1 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect Horizon Power employees and contractors from a potential hazard. Protect the general public from a potential hazard. Prevent the general public from entering a Horizon Power worksite. This instruction does not cover the erection of gantries and scaffolding. Safety Before commencement of work, a risk assessment must be carried out using the Risk Analysis Procedure (OSH ), to identify and document the hazards and risks associated with the task and ensure appropriate control measures are implemented. It is important that, appropriate control measures must be identified, documented and implemented to lessen or control the identified hazards. Instruction The following are examples of where the public may be exposed to hazards: Pedestrian and vehicular traffic through worksites. Reinstatement of walkways, footpaths and nature reserves. Cables protruding from the ground. Excavation work (holes and trenches). Stringing conductors across roadways, un-sealed roads and bush tracks. Access/entry to electrical apparatus. Substation s gates that cannot be locked. Substation s relay room doors that are left open for ventilation, etc. Plant and equipment left unattended e.g. pole top switches, cable drums and transformers, cable poles, generators, cable drum trailers etc. The public must be notified when the erection of temporary safety barriers and/or warning signs restricts them from entering or exiting their property. For planned tasks, a minimum 3 days notice must be given using the Horizon Power - Planned Power Interruption card. For unplanned tasks the property owners/occupiers must be advised of the restricted areas prior to commencing the task. The need for temporary safety barriers and/or warning signs must be established by undertaking an onsite risk assessment with all members of the work crew prior to commencing any task and before leaving a worksite. CS10 # FI 2.15 Temporary Safety Barriers and/or Warning Signs Page 1 of 5

2 Where practicable temporary safety barriers and/or warning signs must be erected around the hazard where the risk assessment identifies a hazard that would put the public at risk of injury or harm. Where this is not practicable, a safety observer must be appointed to prevent the general public from entering the immediate worksite. Where practicable safe access ways through the immediate worksite must be installed to allow the public to enter or exit their properties. Where this is not practicable, members of the public must be escorted through the immediate worksite. Where temporary safety barriers and/or warning signs are used around excavations, they must be placed at a distance, which prevents persons, plant, the temporary safety barriers and/or warning signs or other materials from falling into the excavated area. Installation and Erection The following are examples of the type of temporary safety barriers that may be installed and/or erected: High Visibility Mesh. High Visibility Rope and Flag. Road Safety Barriers. Temporary Fencing. High Visibility Road Traffic Management Cones and Bollards. An appropriate warning/advisory sign(s) may be required to be erected in conjunction with these types of barriers. Walls, fences or other impassable permanent barriers can be used as part of the temporary safety barrier. Where star pickets are used to support temporary barriers or warning sings, they must be driven into the ground firmly to a maximum depth of 600 mm. Care must be taken to avoid driving the star pickets into underground services. The top of the star pickets must be covered to prevent injury. High Visibility Barrier Mesh High visibility barrier mesh is typically used around excavations, live exposed cables etc, to exclude members of the public from entering a hazardous worksite. High visibility barrier mesh must be a minimum height of 900 mm. High visibility barrier mesh must be attached to star pickets, ground screws, freestanding bollards or a suitable permanent support using one of the following methods: Weaving the star picket through the barrier mesh and made secure using a suitable fastener; or Directly against the selected support using a suitable fastener. CS10 # FI 2.15 Temporary Safety Barriers and/or Warning Signs Page 2 of 5

3 To maintain the minimum height of 900mm (to prevent the barrier mesh from falling over), star pickets, ground screws or freestanding bollards must be positioned up to a maximum distance of 2.0 metres apart. High Visibility Flag Rope Barriers High visibility flag rope is typically used to safely guide members of the public through or around a hazardous worksite. High visibility flag rope must be tied to star pickets, ground screws, freestanding bollards or suitable permanent supports or attached to the selected support using a suitable fastener. High visibility flag rope barriers must be positioned between 900mm and 1200mm above the ground. Star pickets, ground screws or freestanding bollards must be positioned up to a maximum distance of 3.0 metres apart to prevent the flag rope from sagging below 900mm. Road Safety Barriers (Concrete) Road Safety Barriers are designed to provide a physical barrier between the travelled way and the work area to inhibit the penetration by an out of control vehicle and will preferably have some vehicle redirecting properties. They are typically used between traffic and a severe hazard such as deep longitudinal excavations for the protection of workers and pedestrians. Road Safety Barriers must be installed where the: Length of excavation is greater than 10m. Duration of exposure is more than 1 day. Depth exceeds 500mm; and The distances from the roadway are less than those shown in Table 1 below. Table 1 Speed (kmh) Distance from Roadway (m) < > The Road Safety Barriers must be offset from the nearest edge of the traffic lane and have a safety space between the Road Safety Barriers and the closest edge of the excavation as shown in Table 2. Table 2 Speed (kmh) Offset (m) Safety Space (m) CS10 # FI 2.15 Temporary Safety Barriers and/or Warning Signs Page 3 of 5

4 Note: Where the nearest edge of the traffic lane is clearly delineated by an edge line, lane line or kerb, the safety space can be taken from the edge line, lane line or kerb. Field Instruction 6.4 Excavation Work and Directional Drilling must be complied with where the Road Safety Barriers are placed in the collapsible area at excavation sites. Plastic Barriers may be used to redirect pedestrian traffic away from a worksite. They must not be installed to provide a physical barrier between the travelled way and the work area. Temporary Fencing Temporary Fencing is used to prevent unauthorised entry to worksites. When installed Temporary Fencing must be at a distance that will not present an additional hazard to the general public. Temporary Fencing must be installed where enclosures are required to prevent unauthorised entry to electrical apparatus, plant and equipment. Temporary fencing must be constructed to a minimum height of 1800 mm, with the panel sections consisting of either: Steel Mesh. Chain Wire. Metal Hoarding. Where access/exit gates have been fitted, they must have suitable provision for locking. Barbed wire extensions may be attached to the top of the temporary fencing for increased security Temporary fencing may be used in conjunction with road safety barriers to protect workers from flying debris in the event of an accident. When used, the fencing must be placed beyond the likely deflection limits of the safety barrier if struck by a vehicle. Warning Signs Temporary warning/advisory signs may be required to be erected in conjunction with temporary safety barriers. The following are examples of warning/advisory signs that may be used on Horizon Power worksites: Power Line Work in Progress. Pedestrians This Way. Do Not Enter. Caution Excavation Work In Progress. Danger High Voltage. Warning/advisory signs must be positioned where they are clearly visible and do not obstruct pedestrians and/or vehicular traffic. All warning/advisory signs must be legible and in good condition. CS10 # FI 2.15 Temporary Safety Barriers and/or Warning Signs Page 4 of 5

5 Reference Occupational Safety & Heath Act 1984 Occupational Safety & Health Regulations 1996 SHMS OSH Job Risk Analysis (JRA) Procedure SHMS OSH Personal Protective Equipment Field Instruction 6.4 Excavation Work and Directional Drilling Field Instruction 2.6 Worksite Clothing / Personal Protective Equipment Requirements Field Instruction 2.15: Temporary Safety Barriers and Warning Signs Field Instruction 2.17 Safe Approach Distances Field Instruction 2.23 Job Hazard and Risk management (JRA) Section 4.6 of Code of Practice for Excavation Barriers and warning signs Utilities Providers Code of Practice for Western Australia Works near Horizon Power Underground and Overhead Networks CS10 # FI 2.15 Temporary Safety Barriers and/or Warning Signs Page 5 of 5

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors 5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors

More information

CITB Construction site safety update

CITB Construction site safety update D: High risk activities Underground and overhead services This text replaces the text from the current GE700 2015, Section D, Chapter D08, Underground and overhead services, pages 133 to 136. 8.6 Overhead

More information

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this

More information

Minimum Safety Requirements for Contractors Working on Railway Property

Minimum Safety Requirements for Contractors Working on Railway Property Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway

More information

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work. 10.6 Management Work Purpose This instruction outlines the minimum requirements for all Horizon Power workers who undertake Management Work. Scope The scope of this instruction is to inform all Horizon

More information

FATAL AND SEVERE RISK PROGRAM

FATAL AND SEVERE RISK PROGRAM FATAL AND SEVERE RISK PROGRAM LEADER SESSION FALL FROM HEIGHTS Only do the task if it can be done safely FALL FROM HEIGHTS OUR COMMITMENT LIFE SAVING BEHAVIOUR: I WILL ALWAYS USE ADEQUATE PROTECTION WHERE

More information

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

WORKSITE TRAFFIC MANAGEMENT

WORKSITE TRAFFIC MANAGEMENT SECTION 3 It is the intention of this section of the Fieldworkers Handbook to provide high level traffic management guidance to employees and contractors of Victorian electrical distributions companies

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

Fall Protection Resource Guide P AGE 1

Fall Protection Resource Guide P AGE 1 Fall Protection Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M Fall Protection 29 CFR 1910.66 Appendix C 29 CFR 1926 Subpart M Duty to Have Fall Protection Provide fall protection systems which meet the criteria of 1926 and 1910 Make fall protection an integral part

More information

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling Stage) June 2013 Document Reference GWF R24 070613 Galloper

More information

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability. This information paper is to provide minimum guidelines and information of the erection of temporary fencing for the purpose of barricading, delineation of a work area, and for protection of workers from

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

Barricades and Falling Object Protection Plans

Barricades and Falling Object Protection Plans Title: Barricades and Falling Object Protection Plans Freeport Site Function: Environmental, Health & Standard No.: BCF020.042 Rev 7 Page: 1 of 7 REVISION HISTORY Date Revision Number Details of Change

More information

Global EHS Powered Industrial Truck and Pedestrian Safety

Global EHS Powered Industrial Truck and Pedestrian Safety Global EHS Powered Industrial Truck and Pedestrian Safety Control No: Policy Name: Powered Industrial Truck and Pedestrian Safety Policy Responsible Corporate Function/Business Segment: Global Environmental

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Vacuum Excavation in the vicinity of the Wellington Electricity Network Vacuum Excavation in the vicinity of the Network. Document no: ENG-116 Document Rev: 1 Issue Status: Final Issue Date: 14/05/2015 Page 1 of 9 Contents 1. PURPOSE... 3 2. POLICY... 3 3. SCOPE... 3 4. REFERENCES...

More information

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with? 1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?

More information

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version. SASKPOWER TRAFFIC CONTROL PLANNING GUIDELINES INTRODUCTION page 3 DEFINITIONS page 3 PLANNING AND PREPARATION page 6 Pedestrian Safety within an Active Work Area page 7 Excavations page 8 Partial Lane

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Planning and Transportation Committee Report No. 5, Clause No. 9, as adopted by City of Toronto Council on June 7, 8 and 9, 2000 Enacted by Council: June 8, 2000 CITY OF TORONTO BY-LAW No. 394-2000

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

GUIDELINE: Roadside Worksites

GUIDELINE: Roadside Worksites Title: GUIDELINE: Roadside Worksites Version 1.0 Short description Relevant to Authority Responsible officer Responsible office A guideline on ensuring a safe method of works on or near roadways within

More information

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents I. Objective II. Policy III. Assignment of Responsibility IV. Training V. Controlled Access Zones VI. Excavations VII. Fall Protection Systems A. Covers B. Guardrail Systems C. Personal Fall Arrest Systems

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0 Whaley Steel Corp Environment, Health & Safety Manual Section-3.0 Title- Fall Protection Effective Date: 03 Jan 14 Revision-0 1.0 PURPOSE 1.1 The purpose of the fall protection program is to: ensure all

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Written Program. For. Fall Protection. <<Company Name>> <<911 Address>> <<City, state, zip code>>

Written Program. For. Fall Protection. <<Company Name>> <<911 Address>> <<City, state, zip code>> Written Program For Fall Protection Table of Contents Purpose.. Page 1 Policy.. Page 1 Definitions. Page 1 Fall Protection Program Responsibilities

More information

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings CIRCULAR NO. O-13 Recommended Practices for Manual Protection of Highway/Railway Grade Crossings Effective: October 1, 2004 CONTENTS 1. SCOPE 2. GENERAL PRINCIPLES 3. DEFINITIONS 4. PROTECTION REQUIRED

More information

PROCEDURES FOR STANDBY

PROCEDURES FOR STANDBY 1 SCOPE This Procedure details both the circumstances in which standby shall be provided and the responsibilities borne by the Standby Man in such circumstances. 2 ISSUE RECORD This is a maintained/controlled

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CONTROL OF TRAFFIC C201 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C201 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS

More information

(1) Minimum Required. At least one entrance of sufficient area shall be provided to

(1) Minimum Required. At least one entrance of sufficient area shall be provided to (B) Clear Spaces. Working space required by this section shall not be used for storage. When normally enclosed live parts are exposed for inspection or servicing, the working space, if in a passageway

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Flagpersons play an important role in the high level of traffic safety expected through work zones on Saskatchewan highway projects. Flagpersons are

More information

Contractors' Code of Safe Practice

Contractors' Code of Safe Practice Contractors' Code of Safe Practice Introduction As the controller of premises, The University of Hong Kong has a duty to ensure, so far as is reasonably practicable, the health and safety of all its employees,

More information

THE CORPORATION OF THE TOWN OF GREATER NAPANEE BY-LAW NO

THE CORPORATION OF THE TOWN OF GREATER NAPANEE BY-LAW NO THE CORPORATION OF THE TOWN OF GREATER NAPANEE BY-LAW NO. 98-42 Being a By-law prescribing the height and description of, and the manner of erecting and maintaining fences and gates around privately owned

More information

Risk Control at United Fire Group

Risk Control at United Fire Group In the United States, falls are the leading cause of fatalities on a construction site. Employers and employees need to do the following: Where protection is required, select fall protection systems appropriate

More information

Best Practice #207. Facility: Entire DOE Complex. Best Practice Title: Identification of Look-Alike Electrical Equipment

Best Practice #207. Facility: Entire DOE Complex. Best Practice Title: Identification of Look-Alike Electrical Equipment Best Practice #207 Facility: Entire DOE Complex Best Practice Title: Identification of Look-Alike Electrical Equipment Point of Contact: Stephanie Collins, LBNL, SLCollins@lbl.gov, 510-486-4914; Mark Mathews,

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL SECTION 900 TRAFFIC CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL Section Number Title 901 GENERAL 902 MATERIALS, EQUIPMENT, AND

More information

GAS PIPELINE SAFETY GUIDE.

GAS PIPELINE SAFETY GUIDE. GAS PIPELINE SAFETY GUIDE. Date of issue 27/02/2017 Date of next review 27/02/2018 Page 1 Vector Limited 2017 Gas Pipeline Safety Guide February 2017 CONTENTS CONTENTS...2 WORKING SAFELY... 3 Your Legal

More information

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY Revised: February 2004 TABLE OF CONTENTS I. Introduction.. -4- II. Definition of a Confined Space -4- III. Responsibilities -5- A. University of Notre

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

Swimming Pool Requirements

Swimming Pool Requirements Swimming Pool Requirements 8040 S. 6th Street Oak Creek, WI 53154 (414) 766-7000 www.oakcreekwi.org Revised: August 8. 2017 PERMITS A permit from the Inspection Department is required prior to putting

More information

Excavations and Trenches

Excavations and Trenches Purpose Excavation and trenching are among the most hazardous work activities undertaken by the TNRD. This document outlines general requirements and specific safe work procedures to ensure the health

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

Underground Mine Signs Guideline Underground Fires Major Hazard Standard

Underground Mine Signs Guideline Underground Fires Major Hazard Standard WMC Environment, Health & Safety Management System Guideline Underground Fires Major Hazard Standard MHS-02 DocsOpen Ref: 57228, 01/03/2001 Uncontrolled copy check web for latest revision Revision Reviewed

More information

(Health, Safety, and Welfare)

(Health, Safety, and Welfare) An Appreciation of The Construction (Health, Safety, and Welfare) Regulations 1996 Course Notes Mark Mallen Health and Safety Manager Fenlock Hansen Ltd October 2002 The Construction Regs 1996: Version

More information

SWIMMING POOL REQUIREMENTS

SWIMMING POOL REQUIREMENTS PERMITS A permit from the Inspection Department is required prior to putting up a permanent pool. A permit is required for permanent pools, such as the following: SWIMMING POOL REQUIREMENTS The pool is

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

1.0 Scope and Application

1.0 Scope and Application 1.0 Scope and Application This policy contains safety requirements to protect employees from falls of six (6) feet or more when performing elevated work except on ladders and scaffolding (See Ladders and

More information

Temporary Vehicle Restraint System Policy

Temporary Vehicle Restraint System Policy Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction

More information

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Appendix H Specific Excavation Requirements This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Surface encumbrances All surface encumbrances

More information

CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations

CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations April 2015 Page 6D-1 CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations 01 A wide range of pedestrians might be affected by TTC zones, including the young, elderly, and people

More information

Residential Swimming pools

Residential Swimming pools City of Republic Community Development Department Residential Swimming pools REVISION DATE: JANUARY 2017 Swimming Pool Safety Definitions: Barrier Requirements: A) Application All swimming pools over 24

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE

INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE Dan Sharina (Building Official) (519) 856-9596 ext. 117 dsharina@get.on.ca www.get.on.ca All Drawings submitted for building permit must

More information

SECURITY ARRANGEMENTS

SECURITY ARRANGEMENTS Security Arrangements :: 43 7 SECURITY ARRANGEMENTS 7.1 INTRODUCTION The precautions taken to prevent the possibility of accidents is called Security Arrangements. In this lesson you will know about the

More information

Field Instruction Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas

Field Instruction Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas 6.14 Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas Purpose Describe the minimum requirements for safe handling, storage, maintenance, repair, transport and disposal of equipment

More information

CONTRACTOR SAFETY RULES

CONTRACTOR SAFETY RULES CONTRACTOR SAFETY RULES CONTRACTOR SAFETY RULES AND REGULATIONS This manual sets forth policy with regards to contractor safety. Each Quinn facility consists of one or several diverse operations under

More information

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs November December

More information

Safety Essentials. Mandatory rules for our high risk activities

Safety Essentials. Mandatory rules for our high risk activities Mandatory rules for our high risk activities Remember... Only undertake activities for which you are trained, competent and authorised to do Before you start a job take a step back, think about all the

More information

Loss Control Alert. Preventing Falls in the Construction Industry

Loss Control Alert. Preventing Falls in the Construction Industry Loss Control Alert Preventing Falls in the Construction Industry Falls from heights are the leading cause of fatalities among construction workers. The Occupational Safety and Health Administration (OSHA)

More information

Right of Way Construction Activity Manual Activity Manual

Right of Way Construction Activity Manual Activity Manual Strathcona County Right of Way Construction Right-of-Way Activity Manual Construction Activity Manual Further information: Transportation and Agriculture Services 780-417-7100 www.strathcona.ca/rowcap

More information

Fall Protection Program

Fall Protection Program Page 1 of 13 Sect: 1.0 Purpose The purpose of the fall protection program is to: o Ensure all work areas are free from uncontrolled fall hazards. o Ensure all employees are properly trained in fall prevention

More information

Risk assessment part 1 of 3

Risk assessment part 1 of 3 Risk assessment part 1 of 3 All exhibitors MUST complete all sections. Emergency information The AA s National Amenity Arboriculture Conference 2018 9 12 September 2018 LOCATED AT: University of Exeter,

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY WORK AREA PROTECTION PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY WORK AREA PROTECTION PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 1 EMPLOYEE TRAINING 2 GENERAL REQUIREMENTS 3 Barriers - Overview 3 Barricade Tape - Overview 3 Hazard Protection 3 Hazard Communication

More information

Our commitment to safety

Our commitment to safety 2 Our commitment to safety At South East Water, we have an absolute commitment to achieving and maintaining a safe and healthy workplace for our people, including our contractors and stakeholders which

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

Imhoff Custom Services Inc.

Imhoff Custom Services Inc. Imhoff Custom Services Inc. Fall Protection Program Falls are the leading cause of deaths in construction situations and account for about one third of all fatalities. These falls and deaths involve a

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

AMITY TWP POOL REQUIREMENTS

AMITY TWP POOL REQUIREMENTS AMITY TWP POOL REQUIREMENTS Construction In-ground, Above-ground and Storable pools and Spas shall be designed and constructed in conformance with International Swimming Pool & Spa Code (ISPSC) Location

More information

APPENDIX A. Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows

APPENDIX A. Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows APPENDIX A Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows 1. In general, fall protection must be provided to construction workers who are

More information

TRAFFIC ACCOMMODATION IN WORK AREAS

TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS Copyright 2005 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Cable Pitch Removal D 10715491 Approved by anager, Work Practices Review team SWS Development Approval date October 2015 Qualifications/icences

More information

Safe Working On Roads Standard Operating Procedures

Safe Working On Roads Standard Operating Procedures Safe Working On Roads Standard Operating Procedures Operational Management Procedures Page 1 of 15 Safe Working on Roads SOPs Prepared by State Operations NSW Rural Fire Service 15 Carter Street, Lidcombe

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if 1 Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) 477-5050, even if there is no apparent damage. Call 911 if gas is blowing

More information

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA 1910.269: Electric Power Generation, Transmission, and Distribution Region IV - OSHA Scope This standard covers the operation and maintenance of electric power generation, control, transformation transmission,

More information

TRAFFIC CONTROL DEVICES

TRAFFIC CONTROL DEVICES TRAFFIC CONTROL DEVICES SIGNS Temporary traffic control work zone signs include regulatory, warning and guide signs utilized to provide regulations, warnings and guidance information to road users impacted

More information

8. Fall Protection Procedures WAC

8. Fall Protection Procedures WAC 1.0 Fall Protection Introduction 8. Fall Protection Procedures WAC 296-155-245 If an employee is exposed to a fall hazard of ten (10) feet or more in height, the employee must use a fall restraint, fall

More information

OSHA Federal Standards October 1, 2016 September 30, 2017

OSHA Federal Standards October 1, 2016 September 30, 2017 OSHA Federal Standards October 1, 2016 September 30, 2017 29 CFR 1926 SUBPARTS 29 CFR 1926. C M L L E M M E X M MOST FREQUENTLY CITED SERIOUS VIOLATIONS IN CONSTRUCTION 2017.501(b)(13) FALL PROTECTION

More information

TLILIC2001 Licence to Operate a Forklift Truck

TLILIC2001 Licence to Operate a Forklift Truck Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed

More information

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Teviot Street, Appleby, Invercargill Outside #11 L1 50 -

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Teviot Street, Appleby, Invercargill Outside #11 L1 50 - TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM Organisation/ TMP reference TMP reference: UCG 23600 Contractor (Working space / TTM): Foveaux Communications Ltd Contractor: Principal: Chorus RCA: Invercargill

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Policy Statement. Objective. Context. References and Supporting Documentation

Policy Statement. Objective. Context. References and Supporting Documentation Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

Self Inspection Checklist

Self Inspection Checklist Self Inspection Checklist Name: Date: Job Name: Title: Time: Job Number: Instructions: Review each lettered subpart under each section that you are responsible for completing. If you have inspected all

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Low Voltage Electricity System Safety Rules & Associated Safety Guidance Annex J To Loughborough University Facilities Management (FM) Health and Safety Policy Low Voltage Electricity System Safety Rules & Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

A. Employer Provide fall protection to effected employees Ensure that all employees understand and adhere to the procedures of this plan

A. Employer Provide fall protection to effected employees Ensure that all employees understand and adhere to the procedures of this plan SECTION 10: FALL PROTECTION PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

Safety Inspection Report #002 for April 21, Gramatan Avenue, Mount Vernon, NY. Exterior Safety, Standpipe, and Pedestrian Safety

Safety Inspection Report #002 for April 21, Gramatan Avenue, Mount Vernon, NY. Exterior Safety, Standpipe, and Pedestrian Safety New York Connecticut New Jersey Florida Client: Curtis J. Woods, P.E. Commissioner Department of Buildings City of Mount Vernon 1 Roosevelt Square Mount Vernon, New York 10550 (914) 665-2660 Fax (914)

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work Method Statement Task details Description Install and Maintain V Overhead Equipment and Associated ardware (de-energised) DM 10716988 Approved by Manager, Work Practices Review

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Substation aintenance D 10721527 Approved by anager, Work Practices Review team SWS Development Approval date October 2015 Qualifications/icences

More information

RESIDENTIAL SWIMMING POOL

RESIDENTIAL SWIMMING POOL MAIL PICK-UP A. SWIMMING POOL PERMIT TYPE ABOVE-GROUND POOL B. IDENTIFICATION PROJECT LOCATION (ADDRESS): NORTH WHITEHALL TOWNSHIP 3256 LEVANS ROAD, COPLAY, PA 18037 610-799-3411 610-799-9629 FAX www.northwhitehall.org

More information