Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab

Similar documents
Pile Gripper Systems

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

TARPON A Minimal Facilities Platform

Minimal Structures for Marginal Nova Scotia Developments

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

TRACK RECORD SEP. 2018

Fully Submersible Heavy Lift Vessel

Offshore Pipeline Installation SEABED INTERVENTION THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING HOW DO YOU MAKE THE SEABED?

Deepwater Floating Production Systems An Overview

The SDS Skip. Subsea Deployment Systems Ltd.

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

BoatWasher Swede, , MS Float

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

OFFSHORE WIND: A CRASH COURSE

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

Construction. MCP-01: Construction to Decommissioning

Siri Caisson Permanent Support - A Unique Challenge

The Impact of Composites on Future Deepwater Riser Configurations

Risers for Deepwater FPSO s

sarens

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers.

OFFSHORE SUPPORT VESSELS 2015

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

RIGID RISERS FOR TANKER FPSOs

SEA BREEZE Sea Breeze

Product highlights Variable frequency and thrust

A DECADE OF EXPERIENCE

Advantage Lockers & Bike

Alternative Installation Methods for. Offshore Wind Substations

Examining the merits of jack up platforms as foundations for the offshore wind industry

SIMOPRO Riser Replacement Novel method for replacement of pliant wave risers whilst continuing production on platform

Cook Inlet pipeline crossing is about making the best choices

Floatover Installation Method

Floatover Installation Method

Fully Submersible Heavy Lift Vessel

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen

Rules for Classification and Construction Additional Rules and Guidelines

by Master Halco ANCHOR GATE SYSTEMS Swing Gates Overhead Slide Gates Cantilever Slide Gates Vertical Lift Gates Fencing Without Boundaries.

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

FPSO Riser Solutions for Harsh environments

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

A Single-Point Mooring System for Direct Pumpout of Hopper Dredges

Our Company. Sail with us into calm waters! -

Learn more at

Design of Offshore Structures Prof. Dr. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

Underwater Blanking Tools. Miko Plaster. Tanker Kit. Sea Chest Blanking. Pipe Plugs

Heron s Application for Wind Industry - Gorillas Need Not Apply

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

Biodec Decanter. Ideal with our CYCLATOR technology

FAQ MOTS (Momac-Offshore-Transfer-System):

Feasibility of Steel Lazy Wave Risers in the North Sea

Learn more at

NAUTICAL TERMINOLOGY

OCEAN BREEZE. Ocean Breeze is a Deeper Water Wind turbine Foundation System for The Largest Wind Turbine Towers Sited in Waters up to 200m

Dynamic Positioning Control Augmentation for Jack-up Vessels

CAISSON SHAFT SYSTEM

Safety System Installation Guide for ARE Wind Poles

Ramp Hand-railing System. Complies with Building Regulations. Lockinex. ea i, ea u i

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

North Sea,

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC


Charmborough Bells Risk Assessment and Method Statement

Installation of Ballast Water Management Systems

Permanent buoyancy systems. matrix composites & engineering

Hoisting Equipment Cable puller & Accessories

TECHNICAL SPECIFICATION SCHILLING UHD III WORK CLASS ROV SYSTEM

Grouped SLOR Deep Water Riser System and Installation Assessment

N2 Membrane+ Nitrogen Production Systems for Offshore. Where you are. Where you need to be. We are here too.

Technical Diving Equipment

Industry Guidelines POLYETHYLENE (PE) PIPES AND FITTINGS FOR COMPRESSED AIR ISSUE 6.8

ISE Subsea Tools and Toolsleds

Our Company. Sail with us into calm waters! -

Wave Energy. ME922/927 Wave energy

Exceeding Your Expectations Through Superior Workmanship and Design

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations

Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science

The WindFloat Project. Hamburg, September 2016

Materials : Dichromate zinc plated steel flanges or AISI 316

ULMATEC LAUNCH AND RECOVERY SYSTEMS

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

APPENDIX D Oil Loading Pipeline - Options

Cathodic Protection Retrofit Options Comparison of Current Distribution

hockey hockey Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals

Corrugated Hose Loop Calculations


Aquashield to Mitigate Water Ingress of Gas Pipes

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Transcription:

REQUIRED READING FOR THE GLOBAL OIL AND GAS INDUSTRY SINCE 1975 www.offshore-engineer.com NOVEMBER 2005 Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab Barging in on Trent PLUS: FLOATEC S ERIC NAMTVEDT ON THE PATH TO TECHNOLOGY AGNOSTICISM

MOAB scores North Sea first A neat engineering solution for building and installing fast track offshore facilities has made its debut in the southern North Sea. In this OE exclusive, Terry Knott talks to the designers of MOAB on the thinking behind the concept and describes its successful installation for extending field life and enhancing recovery in the Trent gas field. As a new connecting bridge to the Perenco-operated Trent platform was lowered into place in mid- September, it marked the conclusion of an impressively compact 11-month design, build and installation programme for the novel offshore structure at the other end of that bridge a mobile offshore application barge (MOAB). The unmanned MOAB, elevated some 20m above the sea surface alongside the existing Trent fixed production platform in UK block 43/24, houses compression and process equipment. The new facility can handle 3.4 million m 3 /d of gas and will allow independent Perenco to recover an additional 1.4 billion m 3 of gas from its Trent and Tyne fields, in addition to providing flexibility in accommodating third party gas streams in the ETS pipeline system linking Trent to the Bacton terminal. With an overall project price tag of 25 million to achieve these goals, MOAB sits at centre stage in demonstrating its cost effective credentials. The MOAB concept was developed by naval architect and marine engineering consultancy Overdick of Hamburg in Germany, targeted at fast track small- to medium-sized offshore developments. It can serve as a standalone platform or as an annex as in the case of Trent, and can fulfil a variety of platform roles compression, production, wellhead, accommodation among them. Whatever duty the MOAB performs, explains Overdick partner Andreas Rosponi, the key factors are it allows concurrent engineering and fabrication, it is self-installing, simple to remove and readily deployable. These combine to give TOP: MOAB barge (left) installed and bridge-linked to Perenco s Trent production platform in UK southern North Sea. ABOVE: Developed by Germany s Overdick, the MOAB concept was also used in Southeast Asia. a solution that does not require heavy lift vessels and offers significant savings in terms of schedule and capex. The Trent MOAB is the third of its kind to be designed by Overdick, with its two predecessors having been contracted by operator Talisman in Malaysia. In 2003, a compression and separation annex platform was installed in Talisman s Bunga Raya field in the Malaysia/ Vietnam joint development area in 56m of water, while earlier this year a standalone integrated wellhead and production MOAB went on location in 70m of water in the South Angsi field in Malaysia s South China Sea. With deck payloads of 2500t and 4400t respectively, the first two were larger structures than the latest one for Trent, which has a payload of 1200t, notes Rosponi. But the sizes and duties of the three demonstrate the flexibility of the concept. The concept he refers to might appear at first to be akin to using a conventional jackup platform the MOAB consists of a main hull supported by a steel substructure on the seabed and four corner legs extending above the sea surface. The barge is wet-towed under its own buoyancy to the offshore field where its legs are lowered and its hull jacked up above water. > page 26 www.offshore-engineer.com OFFSHORE ENGINEER november 2005 25

550t hull built in sections by Keppel Verolme, assembled on the dockside, and lifted into the water for tow into dry dock. Four 9m diameter suction cans provide the seabed foundation for the barge. 1500t barge substructure being built around the hull. The main difference between MOAB and a traditional jackup is that you don t have to buy an integral jacking system which then sits idle for 10-15 years offshore, while still requiring maintenance, Rosponi points out. The MOAB design does not include permanently installed jacks we use temporary strand jacks to lower the legs and raise the hull, and these are hired for the job and then removed. And unlike a jackup which is classified as a seagoing vessel and therefore must be flagged and have a master and crew onboard, the MOAB is classed as a fixed installation which only floats temporarily, and hence does not attract the costs of national flagging. Indeed, says the company, when Overdick was first approached in March 2004 by Dixon Marine Consulting, representing Perenco, a jackup solution of some kind was being sought in the revamping of Trent to include a compression and process plant extension. MOAB was selected in August 2004 as a self installing solution for the 50m water depth, capable of 15 years of operation in exacting North Sea conditions. Building the table top Work on detailed design and fabrication began in earnest two months later with EPC contracts awarded by Perenco to Keppel Verolme in Rotterdam for the barge structure and to Solar Turbines in Houston for the topsides modules Overdick acted as nominated subcontractor for the engineering of the structure and transport and installation operations. Keppel Verolme s contract called for delivery of the table top platform bare of topsides and the 30m bridge link. The 550t hull, measuring 30m x 30m x 5.5m, was prefabricated in five sections in the shipbuilder s workshops and assembled into the finished hull on the side of the dry dock. To speed up the schedule, the corner sections of the hull, which guide and hold 26 OFFSHORE ENGINEER november 2005 www.offshore-engineer.com

Competed MOAB floated and towed out to the field. Hull, substructure and legs completed, followed by topsides modules installation. MOAB arrives in field, the legs are lowered and deck jacked up. FAR RIGHT: Leg in clamp guides. the legs, were outsourced to a local subcontractor. The hull was completed in six months in May this year and then lifted into the water by sheerleg crane and towed into dry-dock. Fabrication of the 1500t substructure and legs progressed in parallel. The substructure, which consists of four partially braced leg towers, was built indoors out of prefabricated and preshaped tubulars SIF supplied the bulk of tubulars with some from EEW. The substructure elements were lifted into dry dock and located around the hull. At the base of each corner of the substructure is a 9m diameter, 5m high suction can which provides the seabed foundation for the installed platform these were also outsourced by Keppel Verolme, as was the bridge, weighing 56t with all interconnecting pipework installed. The 75m long, 2m diameter legs, manufactured from plate up to 40mm thick and 80mm thick at the waterline to resist boat impact, were assembled onto the substructure by two Mammoet crawler cranes, which upended the completed legs on the side of the dock and held them in place for welding. The interconnecting bracings of the substructure were quickly added, followed by seafastenings between hull and substructure. Next came the hired equipment which would make possible the installation of the MOAB in the field. For substructure lowering, four 500t strand jacks were mounted outside the hull on cantilevered platforms, and were connected by steel cables to the substructure. For deck lifting, eight 300t strand jacks were mounted inside the hull at the corners. Steel cables passed through hull to anchor blocks at the top of each leg. In addition, a single 100t strand jack was placed at the top of an A-frame mounted behind the hinged bridge, which would serve both as seafastening and to lower the bridge to the Trent platform. >page 28 www.offshore-engineer.com OFFSHORE ENGINEER november 2005 27

56t bridge being lowered into place to complete the 72 hour installation operation. The strand jacks are at heart of the MOAB concept, Rosponi explains. They are readily available for hire, they are compact, and they have very large lift capacity. For the Trent MOAB, all jacks and associated power packs and controls were supplied by ALE Lastra. Other hired equipment included four can-mounted suction pumps, plus one spare on deck, for pumping water from the suction cans as they penetrated the seabed. The pumping system, capable of removing 300m 3 /h at 500kPa, was delivered and operated by Norway s NGI and Framo. Structural assembly of the barge was completed in June. The topsides modules arrived in July, says Rosponi. The under-deck of the hull required additional reinforcement of 50t to accommodate the point loads of the topsides modules, which was done while the modules were en route from the USA by adding flanged webs and gussets to stiffen the deck. This activity was always in the plan, as we had only specified to Solar a total weight not to be exceeded of 900t, a horizontal and vertical centre of gravity envelope, and footprint boundary. But addition of only 50t of steel to support a 900t topsides is minimal, and the payoff was in the fact that we did not have to manage detailed design interfaces between hull and topsides. The topsides package included two turbo-compressors, two turbo-generators, one slug-catcher for an incoming gas pipeline (with a riser in the north-east leg), a process module for handling liquids in the gas, switchgear and control rooms. Perenco supervised installation of the modules on the deck over a seven week period, preparing the MOAB for sailaway at the end of August. All in one The completed MOAB was towed to the Trent field as a self-floating structure from Rotterdam by four Smit tugs over a period of 65 hours in September. The design allowed us to tow in sea states with up to 4m significant wave heights, and install with waves up to 1.5m high, notes Rosponi. We were fortunate on the day of installation that the weather was very good and never exceeded 1m waves. Plus the waves were of very short period, which gave us basically no heave at all and very little roll. With seafastenings removed, the legs and substructure were lowered to the seabed using the four outboard jacks. As the horizontal bracing of the substructure became submerged, the upper clamp each corner has a lower and upper clamp for final fixing of the structure s legs was closed around each leg to act as a guide. Rollers inside the clamps enabled the smooth lowering of the leg. After touchdown, by using the four lifting jacks, the deck was raised to leave around 0.5m of hull remaining in the water, providing 1000t of on-bottom weight. At the seabed, the suction cans self-penetrated through the first 2m of sand. A carefully controlled combination of jacks and suction pumps then pushed the cans down to a depth of 4.5m into the seabed, achieving a preload of 12,000t, after which the deck was elevated to around 20m above water to be level with the Trent platform. Final fixing of the hull to the legs was made by closing both upper and lower clamps at the four corners for horizontal loads, and installing two giant bolts though the cable eyes in the anchor blocks on top of the legs which were now down at deck level into the deck. The 3.5m long, 160mm diameter bolts are manufactured by SuperBolt, says Rosponi, enabling them to be tightened by normal torque wrench. The entire installation operation, plus the bridge link being established, took around 72 hours, excluding standby time. Installation of the Trent MOAB as a complete unit was a first, he adds. The two Malaysian platforms were installed in stages substructure first, hull and legs second, although they could have been competed in one if desired. We believe the MOAB concept is very robust economically for payloads in the 700t to 5000t range, and provides a very attractive solution for fast track facilities installation. OE 28 OFFSHORE ENGINEER november 2005 www.offshore-engineer.com