SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER

Similar documents
Twin & Triple Control Concealed Thermostatic Shower Valve

Self-help Temperature Adjustment

OWNER S GUIDE DUAL CONTROL THERMOSTATIC SHOWER VALVE. Shower Control. may differ depending on choice of Model. Concealing Plate. Handles and ISSUE 01

TEMPERATURE STABILISED THERMOSTATIC SHOWER PANEL

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

SMV-001 Thermostatic Shower Mixer Valve Installation Instructions & Adjustment Settings

THERMOSTATIC MIXING VALVES

Deluge Optimo Shower valve and kit 10032CP

Installation Instructions and User Guide

bathrooms.com Concentric Thermostatic Shower Mixers Cleaning and Care Installation Manual Contents

INSTALLATION, OPERATING AND MAINTENANCE GUIDE FOR EXPOSED AND CONCEALED MODELS MODERN, TRADITIONAL AND MINIMALISTIC

PRODUCT MANUAL IMPORTANT

Latvin Luxury Shower Panel. Telephone Product Specification. ~ Minimum Working Pressure 1.0 bar ~ Maximum Working Pressure 3.

PEG402, PEG402UA & PEG402UAX TMV3 / TMV2 Combined

TMV3 Requirements IMPORTANT Installer:

V12 THERMOSTATIC SHOWER VALVE PRODUCT MANUAL

BASIN AND WALL MIXER INSTALLATION INSTRUCTIONS

These instructions are to be left with the user

Scald Protection Three-Way Thermostatic Mixing Valve

HORNE 20 THERMOSTATIC MIXING VALVE TYPE H-2003

Intamix Thermostatic Mixing Valve

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

Installation Instructions and User Guide

Thermostatic Mixing Valves 61022CPB & 61028CPB Intamix Pro V

320 c PRODUCT MANUAL IMPORTANT

3.5 litr es per INSTALLATION INSTRUCTIONS. Avon 21 Self-closing taps (Push button) B0992AA Self-closing basin pillar tap

Horne Engineering Ltd

Installation, commissioning and servicing instructions

215 and 222 Series PRODUCT MANUAL

SHOWER FITTINGS INSTRUCTIONS AND MAINTENANCE GUIDE. Please read carefully before use

Scald Protection 3-Way Thermostatic Mixing Valve

Vegas Easyfit Kitchen Sink Mixer

These instructions are to be left with the user

Installation, commissioning and servicing instructions

These instructions must be left with the user

Installation, commissioning and servicing instructions

Issue date: July 2012 Issue 1

book : t95575.fm Seite 1 Mittwoch, September 20, :10 AM. Avensys. Exposed Single Lever Mixer

DB 61 Dolphin TMV3 Integrated Thermostatic Mixing Valve

Rada-Presto TF2020 and TF2020S

INSTALLATION INSTRUCTIONS

Mira Select. Installation & User Guide. These instructions must be left with the user. 1

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

In Line Thermostatic Controller. Copper x Copper

MANUAL FOR INSTALLATION, COMMISSIONING AND MAINTENANCE FOR

PRODUCT MANUAL IMPORTANT

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Tempering valve for solar and instantaneous applications Installation, commissioning and servicing instructions 2522HP series

Bar valve with fixed shower head Installation guide

Options Concentric Petite

MIRA SELECT THERMOSTATIC MIXER INSTALLATION & USER GUIDE. These instructions must be left with the user. 1. Please call us on (UK Only)

OPERATING INSTRUCTIONS

These instructions must be left with the user.

Apricot Kitchen Sink Tap

U.KIT2L (Lever Handles) U.KIT2X (Cross Handles)

These instructions must be left with the user.


Thermostatic Concentric Mixer Valve. with Exposed and Concealed Fitting Options. Fitting Instructions

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

These instructions must be left with the user.

hydraulic valve 1 Introduction

INSTALLATION, COMMISSIONING AND MAINTENANCE INSTRUCTIONS

U.KIT3L (Lever Handles) U.KIT3X (Cross Handles)

TMV20 THERMOSTATIC MIXING VALVE

15/3 THERMOSTATIC MIXING VALVE PRODUCT MANUAL IMPORTANT

MIRA ELEMENT SLT THERMOSTATIC MIXER INSTALLATION AND USER GUIDE. These instructions must be left with the user.

553 Series.

Installation, commissioning and servicing instructions

Atmos Fusion. Thermostatic Concentric Mixer Valve with Riser Rail. Fitting Instructions

INSTALLATION INSTRUCTIONS 1/2 THERMOSTATIC VALVE AND TRIM

Atmos Zone. Thermostatic Concealed Concentric Mixer Valve with Fixed Head. Fitting Instructions

AQUABLEND MM THERMOSTATIC MIXING VALVE

Ligature Resistant Head

215-t3/222-t3 SERIES

Atmos 2 Way. Thermostatic Valve with Riser Rail and Overhead. Fitting Instructions

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

AQUABLEND 2000 THERMOSTATIC MIXING VALVE

Installation, commissioning and servicing instructions. General

Installation Instructions Thermostatic Built-In Shower Valves. Basento

Thermostatic Concentric Mixer Valves

Installation, commissioning and servicing instructions

These instructions are to be left with the user

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

Dynamic Valve Type RA-DV Pressure Independent Radiator Valve

Vibration isolation system 1VIS10W. User manual

Issue date: April 2017

Mainsflush Troubleshooting Guide

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

MARKWIK SEQUENTIAL LEVER OPERATED THERMOSTATIC MIXERS. INSTALLER: After installation please pass this instruction booklet to user

k valve 2 (50)HF 2½ (65)SF installation guide aylesbury For valve sizes (DN): tel fax

Rada Sense Shower T3 DMV PRODUCT MANUAL IMPORTANT

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

CLASS TLP Pressure Reducing Valve

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

By-pass valves Series 466 Thermatic - Series USVR

Transcription:

SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER

CONTENTS 1. INTRODUCTION & SAFETY 1 2. DIMENSIONS 2 3. TECHNICAL DATA 3 4. OPERATION 4 5. COMPONENTS 5 6. SITE INSTALLATION 6-9 7. AFTERCARE 10 8. CALIBRATION 11-13 9. CARTRIDGE REPLACEMENT 14-15 10. FAULT DIAGNOSIS 16 11. INSTALLATION; 17 a) Conditions of use 17 b) Commissioning 18-19 c) Maintenance 19-21 INS005 Rev 1

1. INTRODUCTION This installation guide is for the Thermostatic Sequential Shower Valve. It covers the installation, maintenance and operation of the Shower valve. This valve comes either as an Exposed Type Valve or a Concealed Type Valve. There are different handle and plate types for the valves depending on which valve was supplied. The Thermostatic Shower Valve is a sequential valve, for showering and is thermostatically regulated by a wax element. It is designed to provide a flow of water at a safe temperature when installed as described in this manual. The shower valve is suitable for both low and high pressure installations. The valve is suitable, without modification, for all types of installation, including pumped gravity systems, mains pressure and combination boilers. SAFETY We recommend that this product is fitted by a fully qualified installer. The installation must comply with all current water regulations. Please note: This valve MUST be commissioned on site to suit site conditions. In order for this product to operate as designed it must be installed, commissioned and maintained as stated in this manual. 1

2. DIMENSIONS Exposed: ALL DIMENSIONS ARE APPROXIMATE Concealed: ALL DIMENSIONS ARE APPROXIMATE 2

3. TECHNICAL DATA Max Dynamic Pressure: 5 bar Min Dynamic Pressure: 0.2 bar Factory Outlet Temperature Setting: 43 C Minimum Temperature Differential (Mixed water to hot water): 10 C Temperature Stability: ±2 C The valve is suitable, without modification, for all types of installation, including pumped gravity systems, mains pressure and combination boilers. 3

4. OPERATION HOT OFF NOTE: THIS DIAGRAM DEPICTS A LEVER TYPE HANDLE BUT THE OPERATING PRINCIPLE IS THE SAME REGARDLESS OF THE HANDLE. THE ABOVE IS THE RECOMMENDED LEVER ORIENTATION. The turning angle of the handle is 180 degrees, as illustrated above. This is from the fully closed position to the fully hot position. The cold water will get hot gradually from the off position through the 180 turn. 4

Exposed: 5. COMPONENTS Concealed: 5

6. SITE INSTALLATION We recommend that this product is fitted by a fully qualified installer. Please note: This valve MUST be commissioned on site to suit site conditions and the installation must comply with all current water regulations. Please ensure that all components are in the box prior to fitting. There are Check Valves and Filters in the Elbows of this product. Please ensure that the site conditions are suitable for the installation of this product. The ideal site conditions can be found in section 11. It is recommended that Isolating valves are fitted in conjunction with this product. These are not supplied. Please refer to the diagrams in this section prior to installation. Please plumb the valve in with the hot and cold going to the correct sides as detailed in the diagrams below. If you have plumbed it in the incorrectly already, the cartridge can be reversed (see cartridge replacement section). 6

Exposed Installation: 1. Make sure the pipes are at the correct centres as shown above. 2. Secure the valve to the wall using the screws provided. Be careful not to damage the screws or the valve in the process. 3. Flush the pipework before connecting the valve. Debris can prevent the valve working correctly. 4. Connect the pipework using the compression fittings provided. Check for leaks. 5. The water outlet side can be changed if required. 6. Calibrate and commission the valve as advised. Note: Please make sure the inlet pipework is plumbed entering the valve on the correct sides. If the pipes are plumbed the wrong way around the cartridge can be taken out, turned 180 and replaced. This prevents the need for the pipework to be changed. 7

Concealed Installation: A. B. C. 8

1. Make sure the pipes are at the correct centres. A cavity is required within the depth shown on the diagram. The depth depends on how far you want the valve protruding from the finished surface. The dimension is from the finished surfaced. 2. Remove the handle from the valve and place all components in a safe place (see section 8 for handle removal). You will need to fix the valve to a fixing surface within the cavity and fasten the valve with screws. Flush the pipes through before connecting the valve. 3. Connect the valve using the compression fittings. Connect the required outlet. Check for leaks. 4. Tile up to the valve so that the Plate will cover the cavity. Do not permanently fill the cavity in as this may be required for access at a later date. 5. Place the plate over the valve collar and push flush to the wall. Seal around the plate to prevent water entering the cavity. Replace the handle. 6. Calibrate the valve and commission as advised (see section 8 and 11). 9

7. AFTERCARE When cleaning the valve please do not use a substance that could possibly damage the surface finish. We recommend that soapy water with a mild detergent is used. Please take care not to damage the surface finish of the valve. The finish is polished chrome and can be easily marked. 10

Step 1: 8. CALIBRATION PLEASE NOTE THAT ALL VALVES MUST BE CALIBRATED ON SITE BEFORE THEY ARE USED BY THE END USER. VALVES HAVE BEEN FACTORY SET UNDER LABORATORY CONDITIONS WHICH MAY NOT BE REPLICATED ON SITE. Turn the handle clockwise until it stops in the off position. Remove the cap and undo the screw. Remove the screw and washer. Put these in a safe place. The handle can now be removed. Step 2: Stop lug When the handle is removed the Brass Stop Ring will be revealed. This should be tight against the Stop Lug in the Off position. There should be no flow of water. If there is a flow of water please go to Step 3. Step 3: Brass Stop Ring Spindle 2 1 In order to stop the flow of water the Brass stop Ring position must be reset. To do this, remove the M4 grub screw holding the Brass Stop Ring in position. Then remove the Brass stop Ring. 11

Step 4: Place the Brass Stop Ring back on the spindle one serration anticlockwise of the Stop Ring. Turn the Brass Stop Ring clockwise until it reaches the Stop Lug. If the water still has not shut off repeat the step until it does. When the water stops the Off position has been set and the grub screw can be replaced. Step 5: The water should now have stopped coming from the outlet. This means the Off position has been set and the max hot temperature can be set. Turn the Bras Stop Ring fully anticlockwise until it reached the other side of the Stop Lug. This is the fully on position and the water from the outlet should be at a maximum of 43 C. If it is please go to step 9. If not, proceed to step 6. Step 6: If the water is not the correct temperature, please use a small screw driver to remove the spindle sealing screw. This is located inside the spindle hole. Spindle Sealing Screw Please note: A small amount of water may come from inside the spindle hole when the spindle sealing screw is removed. This is normal. 12

Step 7: In order to calibrate the valve to the correct outlet temperature please place a 3mm flat bladed screw driver into the spindle. Locate the calibration screw slot inside and turn anticlockwise to increase the temperature or clockwise to reduce it. Allow the valve to stabilise after every adjustment and measure the outlet temperature. Step 8: Once the stabilised outlet temperature is correct replace the spindle sealing screw. Make sure the spindle screw is fully screwed in place and no water is coming from the spindle hole. Step 9: The handle can now be replaced and secured using the screw and washer. The indices can then be replaced. Check for leaks. If a lever handle is being used please ensure that the lever is in the correct position. The valve is now calibrated and is ready for commissioning and handover. Remember to leave this instruction and installation booklet with the end user. 13

Step 1: 9. CARTRIDGE REPLACEMENT NB - Please make sure the valve is isolated from the water supply before replacing a cartridge. When the valve has been isolated, turn on the valve to let any water in the pipework escape. Remove the handle cap and undo the screw. Remove the screw and washer. Put these in a safe place Step 2: Brass Stop Ring Please remove the M4 grub screw from the Brass Stop Ring. The Brass stop Ring can then be removed. 2 1 Keep the grub screw and the Stop Ring as they will be required to calibrate the new cartridge. Step 3: In order to remove the Chrome Retaining Collar you must remove the M5 grub screw that holds it. This is positioned at the underside of the body. Retaining Collar The retaining collar can then be taken off by placing a spanner on the flats and turning anti-clockwise. 14

Step 4: Pull the cartridge from the valve body. There will be some residual water in the pipework that will pour out when the cartridge is removed. Step 5: Place the new cartridge in the valve as in the diagram. Slot Step 6: Lug Note: It is very important to replace the cartridge correctly. The lug must be positioned in the correct slot. The hot and cold markings on the cartridge must align with the hot and cold inlets. If the Valve Body has been plumbed the wrong way around the cartridge can be turned 180 to match. Tighten the chrome retaining collar by turning it clockwise. Tighten the collar to 17 Nm and then replace the grub screw to ensure the collar does not come loose. Please ensure that the Cartridge Lug (mentioned above) does not come out of the slot when tightening down the Retaining Collar. Reinstate the water supply to the valve and check for leaks. AT THIS STAGE, THE VALVE NEEDS TO BE CALIBRATED. PLEASE GO TO THE CALIBRATION INSTRUCTION IN SECTION 8. 15

10. FAULT DIAGNOSIS Fault Possible Cause No hot water from the Valve 1. Check the hot water supply temperature from the boiler. 2. Inlets are reversed; cartridge needs to be turned 180. 3. Calibration is incorrect. See section 8. 4. Operating conditions are incorrect. See section 11. 5. Blockage in system. No cold water 1. Inlets are reversed; cartridge needs to be turned 180. from the Valve 2. Operating Conditions are incorrect. See section 11. 3. Blockage in the system. No or low flow 1. Possible blockage in the system. from the Valve 2. Operating Conditions are incorrect. See section 11. 3. Automatic Shut Off has been activated due to water supply conditions (See section 11). Either hot/cold water supply has failed. Mixed water is too hot 1. Calibration is incorrect. See section 8 in order to change to a desired temperature. Refer to section 11 for the maximum water temperature. Flow from Valve 1. The shut off position is incorrect. See section 8. in the off 2. Debris blocking shut off. position 3. Hot seat is damaged. 4. Cold shut off O ring is damaged. Leak from Spindle 1. The Spindle Sealing Screw is not screwed in far enough or not screwed in at all. See section 8. Leak from Body 1. Retaining Collar is not tightened properly. 2. Cartridge O rings need to be replaced. Mixed 1. Hot supply temperature fluctuating (see section 11). Temperature 2. Supply pressure is fluctuating (see section 11). fluctuating 3. Thermostat arrangement is faulty. 16

11. CONDITIONS OF USE Key: High Pressure (HP) Low Pressure (LP) Table 1: Normal Conditions of use. Supply Conditions High Pressure Low Pressure Maximum Static Pressure (bar) 10 10 Flow Pressure Hot & Cold (bar) 1-5 0.2-1 Hot Supply Temperature ( C) 52-65 52-65 Cold Supply Temperature( C) 5-20 5-20 Minimum Temperature Differential ( C) 10 10 Table 2: Recommended Mixed Water Temperature Application Recommended Max Hot Water Temperature C Shower 41 17

b) COMMISSIONING Method for Commissioning Thermostatic Mixing Valves Purpose Since the installed supply conditions are likely to be different from those applied in the laboratory tests it is appropriate, at commissioning, to carry out some simple checks and tests on each mixing valve to provide a performance reference point for future in-service tests. Procedure Check that: a) The designation of the thermostatic mixing valve matches the intended application. b) The supply pressures are within the range of operating pressures for the designation of the valve. c) The supply temperatures are within the range permitted for the valve and by guidance information on the prevention of legionella etc. Adjust the temperature of the mixed water in accordance with the manufacturer s instructions and the requirement of the application and then carry out the following sequence: a) Record the temperature of the hot and cold water supplies. b) Record the temperature of the mixed water at the largest draw-off flow rate. c) Record the temperature of the mixed water at a smaller draw off flow rate, which shall be measured. d) Isolate the cold water supply to the mixing valve and monitor the mixed water temperature. e) Record the maximum temperature achieved as a result of (d) and the final stabilised temperature. NOTE: The final stabilised mixed water temperature should not exceed the values in Table 3. f) Record the equipment, thermometer etc. used for the measurements. 18

Table 3: Maximum Mixed water temperature C Application Maximum Hot Temperature C Shower 43 c) MAINTENANCE In Service Testing Purpose The purpose of in-service tests is to regularly monitor and record the performance of the thermostatic mixing valve. Deterioration in performance can indicate the need for service work on the valve and/or the water supplies. Procedure Using the same measuring equipment or equipment to the same specification as used in the commissioning of the valve, adjust the temperature of the mixed water in accordance with the manufacturer s instructions and the requirement of the application. Carry out the following sequence: a) Record the temperature of the hot and cold water supplies. b) Record the temperature of the mixed water at the largest draw-off flow rate. c) Record the temperature of the mixed water at a smaller draw-off flow rate, which shall be measured if the mixed water temperature has changed significantly from the previous test results (e.g.> 1 K), record the change and before re-adjusting the mixed water temperature check: a) That any in-line or integral strainers are clean. b) Any in-line or integral check valves or other anti-back siphonage devices are in good working order. c) Any isolating valves are fully open 19

With an acceptable mixed water temperature, complete the following procedure: a) Record the temperature of the hot and cold water supplies. b) Record the temperature of the mixed water at the largest draw-off flow rate. c) Record the temperature of the mixed water at a smaller draw-off flow rate, which shall be measured. d) Isolate the cold water supply to the mixing valve and monitor the mixed water temperature. e) Record the maximum temperature achieved as a result of (d) and the final stabilised temperature. f) Record the equipment, thermometer etc. used for the measurements. If at step (e) the final mixed water temperature is greater than the values in Table 3 and / or the maximum temperature exceeds the corresponding value from the previous results by more than about 2 K, the need for service work is indicated. Frequency of in-service tests General In the absence of any other instruction or guidance on the means of determining the appropriate frequency of in-service testing, the following procedure may be used: a) 6 to 8 weeks after commissioning carry out the tests detailed in In- Service Tests. b) 12 to 15 weeks after commissioning carry out the tests detailed in In- Service Tests. Depending on the results of the above tests, several possibilities exist: 20

a) If no significant changes (e.g. 1 K) in mixed water temperatures are recorded between commissioning and 6 to 8 week testing, or between commissioning and 12-15 week testing the next in-service test can be deferred to 24 to 28 weeks after commissioning. b) If small changes (e.g. 1 to 2 K) in mixed water temperatures are recorded in only one of these periods, necessitating adjustment of the mixed water temperature, then the next in-service test can be deferred to 24 to 28 weeks after commissioning. c) If small changes (e.g. 1 to 2 K) in mixed water temperatures are recorded in both of these periods, necessitating adjustment of the mixed water temperature, then the next in-service test should be carried out at 18 to 21 weeks after commissioning. d) If significant changes (e.g. > 2 K) in mixed water temperatures are recorded in either of these periods, necessitating service work, then the next in-service test should be carried out at 18 to 21 weeks after commissioning. The general principle to be observed after the first 2 or 3 in-service tests is that the intervals of future tests should be set to those which previous tests have shown can be achieved with no more than a small change in mixed water temperature. 21