2 INTER-GOVERNMENTAL MARITIME CONSULTATIVE ORGANIZATION ASSEi/IBLY - 11th session Agenda item 11 IMCO Distr. GE11ERAL AXI/Res r 1 Tarch 1980 Original: ENGLISH FLESOLUTIOH A.446(XI) ~Qopted on 15 November 1979 THE ASSEMBLY, RECALLING resolution A.297(VI 11) by which it established the Marine Environment Protection Committee and specified the functions and responsibilities of that Committee, RECALLING ALSO Regulation 13B(2) of Annex I of the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973, concerning requirements for crude oil washing and resolution 15 of the International Conference on Tanker Safety and Pollution Prevention, 1978, which contains the Specifications for the Design, Operation and Control of Crude Oil Washing Systems, RECALLING FURTHER that by the same resolution the Conference requested the Organization to review and revise, as necessary, the Specifications to reflect the latest technology and practices as may be developed by the time of entry into force of the Protocol, HAVING CONSIDERED the recommendation made by the Marine Environment Protection Committee at its eleventh session, 1. ADOPTS: (a) The revised Specifications for the Design, Operation and Control of Crude Oil Washing Systems, the text of which is set out in the Annex to the present resolution, to supersede the Specifications for the Design, Operation and Control of Crude Oil Washing Systems contained in resolution 15 of the International Conference on Tanker Safety and Pollution Prevention, 1978; Agreed interpretations of certain of the provisions of the revised Specifications as shown in Appendix 111 of the revised Specifications. 2. URGES Governments to establish, in time for the entry into force of the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973, requirements for the crude oil 'washing installation and associated equipment and arrangements based on the revised Specifications; 3. URGES FURTHER that the requirements to be established by Administrations should not impose requirements over and above those as laid down in the revised Specifications. For reasons of economy, this document is printed in a limited number. Delegates are kindly asked to bring their copies to meetings and not to request additional copies.

3 A XI/Res ANNEX INDEX OF SECTIONS 1. Purpose 2. Application 3. General provisions 3.1 Definition 3.2 Initial survey 4. Design criteria 4.1 Piping 4.2 Tank washing machines 4.3 Pumps 4.4 Stripping system 4.5 Ballast lines 5. Qualification of personnel 6. Operation 6.1 Tankage to be crude oil washed 6.2 Drainage and discharge ashore of cargo lines 6.3 Filling of departure ballast tanks 6.4 Crude oil washing at sea 6.5 Discharge of oily water effluents on ballast voyage 6.6 Use and control of inert gas 6.7 Precautions against electrostatic generation 6.8 Vapour emission 7. Operations and Equipment Manual APPENDIX I - List of changes when applying the Specifications to new crude oil tankers of 20,000 tons deadweight and above APPENDIX 11 - Training for persons intended to assume overall charge of crude oil washing APPENDIX Agreed interpretations of certain of the provisions of the revised Specifications

4 - 3 - A XI/Res PURPOSE The purpose of these Specifications is to provide specific design criteria, operational requirements and control and enforcement procedures for the crude oil washing of cargo tanks of crude oil carriers as specified in section APPLICATION 2.1 These Specifications apply to: {a) Existing crude oil tankers of 40,000 tons deadweight and above in accordance with Regulation 13(8) of Annex I of the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973 (MARPOL Protocol); and New crude oil tankers of 20,000 tons deadweight and above in accordance with Regulation 13(6) of Annex I of the MAR POL Protocol, with the changes listed in Appendix I. Compliance of these ships with these Specifications shall be shown on the International Oil Pollution Prevention Certificate as modified by the MAR POL Protocol. 2.2 If a crude oil that is not suitable for crude oil washing is intended to be carried as cargo in a ship that is provided with only a crude oil washing system, then that ship must comply with segregated ballast tank requirements in accordance with Regulation 13(7) or dedicated clean ballast tank requirements in accordance with Regulation 13(9) of Annex I of the MAR POL Protocol. 3. GENERAL PROVISIONS 3. 1 Definition For the purpose of these Specifications: "Arrival ballast" means clean ballast as defined in Regulation 1 ( 16) of Annex I of the MAR POL Protocol "Departure ballast" means ballast other than arrival ballast. 3.2 Initial survey The initial survey referred to in Regulation 4 of Annex I of the MAR POL Protocol shall include a complete inspection of the crude oil washing equipment and arrangements and shall include, except for the cases specified in , an examination of the tanks after they have been crude oil washed and the additional controls as specified in to ensure that the washing system efficiency is in accordance with these Specifications. 4. DESIGN CRITERIA 4.1 Piping The crude oil washing pipes and all valves incorporated in the supply piping system shall be of steel or other equiv a lent material and shal I be of adequate strength having regard to the pressure to which they may be subjected, and shall be properly jointed and supported The crude oil washing system shall consist of permanent pipework and shall be independent of the fire mains and of any system other than for tank washing except that sections of the ship's cargo system may be incorporated into the crude oil washing system provided that they

5 A XI/Res meet the requirements applicable to crude oil pipework. Notwithstanding the above requirements, in combination carriers the arrangement may allow: (a) The removal of the equipment, if necessary, when carrying cargoes other than crude oil, provided that, when reinstated, the system is as originally fitted and tested for oil tightness; The use of flexible hose pipes to connect the crude oil washing system to tank washing machines if it is necessary to locate these machines in a cargo tank hatch cover. Such flexible hose pipes must be provided with flanged connexions and be manufactured and tested in accordance with standards acceptable to the Administration and be consistent with the duties the hoses are required to perform. The length of these hoses shall be no greater than necessary to connect the tank washing machines to an adjacent point just outside the hatch coaming. These hoses shall be removed to suitably prepared and protected stowage when not in use and be pressure tested by an authority acceptable to the Administration at intervals of not more than two and a half years Provision shall be made to prevent overpressure in the tank washing supply piping. Any relief device fitted to prevent overpressure shall discharge into the suction side of the supply pump. Alternative methods 10 the satisfaction of the Administration may be accepted provided an equivalent degree of safety and environmental protection is provided Where hydrant valves are fitted for water washing purposes on tank washing lines, all such valves shall be of adequate strength and provision shall be made for such connexions to be blanked off by blank flanges when washing I ines may contain crude oil. Alternatively, hydrant valves shall be isolated from the crude oil washing system by spade blanks All connexions for pressure gauges or other instrumentation shall be provided with isolating valves adjacent to the I ines unless the fitting is of the sealed type No part of the crude oil washing system shall enter the machinery spaces. Where the tank washing system is fitted with a steam heater for use when water washing, the heater must be effectively isolated during crude oil washing by double shut-off valves or by clearly identifiable blanks Where a combined crude oil-water washing supply piping is provided the piping shall be so designed that it can be drained so far as is practicable of crude oil, before water washing is commenced, into spaces designated in the Operations and Equipment Manual. These spaces may be the slop tank or other cargo spaces The piping system shall be of such diameter that the greatest number of tank cleaning machines required, as specified in the Operations and Equipment Manual, can be operated simultaneously at the designed pressure and throughput. The arrangement of the piping shall be such that the required number of tank cleaning machines to each cargo compartment as specified in the Operations and Equipment Manual referred to in these Specifications can be operated simultaneously The piping system shall be tested to one and one half times the working pressure after it has been installed on the ship The crude oil washing supply piping shall be anchored (firmly' attached) to the ship's structure at appropriate locations, and means shall be provided to permit freedom of movement elsewhere to accommodate thermal expansion and flexing of the ship. The anchoring shall be such that any hydraulic shock can be absorbed without undue movement of the supply piping. The anchors should normally be situated at the ends furthest from the entry of the crude oil supply to the supply piping. If tank washing machines are used to anchor the ends of branch pipes then special arrangements are necessary to anchor these sections when the machines are removed for any reason.

6 - 5 - A XI/Res Tank washing machines The tank washing machines for crude oil washing shall be permanently mounted and shall be of a design acceptable to the Administration The performance characteristic of a tank washing machine is governed by nozzle diameter, working pressure and the movement pattern and timing. Each tank cleaning machine fitted shall have a characteristic such that the sections of the cargo tank covered by that machine will be effectively cleaned within the time specified in the Operations and Equipment Manual Tank washing machines shall be mounted in each cargo tank and the method of support shall be to the satisfaction of the Administration. Where the tank washing machines are positioned well below the deck level to cater for protuberances in the tank, consideration may need to be given to additional support for the machine and its supply piping Each machine shall be capable of being isolated by means of stop valves in the supply line. If a deck mounted tank washing machine is removed for any reason, provision shall be made to blank off the oil supply line to the machine for the period the machine is removed. Similarly, provision shall be made to close the tank opening with a plate or equivalent means Where the drive units for the tank cleaning machines are not integral with the tank cleaning machine, sufficient drive units shall be provided to ensure that no drive unit need be moved more than twice from its original position during cargo discharge to accomplish the washing programme as specified in the Operations and Equipment Manual The number and location of the tank washing machines shall be to the satisfaction of the Administration The location of the machines is dependent upon the characteristics detailed in and upon the configuration of the internal structure of the tank The number and location of the machines in each cargo tank shall be such that all horizontal and vertical areas are washed by direct impingement or effectively by deflection or splashing of the impinging jet. In assessing an acceptable degree of jet deflection and splashing, particular attention shall be paid to the washing of upward facing horizontal areas and the following parametres shall be used: (a) (c) For horizontal areas of a tank bottom and the upper surfaces of a tank's stringers and other large primary structural members, the total area shielded from direct impingement by deck or bottom transverses, main girders, stringers or similar large primary structural members shall not exceed 10 per cent of the total horizontal area of tank bottom, the upper surface of stringers, and other large primary structural members. For vertical areas of the sides of a tank, the total area of the tank's sides shielded from direct impingement by deck or bottom transverses, main girders, stringers or similar large primary structural members shall not exceed 15 per cent of the total area of the tank's sides. For existing crude oil tankers, the Administration may permit the percentages required in (a) and above to be exceeded for tanks having complicated internal structural members provided that the percentages calculated over all the cargo tanks do not exceed 10 per cent for horizontal areas and 15 per cent for vertical areas. In some installations it may be necessary to consider the fitting of more than one type of tank washing machine in order to effect adequate coverage.

7 A XI/Res At the design stage the following minimum procedures shall be used to determine the area of the tank surface covered by direct impingement. (a) Using suitable structural plans, lines are set out from the tips of each machine to those parts of the tank within the range of the jets. Where the configuration of the tanks is considered by the Administration to be complicated, a pinpoint of light simulating the tip of the tank washing machine in a scale model of the tank shall be used (a) To confirm the cleanliness of the tank and to verify the design in respect of the number and location of the tank washing machines, a visual inspection shall be made by entry to the tanks after a crude oil wash but prior to any water rinse which may be specified in the Operations and Equipment Manual. The bottom of the tank to be inspected may, however, be flushed with water and stripped in order to remove any heel of crude oil before gas freeing for entry. This inspection shall ensure that the tank is essentially free of oil clingage and deposits. If the flushing procedure is adopted, a similar but unflushed tank must be used for the test specified in below. To verify the effectiveness of the stripping and drainage arrangements, a measurement shall be made of the amount of oil floating on top of the departure ballast. The ratio of the volume of oil on top of the total departure ballast water to the volume of tanks that contain this water shall not exceed This test shall be carried out after crude oil washing and stripping in a tank similar in all relevant respects to the tank examined in accordance with (a) above, which has not been subjected to a water rinse or to the intervening water flushing permissible in (a) above. (c) To verify the design, installation and operation of the system, the arrival ballast, after a typical ballast voyage before which the arrival ballast tanks have been crude oil washed and during which the tanks have been water rinsed in accordance with the programme set out in the Operations and Equipment Manual, shall be totally discharged to the loading port harbour through an oil monitoring system approved by the Administration, and the oil content of the effluent in th is test shall not exceed 15 ppm Where an Administration is satisfied that ships are similar in all relevant respects, the requirements of need only be applied to one such ship. Furthermore, where a ship has a series of tanks that are similar in all relevant respects then, for that series of tanks, the requirements of O(a) need only be applied to one tank of that series The design of the deck mounted tank washing machines shall be such that means are provided external to the cargo tanks which, when crude oil washing is in progress, would indicate the rotation and arc of the movement of the machine. Where the deck mounted machine is of the non-programmable, dual nozzle type, alternative methods to the satisfaction of the Administration may be accepted provided an equivalent degree of verification is attained Where submerged machines are required, they should be non-programmable and, in order to comply with the requirements of 4.2.8, it must be possible to verify their rotation by one of the following methods: (a) By indicators external to the tank; By checking the characteristic sound pattern of the machine, in which case the operation of the machine shall be verified towards the end of each wash cycle. Where two or more submerged machines are installed on the same supply line, valves shall be provided and arranged so that operation of each machine can be verified independently of the other machines on the same supply line;

8 - 7 - A XI/Res.44-6 (c) By gas freeing the tank and checking the operation of the machine with water during ballast voyages. In this case the check shall take place after a maximum of six usages of the machine but the interval between checks shal I not exceed 12 months. Each verification shall be recorded in Supplement 2 to the O ii Record Book. The method of verification shall be stated in the Operations and Equipment Manual. 4.3 Pumps The pumps supplying crude oil to the tank cleaning machines shall be either the cargo pumps or pumps specifically provided for the purpose The capacity of the pumps shall be sufficient to provide the necessary throughput at the required pressure for the maximum number of tank cleaning machines required to be operated simultaneously as specified in the Operations and Equipment Manual. In addition to the above requirement, the pumps shall, if an eductor system is fitted for tank stripping, be capable of supplying the eductor driving fluid to meet the requirements of The capacity of the pumps shall be such that the requirements of can be met with any one pump inoperative. The pumping and piping arrangements shall be such that the crude oil washing system can be effectively operated with any one pump out of use The carriage of more than one grade of cargo shall not prevent crude oil washing of tanks To permit crude oil washing to be effectively carried out where the back pressure presented by the shore terminal is below the pressure required for crude oil washing, provision shall be made such that an adequate pressure to the washing machines can be maintained in accordance with This requirement shall be met with any one cargo pump out of action. The minimum supply pressure required for crude oil washing shall be specified in the Operations and Equipment Manual. Should this minimum supply pressure not be obtainable, crude oil washing operations shall not be carried out. 4.4 Stripping system The design of the system for stripping crude oil from the bottom of every cargo tank shall be to the satisfaction of the Administration The design and capacity of the tank stripping system shall be such that the bottom of the tank being cleaned is kept free of accumulations of oil and sediment towards completion of the tank washing process The stripping system shall be capable of removing oil at a rate of 1.25 times the total throughput of all the tank cleaning machines to be operated simultaneously when washing the bottom of the cargo tanks as described in the ship's Operations and Equipment Manual Means such as level gauges, hand dipping and stripping system performance gauges as referred to in shall be provided for checking that the bottom of every cargo tank is dry after crude oil washing. Suitable arrangements for hand dipping must be provided at the aftermost portion of a cargo tank and in three other suitable locations unless other approved means are fitted for efficiently ascertaining that the bottom of every cargo tank is dry. For the purpose of this paragraph, the cargo tank bottom shall be considered "dry" if there is no more than a small quantity of oil near the stripping suction with no accumulation of oil elsewhere in the tank Means shall be provided to drain all cargo pumps and lines at the completion of cargo discharge, where necessary, by connexion to a stripping device. The line and pump draining shall be capable of being discharged both to a cargo tank and ashore. For discharge ashore a special small diameter line shall be provided for that purpose and connected outboard of the ship's manifold valve. For new oil tankers or existing oil tankers not already fitted with such a line

9 A XI/Res the cross-sectional area of this line shall not exceed 10 per cent of that of a main cargo discharge line. Where such a I ine is already fitted on an existing tanker, a cross-sectional area of not more than 25 per cent of that of a main cargo discharge line may be accepted The means for stripping oil from the cargo tanks shall be by positive displacement pump, self-priming centrifugal pump or eductor or other methods to the satisfaction of the Administration. Where a stripping line is connected to a number of tanks, means shall be provided for isolating each tank not being stripped at that particular time The carriage of more than one grade of cargo shall not prevent crude oil washing of tanks Equipment shall be provided for monitoring the efficiency of the stripping system. All such equipment shall have remote read out facilities in the cargo control room or in some other safe and convenient place easily accessible to the officer in charge of cargo and operations. Where a stripping pump is provided, the monitoring equipment shall include either a flow indicator, or a stroke counter or revolution counter as appropriate, and pressure gauges at the inlet and discharge connexions of the pump or equivalent. Where eductors are provided the monitoring equipment shall include pressure gauges at the driving fluid intake and at the discharge and a pressure/vacuum gauge at the suction intake The internal structure of the tank shall be such that drainage of oil to the tank suctions of the stripping system is adequate to meet the requirements of and Care shall be taken that both longitudinal and transverse drainage are satisfactory and shall be verified during the inspection required by 3.2 and The trim conditions for crude oil washing given in the Operations and Equipment Manual shall be adhered to. In general, trim by the stern is only important during the final stages of tank discharge and shall be the maximum possible compatible with operational constraints but in no case less than that recorded during the crude oil washing prior to the inspection required by 3.2 and Ballast lines Where a separate ballast water system for ballasting cargo tanks is not provided, the arrangement shall be such that the cargo pump, manifolds and pipes used for ballasting can be safely and effectively drained of oil before ballasting. 5. QUALIFICATION OF PERSONNEL 5.1 The training requirements of ships' personnel engaged in the crude oil washing of tankers shall be to the satisfaction of the Administration Where a person such as the master, the chief officer or the cargo control officer assumes overall charge of a crude oil wash he shall: (a) (c) Have at least one year's experience on oil tankers where his duties have included the discharge of cargo and associated crude washing. Where his duties have not included crude oil washing operations, he shall have completed a training programme in crude oil washing in accordance with Appendix 11 to these Specifications and satisfactory to the Administration; Have participated at least twice in crude oil wash programmes one of which shall be in the particular ship for which he is required to undertake the responsiblity of cargo discharge. Alternatively, this latter participation may be acceptable if undertaken on a ship that is similar in all relevant respects; and Be fully knowledgeable of the contents of the Operations and Equipment Manual.

10 - 9 - A XI/Res Where other nominated persons are intended to have particular responsibilities as defined in the Operations and Equipment Manual they shall have at least 6 months' experience on oil tankers where, in the course of their duties, they should have been involved in the cargo discharge operation. In addition, they should have been instructed in the crude oil washing operation in the particular ship for which they are required to undertake this responsibility and be fully knowledgeable of the contents of the Operations and Equipment Manual. Appendix 11 to these Specifications should be used as guidance in establishing the content of such instruction. 6. OPERATION 6.1 Tankage to be crude oil washed Before departure on a ballast voyage, after the complete discharge of cargo, sufficient tanks shall have been crude oil washed in accordance with the procedures specified in the Operations and Equipment Manual to ensure that: (a) As a minimum, sufficient tanks have been washed to permit compliance with the draught and trim requirements of Regulation 13(2)(a), and (c) of Annex I of the MAR POL Protocol during all phases of the ballast voyage; and Account is taken of the ship's trading pattern and the expected weather conditions so that additional ballast water is not put into tanks which have not been crude oil washed. In addition to the tanks referred to in (a) above, approximately one quarter of all remaining tanks shall be crude oil washed for sludge control on a rotational basis, but these additional tanks may include the tanks referred to in above. However, for sludge control purposes, no tank need be crude oil washed more than once in every four months. Crude oil washing shall not be conducted between the final discharge and loading ports; that is to say, no crude oil washing shall be undertaken during the ballast voyage. Ballast water shall not be put into tanks that have not been crude oil washed. Water that is put into a tank which has been crude oil washed but not water rinsed shall be regarded as dirty ballast. 6.2 Drainage and discharge ashore of cargo lines At the end of cargo discharge all cargo mains and stripping lines shall be drained and stripped and the drainings and strippings discharged ashore via the special diameter line required by In addition all cargo tanks are to be stripped before the ship leaves its final port of discharge. 6.3 Filling of departure ballast tanks Care shall be taken at the completion of crude oil washing of any departure ballast tank to strip the tank as completely as possible. Where departure ballast is filled through cargo lines and pumps, these must be drained and stripped of oil using the means required by before ballast is loaded. 6.4 Crude oil washing at sea All crude oil washing must be completed before the ship leaves its final port of discharge. Where any tank is crude oil washed while the ship is at sea between multiple discharge ports, the tank shall be left empty and available for inspection at the next discharge port before commencing the next ballast voyage. This inspection may consist of multiple sounding/dipping of the bottom of the tank when the tank is empty. Departure ballast tanks shall be ballasted prior to departure from port so that examination of the surface of the ballast water can be made. In the latter case the guidance given in is relevant to the inspection.

11 A XI/Res Discharge of oily water effluents on ballast voyage The discharge of departure ballast and any other water effluent discharged during the ballast voyage shall comply with the requirements of Regulation 9 of Annex I of the MAR POL Protocol. 6.6 Use and control of inert gas On ships to which these Specifications apply, no tank shall be crude oil washed unless the inert gas system required by Regulation 13B{3) ot Annex I of the MAR POL Protocol is in proper operation. Before each tank is crude oil washed, the oxygen level shall be determined at a point 1 metre from the deck and at the middle region of the ullage space and neither of these determinations shall exceed 8 per cent by volume. Where tanks have complete or partial wash bulkheads, the determinations should be taken from similar levels in each section of the tank. The oxygen level of the inert gas being delivered during the washing process shall be continuously monitored. If during crude oil washing: (a) The oxygen level of the inert gas being delivered exceeds 8 per cent by volume; or The pressure of the atmosphere at the tanks is no longer positive; then the washing must be stopped until satisfactory conditions are restored Precautions against electrostatic generation To avoid excessive electrostatic generation in the washing process due to the presence of water in the crude oil washing fluid, the contents of any tank to be used as a source of crude oil washing fluid must first be discharged by at least 1 metre before being so used. Any tank used as a slop tank on the previous ballast voyage shall be completely discharged and refilled with dry crude oil if that tank is to be used as a source of washing fluid. 6.8 Vapour emission On ships to which these Specifications apply there shall be means to avoid vapour emission during the filling of departure ballast wherever local conditions require it. The method of preventing the emission of hydrocarbon vapour into the atmosphere shall be: {a) {b) By the use of permanent ballast tanks wherever these are sufficient to provide the minimum departure draught; or By containment of vapour in empty cargo tanks by simultaneous ballasting and cargo discharge. Alternative methods to the satisfaction of the Administrations may be accepted provided an equiv a lent degree of environmental protection is provided. 7. OPERATIONS AND EQUIPMENT MANUAL The Operations and Equipment Manual must be to the satisfaction of the Administration and shall contain the following information and operational instructions: {a) (c) The complete text of the revised Specifications for the Design, Operation and Control of Crude Oil Washing Systems. A line drawing of the crude oil washing system showing the respective position of pumps, lines and washing machines which relate to the crude oil washing system. A description of the system and a listing of procedures for checking that equipment is working properly during crude oil washing operations. This shall include a listing of the system and equipment parameters to be monitored, such as line pressure, oxygen

12 A XI/Res.446 level, machine revolutions, duration of cycles, etc. The established values for these parameters shall be included. The results of the tests carried out in accordance with and the values of all parameters monitored during such tests shall also be included. (d) Details of the requirements of section 6 of these Specifications together with advice and instructions, where appropriate, in meeting these requirements such as: (i) Recommended methods and programmes of crude oil washing in order to accord with all foreseeable circumstances of cargo discharge restraints and to obtain maximum trim during the completion of washing and draining of each tank. (ii) The procedure on ships to avoid vapour emission in accordance with 6.8. (iii) The method of draining tanks which shall include information on optimum trim conditions as required by ( iv) The method of draining cargo pumps, cargo lines, crude oil washing lines and stripping lines, and spaces into which they may be drained, together with the final discharge ashore via the small discharge line on completion of discharge. (v) (vi) (vii) (viii) (ix) Typical washing programmes under various conditions of loading specifying: ( 1) The tanks to be washed in accordance with 6.1; (2) The method for washing each tank, that is single or multi-stage; (3) The number of tank washing machines to be used simultaneously; (4) The duration of the crude oil wash and water rinse where the latter is appropriate; (5) The volume of water used for water rinse, which shall be at least equal to that used in the water rinse prior to the inspection required by 3.2 and ; and (6) The preferred order in which the tanks are to be washed. The procedure for draining and stripping, where appropriate, cargo lines and pumps before being used for the loading of departure ballast. The procedure for water washing lines before discharge of departure ballast and the loading and final discharge of arrival ballast. The procedure for verifying by sound patterns that bottom mounted machines are operating shall be carried out towards the end of the wash cycle for each tank, When carrying out such verification all other machines shall be shut down if necessary. Precise details of procedure to ensure compliance with Regulation 9 of Annex I of the MAR POL Protocol in the discharge of departure ballast, the water flushing of lines and the decanting of the slop tanks at sea. (e) The dangers of leakage from the crude oil washing system and.the precautions necessary to prevent leakage and the action to be taken in the event of a leakage. Guidance shall be given on how the crude oil washing system is to be operationally tested for leakage before each discharge. (f) The method of preventing the entry of oil to the engine room through steam heaters as required by

13 A XI/Res (g) (h) The personnel required at all times to conduct the dual operation of discharging cargo and crude oil washing. The numbers of such personnel shall include: (i) The person meeting the requirements of 5.2 who will have overall control of the crude oil washing process; ( ii) Those persons meeting the requirements of 5.3 who will be expected to undertake the actual operation; and ( iii) At least one person on deck at all times du ring washing to keep watch for leaks and malfunctioning of equipment, to test the oxygen content of tanks before washing, to check tank atmosphere pressure, to sound tank bottoms if required, to lift ullage floats if necessary and to change drive units when this is necessary. The duties of such persons are not necessarily mutually exclusive. An effective means of communication between the watch keeper on deck and the cargo control position so that in the event of a leak in or malfunctioning of the crude oil washing system the washing may be stopped as soon as possible. ( i) The typical procedures for ballasting. (j) A pre-crude oil wash operational check list for the use of the crew at each discharge which shall include the checking and calibration of all instruments. ( k) The recommended intervals for on board inspection and maintenance of crude oil washing equipment in addition to statutory surveys. Reference should be made to technical manuals supplied by the manufacturers of the equipment. (1) A list of crude oils unsuitable for the crude oil washing process and their origin. Appendix I LIST OF CHANGES WHEN APPLYING THE SPECIFICATIONS TO NEW CRUDE OIL TANKERS OF 20,000 TONS DEADWEIGHT AND ABOVE Paragraph number List of changes This paragraph is not applicable Subparagraph (c) is not applicable. 6.1 Replace by the following: 6.1 Tankage to be crude oil washed Before departure on a ballast voyage: (a) Approximately one quarter of the cargo tanks shall be crude oil washed for sludge control purposes on a rotational basis and in accordance with the procedures specified in the Operations and Equipment Manual. However, for these purposes, no tank need be crude oil washed more than once in every four months; and

14 A XI/Res.446 If it is considered that additional ballast in a cargo tank or tanks may be required during the ballast voyage under the conditions and provisions specified in Regulation 13(3) of Annex I of the MA RPO L Protocol, the tank or tanks which may be used for this ballast shal I be crude oil washed in accordance with the procedures specified in the Operations and Equipment Manual Ballast water shall not be put into cargo tanks that have not been crude oil washed. Water that is put into a tank which has been crude oil washed but not water rinsed shall be regarded as dirty ballast Crude oil washing shall not be conducted between the final discharge and loading ports; that is to say, no crude oil washing shall be undertaken during the ballast voyage. 6.3 Replace by the following: 6.3 Filling of additional ballasting cargo tanks Care shall be taken at the completion of crude oil washing of any cargo tank that might contain ballast to strip the tank as completely as possible. Where this ballast is filled through cargo lines and pumps, these must be drained and stripped of oil using the means required by The last two sentences are not applicable. 6.5 Replace by the following: 6.5 Discharge of oily water effluents on ballast voyage The discharge of additional ballast from cargo tanks and any other water effluent discharged during the ballast voyage shall comply with the requirements of Regulation 9 of Annex I of the MARPOL Protocol. 6.8 This paragraph is not applicable. 7.4 This paragraph is not applicable. Appendix II TRAINING FOR PERSONS INTENDED TO ASSUME OVERALL CHARGE OF CRUDE OIL WASHING 1NTRODUCTION Any required training shall be supervised instruction, conducted in a shore-based facility or aboard a suitably equipped ship having training facilities and instructors for this purpose, dealing with the principles involved and the application of these principles to ship operation. In drawing up an Administration-approved syllabus of training, the revised Specifications for the Design, Operation and Control of Crude Oil Washing Systems of tankers shall be taken into account.

15 A XI/Res Such training shall include but not necessarily be limited to: (a) An introduction to the principles of crude oil washing which shall include: the characteristics of crude oil as a washing fluid and its contrast with water washing; top washing; bottom washing; trim requirements; methods of bleeding off from the cargo discharge; maintenance of required washing fluid pressure; washing at sea between discharge ports; recirculatory washing; relative priorities and requirements for the departure ballast tanks, arrival ballast tanks and cargo only tanks. (c) (d) Equipment and design (i) location of washing machines; (ii) washing machines, deck mounted and submerged: types; characteristics; features of construction; operating parameters; (iii) drive units; (iv) washing fluid supply and distribution systems; (v) stripping systems; (vi) means of sounding tanks; (vii) inert gas requirements. Generalized crude oil washing procedures (i) traditional pipeline ship/free flow ship/partial free flow ship; (ii) single/multi parcel cargoes; (iii) optimization of washing procedure in order to minimize extra berth time; (iv) ballasting for departure with various ship and pipeline configurations; (v) procedure for washing at sea between discharge ports. Associated procedure (i) means for minimizing residues on board stripping of cargo tanks; - draining and stripping of cargo lines; - fin al discharge of cargo ashore; ( ii) water rinsing of arrival ballast tanks; (iii) filling and ultimate discharge of arrival ballast;

16 A XI/Res.446 (iv) discharge of departure ballast; (v) build-up and decanting of residues in slop tank; (vi) requirements of Regulation 9 of Annex I of the MAR POL Protocol; (vii) avoidance of venting in port during ballasting operations. (e) (f) (g) (h) Safety (i) inert gas procedure; (ii) maintenance and monitoring of inert gas quality and pressure: (iii) stopping of washing/discharge under abnormal inert gas conditions; (iv) electrostatic generation and the precautions required to avoid it; (v) pipework integrity; (vi) avoidance of surge pressures; {vii) spillage. Check lists ( i) before entering port; ( ii) before commencing crude oil washing; (iii) after crude oil washing; (iv) after sailing. Regulatory enforcement procedures ( i) Operations and Equipment Manual; (ii) Oil Record Book; (iii) sounding of tanks; (iv) measurement of oil on surface of departure ballast. Maintenance of plant and equipment ( i) maintenance of equipment in accordance with manufacturers' instructions; ( ii) additional maintenance items. Administrations shall ensure that the training facility issues an appropriate document to those qualified in accordance with this Appendix to serve as officers primarily responsible for crude oil washing. Appendix 111 AGREED INTERPRETATIONS OF CERTAIN OF THE PROVISIONS OF THE REVISED SPECIFICATIONS This paragraph requires pipes and valves to be of steel or other equivalent material. As classification societies permit grey cast iron tor cargo piping with a maximum permissible working oil pressure of 16 kp/cm>. grey cast iron may be permitted in the supply system for crude oil washing systems when complying with nationally approved standards The requirements of this paragraph allow alternative arrangements. One such alternative is that where the system is served only by centrifugal pumps so designed that the pressure derived cannot exceed that for which the piping is designed, a temperature sensing device located in the pump casing is required to stop the pump in the case of overheating.

17 A XI/Res On new oil tankers the steam heater referred to shall be located outside the machinery spaces. However, on an existing oil tanker with an existing steam heater located in the machinery spaces, no more additional isolation will be required other than that which isolates the crude oil washing system from the machinery spaces With regard to the application of this paragraph a slop tank is considered as a cargo tank Guidelines for the assessment of shadow diagrams (a) Shadow diagrams (to be prepared in accordance with 4.2.9) must be on drawings the scale of which must be at least: ( i) 1: 100 for tankers of less than 100,000 tons deadweight ( ii) 1: 200 for tankers of 100,000 tons deadweight and above. The drawings must provide at least a plan view, a profile view and an end elevation for each tank, or for tan ks considered to be similar. (c) Sufficient detailed drawings of the vessel must be provided to 'check that all large primary structural members have been included. (d) The term "large primary structural members" is to be construed as those components of a tank structure which contribute significant strength to the ship such as web frames and girders. It is intended that smaller components such as those that contribute to plate stiffening be excluded. In general the following I ists, in conjunction with the diagram showing structural components of cargo tanks, may be used to amplify this interpretation. (i) (ii) (iii) Include web frames girders stringers ( iv) webs (v) main bracket (vi) transverses (vii) crossties in transverse web frames unless it can be verified by tank inspection that their presence does not affect the cleanliness of the tank. However, for the purpose of making an initial assessment where there are no more than two crossties and each is less than 1 /15 of the total depth of the tank they may be ignored. Disregard (i) long itud inals (ii) brackets (iii) stiffeners {iv) ladders (e) Shadows cast upon the underside of decks, web frames, centre and side girders can be ignored. (f) Calculations must be provided either on the drawing or separately to show how the percentages required by have been arrived at. The calculations should be itemized so that it is possible to relate each item with a particular shadow area. (g) Where a curved surface is presented to jets it is not necessary to provide exact geometric projections to determine the resultant shadow. A reasonable estimate is acceptable. (h) For the purpose of determining the bottom area of wing tanks the breadth of the tank is to be taken as the horizontal distance measured across the top of the bottom longitudinal frames to the inside of the shell plating, midway between the tank bulkheads. (i) A swash bulkhead may be taken as a tank boundary. However, in this event the bulkhead must be assumed to have no openings in it. {v) pipe work

18 Longitudinal., DIAGRAM SHOWING STRUCTURAL COMPONENTS OF CARGO TANKS Upper deck Longitudinal Stiffener Main brackets Main bracket ' Transverse bulkhead / Stringer Web {on bulkhead) c:: I Web frame Side shell Stiffener...,...::i Longitudinal Crosstie Bottom transverse - Bottom girder Bottom girder - Main bracket Bottom shel I > >< ~ (l) m k O'\

19 A XI/Res "Water rinse" means the water washing process carried out in connexion with tank cleaning after crude oil washing and is not intended to be construed as limiting the amount of water needed in the process (c) The "oil monitoring system" referred to in this paragraph means any approved system, including laboratory tests, which verifies that the oil content of the effluent does not exceed the stated level. If laboratory tests are to be conducted, standards contained in resolution A.393(X) should be used as guidance. Oil tankers engaging in a trade where discharge of cargo takes place in one port State and cargo loading in another port State create a special problem with respect to verification. Two alternatives available to confirm the tanker's capability are: ( i) The tanker cou Id be required to conduct the entire COW operations at the discharge port, taking inspectors to sea if necessary to observe water washing, handling of discharge ballast and departure of arrival ballast; (ii} Co-ordination between the flag State Administrations and port States to obtain the required documentation. However the test is performed, it should be decided on a case-by-case basis taking into account the service of the tanker and the availability of surveyors. I

20

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL Page 42 APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL Note 1: Note 2: The format consists of a standardized introduction and index of the leading paragraphs to each section. This

More information

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 MSC 82/24/Add.2 RESOLUTION MSC.235(82) CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization

More information

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, Page 1 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International

More information

INTERNATIONAL MARITIME ORGANIZATION

INTERNATIONAL MARITIME ORGANIZATION Page 1 of 16 INTERNATIONAL MARITIME ORGANIZATION IMO Resolution A.586(14) REVISED GUIDELINES AND SPECIFICATIONS FOR OIL DISCHARGE MONITORING AND CONTROL SYSTEMS FOR OIL TANKERS. ANNEX This document quote

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.] OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7 [Comrnencernent.] [22nd April, 1968] 1. Short title and interpretation (1) These Regulations may be cited as the Oil in Navigable

More information

RESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN

RESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN MEPC 36/22 THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention of the International Maritime Organization concerning the function of the Committee, NOTING resolution

More information

SLOP RECEPTION AND PROCESSING FACILITIES

SLOP RECEPTION AND PROCESSING FACILITIES RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements...

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice POL-010 Rev. 04/10 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS Annex 4, page 1 ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY FOR TANKERS PART 2 OPERATIONAL

More information

RESOLUTION MEPC.209(63) Adopted on 2 March GUIDELINES ON DESIGN AND CONSTRUCTION TO FACILITATE SEDIMENT CONTROL ON SHIPS (G12)

RESOLUTION MEPC.209(63) Adopted on 2 March GUIDELINES ON DESIGN AND CONSTRUCTION TO FACILITATE SEDIMENT CONTROL ON SHIPS (G12) Annex 3, page 1 ANNEX 3 THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization concerning the functions of the Marine Environment

More information

Cargo pumps shall not be operated in excess of their designed maximum working parameters.

Cargo pumps shall not be operated in excess of their designed maximum working parameters. Page: 1 of 9 4.1. SCOPE This section provides operating instructions and procedures to be complied with in order to ensure that discharging operations are conducted safely and in accordance with the best

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

RESOLUTION MSC.365(93) (adopted on 22 May 2014) AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED

RESOLUTION MSC.365(93) (adopted on 22 May 2014) AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED RESOLUTION MSC.365(93) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, RECALLING ALSO article

More information

RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)

RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) Annex 9, page 1 ANNEX 9 RESOLUTION MEPC.288(71) (adopted on 7 July 2017) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization

More information

Chapter 2 Preparations for Tank Cleaning Work

Chapter 2 Preparations for Tank Cleaning Work Chapter 2 Preparations for Tank Cleaning Work Preparatory Procedures for Tank Cleaning Work Make preparations for tank cleaning work according to the procedures given below. 1. Formulating the tank cleaning

More information

We re Going Global. Vessel Loss Control. Technical Notes #36

We re Going Global. Vessel Loss Control. Technical Notes #36 Technical Notes #36 We re Going Global Vessel Loss Control When the vessel loaded, the gauging reports showed x amount but when it arrived at its discharge port, why was the amount vastly different? In

More information

Testing Procedures of Watertight Compartments

Testing Procedures of Watertight Compartments (1996) (Rev.1 Feb 2001) (Rev.2 May 2001) (Rev.3 May 2010) (Rev.4 Aug 2012) Testing Procedures of Watertight Compartments.1 Application Revision 4 of this UR is to be complied with in respect of the testing

More information

The Merchant Shipping (Marine Pollution) Regulations 2004

The Merchant Shipping (Marine Pollution) Regulations 2004 CAYMAN ISLANDS Supplement No.12 published with Gazette No. 2 dated 27 January, 2004 THE MERCHANT SHIPPING (MARINE POLLUTION) LAW 2001 THE MERCHANT SHIPPING (MARINE POLLUTION) REGULATIONS, 2004 1 of 36

More information

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N SOL 036 Amendment to SOLAS 1974 as amended, Resolution MSC.256 (84) TO: SHIPOWNERS & SHIPS OPERATORS & MANAGERS, MASTERS SURVEYORS TO FLAG

More information

Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course

Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course CONTENTS Prerequisites...1 TOTS

More information

In product vessels, LOT is not normally practiced as the recovered oil is usually discharged to shore reception facilities.

In product vessels, LOT is not normally practiced as the recovered oil is usually discharged to shore reception facilities. Page: 1 of 7 12.1. COMPLIANCE WITH MARPOL 12.1.1. Retention of Oil on Board Oil tankers are provided with facilities to enable them to control operational pollution by cleaning cargo tanks using re-circulatory

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

F All types of inert gas systems are to comply with the following:

F All types of inert gas systems are to comply with the following: (1974) (Rev.1 1983) (Rev.2 1987) (Rev.3 May 1998) (Corr. Sept 2001) (Rev.4 May 2004) (Rev.5 Nov 2005) (Rev.6 May 2012) (Rev.7 May 2015) Inert Gas Systems.1 General Requirements.1.1 All types of inert gas

More information

Installation of Ballast Water Management Systems

Installation of Ballast Water Management Systems (Sept 2015) (Rev.1 May 2016) Installation of Ballast Water Management Systems 1. Application In addition to the requirements contained in BWM Convention (2004), the following requirements are applied to

More information

ANNEX 2. RESOLUTION MSC.256(84) (adopted on 16 May 2008)

ANNEX 2. RESOLUTION MSC.256(84) (adopted on 16 May 2008) RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b)

More information

Testing Procedures of Watertight Compartments

Testing Procedures of Watertight Compartments (1996) (Rev.1 Feb 2001) (Rev.2 May 2001) (Rev.3 May 2010) (Rev.4 Aug 2012) (Rev.5 Jan 2015) (Rev.6 Sept 2016) Testing Procedures of Watertight Compartments.1 Application Revision 6 of this UR is to be

More information

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T) K.B. FERRIE, CDR, Chief, Hull Division References: a. 46 CFR Subchapter T, Parts 178, 179 b. 46 CFR Subchapter S, Parts 170, 171 c. Marine Safety Manual (MSM), Vol. IV d. Navigation and Vessel Circular

More information

RESOLUTION MEPC.86(44) adopted on 13 March 2000 AMENDMENTS TO THE GUIDELINES FOR THE DEVELOPMENT OF SHIPBOARD OIL POLLUTION EMERGENCY PLANS

RESOLUTION MEPC.86(44) adopted on 13 March 2000 AMENDMENTS TO THE GUIDELINES FOR THE DEVELOPMENT OF SHIPBOARD OIL POLLUTION EMERGENCY PLANS MEPC 44/20 RESOLUTION MEPC.86(44) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization concerning the function of the Committee,

More information

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4) RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article

More information

Tanker Familiarisation IMO Model Course Chapter 1-9

Tanker Familiarisation IMO Model Course Chapter 1-9 IMO Model Course 1.01 Chapter 1-9 - Courseware Specification - MarineSoft Entwicklungs- und Logistikgesellschaft mbh Friedrich-Barnewitz-Straße 2 18119 Rostock GERMANY +49 381 12835-0 +49 381 12835-55

More information

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1 IDEPARTMENT OF MARINE ADMIN STRATION MYANMAR Department of Marine Administration - Yangon Myanmar Policy for Testing of Oil Discharge Monitoring and Control Operational Procedure : QOP - 72-01- (17) Revision:

More information

Doors in watertight bulkheads of cargo ships and passenger ships

Doors in watertight bulkheads of cargo ships and passenger ships (June 2002) (Rev.1 Oct 2018) Doors in watertight bulkheads of cargo ships and passenger ships Application This unified interpretation pertains to doors 1 located in way of the internal watertight subdivision

More information

Circular China Classification Society (2014) Circ.No.54 Total No.538 Dec.31,2014 ( Total 25 Pages )

Circular China Classification Society (2014) Circ.No.54 Total No.538 Dec.31,2014 ( Total 25 Pages ) C C S 通函 Circular China Classification Society (2014) Circ.No.54 Total No.538 Dec.31,2014 ( Total 25 Pages ) To relevant departments of the Headquarters, Shanghai Rules & Research Institute, plan approval

More information

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE Page: 1 of 5 5.1. PURPOSE To ensure that: The vessel, as applicable, meets MARPOL requirements; There is adequate trim and the propeller is immersed; Stress conditions are within allowable limits during

More information

Part 7 Fleet in service Chapter 2 Inclining test and light weight check

Part 7 Fleet in service Chapter 2 Inclining test and light weight check RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 7 Fleet in service Chapter 2 Inclining test and light weight check The content of this service document is the subject of intellectual

More information

RESOLUTION A.855(20) adopted on 27 November 1997 STANDARDS FOR ON-BOARD HELICOPTER FACILITIES

RESOLUTION A.855(20) adopted on 27 November 1997 STANDARDS FOR ON-BOARD HELICOPTER FACILITIES A 20/Res.855 17 December 1997 Original: ENGLISH ASSEMBLY 20th session Agenda item 9 RESOLUTION A.855(20) adopted on 27 November 1997 THE ASSEMBLY, STANDARDS FOR ON-BOARD HELICOPTER FACILITIES RECALLING

More information

RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS

RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS RESOLUTION MSC.256(84) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on

More information

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications 1800350/6 IM-P180-12 ST Issue 6 BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications Installation and Maintenance Instructions 1. Safety information 2. General

More information

MSC Guidelines for Independent Fuel Tanks

MSC Guidelines for Independent Fuel Tanks References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division

More information

PV4 and PV6 Piston Valves

PV4 and PV6 Piston Valves 1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.

More information

MSC Guidelines for Vents, Fills and Sounds

MSC Guidelines for Vents, Fills and Sounds S. J. Kelly, CDR, Chief of Engineering Division References: a. 46 CFR 56.50-85 & 56.50-90 (Subchapter F) b. 46 CFR 32.55, 36.20-1 & 38.20 (Subchapter D) c. 46 CFR 119.445 & 119.450 (Subchapter K) d. 46

More information

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS CHINA CLASSIFICATION SOCIETY Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS Version: December, 2016,RCN No.2 Effective date: 03 January, 2017 Beijing Contents PART ONE PROVISIONS

More information

CIRCULAR TO MASTER NO. O 9 DATE SUBJECT: Revision to Cargo Operation Manual Oil Tanker & Company Form

CIRCULAR TO MASTER NO. O 9 DATE SUBJECT: Revision to Cargo Operation Manual Oil Tanker & Company Form CIRCULAR TO MASTER NO. O 9 DATE 01.06.17 APPLICABLE TO OIL TANKER VESSELS SUBJECT: Revision to Cargo Operation Manual Oil Tanker & Company Form Please note the following revision to the Cargo Operation

More information

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE RESOLUTION MSC.397(95) (adopted on 11 June 2015) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee,

More information

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society Guideline No.M-05(201510) M-05 AIR COMPRESSOR Issued date: 20 October 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical requirements

More information

MSC Guidelines for Review of Stability for Towing Vessels (M)

MSC Guidelines for Review of Stability for Towing Vessels (M) S. E. HEMANN, CDR, Chief, Hull Division References Contact Information a. 46 CFR Subchapter M, Part 144 b. 46 CFR Subchapter S, Parts 170, 173 c. Navigation and Vessel Circular No. 17-91, CH 1, Guidelines

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

MSC Guidelines for Sanitary & Sewage Systems

MSC Guidelines for Sanitary & Sewage Systems S. J. Kelly, CDR, Chief of Engineering Division References: Contact Information: a. Title 33 CFR 159; Marine Sanitation Devices (All Vessels) b. Title 46 CFR 56.50-1 & 56.50-95 (Subchapter F) c. Title

More information

IMO DESIGN SUGGESTIONS FOR BALLAST WATER AND SEDIMENT MANAGEMENT OPTIONS IN NEW SHIPS

IMO DESIGN SUGGESTIONS FOR BALLAST WATER AND SEDIMENT MANAGEMENT OPTIONS IN NEW SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. T5/1.01 Ref: T3/1.02 MEPC/Circ.389 21 March 2002 DESIGN

More information

IMO PROMOTION OF IMPLEMENTATION AND ENFORCEMENT OF MARPOL 73/78 AND RELATED INSTRUMENTS

IMO PROMOTION OF IMPLEMENTATION AND ENFORCEMENT OF MARPOL 73/78 AND RELATED INSTRUMENTS INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 53rd session Agenda item 16 MEPC 53/16 16 March 2005 Original: ENGLISH PROMOTION OF IMPLEMENTATION AND ENFORCEMENT OF MARPOL

More information

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE Government of Bermuda Department of Maritime Administration 2015 027 BERMUDA SHIPPING NOTICE Maintenance and Inspection of Fixed Carbon Dioxide Fire Extinguishing Systems Ref: SOLAS 74/88 as amended, Regulation

More information

Type Testing Procedure for Crankcase Explosion Relief Valves

Type Testing Procedure for Crankcase Explosion Relief Valves (Jan 2005) (Corr.1 Nov 2005) (Rev.1 Oct 2006) (Corr.1 Mar 2007) (Rev.2 Sept 2007) (Corr.1 Oct 2007) (Rev.3 Jan 2008) Type Testing Procedure for Crankcase Explosion Relief Valves 1. Scope 1.1 To specify

More information

HARBOUR MASTER S WRITTEN INSTRUCTIONS FOR THE HANDLING OF BULK FLAMMABLE LIQUIDS...1

HARBOUR MASTER S WRITTEN INSTRUCTIONS FOR THE HANDLING OF BULK FLAMMABLE LIQUIDS...1 HARBOUR MASTER S WRITTEN INSTRUCTIONS, 2007 Issued in terms of the National Ports Act No. 12 of 2005, Section (74)(3) HARBOUR MASTER S WRITTEN INSTRUCTIONS FOR THE HANDLING OF BULK FLAMMABLE LIQUIDS...1

More information

ANNEX 15. RESOLUTION MEPC.158(55) Adopted on 13 October 2006

ANNEX 15. RESOLUTION MEPC.158(55) Adopted on 13 October 2006 MEPC 55/23 RESOLUTION MEPC.158(55) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization concerning the functions of the Marine

More information

ANNEX 5. DRAFT RESOLUTION MSC.[ ](93) (adopted on [ ])

ANNEX 5. DRAFT RESOLUTION MSC.[ ](93) (adopted on [ ]) Annex 5, page 1 ANNEX 5 DRAFT RESOLUTION MSC.[ ](93) (adopted on [ ]) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR THE CONSTRUCTION AND EQUIPMENT OF SHIPS CARRYING DANGEROUS CHEMICALS IN BULK (IBC

More information

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF VESSELS IDENTIFIED BY THEIR MISSION SECTION 6 PIPING CHAPTER SCOPE

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF VESSELS IDENTIFIED BY THEIR MISSION SECTION 6 PIPING CHAPTER SCOPE PARTE II RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF VESSELS IDENTIFIED BY THEIR MISSION TITLE 32 OIL TANKERS SECTION 6 PIPING CHAPTER A B C D E F G H I J K T SCOPE MATERIALS AND MANUFACTURE See Title

More information

CURRICULUM, TRAINING AND ASSESSMENT GUIDE Part B

CURRICULUM, TRAINING AND ASSESSMENT GUIDE Part B CURRICULUM, TRAINING AND ASSESSMENT GUIDE Part B Competency Framework : Marine Terminal (Ship/Shore Interface) Operations for Oil, Chemical and Gas Competency Category : Plan Transfer Operations Competency

More information

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 50th session Agenda item 5 DE 50/WP.8 7 March 2007 Original: ENGLISH INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 9 Oil Recovery Vessels Edition 1993 The following Rules come into force on 1st September, 1993. The respective latest edition

More information

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012 R. J. LECHNER, CDR, Tank Vessel and Offshore Division Purpose: To outline procedures for review of vapor control system (VCS) piping plans and pressure drop calculations, and for generating a VCS List

More information

Testing Procedures of Watertight Compartments

Testing Procedures of Watertight Compartments (1996) (Rev.1 Feb 2001) (Rev.2 May 2001) (Rev.3 May 2010) (Rev.4 Aug 2012) (Rev.5 Jan 2015) Testing Procedures of Watertight Compartments.1 Application Revision 45 of this UR is to be complied with in

More information

RESOLUTION MSC.236(82) (adopted on 1 December 2006) ADOPTION OF AMENDMENTS TO THE GUIDELINES FOR THE TRANSPORT AND HANDLING OF LIMITED AMOUNTS OF

RESOLUTION MSC.236(82) (adopted on 1 December 2006) ADOPTION OF AMENDMENTS TO THE GUIDELINES FOR THE TRANSPORT AND HANDLING OF LIMITED AMOUNTS OF RESOLUTION MSC.236(82) (adopted on 1 December 2006) ADOPTION OF AMENDMENTS TO THE GUIDELINES FOR THE TRANSPORT AND HANDLING OF LIMITED AMOUNTS OF HAZARDOUS AND NOXIOUS LIQUID SUBSTANCES IN BULK THE MARITIME

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

MSC Guidelines for Pressure Vessels

MSC Guidelines for Pressure Vessels References: a. 46 CFR Part 54 Pressure Vessels S. T. Brady, CDR, Chief, Engineering Division b. ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Division 1, (1998 Edition) c. Navigation and Inspection

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 9 ACCUMULATORS The material needed for outcome 2 is very extensive so there are

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2) Minimum standard of in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2) Column 2 Knowledge, understanding and proficiency Design and characteristics of a liquefied gas tanker

More information

Work Permit Help Document For changes introduced in ShIPS Revision 7.1 (Released 11/12/2008)

Work Permit Help Document For changes introduced in ShIPS Revision 7.1 (Released 11/12/2008) Introduction Work Permit Help Document For changes introduced in ShIPS Revision 7.1 (Released 11/12/2008) The current ShIPS Revision 7.1 has introduced an automated work permit system which has the benefit

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Interpretations of the IMCO code for the Construction and Equipment of Ships carrying Liquefied Gases in Bulk

Interpretations of the IMCO code for the Construction and Equipment of Ships carrying Liquefied Gases in Bulk INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the IMCO code for the Construction and Equipment of Ships carrying Liquefied Gases in Bulk IACS Int. 2008 Contents, Page 1 CONTENTS

More information

ICE LOADS MONITORING SYSTEMS

ICE LOADS MONITORING SYSTEMS Guide for Ice Loads Monitoring Systems GUIDE FOR ICE LOADS MONITORING SYSTEMS MAY 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011 American

More information

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1 HANDBOOK Ed. 2017 DS-ED 01/2017 - ENG 1 CHAPTER 9 BURSTING DISC DEVICES IN SERIES 3070 SCOPE Use: protection against possible overpressure of the apparatuses listed below, with regard to the operating

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure C. ASSEMBLIES Guideline C-03 Guideline related to: Article 4 paragraph 2 The effect of the derogation in Article 4 paragraph 2 from the introductory paragraph in the same article is not clear. In the circumstances,

More information

Electrical, electronic and control engineering at the operational level

Electrical, electronic and control engineering at the operational level STCW Code Table A-III/6 Specification of minimum standard of for electro-technical officers Ref: https://www.edumaritime.net/stcw-code Source: IMO Function: Electrical, electronic and control engineering

More information

CAST IRON SAFETY VALVE TYPE 6301

CAST IRON SAFETY VALVE TYPE 6301 CHARACTERISTICS The 6301 safety valve is dedicated to protect the equipment from potential overpressure. This is an automatic device that closes when the pressure conditions are back to normal. It is a

More information

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 4059051/3 IM-P405-48 EMM Issue 3 KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

INFORMATION BULLETIN No. 159

INFORMATION BULLETIN No. 159 Bulletin No. 159 Revision No. 00 Issue Date 09 Mar 2016 Effective Date 09 Mar 2016 INFORMATION BULLETIN No. 159 Manned Submersible Craft Guidance and Instructions for Bahamas Recognised Organisations,

More information

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 13.7 Pressure Equipment Directive (PED) 97/23/EC 1 The Pressure Equipment Directive (PED) 97/23/EC applies to the design, manufacturing and conformity

More information

Marine Protection Rules Part 121A Ship Design and Construction Oil Tankers

Marine Protection Rules Part 121A Ship Design and Construction Oil Tankers Marine Protection Rules Part 121A Ship Design and Construction Oil Tankers MNZ Consolidation ISBN 978-0-947527-58-7 Published by Maritime New Zealand, PO Box 25620, Wellington 6146, New Zealand Maritime

More information

Chapter 7. Coal Cargoes. Properties and Characteristics 7.1

Chapter 7. Coal Cargoes. Properties and Characteristics 7.1 Chapter 7 Coal Cargoes This chapter, and all of the chapters in Part 2, should be read in conjunction with the booklet Carrying Solid Bulk Cargoes Safely (Reference 16), published by Lloyd s Register/UK

More information

MSC Guidelines for Review of Passenger Vessel Stability (Subchapters K & H)

MSC Guidelines for Review of Passenger Vessel Stability (Subchapters K & H) S. E. HEMANN, CDR, Chief, Hull Division References Contact Information a. 46 CFR 170: Stability requirements for all inspected vessels b. 46 CFR 171: Special Rules pertaining to Passenger vessels c. Marine

More information

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels (Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope

More information

Hatch cover securing and tightness

Hatch cover securing and tightness (1986) (Rev 1 1996) (Corr.1 June 2000) (Rev.2 July 2005) (Corr.1 Oct 2005) Hatch cover securing and tightness 1. Application 1.1 The following recommendations apply to steel hatch covers that are fitted

More information

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection 1170850/1 IM-P117-36 ST Issue 1 MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE OPENED DURING NAVIGATION

10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE OPENED DURING NAVIGATION E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 Ref. T4/3.01 MSC.1/Circ.1380 10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE

More information

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018 T. O. Phillips, CDR, Chief, Tank Vessel & Offshore Division Purpose: The purpose of this document is to provide guidance and information regarding the submission of vapor control system (VCS) piping plans

More information

IMO REPORT OF THE MARINE ENVIRONMENT PROTECTION COMMITTEE ON ITS FORTY-NINTH SESSION

IMO REPORT OF THE MARINE ENVIRONMENT PROTECTION COMMITTEE ON ITS FORTY-NINTH SESSION INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 49th session Agenda item 22 MEPC 49/22/Add.2 13 August 2003 Original: ENGLISH REPORT OF THE MARINE ENVIRONMENT PROTECTION

More information

Horizontal Bladder Tanks

Horizontal Bladder Tanks DATA SHEET Horizontal Bladder Tanks Features UL Listed and FM Approved for use with various ANSUL proportioners and foam concentrates 175 psi (12.1 bar) maximum allowable working pressure (design pressure)

More information

Vertical Bladder Tanks

Vertical Bladder Tanks DATA SHEET Vertical Bladder Tanks Features UL Listed and FM Approved for use with various ANSUL proportioners and foam concentrates 175 psi (12.1 bar) maximum allowable working pressure (design pressure)

More information

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS

More information

Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017

Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017 Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017 This safe work instrument is approved under section 227

More information

Liquefied gas cargo tanks and process pressure vessels

Liquefied gas cargo tanks and process pressure vessels .1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant

More information

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module: FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS This work covers part of outcome 2 of the Edexcel standard module: UNIT 21746P APPLIED PNEUMATICS AND HYDRAULICS The material needed for outcome

More information

1 Exam Prep. Tabs and Highlights

1 Exam Prep. Tabs and Highlights 1 Exam Prep NFPA 14: Standard for the Installation of Standpipe and Hose Systems Tabs and s These 1 Exam Prep tabs are based on the NFPA 14: Standard for the Installation of Standpipe and Hose Systems,

More information