A Slipway Structure for River Ship Repair

Size: px
Start display at page:

Download "A Slipway Structure for River Ship Repair"

Transcription

1 1 Paper N 0 : III.05 A Slipway Structure for River Ship Repair Zorislav Sorić, Radovan Vugrinec Predrag Kvasnička, Tomislav Kišiček Josip Galić, Leo Matešić Abstract: A slipway structure for ship repair discussed in this paper has been designed and constructed on the River Sava near the town of Sisak in Croatia. The structure consists of reinforced concrete bored piles and girders. In the river, girders are supported by a trapezoidal concrete block of 16x2 m placed in the river bed. From this block up, girders of 2x2 m in cross-section are inclined from the river to a certain bank height after which they are horizontal. For the predicted loads foundation soil was too weak, and for this reason each girder rests on 9 piles from 3 to 12 m in length and 1.0 m in diameter. The joint between the girder and piles is rigid, and thus they make a frame element. There are 11 girders, whose inclined and horizontal parts have a length of 41 m and 26 m respectively. The whole structure covers an area of 82x86 m. Ships are to be supported by trolleys travelling on an inclined rail system. The structure extends underwater for a sufficient distance to enable the ships to float on and off. The movement of trolleys together with a ship is controlled by hauling winches that are situated at the upper end of the slipway. Keywords: slipway, ship repair, foundation, piles, concrete girders, reinforcement 1. Introduction There are over 300 river ships in the Croatian merchant fleet of inland waterway navigation. The average age of these ships is more than 25 years. By law, they are supervised by the Croatian Register of Shipping (the Register). According to the Rules for Technical Supervision of Inland Waterway Navigation Ships laid down by the Register, a river ship must be pulled up on shore once every five years. In addition to compulsory ship pull-ups for inspection and checks, ships are also pulled up for repair of damage, suffered in service,

2 248 Sorić, Vugrinec, Kvasnička, Kišiček, Galić, Matešić which cannot be repaid in the water. It should be noted that the slipway discussed in this paper is the first to be designed and constructed in Croatia. At present, only a small number of ships in the Croatian merchant fleet of inland navigation supervised by the Register are regularly repaired in the Slovenske Lodenice Shipyard in Komarno (Slovakia). Of all the other ships in the fleet, since 1990, only a few of them were pulled up onto dry land in Croatia, either on improvised slipways or by using the changes in the water level. For the reasons mentioned above, there is a need for the construction of two or three slipway structures on the Croatian inland waterways that will be economically justifiable. There are three suitable locations for their construction: 1) two on the River Sava in the area of the towns of Sisak and Slavonski Brod, and 2) one on the River Drava or on the Danube in the area of the city of Osijek and the town of Vukovar respectively. A study showed that the slipway structure on the River Sava at Sisak can attract at least 50 vessels. This number of ships can justify the construction of the slipway and provide employment for 70 workers. The Sisak slipway was constructed as a 13 0 inclined slipways with the horizontal top part (Figure 1). It can hold inland navigation ships of up to 400 tonnes deadweight and 80 metres in length. On this structure ships will be pulled up from the river and lowered into the water sideways using double trolleys on rails, the one for a sloping part of the structure and the other for a horizontal part. The trolleys are pulled up and down by means of special motor driven devices, hauling winches, and ropes. The inclined part of the slipway structure is expended at its top by the horizontal part of the structure extending towards inland. The horizontal part is also provided with supports and pulling system for sideways ship pulling. The slipway can accommodate three ships on the inclined part and two on the horizontal part at the same time. The structure design enables the pulling of ships from the river even at a low river level and holds ships high and dry even when the river level is high. The shipyard site has a shape of a right-angled triangle with the hypotenuse on the river bank. The part of the bank occupied by the shipyard is about 320 m long. The highest water level recorded at the Galdovo measuring station (located near the slipway structure) was 99.7 m above see level and the low water was at the level of 90.5 m with 95% of probability. An analysis of water levels measured over the period of last 10 years showed an average at 89.8 m. The maximum water level was at 99.0 m while the level of the river bottom at the site of the slipway structure is at 88.0 m and that in the waterway is at 85.5 m a.s.l. The elevation of the yard is approximately m. 2. Foundation of the structure Geotechnical investigation showed that the foundation soil consisted of four horizontal layers: clay, silty sand, gravel and silty clay. The depths of the layers and their descriptions are given in Table 1:

3 A Slipway Structure for River Ship Repair 249 Table 1 Data on foundation soil Layer from [m] to [m] Type of material Description Clay high plasticity, firm consistency silty sand loose Gravel dense, poorly graded >15 silty clay high plasticity, firm consistency For the predicted loads the foundation soil was too weak and for this reason each girder rests on a set of nine piles. An analysis of foundation indicated that bored piles perform better when supported by the third layer (i.e. gravel) than when supported in deeper fourth layer (i.e. silty clay). Joints between the girders and piles are rigid, and thus they make a frame element. Figure 1 shows concreting of piles. Figure 1 Concreting of piles

4 250 Sorić, Vugrinec, Kvasnička, Kišiček, Galić, Matešić 3. Description of the slipway structure The slipway structure has shape of a rectangle having the length of 72 m and the width of 70 m. It consists of a horizontal part of 30 m in length at the elevation of 99.3 m and a sloping part inclined at 13 0 of about 53 m width. The lowest height of the latter part is 87.0 m above see level. Basic structural parts of the slipway are eleven reinforced concrete girders spaced 9.0 and 5.0 metres apart. The rails for trolleys/bogies are installed on the girders. The crosssection and the plan view of the slipway, together with pulled up ships are shown in Figure 2. Figure 2 The cross-section and the plan view of the slipway structure

5 A Slipway Structure for River Ship Repair 251 The foundation strips, that are underwater, have a width of 1.0 m. They are located at the elevations of 85.0 m and m. The strips are constructed of reinforced concrete of concrete strength of 30 MPa, a concrete cover of 7 cm, and reinforcing steel of yield strength of 400 MPa. The other parts of the slipway structures consist of eleven girders supported by bored concrete piles. Piles have 100 cm in diameter and are made of reinforced concrete of 30 MPa concrete strength and reinforcing steel of 400 MPa yield strength. Eight piles are spaced 7.7 metres apart and the ninth is 6.2 metres apart. They are bored down to the depths from 4.85 to m. The total number of piles installed is 99. The inclined part of the structure under construction is shown in Figure 3. Figure 3 Inclined part of the slipway structure under construction The horizontal girders are shown in Figure 4. The reinforced concrete girders of the slipway structure have a T-shape cross-section. The width of the girders at the bottom is 170 cm and at the top 210 cm so that rails for the trolleys can be installed. Figure 4 One horizontal girder completed and the other under construction

6 252 Sorić, Vugrinec, Kvasnička, Kišiček, Galić, Matešić The shapes of the girder cross-sections are shown in Figures 5 and 6. Figure 5 Detail A from Figure 2 and cross-sections of girders The reinforced concrete girders were constructed of concrete having compressive strength of 30 MPa and of steel reinforcement with yield strength of 500 MPa. At expansion joints, elastomer bearings of 100x250x52 mm and 625 kn bearing capacity were placed. These

7 A Slipway Structure for River Ship Repair 253 elastomer bearings allow horizontal movements of the structure caused by different reasons such as temperature effects, loading forces, settlement etc. Between the girders, transverse beams of 40 by 40 cm cross-section, perpendicular to the girders, were constructed. These transverse reinforced concrete beams with compression strength of 30 MPa and with steel reinforcement having yield strength of 400 MPa are placed in five lines (see Fig. 2). Figure 6 Cross-section 2-2 with reinforcement of girders shown in Figure 5 A working platform is at the height of 98.8 m above see level. The foundations for hauling winches are installed 4.20 m from the end of the horizontal part of the structure. There are ten winch foundations of 3.0x3.4x2.0 m. In the space between them and the slipway girders, concrete channels of 26 cm in depth and 120 cm in width were placed for hauling winch ropes to be used for ship pulling up from the water. After compaction of the subgrade to the modulus of 50 MPa, reinforced concrete slabs between all girders were constructed. A 2.4 by 5.0 by 2.0 m foundation block was constructed for a drive-motor for all ten hauling winches. The constructed slipway structure with trolleys is shown in Figure 7. Figure 7 The constructed slipway structure with trolleys

8 254 Sorić, Vugrinec, Kvasnička, Kišiček, Galić, Matešić 4. Conclusions The slipway structure designed for repair of inland water navigation ships was an interesting challenge both for designers and for constructors. Such a structure was needed for a long time, and this is the first slipway to be built in Croatia. It is planned to construct two additional similar structures on Croatian rivers in the near future. The entire slipway structure together with foundations, piles, girders and slabs contains 3606 m 3 of concrete and 2508 tonnes of steel reinforcement. References Miljković, B. (2002), Geotechnical report, E , Geokon-Zagreb d.o.o. Vugrinec, R., Miljković, B. & Matešić, L. (2002) Main and working design, E , Geokon-Zagreb d.o.o. Authors Professor, Ph. D. Sc., Dipl. Ing. C.E., Zorislav Sorić: Faculty of Civil Engineering, University of Zagreb, Kaciceva 26, Croatia. , soric@grad.hr Dipl. Ing. C.E., Radovan Vugrinec "Geokon-Zagreb", Starotrnjanska 16a, Zagreb, Croatia. , r.vuginec@geokonzg.com Professor, Ph. D. Sc., Dipl. Ing. C.E., Predrag Kvasnička: University of Zagreb, Faculty of Mining, Geology and Petroleum Engineering, Zagreb, Croatia , pkvasnic@rgn.hr Assistant, M. Sc., Dipl. Ing. C.E., Tomislav Kišiček: Faculty of Civil Engineering, University of Zagreb, Kaciceva 26, Croatia. , kisha@grad.hr Assistant, Dipl. Ing. C.E., Josip Galić: Faculty of Civil Engineering, University of Zagreb, Kaciceva 26, Croatia. E- mail, jgalic@grad.hr Assistant Professor Ph. D. Sc., Dipl. Ing. C.E., Leo Matešić: "Geokon-Zagreb", Starotrnjanska 16a, Zagreb & University of Rijeka, Faculty of Civil Engineering, Rijeka, Croatia. , l.matesic@geokonzg.com

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

The Knowledge Bank at The Ohio State University. Ohio State Engineer. Testing the Bearing Power of Soils.

The Knowledge Bank at The Ohio State University. Ohio State Engineer. Testing the Bearing Power of Soils. The Knowledge Bank at The Ohio State University Ohio State Engineer Title: Testing the Bearing Power of Soils Creators: Morris, Clyde Tucker, 1877- Issue Date: Publisher: Jan-1926 Ohio State University,

More information

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction

More information

EXCITING WORLD OF STEEL STRUCTURES

EXCITING WORLD OF STEEL STRUCTURES ENABLING STRUCTURES INNOVATIVE SOLUTIONS FOR COMPLEX CONSTRUCTION PROBLEMS BY ER. A.B. KARNIK CONSULTING ENGINEER EXCITING WORLD OF STEEL STRUCTURES 1 PART 1- INTRODUCTION PART 2 - CASE STUDIES FOR ENABLING

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries

Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries PA1a Working Group Session, Vukovar, 28 October 2014 Gudrun Maierbrugger, Technical Secretariat Priority

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty

Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty Geotechnical Safety and Risk V T. Schweckendiek et al. (Eds.) 2015 The authors and IOS Press. This article is published online with Open Access by IOS Press and distributed under the terms of the Creative

More information

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

RoaDrain Synthetic Subsurface Drainage Layer (SSDL) RoaDrain Synthetic Subsurface Drainage Layer (SSDL) INSTALLATION QUALITY ASSURANCE MANUAL Contents 1.0 INTRODUCTION... 1 2.0 ROLL PACKAGING... 1 3.0 MATERIAL DELIVERY... 1 4.0 UNLOADING & STORAGE PROCEDURES...

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Ground Failure Mechanism of Micoropiled-raft

Ground Failure Mechanism of Micoropiled-raft Ground Failure Mechanism of Micoropiled-raft T. H. Hwang 1), H. J. Kim 2), and * J.H. Shin 3) 1), 2), 3) Department of Civil Engineering, Konkuk University, Seoul 143-701, Korea 3) jhshin@konkuk.ac.kr

More information

Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing

Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing A. Reto Schreier GEO, Denmark, rsc@geo.dk B. Anders Tovsig Schaarup Andersen Per Aarsleff A/S, Denmark, ata@aarsleff.com C. Nataša Katić + Peter

More information

Structurals Rationalised sizes of Beams/Joists, Channels and Angles

Structurals Rationalised sizes of Beams/Joists, Channels and Angles Structurals Rationalised sizes of Beams/Joists, Channels and Angles Section Dimensions Sectional Weight Length mm kg/m m Beams/Joists Beams Durgapur Steel Plant 175 x 85 x 5.8 19.6 Std length 200 x 100

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Displacement-based calculation method on soil-pile interaction of PHC pipe-piles

Displacement-based calculation method on soil-pile interaction of PHC pipe-piles Seattle, WA Displacement-based calculation method on soil-pile interaction of PHC pipe-piles Dr. Huang Fuyun Fuzhou University 31 st May, 217 Outline Background ing introduction ing results Simple calculation

More information

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS SOIL ANCHORS ignasi.llorens@upc.edu ETSAB/UPC - 2013 PASSIVE ANCHORS - ANTECEDENTS Antecedents of passive anchors can be found in Nature. Roots feed plants and provide uplift resistance against the wind

More information

RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS

RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS 1995 Publications P (Additional Rule Requirements), issued by Polski Rejestr Statków, complete

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 00 04 CIVIL ENGINEERING TUTORIAL QUESTION BANK Course Name Course Code Regulation Course Structure Course Coordinator Course Faculty

More information

Hydrographic Surveying Methods, Applications and Uses

Hydrographic Surveying Methods, Applications and Uses Definition: Hydrographic Surveying Methods, Applications and Uses It is the branch of surveying which deals with any body of still or running water such as a lake, harbor, stream or river. Hydrographic

More information

CE 535, Spring 2002 Preliminary Design Example 1 / 6

CE 535, Spring 2002 Preliminary Design Example 1 / 6 CE 535, Spring 2002 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

Successful slope stabilization under severe conditions

Successful slope stabilization under severe conditions Successful slope stabilization under severe conditions Andreas BRANDNER, Dipl.-Ing., Chartered Consulting Engineer Abstract Two examples of successful slope stabilization show the versatility and strength

More information

Civil Application Solutions

Civil Application Solutions Civil Application Solutions Features - Chiseled Cutting Edges - Increased Surface Area - Lateral Direction Guide Ribs Benefits - Faster Installation and Penetrates Harder Soils - Quicker Loading, Stronger

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

Pressuremeters in Geotechnical Design

Pressuremeters in Geotechnical Design Pressuremeters in Geotechnical Design B.G. CLARKE Department of Civil Engineering University of Newcastle upon Tyne BLACK1E ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Glasgow Weinheim

More information

FP McCann Tunnels and Shafts 1

FP McCann Tunnels and Shafts 1 FP M c Cann FP McCann Tunnels and Shafts 1 The McCann range of shaft and tunnel products have been developed to meet the requirements of the latest industry standards which include the British Tunnelling

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING Tutorial Question Bank Name : FOUNDATION ENGINEERING Code : A60126 Class : III B. Tech II Semester Branch

More information

Perched Box Caisson Overview. January 2014

Perched Box Caisson Overview. January 2014 Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

Port Sections Guide Section 01

Port Sections Guide Section 01 s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station

More information

PTV OBSTACLES The following PTV obstacles are approved for use in Affiliated BHS TREC events

PTV OBSTACLES The following PTV obstacles are approved for use in Affiliated BHS TREC events PTV OBSTACLES The following PTV obstacles are approved for use in Affiliated BHS TREC events (1) Bank (Ridden) (2) Bending (Ridden) (3) Corridor (Led) (4) Corridor (Ridden) (5) Dip/Crater (Ridden) (6)

More information

Bore-Gard Installation - 1,000 ft. Perry, Oklahoma

Bore-Gard Installation - 1,000 ft. Perry, Oklahoma Bore-Gard Installation - 1,000 ft. Perry, Oklahoma Distance of Installation: Maximum Pulling Force on Pipe: Reamer Diameter: Soil Conditions: 1,000 feet Approx. 7,500 pounds 8 inch Beaver Tail Wet Clay

More information

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE 1 1) INTRODUCTION 2) THE UNFAIR ADVANTAGE and Stingray earth anchors are driven tipping plate soil anchors for reaction of tensile loads. anchors have ultimate capacities up to 20 tons, and Stingray anchors

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Risk Control at United Fire Group

Risk Control at United Fire Group In the United States, falls are the leading cause of fatalities on a construction site. Employers and employees need to do the following: Where protection is required, select fall protection systems appropriate

More information

Introduction of world construction methods and trends. Franz-Werner Gerressen, Head of Method Development, Tokyo,

Introduction of world construction methods and trends. Franz-Werner Gerressen, Head of Method Development, Tokyo, Introduction of world construction methods and trends Franz-Werner Gerressen, Head of Method Development, Tokyo, 2017-11-29 1 Introduction of world construction methods and trends Outline Single Pass Piling

More information

Product highlights Variable frequency and thrust

Product highlights Variable frequency and thrust Innovative engineering for extreme global environments FT550 - VIBROCORER The 3rd generation FT550 lightweight variable frequency high power vibrocorer leads the market in its technical innovation and

More information

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1 INTRODUCTION Located along the western coast of Kauai, the Mana Drag Racing Strip (MDRS) at the Kauai Raceway Park was originally constructed in 1971. This 40+ year old track, once home to taro fields

More information

CODE OF PRACTICE AIRGUN RANGE CONSTRUCTION

CODE OF PRACTICE AIRGUN RANGE CONSTRUCTION CODE OF PRACTICE AIRGUN RANGE CONSTRUCTION INTRODUCTION Unlike cartridge ranges, which require a Range Safety Certificate to be issued by the Ministry of Defence, there is no inspection and certification

More information

Special Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in.

Special Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in. Special Considerations for Structural design and Fabrication for tankers or similar vessels with Large Size (150m or more in length) in polar waters He. Guangwei Guangwei_ho@chinagsi.com Mai. Rongzhi MRZ@chinagsi.com

More information

15 GRC AS AN ALTERNATIVE MATERIAL FOR LOW-COST, HIGH-DURABILITY FISHING BOATS

15 GRC AS AN ALTERNATIVE MATERIAL FOR LOW-COST, HIGH-DURABILITY FISHING BOATS 15 GRC AS AN ALTERNATIVE MATERIAL FOR LOW-COST, HIGH-DURABILITY FISHING BOATS H. W. ASHADI, Material Laboratory, Civil Engineering Dept, University of Indonesia B. SOERYONUGROHO, PT KRAZU Musantara, Indonesia

More information

A STUDY ON LIQUEFIED GROUND DISRUPTION EFFECTS ON LIQUID STORAGE TANK BEHAVIOR

A STUDY ON LIQUEFIED GROUND DISRUPTION EFFECTS ON LIQUID STORAGE TANK BEHAVIOR 143 A STUDY ON LIQUEFIED GROUND DISRUPTION EFFECTS ON LIQUID STORAGE EHAVIOR Mutsuhiro YOSHIZAWA 1, Sadatomo ONIMARU 2, Akihiko UCHIDA 3 And Munenori HATANAKA 4 SUMMARY Three liquid storage tanks located

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012 Bridge Design Preliminary Bridge Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

Regulation to amend the Safety Code for the construction industry. Draft Regulation. 6. Section 64 is amended by replacing

Regulation to amend the Safety Code for the construction industry. Draft Regulation. 6. Section 64 is amended by replacing Part 2 GAZETTE OFFICIELLE DU QUÉBEC, July 3, 2013, Vol. 145, No. 27 1901 6. Section 64 is amended by replacing (1) the first occurrence of soudure in the French text by soudage ; (2) certificate issued

More information

Flowtite GRP manholes Installation Manual

Flowtite GRP manholes Installation Manual Flowtite GRP manholes Installation Manual Technical Documentation 09-18 EN V2 0 Contents 1 Introduction 03 1.1 Foreword 03 1.2 Safety 03 1.3 Material 03 2 Shipping, Handling and Storage 04 2.1 Inspection

More information

An Introduction to Deep Foundations

An Introduction to Deep Foundations An Introduction to Deep Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the

More information

Scour monitoring around offshore jackets and gravity based foundations

Scour monitoring around offshore jackets and gravity based foundations Scour monitoring around offshore jackets and gravity based foundations A. Bolle, J. De Winter, W. Goossens, P. Haerens, G. Dewaele ICSE 6, August 2012, Paris 11-Sep-12 / Bolle et al. 2012 ICSE 6, Paris

More information

The Adequacy of Pushover Analysis to Evaluate Vulnerability of Masonry Infilled Steel Frames Subjected to Bi-Directional Earthquake Loading

The Adequacy of Pushover Analysis to Evaluate Vulnerability of Masonry Infilled Steel Frames Subjected to Bi-Directional Earthquake Loading The Adequacy of Pushover Analysis to Evaluate Vulnerability of Masonry Infilled Steel Frames Subjected to Bi-Directional Earthquake Loading B.Beheshti Aval & M. Mohammadzadeh K.N.Toosi University of Technology,

More information

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES J.R. Qian 1 W.J. Zhang 2 and X.D. Ji 3 1 Professor, 3 Postgraduate Student, Key Laboratory for

More information

RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS July

RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS July RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS 2016 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory where applicable.

More information

Bearing Capacity and Settlement Response of PMS Tanks on Cohesionless Soil Lithology in Lekki, Lagos of Nigeria

Bearing Capacity and Settlement Response of PMS Tanks on Cohesionless Soil Lithology in Lekki, Lagos of Nigeria Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research,, ():- (http://scholarsresearchlibrary.com/archive.html) ISSN: 8 Bearing Capacity and

More information

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers.

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers. Case history: Soil investigation for offshore suction anchors anchor foundations for tension and taut leg floaters in deep waters Alternative anchors for floating structures pile Over last 5 - years anchoring

More information

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm STEPPED FOOTING The construction of sloped footing is sometimes difficult and when the slope of the top face of footing is more, say more than 1 vertically to 3 horizontally, it may be difficult to finish

More information

Appendix A Test Pit Logs

Appendix A Test Pit Logs Appendix A Test Pit Logs Pit number : Test Pit 1 Depth Geological Description Scala Penetrometer (mm) 0-200 Light brown silty Topsoil with some gravel 200-400 Fine to medium GRAVEL; grey. Loosely packed;

More information

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research, 201, 2 (4):20-27 (http://scholarsresearchlibrary.com/archive.html) ISSN: 22 0041 Influence

More information

Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture

Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture Jordan Journal of Civil Engineering, Volume, No. 1, 16 Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture Ashis Kumar Bera 1)* and Sayan Kundu 2) 1) Associate Professor

More information

User Instructions. Installing Fall Protection Void Formers. Please read carefully before fixing anchorage components into formwork

User Instructions. Installing Fall Protection Void Formers. Please read carefully before fixing anchorage components into formwork Installing Fall Protection Void Formers. Please read carefully before fixing anchorage components into formwork May 2016 Installing moulds into the formwork. Scissorsafe Insert Moulds are cast into the

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072,

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072, Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072, Introduction Eilat city is located in the southern part of the state

More information

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

THE USE OF SPIN FIN PILES IN MASSACHUSETTS THE USE OF SPIN FIN PILES IN MASSACHUSETTS Les R. Chernauskas, P.E., Geosciences Testing and Research, Inc., North Chelmsford, MA Leo J. Hart, Geosciences Testing and Research, Inc., North Chelmsford,

More information

ANGLO AMERICAN S OPEN CUT COAL MINES IN AUSTRALIA. John Hoelle Ismet Canbulat

ANGLO AMERICAN S OPEN CUT COAL MINES IN AUSTRALIA. John Hoelle Ismet Canbulat A RISK RATING SYSTEM FOR ANGLO AMERICAN S OPEN CUT COAL MINES IN AUSTRALIA John Hoelle Ismet Canbulat ANGLO AMERICAN PLC Anglo American Metallurgical Coal is a wholly owned subsidiary of Anglo American

More information

What prompted the collapse of the Chirajara Bridge?

What prompted the collapse of the Chirajara Bridge? What prompted the collapse of the Chirajara Bridge? Translated by: BENJAMIN SANDOVAL GIL Professional Engineer 11070 Katy Fwy Apt 1480 Houston, TX 77043 Cel. (787) 439-0883 bsand56855@gmail.com E'Huang

More information

IMPACT OF DOCKING METHOD ON LOADS IN ELEMENTS FLOATING DOCK VESSEL UNIT

IMPACT OF DOCKING METHOD ON LOADS IN ELEMENTS FLOATING DOCK VESSEL UNIT IMPACT OF DOCKING METHOD ON LOADS IN ELEMENTS FLOATING DOCK VESSEL UNIT Przemysław RAJEWSKI 1, Oleh KLYUS 2 1,2 Institute of Marine Propulsion Plants Operations, Maritime University of Szczecin, Poland

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66513 14 th STREET (MSAS NO. 103) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

STEEL FRAMED ALUMINUM PANEL SHIELDS "STEEL FRAMED" ALUMINUM PANEL SHIELDS MANUFACTURE S TABULATED DATA 3330 S. Sam Houston Pkwy Houston, Texas 77047 (713)943-0750 USA Toll Free 1-800-231-6662 Fax (713)943-8483 Www.speedshore.com PRINTED

More information

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

Fall Protection Resource Guide P AGE 1

Fall Protection Resource Guide P AGE 1 Fall Protection Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

FIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall

More information

(Refer Slide Time: 1:01)

(Refer Slide Time: 1:01) Port and Harbour Structures. Professor R. Sundaradivelu. Department of Ocean Engineering. Indian Institute of Technology, Madras. Module-3. Lecture-11. Breakwater. So we have so far discussed 5 lectures,

More information

Geo-Vibro Corer

Geo-Vibro Corer High Frequency Vibro Coring System Operational Features Proven performance & high quality cores 30 kn impulse at 30 Hz for fast penetration Reliable, lightweight & cost effective Modular construction (cores

More information

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Introduction to Full Depth Asphalt Repairs Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Asphalt Pothole and Patching Repairs Smaller Repairs! Where do Potholes come

More information

AN EXPERIMENTAL STUDY ON BUBBLE DECK SLAB SYSTEM WITH ELLIPTICAL BALLS

AN EXPERIMENTAL STUDY ON BUBBLE DECK SLAB SYSTEM WITH ELLIPTICAL BALLS Proceeding of NCRIET-2015 & Indian J.Sci.Res. 12(1):021-027, 2015 ISSN: 0976-2876 (Print) ISSN: 2250-0138 (Online) AN EXPERIMENTAL STUDY ON BUBBLE DECK SLAB SYSTEM WITH ELLIPTICAL BALLS ARATI SHETKAR a1

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB) UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 62555B WABASHA STREET SOUTH BOUND (MASA 235 SB) OVER THE MISSISSIPPI RIVER CITY OF ST. PAUL OCTOBER 31, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

FINAL REPORT ON: GEOTECHNICAL INVESTIGATION FOR ENVIRONMENTAL REGULATORY TRAINING INSTITUTE AT NIMLI VILLAGE, TIJARA ALWAR, RAJASTHAN.

FINAL REPORT ON: GEOTECHNICAL INVESTIGATION FOR ENVIRONMENTAL REGULATORY TRAINING INSTITUTE AT NIMLI VILLAGE, TIJARA ALWAR, RAJASTHAN. FINAL REPORT ON: GEOTECHNICAL INVESTIGATION FOR ENVIRONMENTAL REGULATORY TRAINING INSTITUTE AT NIMLI VILLAGE, TIJARA ALWAR, RAJASTHAN Submitted to: M/s. Nilayam Housing Pvt. Ltd. 4, Windmill Place Aya

More information

coolaroo.com Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions.

coolaroo.com Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions. Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions. Features Provides 100% UV block Water resistant M ade with UV stabilised knitted

More information

THE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS

THE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS Guide for the Mooring of Oil Carriers at Single Point Moorings GUIDE FOR THE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS DECEMBER 2010 American Bureau of Shipping Incorporated by Act of Legislature

More information

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS 1 GENERAL Ship designers are encouraged to consider all aspects of pilot transfer arrangements at an early stage in design. Equipment

More information

SAFETY OF NAVIGATION STANDARDS IN THE PORTS OF NAUTICAL TOURISM WITH A SPECIAL FOCUS ON THE MAINTENANCE OF THE PORT ORDER

SAFETY OF NAVIGATION STANDARDS IN THE PORTS OF NAUTICAL TOURISM WITH A SPECIAL FOCUS ON THE MAINTENANCE OF THE PORT ORDER SAFETY OF NAVIGATION STANDARDS IN THE PORTS OF NAUTICAL TOURISM WITH A SPECIAL FOCUS ON THE MAINTENANCE OF THE PORT ORDER Ranka Petrinović, Ph. D, Full Professor Nikola Mandić, Ph. D, Assistant Professor

More information

Inflatable Packers for Grouting 11/10/00

Inflatable Packers for Grouting 11/10/00 Introduction Inflatable Packers for Grouting 11/10/00 Inflatable packers are frequently used for grout injection in geotechnical applications for structural reinforcement and/or water-proofing of foundations,

More information

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D.

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D. Lateral Load Analysis Considering Soil-Structure Interaction ANDREW DAUMUELLER, PE, Ph.D. Overview Introduction Methods commonly used to account for soil-structure interaction for static loads Depth to

More information

tunnels & shafts brochure

tunnels & shafts brochure V1.0 Precast Concrete Solutions tunnels & shafts brochure v.2.0 FP McCann is the UK s market leader in the manufacture, supply and delivery of precast concrete solutions. Our comprehensive precast concrete

More information

Fall Protection Checklist. Guardrail System

Fall Protection Checklist. Guardrail System Fall Protection Checklist Location/Department: Date of Inspection: Inspectors: Corrective Actions: Work order/memos were issued: Yes No Date issued: In accordance with the MIOSHA and OSHA standards the

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections TECHNICAL MANUAL Anchoring Coupler For Smart Bolted Connections Version: PEIKKO GROUP 03/2017 Anchoring Coupler For bolted connections Multi-purpose anchoring system for all bolted connections Simplifi

More information

Alaska Deep-Draft Arctic Port System

Alaska Deep-Draft Arctic Port System Alaska Deep-Draft Arctic Port System Seward Peninsula, AK, Alaska District, Pacific Ocean Division February 2014 PN: ####### Status: DRAFT Alaska Deep-Draft Arctic Ports System i Table of Contents 1.0

More information

Contribution to the snow protection solutions for pitched roofs

Contribution to the snow protection solutions for pitched roofs Contribution to the snow protection solutions for pitched roofs Jozef Oláh1 and Michal Šida1,* 1 Slovak University of Technology in Bratislava, Faculty of Civil Engineering, Radlinského 11, 810 05 Bratislava,

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

Davorin Matanović DRILLING LINE (ROPE) AND BLOCKS

Davorin Matanović DRILLING LINE (ROPE) AND BLOCKS Davorin Matanović DRILLING LINE (ROPE) AND BLOCKS DRILLING LINE (ROPE) AND BLOCKS The term drilling line pertain to the wire rope made from steel wires. It is spooled onto the drum of the draw works hoist,

More information

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position

More information

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0 Whaley Steel Corp Environment, Health & Safety Manual Section-3.0 Title- Fall Protection Effective Date: 03 Jan 14 Revision-0 1.0 PURPOSE 1.1 The purpose of the fall protection program is to: ensure all

More information

Application of pushover analysis in estimating seismic demands for large-span spatial structure

Application of pushover analysis in estimating seismic demands for large-span spatial structure 28 September 2 October 2009, Universidad Politecnica de Valencia, Spain Alberto DOMINGO and Carlos LAZARO (eds.) Application of pushover analysis in estimating seismic demands for large-span spatial structure

More information

Formation level = m. Foundation level = m. Height of the wall above the Ground Level = 7.42 m

Formation level = m. Foundation level = m. Height of the wall above the Ground Level = 7.42 m DESIGN OF RETAINING WALL INTRODUCTION: This wall is designed for active earth pressure and live load surcharge pressure The loads for the purpose of design are calculated per meter length of wall. BASIC

More information