1 Inspector: Office location Telephone Inspection date: 1. Support required: a. The inspection will take approximately ½ day. A representative from the vessel/installation will be required to accompany the inspector for the duration of the inspection. Preferably this person will be the HLO, but if not the person must be able direct the inspector to all required equipment, manuals, and records. b. The helideck must be clear and in serviceable condition or the inspection cannot be done. 2. Please coordinate these items and communicate them to the inspector prior to the inspection day: a. Access to the facility, vessel or shipyard as applicable. b. Directions to the servicing heliport or marine terminal (if traveling offshore). c. Directions to the shipyard and to the vessel in the shipyard (if the visit is pier side). d. Any special HSE equipment requirements or clearance requirements. i. The inspector will have a hard hat, heavy-duty gloves, steel-toed boots, work pants and long or short sleeve work shirt. e. Permission to take pictures of all inspected equipment and areas. 3. Please assemble the following information for the inspector prior to arrival on inspection day: a. Name of person responsible for helideck maintenance. i. Name: ii. Phone: iii. b. Name & contact information of person who will receive helideck inspection report and follow up nonconformances (if different from above). i. Name: ii. Phone: iii. Fax: iv. c. OIMs/Vessel Masters (include back to backs). i. Names: d. Hard or electronic copy of the last Shell, BHAB, HCA or other inspection (for inspector to take away). e. Copy of current approval by HCA (UK) and IVW (NL) or some other certifying agency including any Restrictions/Limitations (for inspector to take away). 1 OF 9

2 f. Helideck Drawings in hard or electronic copy (for inspector to take away). i. Plans that are required - to scale: 1. General Arrangement (overhead view) of the whole Platform/Rig. 2. Elevation (side view) - clearly showing the 180 5:1 sector. 3. Plan view (overhead view) of helideck and the obstacle environment. ii. Detail to be shown: All helideck markings, giving dimensions and color Deck net location Tie down points Perimeter net Lighting - both perimeter and floodlighting Location of RFFF Refueling system Guttering & down-pipes Access points Windsock(s) 210, 150 & 180 sectors to be clearly shown All obstruction non-compliances to be detailed, stating height above/below deck level Height of helideck above MSL (mean operating draft) Structures that might cause turbulence over the helideck. Hot emission sources e.g. flares, turbine exhausts. Cold emission sources e.g. vents, blow-down g. Manuals/procedures. i. Helideck/HLO procedures. ii. Emergency procedures for aviation incidents. h. Records. i. HLO/HDA certification & training. ii. Dangerous goods training records (if dangerous goods shipped by air). iii. Helideck team roster/assignment sheet. iv. Helideck team drills. v. Fuel system inspections (daily, weekly, monthly, three-monthly, six monthly, annually IAW CAP 437 chapter 7). vi. Fuel system bonding lead resistance checks. vii. Fuel system hose pressure test records & age of hose viii. Age of helideck landing net. ix. Helideck friction test (date and results). x. Foam test certificate (annual certification required). xi. Calibration of weighing scales (annual requirement). xii. Water test (pressurized water release) records for helideck fire fighting system (annual requirement). xiii. Produced foam response time test (30 seconds maximum to produce foam). xiv. Portable extinguisher inspection records (annual requirement). xv. Radio operator licenses (if required by local regulation). xvi. Communications log for helicopter radio communications (if used). xvii. Weather reporting equipment calibration (annual requirement) including handheld anemometer if maintained. xviii. Daily weather reporting forms - blanks and filled in samples -OR- HMS system operation and output. 2 OF 9

3 4. Areas to be visited and things to be checked: a. Bridge or control room area: i. Weather equipment. ii. Radio equipment including helideck team handhelds. iii. Beacon/NDB operating certificate or license (if required by local regulation). b. Helideck. i. Markings. ii. Condition. iii. Measurements. iv. Gutters, drains, and tie down points. v. Obstacle clearances. vi. Helideck net if installed. vii. Perimeter safety net. viii. Helideck lighting (perimeter and flood lights). 1. Please determine if the helideck perimeter and floodlights are connected to an uninterruptible power source (UPS) or rapid response emergency generator prior to inspection. ix. General facility lighting. x. Obstruction marking and lighting. c. Helideck equipment. i. Chocks - quantity, type and condition. ii. Tie down strops - quantity, type and condition. iii. Prohibited landing marker - quantity, type and condition. iv. Windsock - location, condition, lighting. d. Structure under helideck. i. Check for asset integrity and turbulence sources. ii. Area should not be obstructed. e. Access points. i. Collapsable handrails, steps, safety notices, access controls. ii. Emergency equipment (breakout boxes) will be inventoried to requirements listed in CAP- 437 section Should be one breakout box per access point. Adjustable wrench (one per crash box) Large rescue axe (one per crash box) Bolt cutters (one per crash box) Large crowbar (one per crash box) Heavy-duty hacksaw (one per crash box) Heavy-duty blades (six per crash box) Fire resistant blanket (one per crash box) Side-cutting pliers (one per crash box) Set of assorted screwdrivers (one set per crash box) Harness knife c/w sheath (one knife for each crew member) 3 OF 9

4 Ladder: should be two sections of an aluminum ladder, each section 2-3 meters long) Hook, grab or salving: (one per access) Fire resistant gloves (min 2 pairs) Life Line (5 cm, 15m in length) f. Fire fighting equipment. i. Foam monitors - number, condition and type. ii. Foam hand branches and inductors - quantity, type and condition. iii. Hydrant points and hoses- quantity. iv. Fire fighting foam production plant - capacity, type and condition. v. Complementary (dry powder) system if installed - capacity, type and condition. vi. Portable extinguishers - quantity, type and condition. vii. Storage area for foam concentrate and backup secondary extinguishing media. 1. Ensure stored foam concentrate matches the inductor and monitor settings. NOTE: Foam systems must be able to produce the following quantity of foam for 5 minutes based on expected aircraft size to be used, and must have the listed quantity of operational stock in the foam system holding tank, and a like quantity of reserve stock for refill. Shell UA may accept self-contained systems using foam premix subject to system review and approval. Foam production quantities below still apply. Tank capacity & contents must be sufficient to support the required foam production. Foam produced per minute (US Gal) Minimum foam concentrate in system tank and in reserve storage for listed inductor setting & matching foam type (US Gal / Ltrs) 1% 2% 3% 4% 6% EC / / / / / 212 AS / / / / / 239 A / / / / / 243 AS-365 N / / / / / 265 EC-155 B / / / / / 288 S-76C/C / / / / / OF 9

5 AW / / / / / 394 EC / / / / / 538 S / / / / / 617 g. Protective clothing: i. Breathing apparatus (minimum of two sets). ii. Quantity, quality and condition of protective clothing: (available for each member of helideck crew). iii. Two-piece suits (bunker coat and trousers) to meet standard EN469 or equivalent, OR. iv. One piece suits (preferably orange) to meet standard EN 469 or equivalent. v. Helmet with full-face visor to meet EN 443 or equivalent. vi. Gloves to meet standard EN 659 or equivalent. vii. Boots to meet standard EN 345 or equivalent. viii. HLO identifying waistcoat: contrasting color to the rest of the helideck crew, flame retardant material, marked with the letters HLO in a reflective material on the front and back. ix. HLO identifying reflective armband (acceptable alternative for use on NUIs). x. Stowage for fire fighting equipment: Clothing should be hung and other equipment stored tidily in a quick access, clean and dry store near the helideck. h. Aviation fueling system. i. Transport tank storage area. 1. Bund size and condition. Deluge system type and condition. i. Bulk storage tank. i. Tank capacity, type and condition, equipped with floating suction? Bund size and condition. Deluge system type and condition. j. Pipe work and hoses. i. Pipeline material, unpainted or black, grade markings, all joints bonded. Suction hose: type, length, fittings and condition. Delivery hose: type, fittings and condition. k. Filtration. i. Filter Water Separator: condition, sample point, air eliminator & pressure differential gauge. ii. Filter Water Monitor: condition, sample point, air eliminator & pressure differential gauge. iii. Transfer Filter Water Separator: (bulk systems only) condition, sample point, air eliminator & pressure differential gauge. iv. All filters marked with date of last element change and date next due. l. Pump cabinet dispensing unit. i. Fuel pump condition of primary and secondary. ii. Fuel pump strainer: condition. iii. Non-return valve fitted? iv. Pump pressure gauge: condition. v. Differential pressure gauges: location and condition (piston type required). Check inspection and calibration checks. 5 OF 9

6 vi. Calibrated flow meter condition. vii. Refueling start and stop switches location, including at least one separate emergency stop button. viii. Dispensing cabinet dispensing equipment must be installed in cabinet. ix. Pump running light visibility and serviceability. x. Delivery hose condition & age (10 year life from date of manufacture stamped on hose, but only if tested annually) - type must meet EN 1361/API 1529 (old BS 3158) Type C. If delivery hose is not pressure checked, life must be reduced to a maximum of 5 years. Hose to be inspected for serviceability and damage monthly. 1. The hose length must be sufficient to reach past the far edge of the landing circle with the hose laid out across the center of the landing H. (See Diagram) xi. Nozzle and/or pressure refueling coupling condition, including cone filter in nozzle and pressure nozzle xii. Bonding lead: condition, fitted with quick disconnect? Date of last continuity check? xiii. Deadman switch for fuel pump with cable for on-deck use fitted? a. Fuel system misc. i. Sample jars size, condition, and quantity. ii. Retention samples - labeled and retained in secure area? iii. Records of receipt, delivery and quality control checks check compliance with industry practice. iv. How are samples disposed of? v. Are Shell or other provider Water Detectors used? If so are stocks sufficient and are they in date? vi. Fuel system commissioning or periodic inspection date done & date due. b. Passenger and cargo weighing area. i. Scales - quantity, type and condition. 6 OF 9

7 ii. Helicopter emergency information & safety posters. iii. General condition and housekeeping. iv. Cargo and baggage control procedures. c. Passenger briefing area. i. Video/DVD player. (NOTE - EPW uses DVD safety briefs. VHS video players are not supported) ii. Survival suit stowage (if required). iii. Storage area for helicopter medical litter/stretcher. iv. Helicopter emergency information & safety posters. 7 OF 9

8 COMMON NON-COMPLIANCES. Item Non-conformance Aircraft tie down points Bar diameter too large. If diameter is larger than tie down hook then converting shackles to be available on site. Chocks Missing or incorrect number. Control of passengers No access control e.g. chain to stop inadvertent access of passengers onto the helideck. Drains and curbs Full of debris or rubbish. Drain filters missing. Does not provide 360 drainage around helideck. Dress out gear - Boots Not EN345/BS1870. Dress out gear - Fire Tunic Not EN469/BS6249. Dress out gear - Gloves Not EN659. Dress out gear - Helmet with Not EN443/BS3864. visor Dress out gear - HLO / HDA Not fire resistant vests DVD / Video player DVD player not compatible with NTSC DVDs Video player provided - EPW uses DVD format for safety videos Emergency procedures No helicopter specific emergency procedures. Procedures do not have a complete list of duties (e.g. no duties for the bridge crew on a vessel). Extinguishers - Dry Powder & Test date expired. CO2 Access to helideck (no ramp and extinguisher is too large or heavy to get up stairs). No lance for large CO2 extinguisher Floodlights. Connected to UPS Often find that lights are connected to an emergency generator that takes seconds to come on line. Transfer of load should be immediate. Foam hand branch To be available on site. Settings to be fixed in order to avoid inadvertent adjustment. Foam inductors Dial is frequently found to be loose. Foam system - Certificate of Conformity Certificate should be available verifying quality of concentrate and foam mixture. Foam system - Delivery rate What is the delivery rate for the monitors? Output should be sufficient such that in the event of a failure of one unit the remaining units can satisfy the requirements. Foam system concentrate Improper concentrations (wrong % concentrate). Tanks not clearly marked with concentrate % required. Less than 100% replenishment available Hand lines Sufficient number and length to reach all parts of the deck. For ease of use there should also be a smaller gauge hose available such as those found in offices. Helicopter emergency Not posted. diagrams Not the correct type helicopter depicted. Helideck crew records Not comprehensive. Training records out of date / not current. Hydrant point To be located close to the helideck and capable of supplying water and/or foam. Markings Improperly marked (should meet CAP-437 or HSAC RP ) 8 OF 9

9 Common Non-compliances Continued Item Non-conformance NDB No certificate for operation. Crew doesn t know operating frequency. Antennae infringes obstacle free / falling gradient zones Passenger / Baggage scales Insufficient capacity. No calibration date. No calibration plan / local calibration procedures in place Perimeter lights. Connected to UPS Often find that lights are connected to an emergency generator that takes seconds to come on line. Transfer of load should be immediate. Bulbs burnt out, lenses cracked, system inoperative. Perimeter net Securing ties are too long. In the event of a tie breaking and unraveling a large section of the net can separate from its frame. Too taut, no hammock effect. Material other than uncoated wire mesh or fric-tape Prohibited Landing Marker Missing. No way to tie down on helideck. Never been installed. Rescue equipment All there, background lighting and accessibility. Torch (flashlight) inoperative - batteries dead Only a single ladder section, need two. Safety notices Missing. Tie down strops Missing or incorrect number. Poor condition. Incorrect breaking strength (coordinate with helicopter company). Incorrect hook size (doesn t fit tie down points, never been physically checked). Weather reporting - No calibration date. Anemometer Wind sensor not in representative location and doesn t indicate wind at helideck. No handheld anemometer available Weather reporting - No calibration date. Barometer Analog barometers located in pressurized compartment Weather reporting - Pitch/Roll/Heave Automatic method of electronically measuring and recording actual and historical information required. No calibration date. Weather reporting - Temperature Temperature sensor not in representative location and doesn t indicate temperature at helideck 9 OF 9

Proc. No.:ASD.F.150 Admt No: 3. Page: 1 of 20 Issue Date: 10/10/13 IRISH AVIATION AUTHORITY APPROVED

Proc. No.:ASD.F.150 Admt No: 3. Page: 1 of 20 Issue Date: 10/10/13 IRISH AVIATION AUTHORITY APPROVED Page: 1 of 20 THIS REPORTING FORM FOR INSPECTIONS CARRIED OUT ON HELICOPTER FACILITIES AT OFFSHORE INSTALLATIONS IRISH AVIATION AUTHORITY APPROVED REPORTING FORM FOR INSPECTIONS CARRIED OUT OF HELICOPTER

More information

RESOLUTION A.855(20) adopted on 27 November 1997 STANDARDS FOR ON-BOARD HELICOPTER FACILITIES

RESOLUTION A.855(20) adopted on 27 November 1997 STANDARDS FOR ON-BOARD HELICOPTER FACILITIES A 20/Res.855 17 December 1997 Original: ENGLISH ASSEMBLY 20th session Agenda item 9 RESOLUTION A.855(20) adopted on 27 November 1997 THE ASSEMBLY, STANDARDS FOR ON-BOARD HELICOPTER FACILITIES RECALLING

More information

HELIDECK INSPECTION CHECKLIST

HELIDECK INSPECTION CHECKLIST HELIDECK INSPECTION CHECKLIST References: CAP 437 8 Edition Standards for Offshore Helicopter Landing Areas (December 2016) on Standards FAA Advisory Circular Heliport Design No: 150/5390-2C (AC150/5390-2C)

More information

Heliport Information Sheet

Heliport Information Sheet Heliport Information Sheet Name: Doc. No.: Rev. No.: Rev. date: Heliport Information Sheet NAME Purpose This information sheet is issued to present information regarding the NAME helideck and heliport

More information

IMO. 4 February 1999 Original: ENGLISH RECOMMENDATION ON HELICOPTER LANDING AREAS ON RO-RO PASSENGER SHIPS

IMO. 4 February 1999 Original: ENGLISH RECOMMENDATION ON HELICOPTER LANDING AREAS ON RO-RO PASSENGER SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR E Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G IMO Ref. T1/3.02 MSC/Circ.895 4 February 1999 Original: ENGLISH

More information

Helideck Limitations List (HLL)

Helideck Limitations List (HLL) HELIDECK LIMITATIONS LIST PART A 1) INTRODUCTION Under the Air Navigation Order (ANO) UK helicopter operators are responsible for ensuring that helidecks to which they fly are fit for purpose. Installation

More information

With amendment issued 28. Jan 2008.

With amendment issued 28. Jan 2008. Regulation 26 October 2007 no. 1181 governing continental shelf operations commercial air traffic to and from helidecks on offshore installations and vessels Issued by the Civil Aviation Authority (CAA-N)

More information

OPITO Helideck Standards Training Facility & Equipment Technical Specification

OPITO Helideck Standards Training Facility & Equipment Technical Specification OPITO Helideck Standards Training Facility & Equipment Technical Specification Page 1 of 9 Record of Changes to Document Revision & Amendments Agreed by Checked Approved Revision 0 March 2013 OPITO G.

More information

Method Statement: Testing Dry Riser System

Method Statement: Testing Dry Riser System Method Statement: Testing Dry Riser System Page 1 of 6 Scope of work Test dry riser system in accordance with BS 5306. Definitions For the purposes of this document, the following definitions apply Rising

More information

Subject Maintenance, inspection and test of Fire-Protection Systems and Appliances on board the Panama-registered ships To whom it may concern Technic

Subject Maintenance, inspection and test of Fire-Protection Systems and Appliances on board the Panama-registered ships To whom it may concern Technic Subject Maintenance, inspection and test of Fire-Protection Systems and Appliances on board the Panama-registered ships To whom it may concern Technical Information No. TEC-0869 Date 14 October 2011 The

More information

Helicopter Landing Officer (HLO) Course Outline

Helicopter Landing Officer (HLO) Course Outline Helicopter Landing Officer (HLO) Course Outline Prerequisites: This course shall have no formal pre-requisite. Course Length: 4-6 hours - Course length shall vary depending on the number of delegates.

More information

Liquefied Petroleum Gas Market Regulations S.L

Liquefied Petroleum Gas Market Regulations S.L Liquefied Petroleum Gas Market Regulations S.L. 423.31 INSPECTION & RISK ASSESSMENT REPORT ON LPG SECONDARY STORAGE INSTALLATIONS i Fill-In Instructions: (i) This LPG Secondary Storage Inspection report

More information

Method statement for. The installation of. Precast Concrete Piles. (Site Name).

Method statement for. The installation of. Precast Concrete Piles. (Site Name). Method statement for The installation of Precast Concrete Piles At (Site Name). 1 of 5 Standard Operating Procedures for Pile Driving. This method statement will outline how the authorised/ competent operatives

More information

2. Application This "Guidelines" applies to all ships. 3. General Requirements for the Maintenance and Inspection of Fire-protection Systems and Appli

2. Application This Guidelines applies to all ships. 3. General Requirements for the Maintenance and Inspection of Fire-protection Systems and Appli Subject Maintenance, inspection and test of Fire-Protection Systems and Appliances on board the Panama-registered ships To whom it may concern Technical Information No. TEC-0910 Date 25 June 2012 The Panama

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

Fire Apparatus Operator: ARFF

Fire Apparatus Operator: ARFF Fire Apparatus Operator: ARFF Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2017 Edition. Alabama Fire College November 26, 2018 Alabama

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 4 Guidelines for Equipment on Fire Fighting Ships Edition 2008 The following Guidelines come into

More information

Chapter 2 Preparations for Tank Cleaning Work

Chapter 2 Preparations for Tank Cleaning Work Chapter 2 Preparations for Tank Cleaning Work Preparatory Procedures for Tank Cleaning Work Make preparations for tank cleaning work according to the procedures given below. 1. Formulating the tank cleaning

More information

Draft Indian Standard SAFES Part 2 Tests for Burglary Resistance (Fifth Revision)

Draft Indian Standard SAFES Part 2 Tests for Burglary Resistance (Fifth Revision) Draft For Comments Only Draft Indian Standard SAFES Part 2 Tests for Burglary Resistance (Fifth Revision) Not to be reproduced without the permission of Last date for receipt of BIS or used as a STANDARD

More information

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

CLIENT NAME: LOCATION: CALM BUOY INSPECTION: INSPECTOR REVIEWED INSPECTION OF CALM BUOY OVERALL PHOTO REVISION DESCRIPTION: Preliminary / Final Page: 1 TABLE OF CONTENT 1. MANAGEMENT SUMMARY... 3 1.1. SCOPE OF WORK:... 3 1.2. CORRECTIVE ACTIONS...

More information

Fire Apparatus Operator Aircraft Rescue and Fire Fighting

Fire Apparatus Operator Aircraft Rescue and Fire Fighting Fire Apparatus Operator Aircraft Rescue and Fire Fighting Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2014 Edition. Alabama Fire College

More information

Vehicle-mounted meters, pump supplied

Vehicle-mounted meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Vehicle-mounted

More information

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING 1 TPCP1 INITIAL & RE-ASSESSMENT Introduction Tests gas safety competencies

More information

Table of Contents. Chapter 1: Health, Safety and Environment Programs. Chapter 2: General Guidelines and Health Control

Table of Contents. Chapter 1: Health, Safety and Environment Programs. Chapter 2: General Guidelines and Health Control IADC Health, Safety and Environmental Reference Guide Table of Contents Chapter 1: Health, Safety and Environment Programs Safety Policy Statement... 1 HSE Meetings... 1 Safety Inspections and Logbooks...

More information

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014 A DEPTH MARKINGS There are Depth Markings on and around a. On the vertical wall of the pool and on this pool that are at least 4 inches high; in contrasting color to the background; of a slip resistant

More information

TurboDraft Fire Eductor

TurboDraft Fire Eductor TurboDraft Fire Eductor Operating Manual Introduction The TurboDraft is designed to be used for rural water supply operations. Many of us take for granted that there is a fire hydrant on every corner.

More information

Piped Air SCBA Refilling System Standard

Piped Air SCBA Refilling System Standard WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

Vertical and Horizontal Bladder Tanks

Vertical and Horizontal Bladder Tanks DATA SHEET Vertical and Horizontal Tanks Application The ANSUL bladder tank is one component in a balanced pressure proportioning system. Its operation requires no external power other than a pressurized

More information

PRE-PURCHASE DECISIONS...1 BEFORE DELIVERY...1

PRE-PURCHASE DECISIONS...1 BEFORE DELIVERY...1 Table of Contents PRE-PURCHASE DECISIONS...1 BEFORE DELIVERY...1 Typical Installation Site...1 SITE ACCESS...2 COVER...2 ELECTRICAL HOOK UP...3 LOAD SHARING...3 ELECTRICAL REQUIREMENTS...4 North American...4

More information

BOEING AIRCRAFT WEIGH WORKSHEET

BOEING AIRCRAFT WEIGH WORKSHEET WEIGHING FACILITIES AND EQUIPMENT ITEM MECH INSP The airplane should be weighed inside a closed facility that will: Exclude all wind and drafts. Permit shutdown of air conditioning during the weighing

More information

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...

More information

ANNEX 2. RESOLUTION MSC.256(84) (adopted on 16 May 2008)

ANNEX 2. RESOLUTION MSC.256(84) (adopted on 16 May 2008) RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b)

More information

Apparatus Operator Refresher Training Program

Apparatus Operator Refresher Training Program Division of Training In-Service Training Program Apparatus Operator Refresher Training Program 1 Single Engine / Single Line Operation Refresher Evolution #1 Objective: Charging single handlines at correct

More information

Working Environment Safety Assessment

Working Environment Safety Assessment For your own safety and/or safety of your workforce, and to improve the efficiency of your business practices, you should be aware of, and be up to date with, the key safety issues and good practices relevant

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N SOL 036 Amendment to SOLAS 1974 as amended, Resolution MSC.256 (84) TO: SHIPOWNERS & SHIPS OPERATORS & MANAGERS, MASTERS SURVEYORS TO FLAG

More information

Fire Apparatus Operator: Pumper

Fire Apparatus Operator: Pumper Fire Apparatus Operator: Pumper Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/Operator Professional Qualifications, 2014 Edition. Alabama Fire College February 2016 revised

More information

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and Bulletin 68-7-11 Swimming pool, hot tub and spa installations Rules 68-000, 68-056, 68-058, 68-064, 68-068, 68-302 and 68-404 Scope (1) Swimming pools - general (2) Grounding & bonding (a) Bonding for

More information

Surface exploration drilling

Surface exploration drilling Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface

More information

Emergency Procedures for Forecourt Sites Storing and Dispensing LPG

Emergency Procedures for Forecourt Sites Storing and Dispensing LPG SECTION F7 Emergency Procedures for Forecourt Sites Storing and Dispensing LPG (Propane) This document has been designed to give essential information FOR ALL STAFF on how to deal with an emergency involving

More information

MSC Guidelines for Independent Fuel Tanks

MSC Guidelines for Independent Fuel Tanks References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division

More information

Idaho Fire Service Technology Pumping Apparatus Driver/Operator Skill Sheet: 1

Idaho Fire Service Technology Pumping Apparatus Driver/Operator Skill Sheet: 1 Skill Sheet: 1 Standard 4.2.1, 4.2.2 Task: Perform and document routine test, inspection and servicing functions on specified systems and components. Performance Outcome: Given a fire department pumping

More information

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK)

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK) Title: Hot Work/Welding Effective Date: 2/6/2013 Control Number: THG_0011 Revision Number: 1 Date: 10/10/2015 Annual Review Completed: 5/13/2015 CONTENTS HOT WORK SAFETY 29 CFR 1910.252 WELDING & CUTTING

More information

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION OCT2010 STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 020 87833050

More information

Swimming Pools, Hot Tubs and Spas

Swimming Pools, Hot Tubs and Spas OLATHE FIRE DEPARTMENT BUILDING CODES 1225 S. Hamilton Circle Olathe, KS 66061 / Main: (913) 971-7900 / Fax: (913) 971-9812 Swimming Pools, Hot Tubs and Spas Definitions: Swimming Pool- Any structure intended

More information

System Pressure Manager Standard & System Pressure Manager Plus

System Pressure Manager Standard & System Pressure Manager Plus System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,

More information

RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS

RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS RESOLUTION MSC.256(84) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on

More information

CORROSION AT THE AIR-WATER INTERFACE REMOVE THE GAS

CORROSION AT THE AIR-WATER INTERFACE REMOVE THE GAS CORROSION AT THE AIR-WATER INTERFACE There are three (3) physical attributes of oxygen that explain why almost all corrosion in wet pipe fire sprinkler systems occurs in close proximity to trapped air

More information

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM Title: Material Handling - Rigging Effective Date: 12/4/2014 Control Number: THG_0049 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

More information

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures Number K-3.0 Issued: 1/2009 Revised: 3/2016 Page 1 of 3 1.0 PURPOSE: To standardize procedures associated with production and maintenance welding and to minimize the potential risk of accident or injury

More information

Fire Apparatus Operator: Pumper

Fire Apparatus Operator: Pumper Fire Apparatus Operator: Pumper Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2017 Edition. Alabama Fire College August, 2018 revised

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Models: EPS Single Pump EPT Twin Pump EPS-HP EPT-HP Single Pump High Pressure Twin Pump High Pressure

More information

i) Filtration machine, measuring equipment and other related machinery

i) Filtration machine, measuring equipment and other related machinery 5 MVA TRANSFORMER SERVICE AND MAINTENANCE FOR TATA CHEMICALS MAGADI. SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

Industry Code: Alberta Small Employer OHS Legislated Requirements

Industry Code: Alberta Small Employer OHS Legislated Requirements This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Services in this industry can

More information

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 13.7 Pressure Equipment Directive (PED) 97/23/EC 1 The Pressure Equipment Directive (PED) 97/23/EC applies to the design, manufacturing and conformity

More information

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp. ASME and PED Requirements for Drum Level Instrumentation 2017 Presented by: Amir Hedayatnia Clark-Reliance Corp. Topics Gage Glasses and Remote Reading Instruments ASME Code Section I Requirements for

More information

Title/Description: Fuel Cell Fill Procedure

Title/Description: Fuel Cell Fill Procedure Fuel Cell Procedure Document No.: Author: Kurt Stiffel Title/Description: Approved by: Revision: 1-00 Effective Date: 1.0 Reference Documents All released OOI documents in Alfresco 3161-20000 Fuel Cell

More information

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Businesses in this industry

More information

RFFS Procedures. Airside Operational Instruction 18. Content

RFFS Procedures. Airside Operational Instruction 18. Content Content 1. Procedures - Introduction 2. RFFS Category 3. Depletion of RFFS 4. Alerting RFFS 5. Response Times 6. Extraneous Duties 7. Safety Accountabilities 8. Equipment Provided 9. Competence of RFFS

More information

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING In SANS 10105 you will find the Minimum water pressure for both the hydrant and the hose reel. Which is 300KPA Manufacturing Standard SANS 543 1 Front & Back plates 2 Curved Plate 3 Waterway assembly 4

More information

Scorched Nuts Fire Art Guide

Scorched Nuts Fire Art Guide Scorched Nuts Fire Art Guide This guide is to serve as a reference for the construction and use of flame effects while at Scorched Nuts. At this time, no pressurized effects(poofers) will be permitted

More information

e.do Gripper Safety requirements, technical features and assembly and integration instructions

e.do Gripper Safety requirements, technical features and assembly and integration instructions e.do Gripper Safety requirements, technical features and assembly and integration instructions Requirements, technical features and instructions for safe installation and use of the e.do Gripper. CR00758190-en_00/2018.05

More information

The Glockemann Pump Site & Installation Guide

The Glockemann Pump Site & Installation Guide GLOCKEMANN PECK ENGINEERING PTY LTD P.O. Box 357 West Ryde NSW 1685 Telephone/Fax: (02) 9708 0900 Email: glocpump@zip.com.au Internet: www.gpe-waterpumps.com The Glockemann Pump Site & Installation Guide

More information

National Occupational Standards. for Deck Operations

National Occupational Standards. for Deck Operations National Occupational Standards for Deck Operations Final Version May 2007 1 of 22 AMENDMENTS AMENDMENT & DATE PAGES CHANGES MADE BY: CHECKED BY: APPROVED BY: Reconciled Unit Scopes with bolded items in

More information

Chapter 2. Before You Get Underway. Copyright Coast Guard Auxiliary Association, Inc.

Chapter 2. Before You Get Underway. Copyright Coast Guard Auxiliary Association, Inc. Chapter 2 Before You Get Underway 1 We ll Discuss: 1 Capacity 2 Float Plan 3 Pre-Departure Checks 4 Trailering & Fueling - Safety 5 Launching and Retrieving 6 Boat Maintenance 7 Boating Accessories 2 Capacity

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

COPY OF STATE CHARTER & CONTRACT WITH CITY / COUNTY, INDICATING DISTRICT OF AUTHORITY, MUST ACCOMPANY THIS CERTIFICATE OF ELIGIBILITY

COPY OF STATE CHARTER & CONTRACT WITH CITY / COUNTY, INDICATING DISTRICT OF AUTHORITY, MUST ACCOMPANY THIS CERTIFICATE OF ELIGIBILITY NORTH CAROLINA ASSOCIATION OF RESCUE & EMERGENCY MEDICAL SERVICES, INC. P.O. BOX 1914, GOLDSBORO, N.C. 27533-1914 TELEPHONE: 919/736-0506 FAX: 919/736-7759 E-MAIL: ncarems@ncarems.org CERTIFICATE OF ELIGIBILITY

More information

Rotary Abreast Automatic Teat Sprayer User Manual. Technical Manual Revision 0.01

Rotary Abreast Automatic Teat Sprayer User Manual. Technical Manual Revision 0.01 Rotary Abreast Automatic Teat Sprayer Technical Manual 006911 Revision 0.01 Contents Contents... 2 Important information - read this first... 3 Icons... 3 1. Introduction... 4 2. Intended Use... 4 3. General

More information

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC United States Environmental Protection Agency RCRA Programs Branch Region IV Atlanta, GA CAA/RCRA Air Rules 27 November 2000 General Inspection Guidance for Waste Management Units Requiring Air Emission

More information

NZQA registered unit standard version 3 Page 1 of 8. Operate bitumen gangbar sprayer transfer, heating, and blending equipment

NZQA registered unit standard version 3 Page 1 of 8. Operate bitumen gangbar sprayer transfer, heating, and blending equipment Page 1 of 8 Title Operate bitumen gangbar sprayer transfer, heating, and blending equipment Level 4 Credits 15 Purpose People credited with this unit standard are able to: identify, assess, control, and

More information

Installation and commissioning instructions 255 series and 256 series

Installation and commissioning instructions 255 series and 256 series Installation and commissioning instructions 255 series and 256 series Table of contents 1 General information... 3 1.1 About these instructions... 3 1.2 About this product... 3 1.3 Appropriate usage...

More information

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING Issue 3.1 ACS.SMB 1 TPCP1A INITIAL & RE-ASSESSMENT Introduction Tests gas safety competencies

More information

OWNER S TECHNICAL MANUAL

OWNER S TECHNICAL MANUAL EL SERIES OWNER S TECHNICAL MANUAL DP7002 1 Air Operated Diaphragm Pump Description The DP7002 1 air operated diaphragm pump is the ideal device for the pumping, transfer and dispensing of chemical liquids,

More information

IFE Level 3 Diploma in Fire Science and Fire Safety

IFE Level 3 Diploma in Fire Science and Fire Safety IFE Level 3 Diploma in Fire Science and Fire Safety Unit 4: Aviation Fire Operations Unit Reference Number: R/505/6009 Introduction This unit focuses on the strategies and activities required to resolve

More information

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels (Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope

More information

Upstream Deepwater Logistics-Aviation

Upstream Deepwater Logistics-Aviation Upstream Deepwater Logistics-Aviation SAR-MEDEVAC Call-out Process --- 27 December 2017 Bob Jablonski Aviation Manager, Gulf of Mexico Logistics-Aviation Upstream Deepwater Robert.Jablonski@Shell.com Bristow

More information

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility,

More information

Inspection Card for Race Category 3 (with liferaft) Monohulls

Inspection Card for Race Category 3 (with liferaft) Monohulls World Sailing Offshore Special Regulations Inspection Card for Race Category 3 (with liferaft) Monohulls PERSON IN CHRGE (See Racing Rules of Sailing 46): please prepare the boat, initial above the underline

More information

RULES PUBLICATION NO. 119/P

RULES PUBLICATION NO. 119/P RULES PUBLICATION NO. 119/P PERIODIC SURVEYS OF FUEL INSTALLATIONS ON SHIPS OTHER THAN LIQUEFIED GAS CARRIERS UTILIZING GAS OR OTHER LOW FLASH POINT FUELS 2019 January Publications P (Additional Rule Requirements)

More information

Corrections. General changes throughout the chapter

Corrections. General changes throughout the chapter 1 JIG Bulletin 56 - Attachment Aug 2012 JIG 1: Table of changes made to Issue 10 Section Page number Description Change from JIG version 10 JIG 1 Summary of changes 2 Replace reference 6.5.5(v) by 6.5.5(a)(v)

More information

LPG SAFETY INFORMATION. Kwik-Gas. Safety Manual. Less talk more energy

LPG SAFETY INFORMATION. Kwik-Gas. Safety Manual. Less talk more energy LPG SAFETY INFORMATION Kwik-Gas Safety Manual Less talk more energy CONTENTS Introduction to the Kwik-Gas program 2 Emergency and contact information 2 Emergency procedures 3 First aid Instructions for

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN CLACKAMAS COUNTY COMMUNITY HEALTH DIVISION ENVIRONMENT & HEALTH SERVICES APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN APPLICATION IS HEREBY MADE

More information

Examiner s Report March 2013

Examiner s Report March 2013 Examiner s Report March 2013 Level 3 Diploma Paper 5: Fire Service Operations UK Specific. Introduction Candidates were required to answer six questions from a choice of ten questions. The most popular

More information

International Civil Aviation Organization. Runway and Ground Safety Working Group. Fourth Meeting (RGS WG/4) (Cairo, Egypt, November 2017)

International Civil Aviation Organization. Runway and Ground Safety Working Group. Fourth Meeting (RGS WG/4) (Cairo, Egypt, November 2017) RGS WG/4-WP/17 05/11/2017 International Civil Aviation Organization Runway and Ground Safety Working Group Fourth Meeting (RGS WG/4) (Cairo, Egypt, 05-07 November 2017) Agenda Item 4: Coordination between

More information

Personal Protective Equipment

Personal Protective Equipment Purpose Personal Protective The purpose of this policy is to meet the minimum standard for Personal Protective (PPE) for Apache Corporation employees and contract personnel working at Apache Corporation

More information

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate December 6, 2010 Foam 21a 1. Description With Multiple Foam/Water Deluge Systems Supplied by a Bladder Tank, multiple deluge foam risers can be supplied from a single foam concentrate source. Where a bladder

More information

Blowdown vessels Meeting the requirements of HSE PM60

Blowdown vessels Meeting the requirements of HSE PM60 Blowdown vessels Meeting the requirements of HSE PM60 BDV60 blowdown vessels A complete range of equipment for the safe disposal of boiler blowdown Boiler blowdown Steam boilers must be blown down to remove

More information

User Information Sheet 013

User Information Sheet 013 User Information Sheet 013 Formerly LPGA Technical Memorandum NO.81 Issue 2 September 2007 ACME threaded couplings 1 INTRODUCTION ACME threaded couplings/end fittings are widely used for LPG transfer operations

More information

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,

More information

Walking-Working Surfaces and Fall Protection Standards Update. OSHA General Industry

Walking-Working Surfaces and Fall Protection Standards Update. OSHA General Industry Walking-Working Surfaces and Fall Protection Standards Update OSHA General Industry Background Slips, trips, and falls account for a majority of all general industry injury incidents. Caused 849 workplace

More information

UTMB RESPIRATORY CARE SERVICES GUIDELINES Respiratory Care Services Medical Gas Cylinder Storage, Use and Transport

UTMB RESPIRATORY CARE SERVICES GUIDELINES Respiratory Care Services Medical Gas Cylinder Storage, Use and Transport Page 1 of 4 I. Title Medical Gas. II. III. IV. Policy This policy applies to all departments and areas where medical gases are used, stored or transported for patient care activities. Respiratory Care

More information

Preferred Instruments Danbury, CT USA

Preferred Instruments Danbury, CT USA Tank Level Sensor Model TG-EL-WF-xx Installation & Operation Instructions SDI-TG-EL-WF March 6, 2006 Preferred Instruments Danbury, CT USA www.preferredinstruments.com CONTENTS Installation Pg. 2 Calibration

More information

BOTTOM HINGED FLOOD BARRIER

BOTTOM HINGED FLOOD BARRIER BOTTOM HINGED FLOOD BARRIER Installation Instructions/Operation and Maintenance Manual Models: BH-590 Contact Information Table of Contents: Safety Precautions... 2 Product Information... 2 Manual Deployment

More information

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books 1. SCOPE OF BOILER LOGBOOK PROGRAM In all cases, there are minimum tasks and functions for an operator to perform

More information

Galva Fire Department SOP

Galva Fire Department SOP Galva Fire Department SOP GENERAL REGULATIONS All firefighters must know and understand the SOG s set forth by the GFD. GFD personnel will be alerted of a call by pager, fire phone or by the fire siren

More information

HANDBOOK. Squeeze Off Unit SOU 400. Please refer any queries to:

HANDBOOK. Squeeze Off Unit SOU 400. Please refer any queries to: HANDBOOK Squeeze Off Unit SOU 400 Please refer any queries to: Hy Ram Engineering Co Ltd Pelham Street Mansfield Nottinghamshire NG18 2EY Telephone No: (01623) 422982 Please note all queries should state

More information