1 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose of this instruction is to specify the minimum requirements and methodology for testing and recording soil compaction results using a Penetrometer. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. Safety Before commencement of work, a risk assessment must be carried out using the Risk Analysis Procedure (OSH ), to identify and document the hazards and risks associated with the task and ensure appropriate control measures are implemented. It is important that, appropriate control measures must be identified, documented and implemented to lessen or control the identified hazards. The cable location must be identified and controls put in place to ensure that the electrical cable(s) are not damaged prior to commencing the soil compaction tests of the first layer of soil laid over a cable. All trenches left open shall be securely barricaded in accordance with Field Instruction FI 2.15 Temporary Safety Barriers and/or Warning Signs. Instruction The following penetrometers may be used as a means of testing the level of compaction of backfill: Perth Penetrometer: The Perth Penetrometer has a flat ended rod driven by a 9 kg mass, dropping 600 mm. (See Fig. 1 for picture of Perth Penetrometer). Note: The Perth Penetrometer method is limited to granular soils with a maximum particle size not exceeding 2 mm and requires the first layer of soil to be a minimum of 500 mm to complete the tests. Dynamic Cone Penetrometer: The Dynamic Cone Penetrometer has a steel cone ended rod driven by a 9 kg mass, dropping 510 mm. (See Fig. 2 for picture of Dynamic Cone Penetrometer) Number of Test Compaction testing of backfill materials shall be done along the length of the trench or excavation. Each backfill layer of 300 mm (excluding bedding sand) must be compaction tested at a minimum rate of one (1) test every 15 metres, at each driveway, road crossing and at each side of any structure. CS10 # FI 5.23 Soil Compaction Testing Requirements Page 1 of 5

2 The evaluation criteria are a pre-determined number of blows which is required to drive the Penetrometer 300 mm above the Flat Ended or Cone Ended rod. The minimum number of blows for the various soil types is listed in Table 1 (below). Table 1 No. of Blows Sand Silty-clay Stone-based Note: These figures are based on 90% relative compaction (or higher) of the surrounding soil. Test Procedure Material such as crushed rock, large gravel, root, organic matter or any other unfavourable material shall be removed as it will be difficult for the Penetrometer to penetrate and could also damage the electrical cable(s). The depth from ground level to the surface level of each layer to be tested must be measured to the nearest 10 mm and recorded on the Compaction Test Certificate (see Fig. 3). The Penetrometer must be held perpendicular with the tip on the surface of the layer to be tested. Note: When using the Perth Penetrometer gently tap the hammer on the anvil until a penetration of 150 mm is achieved. If using the Dynamic Cone Penetrometer gently tap the hammer until the cone has started to penetrate the surface. Raise the hammer to the stop and allow it to fall freely onto the anvil and count the number of blows required to drive the Penetrometer a distance of 300 mm. For a Perth Penetrometer, total penetration of 450 mm must include initial 150 mm. Note: The interpretation of results must be as specified in the relevant construction standard or contract applicable to the work undertaken. References Occupational Safety & Heath Act 1984 Occupational Safety & Health Regulations 1996 SHMS OSH Job Risk Analysis (JRA) Procedure SHMS OSH Personal Protective Equipment Field Instruction 2.6 Worksite Clothing / Personal Protective Equipment Requirements Field Instruction 2.23 Job Hazard and Risk Management (JRA) Field Instruction 2.15 Temporary Safety Barriers and / or Warning Signs CS10 # FI 5.23 Soil Compaction Testing Requirements Page 2 of 5

3 Fig. 1 Perth Penetrometer CS10 # FI 5.23 Soil Compaction Testing Requirements Page 3 of 5

4 Fig. 2 - Dynamic Cone Penetrometer CS10 # FI 5.23 Soil Compaction Testing Requirements Page 4 of 5

5 Fig. 3 Compaction Test Certificate CS10 # FI 5.23 Soil Compaction Testing Requirements Page 5 of 5

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005 TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 1.0 OVERVIEW This safety policy provides guidance for conducting trenching and excavation activities at project sites. Emphasis is placed on sloping

More information

Dynamic Cone Penetrometer SL970. Impact Test Equipment Ltd & User Guide. User Guide

Dynamic Cone Penetrometer SL970. Impact Test Equipment Ltd  &  User Guide. User Guide Dynamic Cone Penetrometer SL970 Impact Test Equipment Ltd www.impact-test.co.uk & www.impact-test.com User Guide User Guide Impact Test Equipment Ltd. Building 21 Stevenston Ind. Est. Stevenston Ayrshire

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 240-20 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description This method describes the test used to evaluate the thickness and bearing capacity of the subbase and subgrade using the Dynamic

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors 5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors

More information

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Vacuum Excavation in the vicinity of the Wellington Electricity Network Vacuum Excavation in the vicinity of the Network. Document no: ENG-116 Document Rev: 1 Issue Status: Final Issue Date: 14/05/2015 Page 1 of 9 Contents 1. PURPOSE... 3 2. POLICY... 3 3. SCOPE... 3 4. REFERENCES...

More information

Geotechnical Engineering Laboratory CIVIL ENGINEERING VIRTUAL LABORATORY Experiment no 8 Standard Penetration Test

Geotechnical Engineering Laboratory CIVIL ENGINEERING VIRTUAL LABORATORY Experiment no 8 Standard Penetration Test OBJECTIVE To determine the Bearing Capacity of the soils. SCOPE This method describes the standard penetration test using the split-spon sampler to obtain the resistance of soil to penetration (N-value),

More information

Specifier Note: Retain or delete material(s) below to conform to project requirements.

Specifier Note: Retain or delete material(s) below to conform to project requirements. SECTION 32 15 40 DECOMPOSED GRANITE SURFACING NOTE: These specifications were current at the time of publication but are subject to change at any time without notice. Please confirm the accuracy of these

More information

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this

More information

EUROFLO CULVERT PIPE. Fittings / Pipes

EUROFLO CULVERT PIPE. Fittings / Pipes EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 520-250-RBR 520-315-RBR 520-400-RBR 520-500-RBR 520-630-RBR

More information

Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials

Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials This unit covers the requirements that you must meet when monitoring the reinstatement of sub-base and base. You must ensure that you act in accordance with all current specifications and procedures and

More information

Field Instruction Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas

Field Instruction Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas 6.14 Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas Purpose Describe the minimum requirements for safe handling, storage, maintenance, repair, transport and disposal of equipment

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

Reinstatement of sub-base and base (roadbase) in non-bituminous materials This unit covers the requirements that you must meet when reinstating sub-base and base (roadbase) in. You must ensure that you act in accordance with all current specifications and procedures and that

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Appendix A Test Pit Logs

Appendix A Test Pit Logs Appendix A Test Pit Logs Pit number : Test Pit 1 Depth Geological Description Scala Penetrometer (mm) 0-200 Light brown silty Topsoil with some gravel 200-400 Fine to medium GRAVEL; grey. Loosely packed;

More information

EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD)

EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD) 1.0 OBJECTIVE EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD) To determine the in-situ density of fine and medium rained soil. 2.0 INTRODUCTION In most specifications

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements 2.6 Wksite Clothing - Personal Protective Equipment (PPE) Requirements Purpose This Field Instruction describes the selection use maintenance of approved Personal Protective Equipment (PPE) f all Hizon

More information

Turf-Tec Penetrometer Instructions

Turf-Tec Penetrometer Instructions Turf-Tec Penetrometer Instructions The Turf-Tec Penetrometer is a professional instrument to determine soil compaction. The Turf-Tec Penetrometer is a necessary tool to help determine problems before they

More information

Soils for civil engineering purposes

Soils for civil engineering purposes BRITISH STANDARD BS 1377-9: 1990 Incorporating Amendments Nos. 1 and 2 Methods of test for Soils for civil engineering purposes Part 9: In-situ tests ICS 93.020 Committees responsible for this British

More information

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work. 10.6 Management Work Purpose This instruction outlines the minimum requirements for all Horizon Power workers who undertake Management Work. Scope The scope of this instruction is to inform all Horizon

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 Scope This procedure covers the determination of density, moisture content, and relative compaction

More information

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical

More information

CONE PENETRATION TESTS

CONE PENETRATION TESTS February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme

More information

SafetyBuletin. Se ingoutriggerstopreventaccidents

SafetyBuletin. Se ingoutriggerstopreventaccidents SafetyBuletin Se ingoutriggerstopreventaccidents Safety Bulletin This document is intended to supplement but not supersede the manufacturer s applicable insrtuctions. Copyright 2010 ACPA All rights reserved

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

Siting and Installation Manual

Siting and Installation Manual Siting and Installation Manual B-Series Advanced Wastewater Treatment Units Revolutionary Waste Treatment Advanced Wastewater Treatment Units (ATUs) that deliver an unsurpassed performance at an unbeatable

More information

STEEL TRENCH SHIELDS DW MODELS

STEEL TRENCH SHIELDS DW MODELS STEEL TRENCH SHIELDS DW MODELS 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Phone: 713.943.0750 Toll Free: 800.231.6662 Fax: 713. 943.8483 COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 2009 April 16,

More information

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements 2.6 Wksite Clothing - Personal Protective Equipment (PPE) Requirements Purpose This instruction describes the selection use maintenance of approved Personal Protective Equipment (PPE) f all Hizon Power

More information

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE 1 1) INTRODUCTION 2) THE UNFAIR ADVANTAGE and Stingray earth anchors are driven tipping plate soil anchors for reaction of tensile loads. anchors have ultimate capacities up to 20 tons, and Stingray anchors

More information

Dig safely. Measures to avoid injury and damage to gas pipes

Dig safely. Measures to avoid injury and damage to gas pipes Dig safely Measures to avoid injury and damage to gas pipes The following protective and precautionary measures MUST be taken when working in the vicinity of gas mains and services. It is the responsibility

More information

MIRABAY PILOT PROJECT REPORT

MIRABAY PILOT PROJECT REPORT MIRABAY PILOT PROJECT REPORT 9/25/2014 By: Ingenium, Inc./Carl A. Hazenberg, P.E. Seawalls along the MiraBay canal system started experiencing problems shortly after construction. Following the issues,

More information

CS10 # Network Safety Performance Objectives (2016)

CS10 # Network Safety Performance Objectives (2016) CS10 #4384287 Network Safety Performance Objectives (2016) Context & Purpose The Horizon Power Network Safety Objectives (2016) (Objective Statement) has been prepared for each of network safety performance

More information

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*) National Unit specification: general information Unit title: Excavation in the Road/Highway Unit code: F933 04 Superclass: TL Publication date: October 2014 Source: Version: Scottish Qualifications Authority

More information

Minimum Safety Requirements for Contractors Working on Railway Property

Minimum Safety Requirements for Contractors Working on Railway Property Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway

More information

Technical Test Theory Crawler - Tractor/Dozer A34

Technical Test Theory Crawler - Tractor/Dozer A34 1 What THREE things should be checked out before carrying out embankment work? 2 How can a qualification or card benefit a plant operator? 3 What is a possible effect on the undercarriage when reversing

More information

INSTALLING SUBAQUEOUS PIPE

INSTALLING SUBAQUEOUS PIPE 08 ACPPA TECHNICAL SERIES INSTALLING SUBAQUEOUS PIPE Subaqueous installation is usually associated with open waters, such as oceans, lakes, or rivers. Access can be achieved with conventional land-based

More information

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) Release: 1 TLILIC2005A Licence to operate a boom-type elevating work platform (boom length 11 meters or

More information

EUROFLO CULVERT PIPE. Fittings / Pipes

EUROFLO CULVERT PIPE. Fittings / Pipes EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 160 OD 200 OD 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 1550 OD 1750 OD 1950 OD 520-160-RBR 520-200-RBR

More information

Reinstatement in hot-lay bituminous materials

Reinstatement in hot-lay bituminous materials This unit covers the requirements that you must meet when reinstating hot-lay bituminous materials in the highway. You must ensure that you act in accordance with all current specifications and procedures

More information

Civil Application Solutions

Civil Application Solutions Civil Application Solutions Features - Chiseled Cutting Edges - Increased Surface Area - Lateral Direction Guide Ribs Benefits - Faster Installation and Penetrates Harder Soils - Quicker Loading, Stronger

More information

Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty

Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty Geotechnical Safety and Risk V T. Schweckendiek et al. (Eds.) 2015 The authors and IOS Press. This article is published online with Open Access by IOS Press and distributed under the terms of the Creative

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 Scope ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 SCOPE This test procedure describes the method of determining the required minimum number of "passes" with approved compaction equipment,

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Venue Name / Location Complex Esportiu - Futbal Salou Report Number R A1. Primary Sport(s) Football

Venue Name / Location Complex Esportiu - Futbal Salou Report Number R A1. Primary Sport(s) Football Labosport ScorePlay Venue Name / Location Complex Esportiu Futbal Salou Report Number R16080A1 Client Surface Type Josep Palau Hybrid Surface Construction Palau Sport Turf Primary Sport(s) Football Category

More information

Method statement for. The installation of. Precast Concrete Piles. (Site Name).

Method statement for. The installation of. Precast Concrete Piles. (Site Name). Method statement for The installation of Precast Concrete Piles At (Site Name). 1 of 5 Standard Operating Procedures for Pile Driving. This method statement will outline how the authorised/ competent operatives

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

Gourock Golf Club. Report on Proposed Course Improvement Works. 11th April 2016

Gourock Golf Club. Report on Proposed Course Improvement Works. 11th April 2016 Gourock Golf Club Report on Proposed Course Improvement Works Present Hugh Logue - Course Manager 11th April 2016 Jay Dobson - Consultant Turfgrass Agronomist Perspective Gourock Golf Club like many in

More information

GOM Diving Safety Work Group

GOM Diving Safety Work Group GOM Diving Safety Work Group COMMITTEE WORK GROUP Underwater Excavation with Hand Jetting July 14, 2015 DISCLAIMER This US GOM DSWG document is not meant to be all inclusive, and not every rule and regulation

More information

Flowtite GRP manholes Installation Manual

Flowtite GRP manholes Installation Manual Flowtite GRP manholes Installation Manual Technical Documentation 09-18 EN V2 0 Contents 1 Introduction 03 1.1 Foreword 03 1.2 Safety 03 1.3 Material 03 2 Shipping, Handling and Storage 04 2.1 Inspection

More information

Richards Bay Coal Terminal

Richards Bay Coal Terminal Text Leon Goussard Manager Port Infrastructure Transnet National Ports Authority Port of Richards Bay leon.goussard@transnet.net Railway and harbour engineering New berth 306 expands capacity of Richards

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Use of Plasterers Stilts

Use of Plasterers Stilts Use of Plasterers Stilts Purpose The purpose of this Guidance Note is to provide builders, plastering contractors, employers and users of stilts with health and safety guidance on the use of stilts in

More information

Excavation and Trenching

Excavation and Trenching Excavation and Trenching An excavation is defined as any man-made cut, cavity, trench, or depression in the earth s surface formed by earth removal. Trenches are narrow, underground excavations that are

More information

SILICA EXPOSURE CONTROL PLAN

SILICA EXPOSURE CONTROL PLAN SILICA EXPOSURE CONTROL PLAN June 2017 Contents Purpose... 3 Scope... 3 Responsibilities... 3 Program Requirements... 4 Initial Exposure Assessment... 4 Periodic Exposure Assessment... 5 Employee Notification...

More information

2. True or False: Inhaling very small crystalline silica can be hazardous to employee health.

2. True or False: Inhaling very small crystalline silica can be hazardous to employee health. COMPETENT PERSON TEST 1. True or False: Crystalline silica is a common mineral that occurs in many naturally occurring and man-made materials used at construction sites. 2. True or False: Inhaling very

More information

Lesson 8 Piles Bearing & Acceptance Transcript. Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance.

Lesson 8 Piles Bearing & Acceptance Transcript. Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance. Lesson 8 Piles Bearing & Acceptance Transcript Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance. To begin, select the start button or press Shift+N on your keyboard.

More information

Special Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following:

Special Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following: SUPPLY EQUIPMENT FOR DRIVING PILES - Item No. SUPPLY EQUIPMENT FOR INSTALLING CAISSON PILES - Item No. SUPPLY EQUIPMENT FOR INSTALLING DISPLACEMENT CAISSON PILES - Item No. SHEET PILES - Item No. H-PILES

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Proper Operation of Heath Consultants Incorporated Plunger Bar

Proper Operation of Heath Consultants Incorporated Plunger Bar Proper Operation of Heath Consultants Incorporated Plunger Bar Heath Consultants Incorporated 9030 Monroe Road Houston, TX 77061 (800) HEATH-US www.heathus.com Notice The contents of this manual are proprietary

More information

Engineers Without Borders Bridge Site Assessment in Bolivia

Engineers Without Borders Bridge Site Assessment in Bolivia Engineers Without Borders Bridge Site Assessment in Bolivia Focus on Engineering Data Patrick Ye, Matt Ball, Ben Gagne, Russell Glorioso, Thomas Grothe Background The idea of building a bridge in Bolivia

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE Registered Charity No. 1096429 STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS

More information

SAFETY HANDBOOK. Working around. natural gas pipelines. works for your safety. Reprinted with permission from ATCO Gas.

SAFETY HANDBOOK. Working around. natural gas pipelines. works for your safety. Reprinted with permission from ATCO Gas. SAFETY HANDBOOK Working around natural gas pipelines works for your safety Reprinted with permission from ATCO Gas. ENSTAR Natural Gas Company provides natural gas service through 3,580 miles of gas mains

More information

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

Density of Granular Material by Modified Sand-Cone Method for Thin Layers Density of Granular Material by Modified Sand-Cone Method for Thin Layers 1. Scope: This test is for determining in-place density of granular materials that have a total thickness of 3 or less. 2. Apparatus:

More information

"DW" TRENCH SHIELDS "SP" TRENCH SHIELDS "TL" TRENCH SHIELDS "SW" TRENCH SHIELDS MANHOLE SHIELDS

DW TRENCH SHIELDS SP TRENCH SHIELDS TL TRENCH SHIELDS SW TRENCH SHIELDS MANHOLE SHIELDS "DW" TRENCH SHIELDS "SP" TRENCH SHIELDS "TL" TRENCH SHIELDS "SW" TRENCH SHIELDS MANHOLE SHIELDS DETAILED SPECIFICATIONS (sample) ASSEMBLY AND INSTALLATION PROCEDURES MANUFACTURE S TABULATED DATA 3330 S.

More information

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination

More information

A Slipway Structure for River Ship Repair

A Slipway Structure for River Ship Repair 1 Paper N 0 : III.05 A Slipway Structure for River Ship Repair Zorislav Sorić, Radovan Vugrinec Predrag Kvasnička, Tomislav Kišiček Josip Galić, Leo Matešić Abstract: A slipway structure for ship repair

More information

TRENCHING/SHORING/EXCAVATIONS Revision Date: 04/2017

TRENCHING/SHORING/EXCAVATIONS Revision Date: 04/2017 TRENCHING/SHORING/EXCAVATIONS 41.1 PURPOSE 41.1.1 The purpose of this policy is to provide guidance and instruction to safely perform work around or in excavations or trenches and protect employees from

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

STEEL FRAMED ALUMINUM PANEL SHIELDS "STEEL FRAMED" ALUMINUM PANEL SHIELDS MANUFACTURE S TABULATED DATA 3330 S. Sam Houston Pkwy Houston, Texas 77047 (713)943-0750 USA Toll Free 1-800-231-6662 Fax (713)943-8483 Www.speedshore.com PRINTED

More information

APPENDIX D HYDRO-VAC

APPENDIX D HYDRO-VAC The City of Winnipeg Bid Opportunity No. 33-2018 Template Version: C420160226 - RW APPENDIX D HYDRO-VAC Corporate Safety & Health Division GUIDELINES FOR EXCAVATION OF CABLES BY WATER PRESSURE/VACUUM SYSTEMS

More information

Sample Project with EPB TBM according to DIN 4085

Sample Project with EPB TBM according to DIN 4085 1 General The aim of the document is to provide information about the required input parameters and the necessary steps for the calculation of a face support pressure. This calculation is carried out under

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

indoor / outdoor INSTALLATION GUIDE

indoor / outdoor INSTALLATION GUIDE indoor / outdoor INSTALLATION GUIDE TEQBALL ONE INSTALLATION GUIDE This document contains a description of the Teqball One multifunctional sports equipment installation. This guide recommends using specific

More information

Elevating Work Platforms. WP Class Assessment Information

Elevating Work Platforms. WP Class Assessment Information Elevating Work Platforms Vic Access 4/123 Chesterville Rd Highett 3190 Ph: 9555 116 Phone 0419 153 143 Tim Hille WP Class Assessment Information * Note: 31 Questions are chosen out of 49 All answers are

More information

Density of Soils and/or Granular Material In-place by the Sand-Cone Method

Density of Soils and/or Granular Material In-place by the Sand-Cone Method Density of Soils and/or Granular Material In-place by the Sand-Cone Method 1. Scope: This test is for determining the in-place density of soils and/or granular materials. 2. Apparatus: 2.1 Density apparatus

More information

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

Cranes and Hoists. Elevating Work Platforms ASSESSMENT Cranes and Hoists Elevating Work Platforms ASSESSMENT Part 1 Part 2 Performance Oral/Written June 1995 Contents Page Assessor guidelines general guidelines for Schedule B i Part one Performance Assessment

More information

CPT and MiHpt Programs Bayou Corne 8 AUG 2013

CPT and MiHpt Programs Bayou Corne 8 AUG 2013 CPT and MiHpt Programs Bayou Corne 8 AUG 2013 Agenda Introduction and purpose of meeting Why CPT and MiHpt Charlie Faust, Tt CPT and MiHpt overview Charlie Faust, Tt Program progress Charlie Faust, Tt

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL APPLICATIONS. 1. Hilltopper Mound Clay for baseball pitching mound or homeplate areas

SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL APPLICATIONS. 1. Hilltopper Mound Clay for baseball pitching mound or homeplate areas Stabilizer Solutions, Inc. 33 South 28 th St. Phoenix, AZ 85034 800-336-2468 (Fax) 602-225-5902 stabilizersolutions.com info@stabilizersolutions.com SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL

More information

Chesil Beach, Dorset UK High energy, shingle coastline. Brighton Beach, Sussex UK Pebble beach

Chesil Beach, Dorset UK High energy, shingle coastline. Brighton Beach, Sussex UK Pebble beach Beaches: Depositional landform Extends from the highest high tide to the lowest low tide. Very important temporary store in coastal system. Accretion: sediment returning to the visible portion of a beach

More information

Natural Gas. Dig safely. Measures to avoid injury and damage to gas pipes

Natural Gas. Dig safely. Measures to avoid injury and damage to gas pipes Natural Gas Dig safely Measures to avoid injury and damage to gas pipes The following protective and precautionary measures MUST be taken when working in the vicinity of gas mains and services. It is the

More information

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 April 2013 Connection Procedure Table of Contents TS 7.70.01 SCOPE... 2 TS 7.70.02 NEW WATERMAIN

More information

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

SPEED SHORE MANUFACTURER S TABULATED DATA MHS MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs January 01, 2005 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Tel:

More information

POWER-MATCHED SPECIALTY BUCKETS FOR TRACTOR/LOADER/BACKHOES Group A

POWER-MATCHED SPECIALTY BUCKETS FOR TRACTOR/LOADER/BACKHOES Group A Group A TRACTOR BACKHOES: TERRAMITE T5C/T7/T92WD/T94WD BOBCAT B100/B250/B300 CASE 480/580/680/590 JCB 1400B/210S/212S/214/215/215S/217/217S JOHN DEERE 210/310/315/410/510/610 A,B,C&D CATERPILLAR 416/420/426/428/430/436/446

More information

SAFE WORK METHOD STATEMENT TRENCHING OPERATIONS

SAFE WORK METHOD STATEMENT TRENCHING OPERATIONS SAFE WORK METHOD STATEMENT TRENCHING OPETIONS Personal Protective Equipment Foot Protection Hearing Protection High Visibility Head Protection Eye Protection Breathing Protection Day Operations Normal

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS SECTION 01550 TRAFFIC REGULATIONS PART 1 - GENERAL 1.01 OBJECTIVES A. The Contractor shall provide for safe movement of vehicular, bicycle and pedestrian traffic, including persons with disabilities in

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

GAS PIPELINE SAFETY GUIDE.

GAS PIPELINE SAFETY GUIDE. GAS PIPELINE SAFETY GUIDE. Date of issue 27/02/2017 Date of next review 27/02/2018 Page 1 Vector Limited 2017 Gas Pipeline Safety Guide February 2017 CONTENTS CONTENTS...2 WORKING SAFELY... 3 Your Legal

More information

BACKGROUND INFORMATION & PURPOSE

BACKGROUND INFORMATION & PURPOSE Mr. Chris Speen, Roads & Maintenance Chairperson Lake Arrowhead Property Owners Association 7065 Arrowhead Trail Gaylord, Michigan 49735 Re: LAPOA Road Maintenance Evaluation Lake Arrowhead Section 32,

More information

Geofabrics. Products to improve the playability of your course. golf courses

Geofabrics. Products to improve the playability of your course. golf courses Geofabrics Products to improve the playability of your course golf courses Megaflo Drainage is the foundation of high performance. Introduction Golf course superintendents are under pressure to improve

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry 1 of 8 level: 3 credit: 7 planned review date: October 2006 sub-field: purpose: Civil Works and Services This unit standard is a component of the selfregulation system for operations in the civil infrastructure.

More information