to raise the pressure until SP1 reads between 3800 and 4094 counts if able. Allow to stabilize and record values (+14.7 psi). 5.14 Close off valve on Nitrogen tank and open SV1 SV6 and SV22 and 24. 5.15 Evacuate GMA to less than 15 psia at nitrogen bottle. 5.16 Close SV5 and SV6 and pressurize GMA to about 15 psia from nitrogen bottle and wait for it to stabilize. Page 7 of 11

5.17 Close HPM1 and HPM2 and SV1 SV4. 5.18 Close connector saver valve at CD1 and move nitrogen bottle to SD2B. 5.19 Open SV22 and SV24 and pressurize GMA to about 15 psia. 5.20 Open SV5 and SV6 and let pressure stabilize. 5.21 Close all solenoids and connector saver valves and disconnect nitrogen and leak detector. 5.22 Record the serial numbers of the sensors at each location. 6 CALIBRATION OF CAGING ASSEMBLY SENSORS Started on: 6.1 Verify all connector saver valves are closed, and connect the leak detector and the nitrogen supply to CD1 using a VCR tee. 6.2 Connect the absolute pressure gauge to CD2 and open connector saver valves at CD1 and CD2. 6.3 Open all CV solenoid valves and evacuate caging assembly. 6.4 Adjust all trimpots to read between 1 and 200 counts for CP1-CP4. 6.5 Close connector saver valve on CD2. 6.6 Introduce Nitrogen as above until CP1-CP4 read between 600 and 1500 counts. Allow to stabilize. 6.7 Record these values. Pressure measurement will be read from the bottle regulator. Add barometric pressure to the gauge reading (14.7 psi). 6.8 Continue to slowly raise the pressure until CP1-CP4 read between 2500-3500 counts. Allow to stabilize. 6.9 Record these values. (+14.7 psi) 6.10 Continue to slowly raise the pressure until CP1-CP4 read between 3800-4094 counts. Allow to stabilize. 6.11 Record these values (+14.7 psi). 6.12 Close the nitrogen bottle valve and evacuate caging assembly. 6.13 Verify CP1-CP4 return to 1-200 counts. 6.14 Pressurize caging assembly to about 15 psia and close all solenoid and manual valves and disconnect nitrogen and leak detector. 6.15 Record the serial numbers of the sensors at each location. 6.16 Disconnect the ECU EU and shut it down. Page 8 of 11

P0807 Rev. 7 TABLE 1 Engineering Evaluation of ECU / GMA Pressure Gage Readouts using Flight Strain Gages and Potentiometer Offset Adjust. ECU Identification: EU Connect the flight Pressure Gages to the harness connectors using connector savers. The gages are installed on The GMA assembly where the pressure can be adjusted and monitored using a calibrated pressure gage. Reduce the pressure to zero psia. Open the appropriate GMA valve for the gage being monitored. Observe the ECU output, and adjust the potentiometer to obtain a count level between 1 and 200 counts, Record the pressure reading and the displayed counts. Adjust the pressure to obtain a count level between 600 and 1500 counts, and record the values. Record two more sets of pressure readings, at approximately 2500 to 3500 counts and 3800 to 4094 counts. Pressure readings should be on scale between 0 psia and at least 80% of the Max P value. The order of sequencing through the gages and monitors may be altered as convenient. Pressure Monitor Gage S/N Max P psia SP5 986 5 SP7 986 5 SP6 986 5 SP8 986 5 SP9 986 5 SP4 986 15 SP3A 986 100 SP3B 986 100 CP3 986 250 CP1 986 250 CP2 986 250 CP4 986 250 SP2 986 1000 1-200 600-1000 2500-3500 3800-4094 Pressure DN Pressure DN Pressure DN Pressure DN Time SP1 986 4000 Data collected by: Date: GMA Cable Harness: Reference Pressure gage Identity: Calibration Due: Page 9 of 11

P0807 Rev. 8 DIAGRAM 1 GMA Cable Harness J4 J3 White Violet J4 J5 EU Aft ECU Cabling to include Potentiometer assembly Page 10 of 11

9 PROCEDURE COMPLETION The results obtained in the performance of this procedure are acceptable: GMA Engineer date: Discrepancies if any: Approved: date: C. Gray, GMA REE Approved: date: D. Ross, QA 10 DATA BASE ENTRY The following data shall be entered into the GP-B DataBase: Name, number and revision of this procedure Date of successful completion of procedure. Page 11 of 11