APPENDIX 2. ACG PHASE III Proposed HSE Design Standards
|
|
- Buddy Derek Harmon
- 6 years ago
- Views:
Transcription
1 APPENDIX 2 ACG PHASE III Proposed HSE Design Standards ACG Phase 3 ESIA A2/1
2 This page is intentionally blank ACG Phase 3 ESIA A2/2
3 HEALTH Descriptions Medicals All project personnel will be medically screened prior to starting work, with particular consideration to hearing and dermatitis checks. Specific surveillance programs will be instituted for personnel potentially exposed to toxic or radioactive substances. Medical support will be provided to all project construction work sites. Hygiene Routine assessment of water quality and catering facilities will be conducted at project construction work sites in Azerbaijan. Changing, toilet and washing facilities will be provided at project construction work sites in Azerbaijan. Lunch will be provided at project construction work sites in Azerbaijan. Noise During project execution, tasks and working environments will be assessed for noise and measures put in place to ensure that levels will be kept as low as possible. The codes used are Noise & Statutory Nuisance EPA 1990 / 1995 and UK HSE Control of Noise (COP for Construction and Open Sites Orders 1984 / 1987) and Noise at Work Regulations The design will be assessed for noise and the following measures used: 85 dba (average level) exposure for a maximum of 12 hours. 45 to 60 dba inside the accommodation (depending upon location such as office or sleeping areas). Health Risk Management Workplace, environmental, and travel health hazards will be identified and risks assessed and managed ACG Phase 3 ESIA A2/3
4 SAFETY Descriptions Training All project personnel will receive an appropriate level of safety and environmental training. A training matrix will be developed for each site and will include training to cover operation of equipment, emergency survival and fire fighting, safe chemical handling and use of MSDSs, emergency response procedures, PPE, evacuation, and applicable regulatory requirements. Project leadership will be trained in Advanced Safety Auditing and Accident and Incident investigation. Design Safety Reviews Hazard Management Plan A risk-based design approach will be adopted, supported by blast calculations, escape and evacuation assessments, fire and explosion risk analysis, HAZOPs, HAZIDs (including supplier packages), formal project safety reviews, and Temporary Refuge impairment analysis. A QRA will be carried out to confirm the Individual Risk and Temporary Refuge Impairment values achieved and to assist in demonstrating that risk has been reduced to ALARP. An overall Hazard Management Register to explain the hazards and the measures included to manage them will be prepared by the design team and approved by the Business Unit Leader. SIMOPS Simultaneous Operations (eg drilling and HUC, drilling and production, installation and production) will be assessed and procedures will be prepared to control the identified risks to an acceptable level. Manual Handling A lifting and access assessment of the design will be completed to eliminate the need for manual handling > 50 kg between two men in the operating phase. During project execution, tasks will be assessed and the need for manual handling > 50 kg between two men will be eliminated. Hazardous Substances The design will be based on eliminating the exposure of individuals to hazardous substances in the operating phase, including well work. Particular emphasis will be placed, in the design phase, on assessing and eliminating the gaseous emission of the carcinogens benzene, toluene, and xylene (BTX) in the operating phase. During project execution tasks will be assessed to ensure adequate controls are in place to minimise the impact of hazardous substances on individuals. Seismic Event The platform will be designed to withstand the 50-year return period seismic event where no loss of life, no loss of containment and little or no damage to the platform is expected. Design will be checked against the 3,000-year return period, where the platform can sustain damage but should not collapse and there should not be major health or safety consequences. Storm The off-shore design will be such that personnel can survive a 100-year storm without leaving the platform. Road Safety A Road Safety Strategy will be developed and implemented for the Project in line with the Business Unit s Road Safety Management, with the aim of eliminating or minimising transportation risks. The strategy will focus on the areas of: Safe driving procedures transportation logistics and journey planning vehicle standards and maintenance training, competence and behaviour of drivers, passengers and others road and access planning safe driving performance measures and assessment assurance that management of Road Safety is implemented and functioning as intended ACG Phase 3 ESIA A2/4
5 ENVIRONMENT Description Applicable Guidelines Monitoring and Measurement Ozone Depleting Substances (ODS) Other Halocarbons with Potential for Global Warming Water Based Drill Fluids and Cuttings The project will be designed to comply with the relevant health, safety and environmental guidelines, standards and practices of International Finance Institutions (IFIs) and Export Credit Agencies (ECAs). The design will provide sufficient sample and measurement points to enable adequate monitoring of emissions and discharges during the operating phase. These substances will not be used. ODS are defined as those substances which are controlled by the Montreal Protocol on Substances that Deplete the Ozone Layer. Other halocarbons that do not deplete the ozone layer, but which have other environmental concerns such as a high global warming potential (GWP) will not be used unless suitable alternatives are not available. These include hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulphur hexafluoride (SF 6 ). Water based cuttings and fluids from the Top Hole (i.e. the conductor hole, nominally 36 ) will be discharged to sea in accordance with the Standards below. Note that it is not technically feasible or safe to return the fluid and cuttings from this section to the rig, and therefore in accordance with normal safe drilling practice they will continue to be discharged directly to the seabed in accordance with the PSA. Options for the management and disposal of all other water based fluid and cuttings has been subject to a Best Practicable Environmental Option (BPEO) Assessment which has concluded that discharge to sea is the BPEO. This study will not be reassessed unless there is a significant change in the assumptions made with respect to the Phase 3 project. Water-based drill cuttings and fluids shall be discharged to sea providing the following conditions are met: 1. The mud systems used are tested and meet US EPA 96 Hour LC 50 toxicity tests (i.e., > 30,000 ppm) or Caspian Specific Ecotoxicity Tests, should these be agreed; 2. Platform discharge is via a caisson that will be at a depth of at least 15m to 20m below the sea surface in all instances except where returns are directly to seabed. 3. All barite used will meet the following heavy metal criteria: Hg < 1 mg/kg and Cd < 3 mg/kg dry weight (Total). 4. Products known or suspected to cause taint, endocrine disruption or contain heavy metals as defined by UK Off-shore Chemical Notification Scheme (OCNS) will be avoided. In the event that suitable alternatives are not available, the impact of the chemical will be risk assessed and mitigation measures agreed as part of the EIA process. Land-take at Sangachal Nuisance at Sangachal Open Drains Offshore There will be no discharge of drill cuttings or fluids unless the maximum chloride concentration is less than four times the ambient concentration in the receiving water. The design of Sangachal will minimise the foot-print without compromising safety. During project execution the impact on the community of dust, noise, light, odours and general disruption will be minimised. There will be no visible sheen on the surface of the sea from deck and open drain discharges ACG Phase 3 ESIA A2/5
6 Description Open Drains Onshore Venting Unburned Gas Clean drains will discharge to the Caspian at less than 10 mg/l monthly average and 19 mg/l on a daily basis. Any fluids discharged will be treated to ensure there is no significant or long-lasting impact on the environment. Sample points will be provided to enable verification of the above standard (ie measurement of water quality and quantity). Oily water from the contaminated open drains will be routed to the produced water disposal facility. During project execution unignited emergency venting will not take place unless it is required for safety reasons. The design will ensure that during normal operation there will be no disposal of gas by continuous venting. Chemicals The design will challenge the need for all chemical use. A management strategy will be put in place to minimise the environmental impact of chemicals through correct selection, transportation, storage, deployment and disposal. Chemicals known or suspected to cause taint, endocrine disruption or contain heavy metals as defined by UK OCNS will be avoided. In the event that suitable alternatives are not available, the impact of the chemical will be risk assessed and mitigation measures agreed as part of the EIA process. Only heavy metal-free pipe dope will be used. Chemicals will be evaluated and tested, based on the European Harmonised Off-shore Chemical Notification Format (HOCNF) and UK OCNS classification, until such time as Caspian-specific standards are agreed. No chemicals will be discharged to land or sea in the project execution phase (eg chemically treated hydrotest fluids) without complete identification and a thorough assessment of their impact. The facility design will prevent, so far as reasonably practical, the need to discharge production and utility chemicals to land or sea. Sewage Sewage from offshore will be discharge to sea following treatment using US Coastguard approved Marine Sanitation Device with an effluent of average residual chlorine concentration of 1 mg/l. Preference will be given to systems that avoid the use of chemicals. The design will ensure that there are no floating solids. Discharge will be via a caisson that is permanently submerged and at least 15 m below the surface. Desalination Waste Desalination unit waste shall be discharged via a caisson that is permanently submerged and at least 60 cm below the surface. Pipeline Construction Activities will be timed to ensure impact on the fish population and other marine life is minimised. Sand The design will enable sand and any associated liquid to be re-injected offshore. In the event that re-injection is not possible sand will be transported to shore, treated and recycled or disposed of on-shore at a location approved by the regulator. Liquid and Solid Waste There will be no discharge of solid and liquid waste to sea during project execution or operations except as provided for elsewhere in these standards. During project execution waste will be managed according to the following hierarchy: reduction at source, re-use, recovery, re-cycle and render harmless through treatment. The design will ensure waste production in the operating phase is minimised and waste can be handled safely. Wax disposal and handling Alternative methods of wax treatment and disposal will be reviewed using the BPEO process and taking into consideration BACT. An effective option will be selected so that the impact of wax waste on the environment is minimised. In the event that sulphur is recovered as a by-product in the onshore sweetening process, appropriate means of sulphur handling and disposal will be reviewed using the BPEO process and taking into consideration BACT ACG Phase 3 ESIA A2/6
7 Description Cooling Water The effluent should result in a temperature increase of no more than 3 C at the edge of the zone where initial mixing and dilution takes place. The boundary of the zone will be defined on a case by case basis taking into account factors such as the existing ecology. Seawater Abstraction for Operations Produced Water Offshore The design will allow seawater to be abstracted during operations at depths > or = 50m. A BPEO will be conducted to determine minimization of chemicals in seawater discharged back to sea. In FFD the design will permit produced water to be re-injected. In the event of the plant being unavailable, produced water discharged to the Caspian must not exceed oil and grease concentration > 42 mg/l on a daily basis or > 29 mg/l monthly average. The design will incorporate treatment facilities to meet these discharge standards. Discharge will be via a caisson to below the productive zone (-40m Lowest Astronomical Tide). Operational procedures will be developed when the produced water facilities are installed to control the time allowed for overboard discharge. Decommissioning Design will ensure that the facilities can be safely decommissioned in compliance with OSPAR and IMO regulations, without long-term impact on the environment. Fugitive Emissions Storage Tanks Fugitive Emissions Compressors, Valves, Seals, Flanges Combustion Emissions Produced Water Onshore Routine Flaring Onshore Fugitive emissions from the Sangachal oil storage tanks will be controlled using external floating roof technology with primary, secondary rim seals and low-loss fittings. The aim will be to minimise fugitive emissions throughout the design process by measures including: Component evaluation and selection. Material evaluation and selection. Best Available Control Technology (BACT) PSA. The design will be based on minimising combustion emissions (eg SOx, NOx, CO 2, CO and particulates). Options for minimizing combustion emissions will be assessed to determine Best Available Control Technology as required by the PSA. Dry low emission technology will be adopted onshore. Re-injection of on-shore produced water from Sangachal Terminal is the Base Case but final disposal route will be subject to BPEO and BACT assessment. The design implications and options for the disposal of onshore produced water during non-availability of the PW re-injection system will be reviewed using the BPEO process and taking into consideration BACT consistent with the PSA. The flare will be designed to allow for continuous flaring and emergency relief. Any flaring will be smokeless under normal operations. Flare gas metering will be installed. The design will minimise flaring from pilots without compromising safety. This will include installation of inert gas purge and conservation pilots. Flare gas recovery will be installed. Operational flare policy for Phase III will be developed in conjunction with Phase I and II. The policy will address the potential need to flare sour gas. The design eliminates all routine non-emergency flaring, with the exception of pilots, without compromising safety ACG Phase 3 ESIA A2/7
8 Description Routine Flaring Offshore The flare will be designed to allow for continuous flaring and emergency relief. Any flaring will be smokeless under normal operations. Flare gas metering will be installed. Flare will be designed for >98% combustion efficiency. The design will minimise flaring from purges and pilots without compromising safety. This will include installation of purge gas reduction devices and conservation pilots, or alternative if BACT and BPEO. Source gas reduction measures will be implemented. Options to address reduction in offshore flaring and combustion emissions will be evaluated. Operational flare policy for Phase III will be developed in conjunction with Phase I and II. Well Testing Well testing, resulting in emissions, will be by exception and strongly challenged. If testing is justified, then all best available techniques will be utilised to minimise emissions to air, land and sea. Energy Efficiency The Phase III design will be based on maximising energy efficiency in line with BPEO. Non-water-based Drill Fluids and Cuttings For platform drilling the base case is cuttings re-injection with a contingency option of shipment to shore and treatment or disposal on-shore at an approved location. For drilling from a mobile offshore drilling unit the base case is shipment to shore and treatment or disposal on-shore at an approved location. There will be no discharge of oil-based or synthetic-based drilling fluids or cuttings from the Phase 3 drilling programme. Should drilling fluids be developed that meet international and Caspian acceptability criteria for discharge then they will be evaluated and the option to use and discharge considered. An operating policy will be developed to address the actions to be taken in the event of down-time of cuttings re-injection equipment. All barite used will meet the following heavy metal criteria: Hg < 1 mg/kg and Cd < 3 mg/kg dry weight (total). Products known or suspected to cause taint, endocrine disruption or contain heavy metals as defined by UK OCNS will be avoided. In the event that suitable alternatives are not available, the impact of the chemical will be risk assessed and mitigation measures agreed prior to use. The system will be designed to prevent mud loss on cuttings so far as technologically practical and economically justifiable ACG Phase 3 ESIA A2/8
How HSE regulates onshore oil and gas
Health and Safety Executive How HSE regulates onshore oil and gas Paul Bradley (Operations Manager Wells and Mines) Craig Norman (Well Engineering and Operations Inspector) Health & Safety Executive Health
More informationHazardous Materials Management. Presented by. James E. Roughton, MS, CSP, CRSP, CHMM.
Hazardous Materials Management Presented by. James E. Roughton, MS, CSP, CRSP, CHMM. Hazardous Waste Operations And Emergency Response (HAZWOPER) 29 CFR 1910.120 Scope Clean-up Operations At Uncontrolled
More informationAUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011
AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF SEMS HAZARD ANALYSIS TRAINING September 29, 2011 Purpose The purpose of this meeting is to provide guidelines for determination of hazard
More informationSection J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS
Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives
More informationHazardous Materials Management Guidelines
Environmental, Health and Safety Guidelines Hazardous Materials Management Guidelines Applicability These guidelines apply to facilities and activities involving the transportation, production, handling,
More informationDri-Line Mk3 Monnier Compressed Air Drain Trap
5044050/2 IM-P504-24 CH Issue 2 Dri-Line Mk3 Monnier Compressed Air Drain Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation and Operation
More informationDF1 and DF2 Diffusers
1550650/4 IM-P155-07 ST Issue 4 and Diffusers Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6. Maintenance
More informationEnvironmental, Health, and Safety Guidelines for Offshore Oil and Gas Development
for Offshore Oil and Gas Development Introduction The Environmental, Health, and Safety (EHS) Guidelines are technical reference documents with general and industryspecific examples of Good International
More informationJOSOP 603 flaring and venting Standard
JOSOP 603 flaring and venting Standard Dec, 2010 Approved December 29, 2010 Version 01 Posted February 3, 2011 Table of Contents 1.0 Purpose, Objectives and Scope... 3 1.1 Purpose... 3 1.2 Objective...
More informationSA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)
3820050/4 IM-P382-01 CH Issue 4 SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment) Installation and Maintenance Instructions 1. Safety information 2. Use 3.
More informationTP1 and TP2 Temporary Cone Shaped Strainers
1698051/2 IM-P169-07 ST Issue 2 TP1 and TP2 Temporary Cone Shaped Strainers Installation and Maintenance Instructions TP1 1. Safety information 2. General product information 3. Installation and commissioning
More informationCONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY
CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition
More informationSA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)
3810050/5 IM-P381-01 CH Issue 5 SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment) Installation and Maintenance Instructions 1. Safety information 2. Use 3.
More informationIntroduction to Emergency Response & Contingency Planning
& Contingency Planning Rationale Why is it important for you to learn this material? Designed for those who may witness a release, this is an introductory course designed to help ensure those who are likely
More informationFV Flash Vessel Installation and Maintenance Instructions
4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning
More informationPOLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY
POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY Written By: Nursery Manager Date approved by Directors: Signature: Date for Review: November 2018 COSHH (CONTROL OF SUBSTANCES HAZARDOUS
More information(b) Venting or flaring shall only be authorized by the Commission under the following circumstances:
Chapter 3, Section 39. Authorization for Flaring and Venting of Gas. (a) Venting or flaring must be in accordance with Commission requirements to prevent waste as specified in W.S. 30-5-101(a)(i)(G), 102(a),
More informationIGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL
IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk
More informationEngineering Safety into the Design
Engineering safety into the design Peter Scantlebury P.Eng Technical Safety Manager Amec Foster Wheeler, Oil & Gas Canada Abstract Safety by design is Amec Foster Wheeler s systematic approach to engineering
More informationBT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications
1800350/6 IM-P180-12 ST Issue 6 BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications Installation and Maintenance Instructions 1. Safety information 2. General
More informationDri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap
0509950/2 IM-P050-21 CH Issue 2 Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation and
More informationANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS
Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This
More informationCONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE
CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure
More informationIndustry Code: Alberta Small Employer OHS Legislated Requirements
This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Services in this industry can
More informationSpirax Compact FREME Flash Recovery Energy Management Equipment
IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.
More informationTSS21 Sealed Thermostatic Steam Tracer Trap
1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationOPERATING PROCEDURES
OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan Issue date: July 2013 Page 1 of 9 Contents 1. PREVENTATIVE MECHANISMS: 1(a) Hazards to health and the environment Page 3 1(b) Pollutant Inventory Page 4 1(c)
More informationSPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN
SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, without the written
More informationScottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement
SHEPD Section ID 154 Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement Contents Definitions and Abbreviations...
More informationIdentification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI
Identification and Screening of Scenarios for LOPA Ken First Dow Chemical Company Midland, MI 1 Layers of Protection Analysis (LOPA) LOPA is a semi-quantitative tool for analyzing and assessing risk. The
More informationManual Actuated Boiler Blowdown Valves
Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety
More informationAPPENDIX D Oil Loading Pipeline - Options
MAUREEN DECOMMISSIONING PROGRAMME APPENDIX D CONTENTS D.1 Summary of Decommissioning Options Considered 3 D.1.1 D.1.2 D.1.3 Option 1 - Float the Pipeline and Tow it to Shore for Disposal 3 Option 2 Recover
More informationS1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators
0231150/8 IM-P023-55 ST Issue 8 S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationMF2M Monnier Miniature Compressed Air Filter
5040050 / 2 IM-P504-02 CH Issue 2 MF2M Monnier Miniature Compressed Air Filter Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation and commissioning
More informationABIOSH INT L TECHNICAL CERTIFICATE IN OIL AND GAS SAFETY OPERATIONS (ONSHORE & OFFSHORE)
ABIOSH INT L TECHNICAL CERTIFICATE IN OIL AND GAS SAFETY OPERATIONS (ONSHORE & OFFSHORE) INTRODUCTION The oil and gas industry is a highly risk environment, therefore Safety and Health management is becoming
More informationIX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions
0575050/2 IM-P057-04 CH Issue 2 IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions 1 Safety information 2 General product information 3 Installation and commissioning
More informationSAFETY DATA SHEET INTERNATIONAL FLAVORS & FRAGRANCES
Print Date 08/20/2015 Page 1 (8) SECTION 1. PRODUCT AND COMPANY IDENTIFICATION name : IFF Code : 00044940 Cust. Material : 00044940 MSDS Number : R00000219533 Use Description : Flavour or Fragrance Ingredient
More informationPOLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)
POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH) INTRODUCTION & LEGISLATION Using chemicals or other hazardous substances at work can put people s health at risk. The law requires employers
More informationMST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap
1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationCapacity and pressure similar to R-507. Flooded systems. Low temperature (-46.7 C). R22 replacement as long as the condenser has the right size.
TECHNICAL DATA SHEET R-428A () Features and uses of R-428A () R-428A (RS-45) is a non flammable azeotropic blend, with zero ODP, compatible with traditional mineral lubricants, alkyl benzene and also with
More informationAWHEM RECOMMENDED PRACTICE
AWHEM RECOMMENDED PRACTICE COMMON SERVICES PRACTICE RECOMMENDED PRACTICE RP 0201 AWHEM publications may be used by anyone desiring to do so. Every effort has been made by the Association to assure the
More informationSpiratec ST14, ST16 and ST17 Sensor Chambers and sensors
0862050/1 IM-P086-18 MI Issue 1 Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors Installation and Maintenance Instructions 1. Safety Information 2. General product information 3. Installation 4.
More informationIDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)
IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN 46206-6015 OLQ PH: (317) 232-8941 Information SUBPART CC AIR EMISSION STANDARDS (40 CFR 264.1080
More informationOFFICIAL 2016 A YEAR OF CHANGE IN THE REGULATION OF DECOMMISSIONING?
2016 A YEAR OF CHANGE IN THE REGULATION OF DECOMMISSIONING? Nov 2016 What a difference a year makes. 24 fields ceased production Offshore Decommissioning Regulation: Introduction 2015 2016 ~29 fields with
More informationTA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions
3500032/2 IM-P350-02 CH Issue 2 TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.
More informationAPPENDIX A1 - Drilling and completion work programme
APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme
More informationPV4 and PV6 Piston Valves
1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.
More informationPIP PNE00012 Piping Examination and Leak Test Guide
October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
More informationDrum / cylinder handling
Page 1 of 8 Drum / cylinder handling This Technical Measures Document covers the storage and handling of toxic and flammable substances in drums and cylinders and refers to relevant codes of practice and
More informationDCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions
1340050/7 IM-P134-07 CMGT Issue 7 DCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationCaltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement
Caltec brings simple passive technology that enables oil and gas operators to harness the kinetic energy of the production process to enhance their production, extending economic field life and reducing
More informationBP U.S. Pipelines & Logistics (USPL) Safety Manual Page 1 of 8
Safety Manual Page 1 of 8 1. Purpose The purpose of this policy is to protect USPL employees and contractors from overexposure to benzene. 2. Scope This policy applies to all USPL employees and contractors
More informationHydrogen Cyanide OC 275/3. Target Audience:
Hydrogen Cyanide OC 275/3 Target Audience: Agricultural and Factory Inspectors FCG Specialist Inspectors (Occ Hyg) Senior/Employment Medical Advisers Employment Nursing Advisers Date issued: 1990-11-22
More informationINSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017
INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL Graça Bravo 26th September 2017 SUMMARY 1. IDENTIFICATION OF THE LPG ESTABLISHMENTS 2. GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 3. INSPECTION SUPPORTING
More informationPERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5
INTERNAL AND EXTERNAL PAGE: 1 1.0 OBJECTIVE The Federal Occupational Safety and Health Administration (OSHA) requirements for personal protective equipment (PPE) are presented in 29 CFR 1910.132 General
More informationCP10 Sensor Installation and Maintenance Instructions
4030150/9 IM-P403-26 EMM Issue 9 CP10 Sensor Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Maintenance 5. Spare parts Copyright 2017
More informationField Instruction Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas
6.14 Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas Purpose Describe the minimum requirements for safe handling, storage, maintenance, repair, transport and disposal of equipment
More informationB S Glass Ltd Safety procedures- outsourced Workplaces
B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission
More informationRESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS
INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING
More informationBRINGING A NEW DIMENSION TO PIPELINE PIGGING. By: David Aitken, Aubin Group, UK
BRINGING A NEW DIMENSION TO PIPELINE PIGGING By: David Aitken, Aubin Group, UK The importance of keeping pipework clear of restrictions and debris to allow maximum flow conditions cannot be emphasised
More informationExhaust Scrubbers. What you need to know. Move Forward with Confidence
Exhaust Scrubbers What you need to know Move Forward with Confidence Wärtsilä From January 1, 2015 ships navigating in designated areas globally will face very tight limits on how much sulphur can be emitted
More informationHazard Management Making your workplace safer
Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,
More informationDCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps
6018050/1 IM-P601-33 ST Issue 1 DCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationWHS CONTRACTOR INFORMATION PACKAGE
WHS CONTRACTOR INFORMATION PACKAGE Introduction This information package provides Informa exhibitors and contractors with important information that will be required to plan and manage work on all stages
More informationRelease: 1. UEPOPL002A Licence to operate a reciprocating steam engine
Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)
More informationSafe High Pressure Water Washing (HPWW) Requirement
Safe High Pressure Water Washing (HPWW) Requirement Index Page Introduction 3 Flow chart of process steps 4-5 Responsibilities 6 Risk assessment process 7-9 Job safety analyses considerations 10-11 Compliance
More informationCCR Fugitive Dust Control Plan
CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision
More informationCONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION
PAGE : 1 / 8 CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION SUB-CHAPTER 1.1 INTRODUCTION SUB-CHAPTER 1.2 GENERAL DESCRIPTION OF THE UNIT SUB-CHAPTER 1.3 COMPARISON WITH REACTORS
More informationSafeLandUSA - Syllabus
1. Incident Reporting and Investigation Responsibility for reporting Definition of an incident to report How to report an incident Types of incidents Purpose of incident investigation Explain why incidents
More informationS1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions
PREVIOUS REFERENCE NO. IMP02355 0231150/13 IMF0501ENISS2 CMGT S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information
More informationIssue Date 11/21/13 Revision Date 01/04/18 Benzene
PURPOSE The purpose of this program is to define work practices, administrative procedures and engineering controls to reduce employee exposure to or below the PEL of benzene. This plan shall be implemented
More informationHAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE
Page 1 of 10 HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE 1.0 SCOPE This Performance Assessment Guide for Hazardous Waste Operations and Emergency Response (HAZWOPER) will be used to carry out the
More informationResponding to Natural Gas Pipeline Emergencies
Responding to Natural Gas Pipeline Emergencies Who is Florida Gas Transmission? Florida Gas Transmission operates nearly 5,000-miles of interstate natural gas transmission pipelines, a system that extends
More informationProcess Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR
Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.
More informationSafety Data Sheet. Bromotrifluoromethane (Halon 1301, R13B1) Version : 1
Page :1/5 1 IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY Product name Chemical formula CBrF3 Company identification see heading and/or footer Emergency phone numbers see heading and/or
More informationSports Grounds Safety Authority (SGSA) Guidance regarding the handling of pyrotechnics (flares, smoke bombs and fireworks) in sports grounds
Sports Grounds Safety Authority (SGSA) Guidance regarding the handling of pyrotechnics (flares, smoke bombs and fireworks) in sports grounds This guidance has been produced to help clubs and venue managers
More informationA Different Sort Of Knowledge Box
The Oil & Gas Safety Library contains courses addressing Federally Mandated Training, including topics such as: Emergency Response Powered Industrial Equipment Environmental Product/Process Standards Hazard
More informationDangerous Substances and Explosive Atmosphere Regulations 2002 Appendix 2 Detailed assessment & zone classification where DSEAR applies to an area
Dangerous Substances and Explosive Atmosphere Regulations 2002 Appendix 2 Detailed assessment & zone classification where DSEAR applies to an area Area /Process / Equipment under Assessment (To be used
More informationPROCEDURES AND CRITERIA FOR DETERMINING AND ADDRESSING EMERGENCY SITUATIONS AS REFERRED TO IN ARTICLES 8 AND OF THE 1996 LONDON PROTOCOL
PROCEDURES AND CRITERIA FOR DETERMINING AND ADDRESSING EMERGENCY SITUATIONS AS REFERRED TO IN ARTICLES 8 AND 18.1.6 OF THE 1996 LONDON PROTOCOL 1 INTRODUCTION 1.1 Under Article 8.1 of the 1996 Protocol,
More informationOCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE
OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE Subject: Installation, Use and Maintenance of Gas Source Semiconductor Tools Date: 5/28/03 Revision: 00 SUMMARY: Individuals working with gas source
More informationAnnex BB to Facilities Management Health and Safety Policy guidance.
Annex BB to Facilities Management Health and Safety Policy guidance. 1. This guidance has been produced to give guidance to help prevent staff from developing hand-arm vibration related health conditions.
More informationOPERATIONL RISK ASSESSMENTS
OPERATIONL RISK ASSESSMENTS Table of Contents SUBJECT Introduction... 3 Formal Risk Assessment Rating... 6 Action Criteria Framework... 7 Summary - Overall Highest To Lowest Risk... 8 DEPARTMENT Operation
More informationSeries Confined Space Rescue - Draft Page 1 of 6 Adopted: Revised: INCIDENT MANAGEMENT SYSTEM AND TACTICAL OPERATIONS MANUAL
Series 387 - Confined Space Rescue - Draft Page 1 of 6 INCIDENT MANAGEMENT SYSTEM AND TACTICAL OPERATIONS MANUAL SERIES 387 PURPOSE OPERATIONAL GUIDELINE CONFINED SPACE RESCUE To establish guidelines relative
More informationReduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology
Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Jim Woodard Vice President of Sales Bryant Woods Lead Project Engineer 4/3/18 Page 1 Objectives Impact
More informationAVC32 Carbon Steel Air Vent for Steam Systems
1234050/4 IM-P123-14 ST Issue 4 AVC32 Carbon Steel Air Vent for Steam Systems Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationDesign. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle
SB Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing A family of API liquid ring compressors has been developed and has been in the market for nearly a decade, they are specifically made
More informationHAZARDOUS SUBSTANCE AND DANGEROUS GOODS
The Barro Group is committed to continuously improving the management and standards of Occupational Health and Safety. This commitment extends to minimising exposure of employees, contractors, visitors
More informationHazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager
Procedure No.: PA-033-0006 Page: 1 of 19 Port Arthur, TX. Reviewed: 02/18 Effective: 02/06/18 (Rev.03) Supersedes: 02/15/16 Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Document
More informationCaptains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl
Captains Meeting 2009 Introduction to Well Testing- Expro Edwin Schoorl Agenda Oil and Gas presence Well construction Well testing Welltest System Welltest Equipment Welltest Video Questions Oil and gas
More informationMSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012
R. J. LECHNER, CDR, Tank Vessel and Offshore Division Purpose: To outline procedures for review of vapor control system (VCS) piping plans and pressure drop calculations, and for generating a VCS List
More informationCOAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN
~ Colorado Springs Utilities Ir's h
More information2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES
2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES This section of the GOSRP provides the general procedures to be followed at the time of an incident. The section is distinctively marked by a RED
More informationMATERIAL SAFETY DATA SHEET
Page 1 sur 6 SECTION 1 : IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING 1.1. Product identifier 1.2. Relevant identified uses of the substance or Recommended use(s) : Laser (on
More informationWorking safely in an engineering environment
Unit 001 Working safely in an engineering environment Level: 2 Credit value: 5 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to work
More informationTexas Department of Insurance. Respiratory Protection. Provided by. Workers Health & Safety HS01-027B (1-06)
Texas Department of Insurance Respiratory Protection Provided by Workers Health & Safety HS01-027B (1-06) Contents Introduction... 3 Definitions... 3 Approved Respirators... 3-4 New Respirator Selection
More informationEXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors
Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have
More informationBusiness Plan Presentation
2019 Department of Water Resources Business Plan Presentation Wednesday, August 29, 2018 Mission To Provide Superior Water Services at an Excellent Value Vision To be widely recognized as a leader in the
More informationSAFETY DATA SHEET SECTION 1 PRODUCT AND COMPANY INFORMATION SECTION 2 COMPOSITION INFORMATION ON INGREDIENTS SECTION 3 HAZARDS IDENTIFICATION
www.edmac.com www.pfifilter.com SAFETY DATA SHEET SECTION 1 PRODUCT AND COMPANY INFORMATION Product Name: POE 46 Product Code: 3003105220 Product Type: Synthetic Compressor Lubricant Intended Use: Industrial
More informationOverview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)
OPIPOH7 - SQA Unit Code HG1X 04 Overview This process involves the operation of the compression of gas to a higher pressure for the purpose of gas lift, export, fuel gas, reinjection or fractionation.
More information