1 Method statement for The installation of Precast Concrete Piles At (Site Name). 1 of 5

2 Standard Operating Procedures for Pile Driving. This method statement will outline how the authorised/ competent operatives of Conway piling perform the task of Pile driving on site(s). I. Establish Rig on to site. II. Discuss with client s representatives any safety procedures applicable to the site and establish a safe working area. This includes any safety induction. III. Check pile position locations (responsibility of main contractors) and sequence of piling works commencement. IV. All under ground services should be clearly marked by main contractor and he/she shall carry out Cat scan if in doubt. V. Where the pile construction is in the vicinity of a power or gas service, consideration should be within the risk assessment for the perimeter of the pile structure to be a minimum of three dia meters away from services. The immediate area should be a No Smoking zone. Power should be turned off to power cables and conformation note issued to the piling foreman. VI. Pitching of the pile is carried out by looping the chain around the pile approximately 1mtr from the end and winching up into helmet of hammer by rig operator. VII. Pile is then guided into the pile clamps by assistant on ground. VIII. Set up piling rig with pitched pile over marked position and the driver then places pile onto the ground. IX. Assistant then checks pile is plum with level. X. Driver lowers service winch and proceeds to operate driving hammer at low drop height until pile has safely entered the ground. XI. Assistant will then carry out vertical check if required. XII. Pile is then driven to the required height. XIII. If piles are to be driven deeper than segment pitched an additional pile is pitched with jointing end at bottom of pitched pile. 2 of 5

3 XIV. Jointing is carried out by placing pitched pile over driven pile, removing dirt cover off pitched pile by assistant and lowering of pitched pile on top of driven pile by rig driver with directions from assistant. XV. Jointing pins are placed in their locking position by the rig operators assistant with the use of a sledge hammer. XVI. Pile is checked for vertical plum again and then service winch is lowered and removed. XVII. Driving is carried out using the same procedure again. XVIII. Driver and assistant decide as work proceeds depending on how much of finished pile is protruding from the ground level which piles are to be driven in sequence. XIX. When pile testing is required an independent person ie, site foreman marks piles for testing ensuring not to mark any with damaged end due to driving operations. XX. Testing is carried out when piles are complete and before piling rig leaves site. It is carried out by an independent company. XXI. The test engineer establishes himself onto the site and checks piles for testing. XXII. He proceeds to drill required taps into test piles. XXIII. He then connects test lead cables to same. XXIV. When ready the piling rig operator places the rig hammer over test pile and on testing engineers command strikes pile the number of blows required to give the test engineer required readings. XXV. The same procedure carries onto next pile until finished. All operatives must wear personal protective equipment at all times during piling. Only authorised personnel should operate in the piling zone(s). Piling zone(s) should be cordoned off as a safety measure. 3 of 5

4 Conway Piling: Risk Assessment for Piling Operations. Hazards 1. Failure to check manufacturer s instruction. 2. Overhead power lines. 3. Underground services not identified. 4. Inadequate operator training. 5. Wire rope-broken wires or kinks, distorting links, rings or hooks. 6. Pitching of new pile. 7. Possibility of Rig overturning due to an unstable ground surface or working near excavations. 8. Joining pile to existing pile, if deeper piling is necessary. 9. Unexpected visitors entering the site. 10. Back leg, shoulder and arm injuries. Control Measures 1. Always check the manufacturer s handbook for instructions regarding the Piling Rig. 2. Always carry out a walk through survey of the site before bringing the rig into the operating zone. If cables pose a threat contact the ESB as soon as possible to safe guard the area in question. 3. Inspect all site maps relating to ground works so as to identify if there is any underlying services present that need to be highlighted. 4. All drivers will be trained and competent to operate Piling Rigs. 5. Wire ropes, rings and hooks will be inspected regularly and any defects are to be reported as soon as possible to Mr Lar Conway. 6. When pitching the new pile the assistant must ensure that chain is not twisted by using the looping technique, (chain running through ring on end of same) chain around pile approximately one metre from end and winching up into the helmet of hammer by rig operator. The pile is then guided into place by the assistant on ground. 7. The ground on which the piling rig has to operate must be inspected so as to ensure it s stability and that excavation don t pose a threat of overturning to the operatives. 4 of 5

5 8. The joining of the pile must be done safely and the assistant to the piling rig operator must be wearing gloves and he does not try to align pile by feeling with his fingers, he must remove plastic dirt covers and then he directs the rig operator to lower the pitched pile on to the top of the driven pile and then inserting the pile joint pins using a sledge hammer. 9. Only authorised person s may operate in the vicinity of the Piling Rig. 10. All employee s of Conway Piling have received manual handling training. 11. All ground assistance and other operatives on the site must not stand facing the hammer when it is in motion as this is very dangerous in the event of the wire rope breaking and flying forward. Resources: All operatives of Conway Piling will wear high visibility clothing, wet gear, helmets and safety boots. First aid box will be available to all the operatives of Conway piling. Only competent and trained operatives will be allowed to work with the Piling Rigs that are owned by the company. All employees working on construction sites will have safe pass. Lubricants and oils will be available during operations so as to ensure the safe working of the rigs Certificates will also be available on request. 5 of 5

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157 1 of 6 1.0 PURPOSE To establish minimum requirements and guidelines for controlling hazardous exposure of personnel to falls from working elevations in conformance with Federal and State OSHA rules and

More information

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM Title: Material Handling - Rigging Effective Date: 12/4/2014 Control Number: THG_0049 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

More information

Sample Sailing Instructions for Sanctitoned Lightning Class Championship Regattas

Sample Sailing Instructions for Sanctitoned Lightning Class Championship Regattas Sample Sailing Instructions for Sanctitoned Lightning Class Championship Regattas I. ORGANIZING AUTHORITY II. RULES III. NOTICE TO COMPETITORS IV. CHANGES TO SAILING INSTRUCTIONS V. SIGNALS MADE ASHORE

More information

i) Filtration machine, measuring equipment and other related machinery

i) Filtration machine, measuring equipment and other related machinery 5 MVA TRANSFORMER SERVICE AND MAINTENANCE FOR TATA CHEMICALS MAGADI. SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved

More information

Analysis!of!Rainforest!Alliance!Report!on!the!Verification!of!Progress!Related!to!Enabling!Activities! for!the!guyana"norway!redd+!agreement!!!

Analysis!of!Rainforest!Alliance!Report!on!the!Verification!of!Progress!Related!to!Enabling!Activities! for!the!guyananorway!redd+!agreement!!! April14,2011 HansBrattskar Director NorwegianInternationalClimateandForestInitiative(NICFI) TensieWhelan ExecutiveDirector RainforestAlliance AnalysisofRainforestAllianceReportontheVerificationofProgressRelatedtoEnablingActivities

More information

Operating Engineers Agreement

Operating Engineers Agreement 2014-2016 Operating Engineers Agreement TABLE OF CONTENTS Click on any heading below to view text Section Page Parties to Agreement... 1 Purpose... 1 Article I- General Provisions... 1 Definitions... Par.

More information

DEFINITION OF PENALTIES

DEFINITION OF PENALTIES C. AAU Nationals/AAU Junior Olympic Games: Your entry must be completed online and all entry fees sent to the AAU. You must also send a copy of what you are entering for the AAU National/AAU Junior Olympic

More information

DEFINITION OF PENALTIES

DEFINITION OF PENALTIES V. Technical Coach A. You must be an AAU member. B. You must complete the PCA training online for all coaches. C. You must follow the AAU Baton Twirling Rules that have been set forth. D. You must wear

More information

KRAV MAGA LEVEL 1 CURRICULUM

KRAV MAGA LEVEL 1 CURRICULUM KRAV MAGA LEVEL 1 CURRICULUM I. Fighting Stance a. This is the posture the defender takes preparing for a confrontation b. Foot Positions 1. Assuming defender is right handed, he should stand with his

More information

KRAV MAGA LEVEL 1 CURRICULUM

KRAV MAGA LEVEL 1 CURRICULUM KRAV MAGA LEVEL 1 CURRICULUM Technique Breakdown I. Fighting Stance a. This is the posture the defender takes preparing for a confrontation b. Foot Positions 1. Assuming defender is right handed, he should

More information

Rates of various Line materials and Labour charges used in cost sheets for general works

Rates of various Line materials and Labour charges used in cost sheets for general works Rates of various Line materials and Labour charges used in cost sheets for general works SL.NO Particulars Unit Materials rate in Rs. Labour charges (Casual) in Rs 1 2 3 4 5 RCC Poles a) 9.5 M 350kg WL

More information

RAYB 2018 A-LEAGUE Baseball League Rules General Rules: updated May 2018 All coaches must have a copy of these rules at all A-League games.

RAYB 2018 A-LEAGUE Baseball League Rules General Rules: updated May 2018 All coaches must have a copy of these rules at all A-League games. RAYB 2018 A-LEAGUE Baseball League Rules General Rules: updated May 2018 All coaches must have a copy of these rules at all A-League games. In general A-League follows the regular High School rules. The

More information

The Sports Betting Champ s Never Lost NFL Super Bowl Betting System

The Sports Betting Champ s Never Lost NFL Super Bowl Betting System The Sports Betting Champ s Never Lost NFL Super Bowl Betting System Here s the Never Lost NFL Super Bowl Betting System. In a nutshell, you will be betting that once an underdog covers the spread in the

More information

Corinthian Yacht Club of Bellingham 2015 Racing Series Race Packet

Corinthian Yacht Club of Bellingham 2015 Racing Series Race Packet Corinthian Yacht Club of Bellingham 2015 Racing Series Race Packet Series 1: April 16, 23, 30, May 7, 14 Series 2: May 21, 28, June 4, 11, 18 Series 3: June 25, July 2, 9, 16, 23 Series 4: July 30 August

More information

Your grade may then be calculated by the following formula (Daily Points + Test Scores) / (# of days * 4 + # of tests * 100)

Your grade may then be calculated by the following formula (Daily Points + Test Scores) / (# of days * 4 + # of tests * 100) Martin Luther High School Physical Education 2017 2018 Mr. Taylor Rules: 1. Follow all rules as printed in the student handbook 2. The student will be in the gym in proper uniform no later than five minutes

More information

ABB NASOM Fun Run 2017

ABB NASOM Fun Run 2017 ABB NASOM Fun Run 2017 Day/date: Sunday/February 19, 2017 Time: 6.30 am 10.00 am Venue: Perdana Botanical Garden (Lake Gardens) A. Race Info a. Apparel Adult XXL XL L M S XS Children XL L M S b. Race Categories

More information

2017 DISCOVERY CUP OFFICIAL RULES

2017 DISCOVERY CUP OFFICIAL RULES 2017 DISCOVERY CUP OFFICIAL RULES Tournament Headquarters will be located at the Discovery Sports Center at the Maryland SoccerPlex located at 18031 Central Park Circle, Boyds, MD 20841. I. TOURNAMENT

More information

Synchronised Swimming Skill Level 4

Synchronised Swimming Skill Level 4 1 2 3 4 5 6 7 8 9 10 11 Synchronised Swimming Skill Level 4 The must be an Advanced Name. Date Contents Pre requisite; PRE 1 Right or Left Flat Split on land PRE 2 Right or Left Leg Over Split on land

More information

Upper body as upright as possible with knees slightly bent, much like the position used in fencing.

Upper body as upright as possible with knees slightly bent, much like the position used in fencing. Handbook of Free Wrestling A. Birmann, 1876 Translated and summarised by P.T. Crawley, 2014 Context: In 1870 M. Birmann put together a collection of the most current grips of free and Swiss wrestling,

More information

NRHSAA GIRLS RUGBY

NRHSAA GIRLS RUGBY NRHSAA GIRLS RUGBY 2014-2015 IMPORTANT: The policies that follow are specific to this sport and must be adhered to by every member of the NRHSAA. Each sport policy is numbered. Sometimes within a sport

More information

OFFICIAL RULES AND REGULATIONS 2017

OFFICIAL RULES AND REGULATIONS 2017 OFFICIAL RULES AND REGULATIONS 2017 I. UMPIRES The league will use A.S.A. Umpires for all regular season and playoff games. If no umpire shows for the game: Please call Rob Keane (516-375-8910), Dennis

More information

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment Orignal Issue Date : 28-10-10 Date of Revision: Page- - 1-1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment (Slings & Ropes) 2.0 Reference: 3.0 Associated

More information

Title: NFPA 70E Effective Date: 12/8/2014 Control Number: THG_0053 Revision Number: 1 Date: 10/26/2015 Annual Review Completed: 5/13/2015 NFPA 70E

Title: NFPA 70E Effective Date: 12/8/2014 Control Number: THG_0053 Revision Number: 1 Date: 10/26/2015 Annual Review Completed: 5/13/2015 NFPA 70E Title: NFPA 70E Effective Date: 12/8/2014 Control Number: THG_0053 Revision Number: 1 Date: 10/26/2015 Annual Review Completed: 5/13/2015 CONTENTS NFPA 70E I. INTRODUCTION II. PURPOSE III. SCOPE IV. ENGINEERING

More information

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title Risk assessment Introduction Please complete the form as fully and accurately as you can. Assessment details Name of organisation Assessor's name Assessors job title Any Company John Smith Manager Date

More information

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT Prepared for:- Date:- Work Scheduled:- SCOPE OF WORK Carry out installation of flow meters / pressure sensors. Installation of flow meter procedure

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

3/4 SafeClaw Anchorage Connectors

3/4 SafeClaw Anchorage Connectors Operations and Instruction Manual Model #4075 Portable Concrete Anchorage Connector ANSI Z359.1-07 5,000 lbs / 22kn OHSA 1910.66 & 1926.502 Effective: 01/2012 Expires: 01/2022 IM-0049 REVA 3/4 SafeClaw

More information

Ground Release Shackle

Ground Release Shackle Operator Manual Subhead Advantages: In the process of installing Slide Rail, the shackle connecting the top of posts, panels, and sheeting must be removed manually. This is normally done by climbing on

More information

Howland LL

Howland LL Howland LL 00181243 1 Table of Contents Page I. Safety Officer 3 II. ASAP Plan Publication 3 III. Emergency Contacts 3 IV. Volunteer Application Process 3 V. Fundamentals Training 3 VI. First Aid Training

More information

THE NATURAL RESOURCES BODY FOR WALES WATER RESOURCES ACT 1991 THE WALES ROD AND LINE (SALMON AND SEA TROUT) BYELAWS 2017

THE NATURAL RESOURCES BODY FOR WALES WATER RESOURCES ACT 1991 THE WALES ROD AND LINE (SALMON AND SEA TROUT) BYELAWS 2017 THE NATURAL RESOURCES BODY FOR WALES WATER RESOURCES ACT 1991 THE WALES ROD AND LINE (SALMON AND SEA TROUT) BYELAWS 2017 The Natural Resources Body for Wales in exercise of powers vested in it by section

More information

Rebreather Training Council Standard

Rebreather Training Council Standard : WARNING - IMPORTANT NOTICE - DISCLAIMER Scuba diving (Recreational and Technical) is a potentially dangerous activity that can result in serious injury and death. Diving with Rebreathers amplify inherent

More information

LESS LETHAL, FLASH SOUND DIVERSIONARY DEVICE, CHEMICAL AGENTS INSTRUCTOR CERTIFICATION COURSE OVERVIEW AND INSTRUCTIONAL GOALS COURSE OVERVIEW

LESS LETHAL, FLASH SOUND DIVERSIONARY DEVICE, CHEMICAL AGENTS INSTRUCTOR CERTIFICATION COURSE OVERVIEW AND INSTRUCTIONAL GOALS COURSE OVERVIEW LESS LETHAL, FLASH SOUND DIVERSIONARY DEVICE, CHEMICAL AGENTS INSTRUCTOR CERTIFICATION COURSE OVERVIEW AND INSTRUCTIONAL GOALS COURSE LENGTH: 40 Hours 5 Days 29 Hours Classroom 11 Hours Practical COURSE

More information

Rules & Regulations on Membership Approved (January 28, 2017) a. Regular Members shall meet all requirements in the ASA By-Laws and the following;

Rules & Regulations on Membership Approved (January 28, 2017) a. Regular Members shall meet all requirements in the ASA By-Laws and the following; 1. Membership Requirements Rules & Regulations on Membership Approved (January 28, 2017) a. Regular Members shall meet all requirements in the ASA By-Laws and the following; i. Must file with the ASA annually

More information

Ministry of Finance Bulletin

Ministry of Finance Bulletin Ministry of Finance Bulletin ISSUED: July 2004 REVISED: July 2014 Bulletin PNG 001 www.fin.gov.bc.ca/rev.htm Royalty Programs for Deep Gas Wells Petroleum and Natural Gas Act Latest Revision: The revision

More information

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge AB Safety Flash IMCA Safety Flash 08/10 December 2010 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been

More information

PRODUCT INSTRUCTION MANUAL. THANK YOU FOR PURCHASING A HANG10 TREESTAND. Our Treestands are proudly Made in America.

PRODUCT INSTRUCTION MANUAL. THANK YOU FOR PURCHASING A HANG10 TREESTAND. Our Treestands are proudly Made in America. 1 PRODUCT INSTRUCTION MANUAL FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR DEATH! THANK YOU FOR PURCHASING A HANG10 TREESTAND. Our Treestands are proudly Made in America. PLEASE

More information

Rigging. Student Booklet

Rigging. Student Booklet Student Booklet Ministry of Education. December 2009. The material was developed for Continuing Education Committee for the building / construction industry and in cooperation with lecturer Ole Østergaard

More information

City of Roseville - Adult Softball League Rules

City of Roseville - Adult Softball League Rules City of Roseville - Adult Softball League Rules Summer, 2014 I. Season Format a. Mens Double Headers - All mens leagues will play a 10 week (20 game) regular season. There will be a regular season and

More information

Made in the USA. For Fall Protection Only. SafeLok Part Description

Made in the USA. For Fall Protection Only. SafeLok Part Description Operations and Instruction Manual SafeLok Anchorage - Model # 4011 IM-0051 REV A Portable Concrete and Steel Anchorage Connector ANSI Z359.1-07 5,000 lbs / 22kn Made in the USA The 3/4 Fall Protection

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK)

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK) Title: Hot Work/Welding Effective Date: 2/6/2013 Control Number: THG_0011 Revision Number: 1 Date: 10/10/2015 Annual Review Completed: 5/13/2015 CONTENTS HOT WORK SAFETY 29 CFR 1910.252 WELDING & CUTTING

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30. OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part 1926.251, 1926.550, 1910.180, 1910.184, 1910.330, & ANSI B30.5, ANSI B30.8) Nearly every project is required to perform some type of rigging

More information

1 SafeClaw Anchorage Connectors

1 SafeClaw Anchorage Connectors Operations and Instruction Manual Model #4077 Portable Concrete Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn OHSA 1910.66 & 1926.502 Effective: 01/2012 Expires: 01/2022 IM-0050 REVA 1 SafeClaw Anchorage

More information

Regulation (EU) 965/2012 on air operations. and related EASA Decisions (AMC&GM and CS-FTL.1)

Regulation (EU) 965/2012 on air operations. and related EASA Decisions (AMC&GM and CS-FTL.1) IR, AMC, GM and CS-FTL.1 Commission Regulation (EU) No 965/2012 on air operations and related EASA Decisions (AMC&GM and CS-FTL.1) Third Edition December 2015 SUBPART E: SPECIFIC REQUIREMENTS SECTION 1

More information

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel. SOP FB-009 (Revised MAR 2014) STANDARD OPERATING PROCEDURES-FLOWBACK Control of Trapped Pressure Section 1.0 Introduction and Background Rockwater Energy Solutions, Inc. (and all its affiliated and subsidiary

More information

Personal Protective Equipment Policy & Procedure

Personal Protective Equipment Policy & Procedure Title: PPE Policy and Procedure Effective Date: 11/17/2014 Control Number: THG_0010 Revision Number: 2 Date: 10/28/2015 Annual Review Completed: 5/13/2015 CONTENTS Personal Protective Equipment Policy

More information

MARIA HF31. SCALE: 1/72 Length: 365 mm width: 85mm height: 295 mm

MARIA HF31. SCALE: 1/72 Length: 365 mm width: 85mm height: 295 mm MARIA HF31 SCALE: 1/72 Length: 365 mm width: 85mm height: 295 mm HISTORY: Maria HF 31 is a fishing Ewer whose home base was Finkenwerder in northern Germany. Maria HF31 operated in the North Sea for more

More information

AltMoC SPO.SPEC.HESLO.100 Standard Operating Procedures

AltMoC SPO.SPEC.HESLO.100 Standard Operating Procedures AltMoC SPO.SPEC.HESLO.100 Standard Operating Procedures STANDARD OPERATING PROCEDURES (a) (b) Before conducting any HESLO, the operator should develop its SOPs taking into account the elements below. Nature

More information

Title: Control of Hazardous Energy Lockout / Tagout Program

Title: Control of Hazardous Energy Lockout / Tagout Program Document Number: P-SF-0000-0008 Issue Date: 05/12/08 Revision Number: original Revision Date: Written By: Scott Cole Bradshaw, Dave Long, Gary Martin, Rick Saari, Al Sumrada, Jack Title: Control of Hazardous

More information

Surface exploration drilling

Surface exploration drilling Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface

More information

Title: Fall Protection Effective Date: 5/20/2006 Control Number: THG_0003 Revision Number: 1 Date: 10/10/2015 Annual Review Completed: 5/13/2015

Title: Fall Protection Effective Date: 5/20/2006 Control Number: THG_0003 Revision Number: 1 Date: 10/10/2015 Annual Review Completed: 5/13/2015 Title: Fall Protection Effective Date: 5/20/2006 Control Number: THG_0003 Revision Number: 1 Date: 10/10/2015 Annual Review Completed: 5/13/2015 Fall Protection CONTENTS I. INTRODUCTION II. PURPOSE III.

More information

INTERNATIONAL CASTING SPORT FEDERATION. International Tournament Rules for Casting sport. Print 2016

INTERNATIONAL CASTING SPORT FEDERATION. International Tournament Rules for Casting sport. Print 2016 1 INTERNATIONAL CASTING SPORT FEDERATION International Tournament Rules for Casting sport ICW Edition: 2015 Print 2016 INTERNATIONAL CASTING SPORT FEDERATION (ICSF) International Tournament Rules for Castingsport

More information

CASH PRIZE SCHEME PREAMBLE

CASH PRIZE SCHEME PREAMBLE 1 SCHEME PREAMBLE The Government through the Ministry of Youth and Sports encourages athletes to achieve the highest level of performance in the international arena. The Cash Prize Scheme is an incentive

More information

European Seniors Basketball Association (ESBA) REGULATIONS for Championship Pula 2018 (edited on March 14, 2018)

European Seniors Basketball Association (ESBA) REGULATIONS for Championship Pula 2018 (edited on March 14, 2018) European Seniors Basketball Association (ESBA) REGULATIONS for Championship Pula 2018 (edited on March 14, 2018) I. GENERAL REGULATIONS 1. The rules of the current Regulations apply for championships organized

More information

ISS Safety Rules. Make safety second nature

ISS Safety Rules. Make safety second nature ISS Safety Rules Make safety second nature 2 ISS SAFETY RULES ISS SAFETY RULES 3 INTRODUCTION We are a company driven by close to 500,000 strong people spread across 77 countries around the globe. And

More information

NRHSAA GIRLS GYMNASTICS

NRHSAA GIRLS GYMNASTICS NRHSAA GIRLS GYMNASTICS 2015-2016 IMPORTANT: The policies that follow are specific to this sport and must be adhered to by every member of the NRHSAA. Each sport policy is numbered. Many of the Policies

More information

2017 T.A.A.F. State Invitational Kickball Tournament (Co-Ed Division)

2017 T.A.A.F. State Invitational Kickball Tournament (Co-Ed Division) 2017 T.A.A.F. State Invitational Kickball Tournament (Co-Ed Division) Entry Packet and Information Hosted by The Colony Parks and Recreation Department 2017 T.A.A.F. Kickball Tournament DATES OF PLAY:

More information

Synchronised Swimming Skill Level 5

Synchronised Swimming Skill Level 5 1 2 3 4 5 6 7 8 9 10 11 Synchronised Swimming Skill Level 5 The must be an Advanced Name. Date Contents Pre requisite: PRE 1 Right Leg over Split on land PRE 2 Left Leg over Split on land 1. Barracuda

More information

Rules & Regulations. January 2011 Yukigassen Canada Inc.

Rules & Regulations. January 2011 Yukigassen Canada Inc. Rules & Regulations Under the guidance, direction and permission from the Showa-Shinzan International Yukigassen, the rules herein are the Official Rules & Regulations for all sanctioned Yukigassen Canada

More information

Please refer to the ISAF website for the details of the submissions on this agenda/referred to in these minutes.

Please refer to the ISAF website   for the details of the submissions on this agenda/referred to in these minutes. Windsurfing & Kiteboarding Committee Agenda The Windsurfing & Kiteboarding Committee will meet at 09:30 13:30 hours on Sunday 4 November 2012 at the Royal St George Yacht Club, Dun Laoghaire, Dublin, Ireland

More information

Fall Protection Checklist. Guardrail System

Fall Protection Checklist. Guardrail System Fall Protection Checklist Location/Department: Date of Inspection: Inspectors: Corrective Actions: Work order/memos were issued: Yes No Date issued: In accordance with the MIOSHA and OSHA standards the

More information

8. Fall Protection Procedures WAC

8. Fall Protection Procedures WAC 1.0 Fall Protection Introduction 8. Fall Protection Procedures WAC 296-155-245 If an employee is exposed to a fall hazard of ten (10) feet or more in height, the employee must use a fall restraint, fall

More information

Databank. India Census 1881

Databank. India Census 1881 Institute for Social and Economic Change 7. Data Available in Microfiche Form: Databank Census of India data from 1871-1951 is available in microfiche form. India Census 1872 Name of the State Vol. Part

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

LCW3-YFFL OFFICIAL RULES

LCW3-YFFL OFFICIAL RULES Revised as of August 14, 2018 2018 Lake Charles Ward 3 Recreation LCW3-YFFL OFFICIAL RULES (The 7/8 Year Old Leagues) These rules and regulations were put in place by the Directors of Ward 3 Recreation.

More information

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 CONTENTS 1. Introduction 2. Definitions and Statements 3. LOLER Considerations

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

Work Standard CABLE PULLING OPERATIONS

Work Standard CABLE PULLING OPERATIONS Page 1 of 19 ****This document supercedes BECo WMS 2.9-1.1**** 1.0 Purpose CABLE PULLING OPERATIONS 1.1 This Work Method Standard prescribes the preferred methods of removing and installing cables between

More information

Premium PowerPoint Presentation. Rigging Review

Premium PowerPoint Presentation. Rigging Review Premium PowerPoint Presentation Rigging Review Chapter 1 Hoisting Safety Review: What about the CG Symmetrical vs. Asymmetrical Balanced and Unbalanced Lifting Lug Hooks Angle Deformation Safety Gates

More information

Worker s Safety Handbook for Rigger and Signalman

Worker s Safety Handbook for Rigger and Signalman Worker s Safety Handbook for Rigger and Signalman Contents Preface 3 Proper Attire for Rigger and Signalman 4 Roles and Responsibilities of a Rigger 5 Good and Bad Rigging Practices 12 Inspection of Hooks

More information

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

Triple Tine Mechanical Grapple

Triple Tine Mechanical Grapple Attachment Solutions Triple Tine Mechanical Grapple Operators Manual KENCO Mechanical Grapple Operation Manual 1 TABLE OF CONTENTS 170 State Route 271 Section I. General Information.... 3 Section II. Safety...

More information

DISCLAIMER & COPYRIGHT CONTENTS

DISCLAIMER & COPYRIGHT CONTENTS DISCLAIMER & COPYRIGHT No part of this publication may be duplicated or edited in any form or by any means, including any type of electronic or mechanical method without prior written permission from ShowTe.

More information

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability. This information paper is to provide minimum guidelines and information of the erection of temporary fencing for the purpose of barricading, delineation of a work area, and for protection of workers from

More information

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents I. Objective II. Policy III. Assignment of Responsibility IV. Training V. Controlled Access Zones VI. Excavations VII. Fall Protection Systems A. Covers B. Guardrail Systems C. Personal Fall Arrest Systems

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

ATTACHMENTS : LANDSCAPE MAPS AND PHOTO ESSAY

ATTACHMENTS : LANDSCAPE MAPS AND PHOTO ESSAY PAERATA - PUKEKOHE STRUCTURE PLAN : BACKGROUND INVESTIGATIONS AND VISUAL ASSESSMENT ATTACHMENTS : MAPS AND PHOTO ESSAY Opus International Consultants Ltd Landscape Architecture and Urban Design Level 3

More information

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile: Project/Contract Contractor Site Address Project Start Date Expected Duration Projected Completion Date Your company details Address Tel: Fax: Mobile: Document Author Authorised by Name Title Signature

More information

Synchronised Swimming Skill Level 3

Synchronised Swimming Skill Level 3 1 2 3 4 5 6 7 8 9 10 11 Synchronised Swimming Skill Level 3 The must be an or Advanced Name. Date Contents Pre requisite; 2 different splits must be shown PRE 1 Right, left or box split PRE 2 Right, left

More information

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6 Samark North Qld Pty Ltd SWMS SWMS No 0 Samark North Qld Pty Ltd ABN : 99 08 98 87 Electrical Contractors License C37 Page of 6 Safe Work Method Statement Title: SWMS:0 INSTALLING LIGHT POLES Work Method

More information

Risk Assessment Form (Qualitative)

Risk Assessment Form (Qualitative) Assessment Form (Qualitative) Project / ocation:..d.a.s WATERS Contract No: RA & Issue No: 008 Prepared by:.r.smit Date: 10/10/16 Signature: ACTIVITY DESCRIPTION: Person (s) at risk: General Ground works

More information

GAS CYLINDERS RULES, 2004

GAS CYLINDERS RULES, 2004 GAS CYLINDERS RULES, 2004 In exercise of the powers conferred by sections 5 and 7 of the Explosives Act, 1884 (4 of 1884) and in suppression of the Gas Cylinders Rules, 1981, except in respect things done

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

POWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment

POWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment Personal Protective Equipment ( PPE ): All PPE worn on IPL job sites must have ANSI and/or approval ratings. Hard hats and safety glasses with side shields (including prescription eyewear) shall be worn

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM 0 Appendix C OCCUPATIONAL SAFETY AND HEALTH PROGRAM LOCKOUT/TAGOUT PROGRAM Hazardous Energy Control Lockout/Tagout Program TABLE OF CONTENTS Section Page I. Purpose and Scope. 1 II. Definitions 1 III.

More information

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , & REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1

More information

SCVAA Senior and Junior Baseball League Rules Updated 3/7/2019

SCVAA Senior and Junior Baseball League Rules Updated 3/7/2019 SCVAA Senior and Junior Baseball League Rules Updated 3/7/2019 SCVAA Senior and Junior League is an association of teams from several area communities including Little Canada, Mahtomedi, Maplewood, Oakdale,

More information

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc. CONSTRUCTION SAFETY PROGRAM FOR Golder Acoustics Inc. TABLE OF CONTENTS Topic... Page Safety and Health Policy... 2 Safety and Health Objectives... 3 Job Site Inspections... 4 Contractor Safety Administrator...

More information

SWLA USSSA BASEBALL RULES AND GUIDELINES Revised 3/17/2014

SWLA USSSA BASEBALL RULES AND GUIDELINES Revised 3/17/2014 SWLA USSSA BASEBALL RULES AND GUIDELINES Revised 3/17/2014 ***These local rules and guidelines are intended to be used in conjunction with USSSA Official Baseball National Bylaws and Rules. See www.swlausssa.com

More information

Apex Evaporator Manual

Apex Evaporator Manual Apex Evaporator Manual Table of Contents I. Handling/Transportation of Apex II. Placing the evaporator III. Connecting Power to the control Panel IV. Placing the control panel and weather station V. Attaching

More information

2015 Fact Sheet Match Day Requirements

2015 Fact Sheet Match Day Requirements 2015 Fact Sheet Match Day Requirements Match day requirements 1. Teams 1. Before the Match (a) The playing teams must be ready within 30 minutes of the scheduled starting time. (rule 72 xv, $100 fine also

More information

Open Volleyball Rules

Open Volleyball Rules Open Volleyball Rules Season League Games are played at the Campus Recreation Center Number of Players: 4 vs. 4 MAXIMUM OF 8 PLAYERS ON A ROSTER 1. GOVERNING RULES a. Situations not specifically covered

More information

Rules of Play March 2, 2018

Rules of Play March 2, 2018 Rules of Play March 2, 2018 Table of Contents I. Definitions... 2 II. Equipment... 3 III. Eligibility... 4 IV. Divisional Eligibility... 5 V. Seasonal Play... 5 VI. WS Berths... 6 VII. WS Berth Tournaments

More information

2018 SUMMER FLAG SESSION

2018 SUMMER FLAG SESSION 2018 SUMMER FLAG SESSION FLAG FOOTBALL RULE BOOK ADOPTED APRIL 2016 (CATAWISSA-CENTRAL-BLOOMSBURG-SOUTHERN) I. GAME 1. At the start of each game, captains from both teams shall meet at midfield for the

More information

Grip-Lock Chock Repair Decision Instructions: Procedure and Examples (June 2013)

Grip-Lock Chock Repair Decision Instructions: Procedure and Examples (June 2013) Grip-Lock Chock Repair Decision Instructions: Procedure and Examples (June 2013) A. Upperside Components All major plastic chock components, namely the Base, Platform, Flip-Face, Cover, Operating Lever

More information

FIREFIGHTER COMBAT CHALLENGE RULES

FIREFIGHTER COMBAT CHALLENGE RULES FIREFIGHTER COMBAT CHALLENGE RULES New Zealand June 2017 INDEX GENERAL RULES... 3 CATEGORIES... 3 ELIGIBILITY... 3 REFUND AND CANCELLATION... 3 CHECK IN... 3 WAIVER AND RELEASE... 4 COMPETITION PROTOCOL...

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

Installation and Training Manual

Installation and Training Manual AirForce1 Tower Kit Installation and Training Manual FuturEnergy Limited Ettington Park Business Centre Stratford upon Avon CV37 8BT +44 (0)1789 451070 Table of Contents Safety Notes... 3 Parts Supplied

More information

Westridge Sponge Hockey League

Westridge Sponge Hockey League 2015-16 Westridge Sponge Hockey League Section 1 - Basic Sponge Hockey Rules a) There shall be no body contact. The players must play the puck, NOT the players, or else penalties will be called at the

More information