Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1

Size: px
Start display at page:

Download "Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1"

Transcription

1 INTRODUCTION Located along the western coast of Kauai, the Mana Drag Racing Strip (MDRS) at the Kauai Raceway Park was originally constructed in This 40+ year old track, once home to taro fields and agricultural lands, was developed to help take racing off the streets and promote a safe environment for people to drag race their vehicles. The project site is owned by the Department of Land and Natural Resources (DLNR) and leased to the Garden Isle Racing Association (GIRA), a non-profit organization, who manages, maintains, and hosts events with the help of volunteers and donations. Races held at MDRS are family oriented community events that draw families and individuals both young and old from across the island to watch and participate in drag races. Junior drag racing competitions allow youths between the ages of 8 and 17 to get involved and learn about drag racing while Top Gun races provide a place for the fastest cars in the state to show off their muscle. As one of the few drag racing strips left in Hawaii and one of only two NHRA member tracks in the state, the MDRS is an important part of the motorsports community, Kauai, and the State of Hawaii. EXISTING TRACK CONDITION MDRS is a 3/4 mile long Asphalt Concrete (AC) track including a 100 long concrete launch pad located at the starting line. The original asphalt pavement constructed in 1971 still composes a majority of the track surface. With 40+ years of racing and no repaving done to the track, the pavement showed its age with areas of raveling aggregate and large cracks on both the concrete launch pad and asphalt pavement. To ensure that the track was drivable, volunteers would burn grass and weeds growing through the cracks in the pavement prior to each race. Several areas were also patched with concrete pavement to repair settlement issues throughout the years. Figure 1 Existing Track Condition: Grass/Weeds growing through numerous cracks. Figure 2 Existing Track Condition: Concrete patches along track length. Page 1

2 THE ISSUES The MDRS was originally designed with a typical 2% crowned roadway pavement section. As a sanctioned NHRA track, the 2% cross slope exceeded the NHRA guidelines which allowed for a maximum 1% cross slope. At top speeds in excess of 120 MPH, the 2% cross slope created uneven traction conditions pulling drivers toward the edge of the track. Racers unware or not used to these conditions were at high risk of crashing. Throughout its 40+ year life, the track also experienced pavement settlement in several locations. Concrete patches used to repair the areas created varying pavement conditions. At high speeds, the change in pavement conditions could potentially cause vehicles to lose traction or move erratically. Drivers put in those situations where required to make sharp corrections which could cause them to veer into the barriers or adjacent lane putting the other driver or public at risk. In addition to the safety conditions of the track, the 40+ year old pavement showed its age. Pavement cracking accelerated by the hot and dry climate at Mana was prevalent throughout the track. Grass and weed growth through the cracks required continues maintenance and promoted wear and tear and at times damage to vehicles. Experience, skill and education of new drivers help minimize accidents on the track. However, to ensure the ongoing safety of both spectators and participants and allow GIRA to continue promoting safe and legal motorsports, improvements to the track surface at MDRS were necessary. PROJECT OBJECTIVES AND CHALLENGES The Limtiaco Consulting Group (TLCG) was tasked to develop an economic and timely solution that would allow for the maximum length of track to be repaired meeting NHRA regulations. Working closely with GIRA and the Department of Land and Natural Resources (DLNR), TLCG was able to identify the following project challenges: Limited construction budget and schedule; Strict specifications to maintain NHRA sanctioning status; and Land use approvals. The Mana Drag Racing Strip Improvements project was a state funded project awarded after many years of petitioning by the community. Appearing as a non-essential state improvement, budget for the project was very limited and well below estimates required to repair the entire drag strip. In addition, as a non-profit organization managing the track, GIRA relied heavily on the monthly races to maintain their operating budget. Schedule and budget would play a big role in the design approach taken. Page 2

3 As a sanctioned NHRA track, strict requirements governed not only the rules of the race track and its operations; it also provided stringent design requirements to adhere to. Pavement gradients not typical to industry standards (maximum 1% slopes) posed a concern to the end product. Other requirements such as clear spaces and safety barriers were made more challenging given the existing site conditions. The MDRS located along the west shore of Kauai also required a number of land use permits and environmental clearances. In addition to an Environmental Assessment required for State funding, the project was located along the shoreline and was in the Special Management Area and Conservation District. The project site was also in proximity of the flight path for endangered birds and adjacent to areas with historical archaeological finds. DESIGN APPROACH Design of the Mana Drag Racing Strip Improvements project incorporated the use of AutoCAD Civil3D; a 3D modeling and drafting program. Civil3D was used to create a 3D model of the existing race track and any proposed track improvements. Modeling allowed for immediate evaluation of proposed design scenarios; providing impacts to material quantities and the construction budget. Given the limited construction budget, TLCG worked closely with GIRA and DLNR to ensure efficient use of the funding. An approach was developed creating a base scope of work which included GIRA s minimum requirements (reconstruction of the launch area and repaving the first ¼ mile). The construction documents were also prepared to allow for additional work including additional pavement resurfacing should the bid and budget allow. Soil borings were taken along the track surface to determine the existing subsurface conditions and develop a specific pavement restoration design. Through discussions with GIRA, the starting launch area would be reconstructed with concrete having a 0% slope. This would provide a flat, even, and durable surface allowing for safe and controlled launches. The track would then transition to an asphalt concrete surface with a 1% crown slope. TLCG worked with GIRA to determine the appropriate length of the concrete launch pad to ensure that the pad and transition lengths were long enough to allow for the vehicle to gain full traction after their launch and ease them into the 1% crowned slope. CONSTRUCTION CHALLENGES During construction, a known layer of sand and clay provided a challenge for the contractor to create a stable subgrade for the new concrete launch pad. Clay layers were removed to expose the underlying sand, but maintaining compaction and moisture proved difficult. Working together to find a solution, a quick and efficient work flow of subgrade compaction and base course installation was established to ensure a good foundation for the concrete slabs. Page 3

4 Figure 3 Pouring of concrete launch Pad Figure 4 Checking loose AC with 3foot digital level prior to rolling. To eliminate perpendicular cold joints and the possibility of dissimilar movement of the concrete slabs, each lane of the concrete launch pad was designed to pour monolithically. Given Mana s hot and dry climate, the contractor quickly discovered that pouring concrete during the day would be difficult. Under the collaboration with DLNR and TLCG, the contractor adjusted his schedule to pour all concrete slabs at night. Preparation for the pours started in the late night hours with the concrete pour occurring through early morning to ensure workability of the concrete. Work lights were necessary for the contractor to complete their work, but location of the project near the flight path of endangered birds posed a potential risk. TLCG coordinated with the U.S. Fish and Wildlife service to ensure proper precautions were taken and minimize the possibility of injuring the seabirds. QUALITY CONTROL With the strict NHRA guidelines and tight tolerances not typically found in roadway pavement construction, the contractor needed to implement additional quality control measures. Topographic surveys were conducted during multiple stages of construction to ensure the strict tolerances were met. Surveys of the subbase, base course, and finished pavement were assessed in 3D models to ensure design specifications were met. Verification with a 3-foot digital level and 10-foot straight edge was also done to meet specification requirements. Page 4

5 Figure 5 Pavement installed using the tried and true String Line method Figure 6 Verifying pavement thickness prior to rolling. Paving to meet a 1% maximum cross slope is not the industry standard and is difficult at best. The paving contractor decided to utilize the tried and true string line method of pavement installation. In addition, checks during various stages of the paving process were done. A straight edge and tape measure was used intermittently to check the asphalt concrete lift before compacting. The contractor also used the 3-foot digital level as he laid the asphalt concrete to ensure that even the loose layer was close to the required finish specification. To minimize the impact on the vehicle traction and ride and to help promote longevity of the pavement, the asphalt concrete pavement was laid with joints at mid-lane. Figure 7 Good practices result in a good product. Contractor cleans the edge of the pavement joints before rolling. Figure 8 AC pavement joints kept at mid-lane to minimize impact of vehicle tires. Page 5

6 CONCLUSIONS Prior to the project, the aging track surface was in dire need of repairs and posed safety concerns for the racers and public spectators. The track improvements at MDRS were a success. The concrete and asphalt pavements were installed and met the strict NHRA requirements. MDRS was able to retain its NHRS member track designation. On the weekend of July 4, 2014, the Mana Drag Racing Strip was reopened to the public and the first race of the season was a success. The improvements garnered complements from seasoned race goers as the flatter, smoother, and ultimately faster track surface was a stark contrast to the previously aging track. Successful completion of the project attracted the attention of not only local drag racers but the NHRA, with Kauai Raceway Park receiving an award for the Most Improved Facility in the Pacific region. With the completion of the improvements, GIRA hopes to continue with their mission to promote safe motor sports, host family oriented community events, and to educate and encourage safe driving practices for another 40+ years. Figure 9 Completed Track Improvements (Concrete Launch Pad) Figure 10 On Your Mark, Get Set, Governor Abercrombie gives the green light Page 6

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Introduction to Full Depth Asphalt Repairs Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Asphalt Pothole and Patching Repairs Smaller Repairs! Where do Potholes come

More information

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently

More information

SECTION 5: PEER CITY REVIEW

SECTION 5: PEER CITY REVIEW SECTION 5: PEER CITY REVIEW 5.1 Introduction It is evident that the City of Lincoln continually strives to improve its operations and practices. To that end, a list of peer cities was developed to compare

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -

More information

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

RoaDrain Synthetic Subsurface Drainage Layer (SSDL) RoaDrain Synthetic Subsurface Drainage Layer (SSDL) INSTALLATION QUALITY ASSURANCE MANUAL Contents 1.0 INTRODUCTION... 1 2.0 ROLL PACKAGING... 1 3.0 MATERIAL DELIVERY... 1 4.0 UNLOADING & STORAGE PROCEDURES...

More information

Road Quality Working Group. June 11, 2015

Road Quality Working Group. June 11, 2015 Road Quality Working Group June 11, 2015 1 Why do roads fail? PRIMARY CULPRIT: Alkali/silica reaction, or ASR, which causes concrete to expand and crack when exposed to moisture over time Road damage from

More information

High Performance Racetracks

High Performance Racetracks High Performance Racetracks Good for a Racetrack, Good for a Highway? 38 th Annual Rocky Mountain Asphalt Conference and Equipment Show Brian D. Prowell, Ph.D., P.E. Road Courses Advanced Materials Services

More information

ADA TRANSITION PLAN 2013

ADA TRANSITION PLAN 2013 ADA TRANSITION PLAN 2013 TABLE OF CONTENTS Contents Introduction 1 Purpose 2 Identified Obstacles to the Public Right of Way 3 Criteria for Determining Impediments at Village Facilities 4 Removing Barriers

More information

City Sidewalk Repair and Replacement Program

City Sidewalk Repair and Replacement Program City Sidewalk Repair and Replacement Program May 30, 2006 http://www.adventuregovernment.com Purpose Improve pedestrian safety Increase handicap accessibility Create a more walkable community Decrease

More information

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research 2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Office of Pavement Engineering October 14, 2003 Abstract: This paper summarizes the current practice in ODOT regarding the construction

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

Chapter 9 Maintenance

Chapter 9 Maintenance Chapter 9: 9-1.0 Introduction Maintenance The maintenance of bikeways is closely linked to bicyclists safety and the preservation of the bikeway function and investment. Poor maintenance, resulting in

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996

ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996 ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and July.

More information

900 BICYCLE FACILITIES Traffic Engineering Manual

900 BICYCLE FACILITIES Traffic Engineering Manual TABLE OF CONTENTS Part 9 - BICYCLE FACILITIES 900 GENERAL... 9-3 900-1 General Background... 9-3 900-2 Designated Bicycle Routes... 9-3 901 SIGNING... 9-4 901-1 General... 9-4 901-2 Bicycle 3-Foot Clearance

More information

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC Page 1 of 14 FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC FSH 7709.55 - TRAVEL PLANNING HANDBOOK Amendment No.: 7709.55-2009-3 Effective Date: January 8, 2009 Duration: This amendment

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

MARTIN LUTHER KING JR. WAY

MARTIN LUTHER KING JR. WAY OCTOBER 2011 40 Vision and Goals The Martin Luther King, Jr. Way Illustrative Master Plan that follows has been developed through a process of community involvement. It expresses a long term vision for

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway. Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along

More information

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study DRAFT Technical Memorandum #6 Cost and Benefit Evaluation Methodology August 2016 Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT

More information

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another. Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized

More information

Specifier Note: Retain or delete material(s) below to conform to project requirements.

Specifier Note: Retain or delete material(s) below to conform to project requirements. SECTION 32 15 40 DECOMPOSED GRANITE SURFACING NOTE: These specifications were current at the time of publication but are subject to change at any time without notice. Please confirm the accuracy of these

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force 1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria

More information

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE FORM GEN. 160 (Rev. 11-02) CITY OF LOS ANGELES INTERDEPARTMENTAL CORRESPONDENCE Date: To: Honorable City Council From: Gary Lee Moore, City Engineer Bureau of Engineering 7%mt /Electronically signed by

More information

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

Expanding Your Tennis Court Knowledge

Expanding Your Tennis Court Knowledge Expanding Your Tennis Court Knowledge Randy Futty Vice President - Business Development California Sports Surfaces Maiysha Warren National Manager, CTAs, Parks and Tennis Facility Development United States

More information

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access. Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access. For the following slides assume an overlay project and provide pedestrian

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

Global EHS Powered Industrial Truck and Pedestrian Safety

Global EHS Powered Industrial Truck and Pedestrian Safety Global EHS Powered Industrial Truck and Pedestrian Safety Control No: Policy Name: Powered Industrial Truck and Pedestrian Safety Policy Responsible Corporate Function/Business Segment: Global Environmental

More information

ADA & Public Rights of Way

ADA & Public Rights of Way ADA & Public Rights of Way Overview of Current and Up-coming Requirements FDOT Design Training Expo 2012 Orlando, FL Dean Perkins, RA - ADA Coordinator Florida Department of Transportation Office of Design,

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

900 BICYCLE FACILITIES Traffic Engineering Manual

900 BICYCLE FACILITIES Traffic Engineering Manual TABLE OF CONTENTS Part 9 - BICYCLE FACILITIES 900 GENERAL... 9-3 900-1 General Background... 9-3 900-2 Designated Bicycle Routes... 9-3 901 SIGNINGS... 9-4 902 MARKINGS... 9-4 902-1 General... 9-4 902-2

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

NASHVILLE BICYCLE PARKING GUIDE

NASHVILLE BICYCLE PARKING GUIDE NASHVILLE BICYCLE PARKING GUIDE TABLE OF CONTENTS ABOUT WALK BIKE NASHVILLE 3 WHY BICYCLE PARKING MATTERS 4 BICYCLE PARKING GUIDANCE 5 Build for a Purpose 5 Staff Parking vs. Customer Parking 5 Good Frame

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

Bicyclist Signing Guidelines

Bicyclist Signing Guidelines Bicyclist Signing Guidelines April, 2009 1 Introduction This paper describes the Montana Department of Transportation s (MDT) current practices related to bicyclist safety and signing issues and presents

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

Improve the livability of our streets by

Improve the livability of our streets by Pedestrian and Traffic Calming Policy March 2018 2 of 6 Neighborhood Traffic Calming Policy The City of Aspen continually strives to protect multimodal function while maintaining a high standard of safety.

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3

More information

TGSI Tactile Ground Surface Indicators

TGSI Tactile Ground Surface Indicators TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program County of Greenville South Carolina Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program (rev) August 2008 I. PURPOSE The potential negative impacts from vehicular traffic

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

County of Spartanburg South Carolina

County of Spartanburg South Carolina County of Spartanburg South Carolina Traffic Calming Program June 2012 (Revised/Program on Hold) PURPOSE The potential negative impacts from vehicular traffic on residential roads have been a longstanding

More information

A Residential Guide to Neighborhood Speed Enforcement

A Residential Guide to Neighborhood Speed Enforcement A Residential Guide to Neighborhood Speed Enforcement City of Delaware, Ohio A Residential Guide to Neighborhood Speed Enforcement Introduction: The perception of speeding on local streets is probably

More information

PROJECT FACT SHEET May 25, 2018

PROJECT FACT SHEET May 25, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

AERODROME ADVISORY CIRCULAR

AERODROME ADVISORY CIRCULAR GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION AD AC NO. 2 of 2017 5 th July 2017 AERODROME ADVISORY CIRCULAR Subject: Guidance on Movement Area Pavement Maintenance Procedures at Aerodromes.

More information

Idaho Driver Education and Training

Idaho Driver Education and Training Idaho Driver Education and Training Strategies for Controlled Access Highways Part I M13-1 Introduction to Controlled Access Highways Plans for the Interstate System," began in the late 1930s The system

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Off-Road Facilities Part 1: Shared Use Path Design

Off-Road Facilities Part 1: Shared Use Path Design Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign

More information

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective

More information

Track Use and Maintenance Guidelines

Track Use and Maintenance Guidelines Precision Sports Surfaces, Inc. 3325 Lobban Place, Charlottesville, VA 22903 (434) 971-9628 Fax (434) 971-1131 www.precisionsurfaces.com Track Use and Maintenance Guidelines The following information is

More information

ESTABLISHING PERFORMANCE GUIDELINES FOR SPORTS FIELDS IN AUSTRALIA

ESTABLISHING PERFORMANCE GUIDELINES FOR SPORTS FIELDS IN AUSTRALIA ESTABLISHING PERFORMANCE GUIDELINES FOR SPORTS FIELDS IN AUSTRALIA Draft document prepared by the Sports Turf Institute Nov 2011 keith@turfinstitute.com.au Brief This information sheet provides recommended

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

ADA Self Evaluation and Transition Plan for Public Rights-of-Way ADA Self Evaluation and Transition Plan for Public Rights-of-Way 2014 NWPMA Conference Akmal Siddiqui WSDOT Local Programs 310 Maple Park Avenue SE Olympia, WA 98504 Phone: 360-705-7539 siddiqa@wsdot.wa.gov

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

ADA Operations Contact Info

ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

Neighborhood Traffic Calming Policy & Guidelines

Neighborhood Traffic Calming Policy & Guidelines Policy & Guidelines Town of Lantana 500 Greynolds Circle Lantana, FL 33462-4594 Index Topic Page Introduction 3 Definitions 4 Objectives 5 Policies 5 Process 6 Phases of Traffic Calming Study 7 Rating

More information

Human Hamster Balls & Conditions

Human Hamster Balls & Conditions Human Hamster Balls & Conditions Human Hamster Balls purchased from Gameops.com have a limited warranty on craftsmanship. If there is a manufacturing error, such as seam that is not sealed completely,

More information

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed Seite 1/11 Job Site Details 1/2 Rehabilitation

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 204-6 Standard Test Procedures Manual Section: 1. SCOPE This procedure determines the density of asphalt concrete in place by using the backscatter position (the gamma radiation source remains on the

More information

Steps to Conducting a Complete Streets Assessment

Steps to Conducting a Complete Streets Assessment Steps to Conducting a Complete Streets Assessment Familiarize yourself with Complete Streets Read through the Complete Streets Assessment Guidelines. This will give you an idea of what Complete Streets

More information

Free Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack

Free Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack Free Floating Screed Screed Weight Forward Motion Material Stability Head of Material Angle of Attack Stability of the Mix Stability of Mix is Critical. Temperature Changes in Mix Can Effect Mat Being

More information

VILLAGE OF NILES TRAFFIC CALMING POLICY

VILLAGE OF NILES TRAFFIC CALMING POLICY INTRODUCTION There is increasing interest across the country in developing new strategies to reduce the speed and amount of traffic in residential neighborhoods. Measurement of speeds, traffic volumes,

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

I-25 South Gap Project Monument to Castle Rock

I-25 South Gap Project Monument to Castle Rock I-25 South Gap Project Monument to Castle Rock Project Overview Castle Rock Town Council April 3, 2018 by Chuck Attardo I-25 South: Monument to C-470 An Important Corridor to Colorado Links the state s

More information