Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty

Size: px
Start display at page:

Download "Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty"

Transcription

1 Geotechnical Safety and Risk V T. Schweckendiek et al. (Eds.) 2015 The authors and IOS Press. This article is published online with Open Access by IOS Press and distributed under the terms of the Creative Commons Attribution Non-Commercial License. doi: / Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty Ir. drs. R.E.P. DE NIJS a, ir. A.C.A. NAP b, W. KORTE c and W.J. NEDERLOF c a Witteveen+Bos, Deventer, The Netherlands b Port of Rotterdam, Rotterdam, The Netherlands c GEKA, Dordrecht, The Netherlands 275 Abstract. During the design phase of the reconstruction of the existing mooring facility EBS Biohub at the port of Rotterdam, the Netherlands, a high risk profile was recognized in the proximity of four new dolphins next to the existing jetty. The risk originated from the greater installation depth of the dolphins related to the limited foundation depth of the existing foundations and from the structural analysis which indicated that the superstructure could only withstand limited settlement differences. Risk management aspects were incorporated in the contract by defining an observational approach involving monitoring of the structure and the subsoil. The contractor Geka offered a pile test at dolphins to be installed at a safe distance from the jetty. A number of test piles were installed at varying distances from the dolphins in order to detect settlements. The induced settlements were compared with a contractually defined criterion. Based on the test, two installation methods were in place. Two dolphins were installed under a slope in order to create a minimum of 5 m distance between the installation trajectory and adjacent piles. Two dolphins at shorter distance were placed while two adjacent piles per dolphin were cut from the jetty platform with an alternative support by a reaction frame with active hydraulic compensation at service load. All criterion on bearing capacity, vibration levels, settlements, deformations and cone resistance were met. No damage on nor deformation of the existing structure was encountered resulting in a success in terms of budget, planning and risk management. Keywords. risk management, settlement, capacity, contract, observational 1. Project Introduction The project comprised the reconstruction and extension of the existing mooring facility EBS Biohub at the port of Rotterdam, the Netherlands, see Figure 1. The jetty had an initial length of 230 m and a width of 16 m. Part of the reconstruction involved the installation of seven mooring dolphins of which four dolphins were foreseen at close proximity of the existing jetty, see Figure 2. Figure 2. Existing jetty and new dolphins M1 to M4 Figure 1. Initial northern aerial view jetty EBS Bio Hub. The existing jetty structure consisted of two longitudinal loader beams with a crane rail on top, supported at 4.5 m intervals by a joke of two hollow pre stressed piles per loader beam. At each joke a pre stressed cross beam was mounted,

2 in total, with a length of 11 m. According to the as built information of the jetty, the piles were founded at 3 m depth in the first sand layer, see Figure 3. The foundation level was estimated at NAP -23 m, 6 m below dredging depth. The new dolphins had a tip level of NAP -35 m. structural risk assessment. The following paragraphs will explain the analyses. Pile tip Dolphin Figure 4. electrical Cone Penetration Test Effect of New Pile Driving Figure 3. loader beam, cross beam and pile foundation 2. Risk Analysis A high risk profile was recognized in the proximity of four new dolphins next to the existing jetty. The geotechnical risk originated from the installation depth of the dolphins related to the limited foundation depth of the existing pile foundations and low density of the sand layer at pile tip level, see Figure 4. Further analysis was based on a potential volume loss in the trajectory from pile tip level (NAP -23 m) to dolphin installation depth (NAP -35 m), marked in Figure 4. Based on previous projects involving (sheet)pile driving in granulair soils (de Nijs 2003, de Nijs 2015) an estimated lower boundary on compaction was used in a settlement analysis. The lower boundary was chosen in order to define a minimum risk level in the analysis of the During pile installation, either by use of a hammer or a vibratory hammer, volume loss due to compaction caused by the driving energy should be anticipated in loosely packed granular soils. A lower bound compaction of 1% over 0.75 meter from the dolphin had been estimated. This volume loss was applied over the installation depth below pile tip level. Since the dolphins were to be installed within 2 m from the piles, a lower boundary settlement of 20 mm at pile tip level was to be considered in the structural analysis, see Figure 5. settlement (mm) Prediction installation effect NAP -23 m in trajecory NAP -23 m to -35 m 1% volume loss distance between dolphin and pile (m) Figure 5. Predicted volume loss, lower bound

3 Impact on Superstructure The main elements form the superstructure, the longitudinal loader beams, had a rigid behavior. The connection with the cross beams and piles acted as hinges. The limited thickness, 8 cm, of the in situ casted deck implied it couldn t redistribute alternative loading caused by deformations. At pile settlement, the 4 to 1 slope of the piles would cause a movement in horizontal direction or would require a reaction force, see the red marked pile in Figure 6. The horizontal displacement would initiate a tension load in the cross beam, since the unaffected surrounding piles outside the active wedge would not respond to the deformations. The connections with the loader beams could not withstand this additional load. As a result the deck would be damaged and the crane rail distance would exceed the horizontal tolerance. From the structural analysis in FEM it was found that the jetty could only withstand limited settlement differences between piles to a maximum of 10mm. wedge Sand layer 3. Contractual Approach 3.1. Contractual Approach on Risks The analysis indicated a high risk on damage to the jetty as a result of pile settlements induced by dolphin installation by means of hammering. From a clients point of view The Port of Rotterdam perceived an uncertain outcome if only the requirement of a maximum settlement of 10 mm would be contracted. The specification itself could not guarantee that the requirement would be met by the contractor. Exceeding the criterion was a most unfavorable outcome for the client as well as the contractor, introducing new uncertainties on repair and future usability of the jetty. The alternative however, a reliable and cost effective design or procedure on pile installation to mitigate this risk, proved to be very difficult to design and define in a contract. Especially the practical aspects of pile installation or structural mitigation were difficult to estimate or to define. In response to this uncertainty the client adopted the strategy to invite contractors to offer a risk management procedure. In the selection procedure the contractor would benefit from the offered quality regarding settlement control and preservation of structural integrity. The offered risk management was therefore incorporated in the bid and ultimately in the contract between client and contractor. In order to allow the contractor to optimize and demonstrate its risk management procedure, the observational method was in place. Since three dolphins could be installed prior to the four critical ones, a learning curve on site was possible. The contractor was also allowed to reduce pile driving energy by means of flushing the dolphin internally up to 2 m above tip level Preservation of Structural Integrity Figure 6. Impression on structural deformation The contractor GEKA offered a plan which consisted of a monitored trial run on two dolphins, M6 and M7, to be installed at a safe distance from the jetty and its pile foundation. The dolphin positions would be surrounded by nine test piles in comparable size and depth to the piles of the existing jetty. The test piles would be installed at varying distances from the

4 278 new dolphins. The settlements of the piles induced by the installation of the dolphins would be recorded. Vertical load was applied at piles P3 to P5. The site overview is presented in Figure 7. Figure 8. Dolphin install4ed with slope 7 to 1. Figure 7. Overview test piles at dolphins M6 and M7 Based on this test the recorded settlement would be compared with the contractually pre defined maximum settlement criterion of 10 mm. In case the criterion would be exceeded, two alternative methods would be in place for the remaining four critical dolphins to be installed. The first alternative was to position the dolphins under a slope 7 to 1 in order to optimize the distance of the installation trajectory to adjacent piles, see Figure 8. The second option, see Figure 9, was to cut the piles loose from the jetty platform and use a hydraulic compensation frame in order to pressurize them. Figure 9. Dolphin installed with hydraulic compensation.

5 4. The Works 4.1. Test piles First a series of nine test piles were driven in the vicinity of the installation positions of dolphins M6 and M7. The impact on the subsoil after installation of the dolphins was recorded by leveling the surrounding test piles, see Figure This implied that the encounterd settlement was most certainly too big in order to allow regular dolphin installation at the jetty. Based on the results at dolphins M6 and M7 the contractor concluded that both alternative dolphin installation methods were in place Installation of Dolphins at Slope 7 to 1 The dolphins M3 and M4 were installed by a diesel hammer type Delmag D100 under a optimized slope of 7 to 1, see Figure 12. At this slope, the distance at the foundation depth between existing piles would meet the minimum distance of 5 m. At a distance of 5 m or more between the existing and new piles, the slope solution was sufficient. The hammer operated at 75% of its capacity, since the application of full energy seemed to increase settlements at M6 en M7. Another important aspect was the reduction of soil resistance in the dolphin by means of flushing the piles internally up to 2 m above the tip. This remedy was in place in case the blow count exceeded 65 blows / 25 cm. At dolphin M3 the blowcount reduced from 70 to 21 blows / 25 cm after flushing. Non continuous hammering did not cause additional problems. Figure 10. Dolphin installation with adjacent test piles The results were collected and interpreted, see Figure 11. The results proved that the lower bound prediction of 1% volume loss was exceeded significantly on all test piles, loaded as well as unloaded. The results indicated a volume loss in the range of 2 to 3%, regardless of the installation equipment of the dolphins. Settlement testpiles 0 2 distance test pile - dolphin (m) settlement (mm) lower bound prediction -1% P1-23 unloaded P2-23 unloaded -40 P3-23 pile load -50 P4-23 pile load -60 P5-23 pile load P unloaded -70 P7-25 unloaded -80 P8-23 unloaded vibratory -90 P9-23 unloaded vibratory -100 postdiction -3% and -2% Figure 11. Settlements test piles after dolphin installation Figure 12. Dolphin installation with slope 7 to 1.

6 Active Support During Hammering Dolphins The dolphins M1 and M2 were installed in the same manner and with the same equipment as M3 and M4, although vertical. At these positions the jetty was also equipped with a rigid connection between the two loader beams, see Figure 13. The connection was also supported by piles, hindering the 7 to 1 slope solution. Figure 14. Frame for hydraulic compensation 5. Resume In the reconstruction of the existing mooring facility EBS Biohub at the port of Rotterdam, the Netherlands, a high risk profile was recognized in the proximity of four new dolphins next to the existing jetty. The contractually requested risk management allowed the contractor sufficient freedom to implement specific knowledge on pile installation and settlement control. During the works, the importance was confirmed at the installation test of three dolphins at safe distance from the jetty. The mitigating measures, slope installation and hydraulic compensation, proved to meet the requirements on settlement control and structural integrity. All criterion on bearing capacity, vibration levels, settlements, deformations and cone resistance were met. Figure 13. Dolphin positions M1 and M2, vertically installed Per dolphin the adjacent piles with a slope towards the dolphin were cut and hydraulically compensated, see the marked piles in Figure 13. Before cutting the piles, a reaction frame was installed, see Figure 14. The piles were loaded up to service load. During installation of the dolphins the system was kept at its original load by hydraulics. During driving of the dolphins approximately 40 mm settlement occurred. References Nijs, R.E.P. de (2003). Installation of sheetpiles in granulair soil, Geotechniek, october 2003, (in Dutch) Nijs, R.E.P de, Kaalberg, F.J, Osselaer, G, Couck, J. van Royen, K. (2015). Full scale field test (sheet)pile drivability in Antwerp (Belgium), Proceedings of XVI ECSMGE 2015, Edinburgh, September 2015.

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

THE USE OF SPIN FIN PILES IN MASSACHUSETTS THE USE OF SPIN FIN PILES IN MASSACHUSETTS Les R. Chernauskas, P.E., Geosciences Testing and Research, Inc., North Chelmsford, MA Leo J. Hart, Geosciences Testing and Research, Inc., North Chelmsford,

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction

More information

MIRABAY PILOT PROJECT REPORT

MIRABAY PILOT PROJECT REPORT MIRABAY PILOT PROJECT REPORT 9/25/2014 By: Ingenium, Inc./Carl A. Hazenberg, P.E. Seawalls along the MiraBay canal system started experiencing problems shortly after construction. Following the issues,

More information

Typical factors of safety for bearing capacity calculation in different situations

Typical factors of safety for bearing capacity calculation in different situations Typical factors of safety for bearing capacity calculation in different situations Density of soil: In geotechnical engineering, one deals with several densities such as dry density, bulk density, saturated

More information

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23.

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. (2) For the resisting side, passive pressure theory indicates

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Structure Failure Modes

Structure Failure Modes US Army Corps Monitoring and Maintenance of Coastal Infrastructure Structure Failure Modes Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical

More information

TIE DOWN DESIGN CONSIDERATIONS FOR STS CONTAINER CRANES

TIE DOWN DESIGN CONSIDERATIONS FOR STS CONTAINER CRANES TIE DOWN DESIGN CONSIDERATIONS FOR STS CONTAINER CRANES Published in Port Technology International, Spring 2018 Edition 77 BY SIMO HOITE, PATRICK MCCARTHY, AND MICHAEL JORDAN LIFTECH CONSULTANTS INC. Introduction

More information

(Refer Slide Time: 1:22)

(Refer Slide Time: 1:22) Foundation for Offshore Structures Professor S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology Madras Module 1 Lecture 17 Pile Installation 2 Anyway we will continue with pile

More information

Port of Zeebrugge: Upgrading the Brittannia Dock

Port of Zeebrugge: Upgrading the Brittannia Dock ABSTRACT Port of Zeebrugge: Upgrading the Brittannia Dock by L. Missinne 1 and L. Van Damme 2 The Flemish authority started with the upgrading of the Brittannia Dock in the port of Zeebrugge. The Brittannia

More information

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Guidance on piling, heavy loads, excavations, tunnelling and dewatering Guidance on piling, heavy loads, excavations, tunnelling and dewatering thameswater.co.uk/developerservices Contents 1 Introduction... 3 2 Works That Can Impact Our Assets And Cause Damage... 3 3 What

More information

Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing

Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing A. Reto Schreier GEO, Denmark, rsc@geo.dk B. Anders Tovsig Schaarup Andersen Per Aarsleff A/S, Denmark, ata@aarsleff.com C. Nataša Katić + Peter

More information

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D.

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D. Lateral Load Analysis Considering Soil-Structure Interaction ANDREW DAUMUELLER, PE, Ph.D. Overview Introduction Methods commonly used to account for soil-structure interaction for static loads Depth to

More information

Statnamic Load Testing Using Water as Reaction Mass

Statnamic Load Testing Using Water as Reaction Mass Sixth International Conference on the Application of Stress-Wave Theory To Piles 1 Statnamic Load Testing Using Water as Reaction Mass.D. Justason Berminghammer Foundation Equipment, Hamilton, Canada M.C.

More information

MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS

MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS OBJECTIVE Establish conditions for the proper handling, transportation and storage of electric cable reels, in order to keep the

More information

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers.

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers. Case history: Soil investigation for offshore suction anchors anchor foundations for tension and taut leg floaters in deep waters Alternative anchors for floating structures pile Over last 5 - years anchoring

More information

Analysis of dilatometer test in calibration chamber

Analysis of dilatometer test in calibration chamber Analysis of dilatometer test in calibration chamber Lech Bałachowski Gdańsk University of Technology, Poland Keywords: calibration chamber, DMT, quartz sand, FEM ABSTRACT: Because DMT in calibration test

More information

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS SOIL ANCHORS ignasi.llorens@upc.edu ETSAB/UPC - 2013 PASSIVE ANCHORS - ANTECEDENTS Antecedents of passive anchors can be found in Nature. Roots feed plants and provide uplift resistance against the wind

More information

Dredging Stiff to Very Stiff Clay in thewielingen Using the DRACULA System on a Hopper Dredger

Dredging Stiff to Very Stiff Clay in thewielingen Using the DRACULA System on a Hopper Dredger Dredging Stiff to Very Stiff Clay in the Wielingen Using the Dracula System on a Hopper Dredger Stefaan Vandycke Dredging Stiff to Very Stiff Clay in thewielingen Using the DRACULA System on a Hopper Dredger

More information

A Slipway Structure for River Ship Repair

A Slipway Structure for River Ship Repair 1 Paper N 0 : III.05 A Slipway Structure for River Ship Repair Zorislav Sorić, Radovan Vugrinec Predrag Kvasnička, Tomislav Kišiček Josip Galić, Leo Matešić Abstract: A slipway structure for ship repair

More information

CONE PENETRATION TESTS

CONE PENETRATION TESTS February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft Scissor Mechanisms Scissor mechanisms are very common for lifting and stabilizing platforms. A variety of manlifts, service platforms and cargo lifts utilize this visually simple but structurally complex

More information

AIS data analysis for vessel behavior during strong currents and during encounters in the Botlek area in the Port of Rotterdam

AIS data analysis for vessel behavior during strong currents and during encounters in the Botlek area in the Port of Rotterdam International Workshop on Next Generation Nautical Traffic Models 2013, Delft, The Netherlands AIS data analysis for vessel behavior during strong currents and during encounters in the Botlek area in the

More information

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS 1. SCOPE This specification details the six (6) stage permanent strain Repeated Load Triaxial (RLT) test for unbound and modified

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072,

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072, Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072, Introduction Eilat city is located in the southern part of the state

More information

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE 1 1) INTRODUCTION 2) THE UNFAIR ADVANTAGE and Stingray earth anchors are driven tipping plate soil anchors for reaction of tensile loads. anchors have ultimate capacities up to 20 tons, and Stingray anchors

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES

AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com ANNUAL KANSAS CITY SPECIALTY GEOTECHNICAL

More information

382. Fellenius, B.H. and Terceros, M.H., Information on the single pile, static loading tests at B.E.S.T. Proceedings of the 3rd Bolivian

382. Fellenius, B.H. and Terceros, M.H., Information on the single pile, static loading tests at B.E.S.T. Proceedings of the 3rd Bolivian 382. Fellenius, B.H. and Terceros, M.H., 2017. Information on the single pile, static loading tests at B.E.S.T. Proceedings of the 3rd Bolivian International Conference on Deep Foundations, Santa Cruz

More information

DEFINITIONS. Aerofoil

DEFINITIONS. Aerofoil Aerofoil DEFINITIONS An aerofoil is a device designed to produce more lift (or thrust) than drag when air flows over it. Angle of Attack This is the angle between the chord line of the aerofoil and the

More information

Request Number IR1-12: Flow Passage. Information Request

Request Number IR1-12: Flow Passage. Information Request Request Number IR1-12: Flow Passage Information Request Provide additional information about the 100 metre flow passage channel scenario between the Westshore Terminals and the proposed Project terminal

More information

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise GRIP TEST REPORT NOVA SIRIA, ROLETTO, 07.10.2013 1. Premise The present report covers the witnessing of the test conducted in the Nova Siria Factory in Roletto (Torino, Italy) to verify the behavior of

More information

Lesson 8 Piles Bearing & Acceptance Transcript. Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance.

Lesson 8 Piles Bearing & Acceptance Transcript. Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance. Lesson 8 Piles Bearing & Acceptance Transcript Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance. To begin, select the start button or press Shift+N on your keyboard.

More information

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring In 2012, the Delaware Surfrider Foundation Chapter formed the Surf Quality and Access Committee to focus on issues such as surf spot

More information

Application of pushover analysis in estimating seismic demands for large-span spatial structure

Application of pushover analysis in estimating seismic demands for large-span spatial structure 28 September 2 October 2009, Universidad Politecnica de Valencia, Spain Alberto DOMINGO and Carlos LAZARO (eds.) Application of pushover analysis in estimating seismic demands for large-span spatial structure

More information

Single slide rail system Linear shoring

Single slide rail system Linear shoring E+S Trench shoring systems / Sliding rail systems Single slide rail system Linear shoring Single-rail linear shoring with U-type and rectangular roller unit Module length Length slide rail Panel height

More information

TRACK RECORD SEP. 2018

TRACK RECORD SEP. 2018 TRACK RECORD SEP. 2018 TABLE OF CONTENTS 1 INTRODUCTION... 3 2 MOTION COMPENSATED GANGWAY... 5 2.1 In operation at Walney Extension... 6 2.2 In operation at Borkum Riffgrund II... 7 3 MOTION COMPENSATED

More information

Offshore Stabilization Pontoon for a heavy lift vessel Concept design & workability

Offshore Stabilization Pontoon for a heavy lift vessel Concept design & workability Offshore Stabilization Pontoon for a heavy lift vessel A.M. ten Klooster Delft University of Technology OFFSHORE STABILIZATION PONTOON FOR A HEAVY LIFT VESSEL CONCEPT DESIGN & WORKABILITY by A.M. ten Klooster

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited Feb 2016. 1 of 6 The MultiPole advantage Introducing the TTT MultiPole an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable

More information

Welcome to Emerald City

Welcome to Emerald City Welcome to Emerald City Anchor Shoring & Caissons Ltd. and partners overcome challenges to construct three condo towers simultaneously By Dawn Tattle The Emerald City Condominium project by ELAD Canada

More information

SPECIALISED SERVICES. Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia.

SPECIALISED SERVICES. Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia. SPECIALISED SERVICES Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia. Figure 1. Shore approach for the Macedon project in Australia.

More information

1 General. 1.1 Introduction

1 General. 1.1 Introduction 1 General 1.1 Introduction The contents of this book will focus on the anatomy of the aeroplane and the various systems that enable it to operate both on the ground and in the air. Flight controls Landing

More information

PILING RIGS DRILLING RIGS

PILING RIGS DRILLING RIGS PILING RIGS DRILLING RIGS PRODUCT range An introduction to Dieseko Group Foundation Equipment Established in1974, Dieseko Group represents several brands in the foundation equipment industry, in four product

More information

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES Prepared by Hiram Arden (Corps of Engineers), David Fox (Corps of Engineers) and Ted Benson (DNR) for the PSDDA agencies. INTRODUCTION In a PSDDA sediment

More information

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR - 9 - AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR O Gorman S., Nuttall R., Purchase A. Parsons Brinckerhoff, Australia ABSTRACT Recent fire tests for tunnels

More information

Cubzac-les-Ponts Experimental Embankments on Soft Clay

Cubzac-les-Ponts Experimental Embankments on Soft Clay Cubzac-les-Ponts Experimental Embankments on Soft Clay GEO-SLOPE International Ltd. www.geo-slope.com 1, 7 - th Ave SW, Calgary, AB, Canada TP T Main: +1 3 9 Fax: +1 3 39 Introduction In the 197 s, a series

More information

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date: Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:22.05.2014 Related Requirement: UR S27 (Rev.6 June 2013) Subject: Retroactive Application for Strength Requirements for Fore Deck Fittings and Equipment

More information

Taking the Bend at Full Throttle

Taking the Bend at Full Throttle SUPER 1900 builds test circuit with parabolic profile in Michoacan, Mexico. Taking the Bend at Full Throttle SUPER 1900 builds test circuit with parabolic profile in Michoacan, Mexico. Taking the Bend

More information

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007 Aalborg Universitet Design Loads on Platforms on Offshore wind Turbine Foundations with Respect to Vertical Wave Run-up Damsgaard, Mathilde L.; Gravesen, Helge; Andersen, Thomas Lykke Published in: Proceedings

More information

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT

More information

RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY

RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY Yusuf Mansur Hashim M. Tech (Structural Engineering) Student, Sharda University, Greater Noida, (India)

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Vertical Uplift Capacity of a Group of Equally Spaced Helical Screw Anchors in Sand

Vertical Uplift Capacity of a Group of Equally Spaced Helical Screw Anchors in Sand SECM/15/080 Vertical Uplift Capacity of a Group of Equally Spaced Helical Screw Anchors in Sand S. Mukherjee 1* and Dr. S. Mittal 2 1 Amity University, Noida, India 2 Indian Institute of Technology, Roorkee,

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 240-20 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description This method describes the test used to evaluate the thickness and bearing capacity of the subbase and subgrade using the Dynamic

More information

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES J.R. Qian 1 W.J. Zhang 2 and X.D. Ji 3 1 Professor, 3 Postgraduate Student, Key Laboratory for

More information

OMAE S&R Paper 6129

OMAE S&R Paper 6129 Proceedings of ETCE/OMAE2000 Joint Conference Energy for the New Millenium February 14-17, 2000, New Orleans, LA OMAE 2000 - S&R Paper 6129 RISK ASSESSMENT OF DELAYS DURING DEEP WATER PIPE-LAYING Vladimir

More information

SPECTRAL CHARACTERISTICS OF FLUCTUATING WIND LOADS ON A SEPARATE TWIN-BOX DECK WITH CENTRAL SLOT

SPECTRAL CHARACTERISTICS OF FLUCTUATING WIND LOADS ON A SEPARATE TWIN-BOX DECK WITH CENTRAL SLOT The Seventh Asia-Pacific Conference on Wind Engineering, November 8-, 009, Taipei, Taiwan SPECTRAL CHARACTERISTICS OF FLUCTUATING WIND LOADS ON A SEPARATE TWIN-BOX DEC WITH CENTRAL SLOT Le-Dong Zhu, Shui-Bing

More information

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay 43 Module 3: Lecture - 5 on Compressibility and Consolidation Contents Stresses in soil from surface loads; Terzaghi s 1-D consolidation theory; Application in different boundary conditions; Ramp loading;

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

Tapered Roller Bearings in X-life quality Customer Information. Business Unit TRB Schweinfurt, 2013

Tapered Roller Bearings in X-life quality Customer Information. Business Unit TRB Schweinfurt, 2013 Tapered Roller Bearings in X-life quality Customer Information Business Unit TRB Schweinfurt, 2013 X-life roll-out BU TRB Agenda Tapered Roller Bearings in X-life quality 1 2 3 4 X-life what is it? X-life

More information

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1

More information

Caltrans compendium of underwater sound data from pile driving 2014 update

Caltrans compendium of underwater sound data from pile driving 2014 update Caltrans compendium of underwater sound data from pile driving 2014 update Richard RODKIN 1 ; Keith POMMERENCK 2 1 Illingworth & Rodkin, Inc., United States 2 Illingworth & Rodkin, Inc., United States

More information

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1 INTRODUCTION Located along the western coast of Kauai, the Mana Drag Racing Strip (MDRS) at the Kauai Raceway Park was originally constructed in 1971. This 40+ year old track, once home to taro fields

More information

Development of New Type of Breakwater Reinforced with Steel Piles against a Huge Tsunami

Development of New Type of Breakwater Reinforced with Steel Piles against a Huge Tsunami Technical Report UDC 627. 235 : 550. 344. 4 Development of New Type of Breakwater Reinforced with Steel Piles against a Huge Tsunami Shunsuke MORIYASU* Shin OIKAWA Shinji TAENAKA Noriyoshi HARATA Ryuta

More information

Introduction Introduction

Introduction Introduction Introduction Maritime International is a leading manufacturer of marine bollards and cleats worldwide. Our range of bollards and cleats is unsurpassed by any other manufacturer or supplier. Maritime can

More information

Design and Construction of Large Diameter Circular Shafts

Design and Construction of Large Diameter Circular Shafts Underground Singapore 2014 Design and Construction of Large Diameter Circular Shafts T.T. Aye, M.S.Y. Tong, K.H. Yi, E. Arunasoruban AMBERG & TTI Engineering Pte Ltd, Singapore ABSTRACT: Three numbers

More information

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM 18 th Southeast Asian Geotechnical & Inaugural AGSSEA Conference 29-31 May 213, Singapore Leung, Goh & Shen (eds) SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM GOUW TJIE-LIONG

More information

Pole Foundation Design with Spreadsheet

Pole Foundation Design with Spreadsheet PDHonline Course S235 (1 PDH) Pole Foundation Design with Spreadsheet Instructor: John W. Andrew, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

Geotechnics, Face & Stockpile Operations

Geotechnics, Face & Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face & Stockpile Operations Information Sheet 1 June 2009 Guidance on Safe Face Management Operations in Quarries Approved by the Quarries

More information

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT ASSET INTEGRITY INTELLIGENCE CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT JAMES R. WIDRIG, Manager Advanced Engineering at Quest Integrity Group VOLUME 23, ISSUE 6 NOVEMBER DECEMBER

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited July 2017. 1 of 6 The MultiPole advantage The TTT MultiPole is an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable for structural

More information

DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER

DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER Roger Failmezger, P.E. In-Situ Soil Testing, L.C., Lancaster, Virginia, USA ABSTRACT A push-in pressuremeter was developed using slotted steel casing with

More information

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research, 201, 2 (4):20-27 (http://scholarsresearchlibrary.com/archive.html) ISSN: 22 0041 Influence

More information

TEPZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION

TEPZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION (19) TEPZZ 55475 A_T (11) EP 2 554 752 A1 (12) EUROPEAN PATENT APPLICATION (43) Date of publication: 06.02.2013 Bulletin 2013/06 (21) Application number: 11176100.3 (51) Int Cl.: E02D 7/06 (2006.01) E02D

More information

What prompted the collapse of the Chirajara Bridge?

What prompted the collapse of the Chirajara Bridge? What prompted the collapse of the Chirajara Bridge? Translated by: BENJAMIN SANDOVAL GIL Professional Engineer 11070 Katy Fwy Apt 1480 Houston, TX 77043 Cel. (787) 439-0883 bsand56855@gmail.com E'Huang

More information

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS 1 GENERAL Ship designers are encouraged to consider all aspects of pilot transfer arrangements at an early stage in design. Equipment

More information

Systems of Play. Points to consider: Age of players Technical ability of players Physical attributes of the players Vision and transitional qualities

Systems of Play. Points to consider: Age of players Technical ability of players Physical attributes of the players Vision and transitional qualities Systems of Play Debates abound regarding the perfect tactical formation for a soccer team. Many are a result of a new system that has proven effective at a major tournament such as a World Cup or a European

More information

ICE PRESSURE MEASUREMENT UNDER FLOWING CONDITIONS ON HARBIN REACH OF SONGHUA RIVER

ICE PRESSURE MEASUREMENT UNDER FLOWING CONDITIONS ON HARBIN REACH OF SONGHUA RIVER Ice in the Environment: Proceedings of the 16th IAHR International Symposium on Ice Dunedin, New Zealand, 2nd 6th December 2002 International Association of Hydraulic Engineering and Research ICE PRESSURE

More information

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk 01 Introduction and Scope This Standard describes the requirements for non-turf cricket pitch systems intended

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

TENSOREX C+ TENSOREX C+

TENSOREX C+ TENSOREX C+ Installation instruction TENSOREX C+ TENSOREX C+ is a new spring automatic tensioning device for tramway, light and heavy railways Overhead Contact Lines ( OCL ). TENSOREX Products are only by PFISTERER

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY

EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY 18 th World Conference on Non destructive Testing, 16-20 April 2012, Durban, South Africa EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY Arno VOLKER 1 and Hendrik VOS 1 TNO, Stieltjesweg 1,

More information

CONSTRUCTION SPECIFICATION FOR PILING

CONSTRUCTION SPECIFICATION FOR PILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 903 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR PILING 903.01 SCOPE 903.02 REFERENCES 903.03 DEFINITIONS 903.04 Not Used 903.05 MATERIALS 903.05.01

More information

PHASE 1 WIND STUDIES REPORT

PHASE 1 WIND STUDIES REPORT PHASE 1 WIND STUDIES REPORT ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN FOR A SUICIDE DETERRENT SYSTEM Contract 2006-B-17 24 MAY 2007 Golden Gate Bridge Highway and Transportation District Introduction

More information

ANALISYS OF STATICAL RESPONSE OF THE GLORIA TYPE JACK-UP STRUCTURE

ANALISYS OF STATICAL RESPONSE OF THE GLORIA TYPE JACK-UP STRUCTURE Scientific Bulletin of the Politehnica University of Timisoara Transactions on Mechanics Special issue The 6 th International Conference on Hydraulic Machinery and Hydrodynamics Timisoara, Romania, October

More information

TECHNICAL AUDIT OF REHABILITATION WORKS ON UNPAVED RURAL ACCESS ROADS

TECHNICAL AUDIT OF REHABILITATION WORKS ON UNPAVED RURAL ACCESS ROADS TECHNICAL AUDIT OF REHABILITATION WORKS ON UNPAVED RURAL ACCESS ROADS J A MOOLMAN and DR P C LOMBARD AFRICON, P O Box 905, Pretoria, 0001 ABSTRACT Rural access roads (such as district roads, feeder roads

More information