Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA
|
|
- Gavin Copeland
- 5 years ago
- Views:
Transcription
1 Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA
2 First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic: 140,000 to 170,000 AADT Truck Traffic: 20%
3
4 Design Loading Analysis Table 1 RCC Thickness Required Allowable Interior Load Repetitions Over Lifetime of RCC Pavement Design Life in Years 20 yr 10 yr Allowable Daily Repetitions 5 yr
5 Existing Asphalt Shoulder Removed
6
7
8
9
10
11
12 Design and Acceptance RCC: Required 28-day Mix Design Strength of 4,000 psi Cement: 500 lbs/cy Acceptance based on density- 98% AASHTO T-180 or 28-day core strength of 3500 psi Core strength : 3980 psi avg Cylinder strength : 3964 psi avg
13 Concrete Plant
14
15
16 Completed Shoulder
17 Rumble Strips
18 Finished Product
19 March 2010
20 RECONSTRUCTION OF SR 6 RCC SHOULDER RCC MEDIAN
21
22
23
24 RCC 500 lbs/cy cement 5500 psi compressive strength
25 I-985 Gainesville, GA 6000 Cubic Yards of 7 RCC Pavement. 10 Inside Shoulders used for temporary lane. 2.5 Asphalt Overlay for Rideability.
26 I-985 Gainesville, GA
27 I-985 Gainesville, GA
28
29 After Removal of Asphalt Layer 2009
30
31 I-85 Kia Interchange LaGrange, GA 6600 Cubic Yards of 12 RCC Pavement. 10 Outside Shoulders. First use of Dual Lift RCC Shoulders in US.
32 I-85 Kia Interchange LaGrange, GA
33
34
35 GDOT MAINTENANCE FACILITY
36
37
38 Current Project I-75 Widening and Reconstruction in Cook and Tift Counties
39 NH-75-1(206) Cook CSNHS (073) Tift Reconstruct 10 miles of I-75 in northern Cook and southern Tift Counties Let to Contract Successful low bidder was Archer Western Contractors Ltd. Bid Amount: $ 128,485, Contract completion date of
40 NH-75-1(206) Cook CSNHS (073) Tift
41 NH-75-1(206) Cook CSNHS (073) Tift Project in a nutshell Remove existing 4 lanes plain PCC pavement Install 12 Graded Aggregate Base Place mm asphalt superpave Install 6 lanes of 12 Continuous Reinforced Concrete Pavement (413,661 SY) Install Concrete median barrier (51,785 LF) Install inside and outside paved shoulders
42 NH-75-1(206) Cook CSNHS (073) Tift Stage construction was required 51,000 vpd 24% trucks Contractor chose to use Roller Compacted Concrete alternate on outside shoulder Staging called for SB outside shoulder to carry mainline traffic
43 NH-75-1(206) Cook CSNHS (073) Tift
44 NH-75-1(206) Cook CSNHS (073) Tift RCC Shoulder SBL Subcontractor: Site Prep Inc. of North Carolina RCC Paving SBL began: and RCC Paving SBL concluded: and Plant was located on the project SBL Shoulder opened to Stage Construction traffic on: and
45
46
47
48
49
50
51 NH-75-1(206) Cook CSNHS (073) Tift
52
53 NH-75-1(206) Cook CSNHS (073) Tift Shortly after opening to traffic RCC began to show problems on the surface Surface looked like asphalt stripping Surface has continued to ravel and spall Contractor has repaired areas with epoxy based patches
54
55
56
57
58
59
60
61
62 GDOT Specification Density Requirements: In-place field density will be not less than 98% of the average maximum laboratory density obtained according to AASHTO T 180, Method D, based on a moving average of five consecutive tests, with no test below 95%. RCC properly placed and compacted, but not meeting these requirements will be cored and tested at no additional cost.
63 GDOT Specification RCC pavement not meeting density requirements outlined in Subsection D.8, Density Requirements will be accepted based on compressive strength development at 28 days. The compressive strength value shall be at least 3,500 psi (25 MPa).
64 GDOT Specification No Direct Requirement for a test section Rolling: Determine the sequence and number of passes by vibratory and non-vibratory rollers to obtain the specified density and surface finish. Only operate rollers in the vibratory mode while in motion. Rubber-tire rollers may be used for final compaction.
65 GDOT Specification No Direct Requirement for a test section Paver Requirements: Adjust the paver and regulate the speed to prevent segregation and provide a surface course that is smooth and continuous without tears and pulling.
66 GDOT SPECIFICATION Place RCC with an asphalt paver meeting the following requirements: 1. Equip the paver with compacting devices capable of producing a RCC pavement with a minimum of 90% of the maximum density in accordance with AASHTO T 180, Method D. 2. Spread and finish the RCC material without segregation, to the required thickness, smoothness, surface texture, cross-section and grade using a paver of suitable weight and stability.
67 GDOT SPECIFICATION Immediately begin compaction behind the placement of RCC material and complete within 60 minutes of the start of mixing at the plant. This time may be increased or decreased depending on the use of set retarding admixtures or ambient weather conditions of temperature, wind and humidity.
68 GDOT SPECIFICATION Multiple Lift Placement: For multi-layer construction, a horizontal joint is considered a fresh joint when an subsequent RCC lift is placed within 60 minutes of placing the previous lift, with time adjusted depending on use of retarders or ambient weather conditions.
69 GDOT SPECIFICATIONS If segregation occurs in the RCC during paving operations, CEASE the spreading until the cause is determined and corrected to the satisfaction of the Engineer. If the Engineer determines the segregation to be severe, remove and replace the segregated area at no additional cost.
70 Upcoming Project I-16 Replacement of Outside Lane 9 inch RCC for Inside and outside shoulders 330,000 sy Bid Price $18.39 sy
71 QUESTIONS OR COMMENTS
Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E
Presented to: Louisiana Transportation Conference February 26, 2018 Presenter: Corey Zollinger, P.E. - 1 - AGENDA What is Roller Compacted Concrete, Where has it Been Used, and Why? RCC Construction Process
More informationEmerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)
Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council
More informationROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS
ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS James N. McLeod, P.Eng. Regional Manager - Rail Adam Laughlin, EIT Project Engineer Telephone: (780) 486-7000 Fax: (780) 486-7070
More information1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD
Standard Method of Test for Field Determination of Target Density for Plant Produced Asphalt Mix by Use of the Control Strip Technique SCDOT Designation: SC-T-65 (08/18) 1. SCOPE 1.1 This test method is
More informationRennick Yard Roller-Compacted Concrete Pavement
RCC Pavement Council Rennick Yard Roller-Compacted Concrete Pavement February 12, 2016 Submitted By: NCE 1885 S. Arlington Ave., Suite 111 Reno, NV 89509 Phone: 775.329.4955 Site Plan and Pavement Sections
More informationRECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES
RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES C. Zollinger Paving Solutions, CEMEX, Inc, Houston, TX USA Coreyj.zollinger@cemex.com ABSTRACT Roller Compacted Concrete
More informationManaging Density For Asphalt Pavement
Managing Density For Asphalt Pavement 1 Density vs. Pavement Performance 2 Cost of Compaction Least expensive part of the process Compaction adds little to the cost of a ton of asphalt Importance of Compaction
More informationI-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION
I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION Affan Habib, P.E., Pavement Program Manager March 1, 2019 Presentation Outline 1. Introduction 2. Project Descriptions 3. Pavement Performance 4. Predicted
More informationConcrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas
More informationAdvanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In
More informationCompaction Theory and Best Practices
Compaction Theory and Best Practices 2017 Idaho Asphalt Conference Moscow Idaho October 26, 2017 Dave Johonson, P.E. Senior Regional Engineer Asphalt Institute Understanding the Importance of Density 1
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -
More informationSUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003
SUPERPAVE Construction Lessons Learned NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003 SUPERPAVE Construction Lessons Learned LESSON #1 Lesson #1 What is this Stuff? Lesson #1 What is This Stuff?
More informationIntroduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!
Introduction to Full Depth Asphalt Repairs Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Asphalt Pothole and Patching Repairs Smaller Repairs! Where do Potholes come
More informationHIR on Oklahoma Turnpikes
HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center HIR on Oklahoma
More informationATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD
1.0 Scope ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 SCOPE This test procedure describes the method of determining the required minimum number of "passes" with approved compaction equipment,
More information50 Year Roads: Don't Accept Anything Less
50 Year Roads: Don't Accept Anything Less Prepared By Thomas O. Malerk Director of Transportation Engineering Florida Concrete & Products Association NACE Annual Meeting April 22, 2015 Presented by Roger
More information9 QUALITY ASSURANCE PROCEDURES
9 QUALITY ASSURANCE PROCEDURES Random Numbers Design Mix Formula Lot/Sublot -- QC/QA HMA and SMA Acceptance Samples Adjustment Period -- QC/QA HMA and SMA Mixture Acceptance QC/QA HMA HMA SMA Pay Factors
More informationFree Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack
Free Floating Screed Screed Weight Forward Motion Material Stability Head of Material Angle of Attack Stability of the Mix Stability of Mix is Critical. Temperature Changes in Mix Can Effect Mat Being
More informationT-24. A Practical Approach to Managing Density
T-24 A Practical Approach to Managing Density PRESENTED BY: TODD MANSELL, CATERPILLAR March 22-24, 2016 Nashville, TN www.worldofasphalt.com Why do we chase density instead of manage it? Lack of training
More informationAsphalt Mixture Quality Acceptance
Supplemental Technical Specification for Asphalt Mixture Quality Acceptance SCDOT Designation: SC-M-400 (January 1, 2018) 1. SCOPE Use this specification for the acceptance of both hot mix and warm mix
More informationHot Mix Asphalt (HMA) Quality Assurance
Supplemental Technical Specification for May 2, 2008 Hot Mix Asphalt (HMA) Quality Assurance SCDOT Designation: SC-M-400V (06/08) 1. SCOPE Base field acceptance of hot mix asphalt (HMA) mixtures on asphalt
More informationBEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009
BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009 DAILY SAFETY-QUALITY- PRODUCTION EVERY PROJECT EVERY DAY EVERY TON 101 COST SAVING IDEAS FROM NAPA WARM MIX ASPHALT RAP STOCKPILE
More informationBest Practices for Smoothness & Density
Best Practices for Smoothness & Density 55 th Annual Paving Conference Presented by Todd Mansell, CAT Paving Outline 1. Paver Setup Smoothness 2. Balanced Paving Paver & Roller Speed Paver operation 3.
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationSummary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps
Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Office of Pavement Engineering October 14, 2003 Abstract: This paper summarizes the current practice in ODOT regarding the construction
More informationAppendix B Existing ADOT Data Parameters
Appendix B Existing ADOT Data Parameters Appendix 08/04/03 HPMS by Item Number All records 1 Year of Submittal 2 State Code 3 English or Metric Reporting Units 4 County Code 5 Section Identification (ID)
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationFull Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE
Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department of Transportation Bureau of Materials and Tests 110 + MILES ALDOT FDR TOTALS
More informationKentucky Transportation Center
Kentucky Transportation Center TECHNICAL ASSISTANCE REPORT Forensic Pavement Evaluation for US 31 W, Jefferson County, Kentucky KTC TA-15 02/KH91 14 1F DOI: http://dx.doi.org/10.13023/ktc.ta.2015.02 Author(s):
More informationHot Mix Asphalt (HMA) Quality Assurance
Supplemental Technical Specification for March 3, 2010 Hot Mix Asphalt (HMA) Quality Assurance SCDOT Designation: SC-M-400 (05/10) 1. SCOPE Base field acceptance of hot mix asphalt (HMA) mixtures on asphalt
More informationNCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices
NCHRP Project 20-05 Synthesis Topic 48-02 Tack Coat Specifications, Materials, and Construction Practices Danny Gierhart, P.E. Dave Johnson, P.E. Principal Investigators What Exactly Is a Synthesis? A
More information24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year
48 th Annual: Idaho Asphalt Conference 24,801 Roadway Departure Fatalities Nationally The Safety Edge : Minimizing The Effects of Shoulder Drop-off 49% jl 51% Roadway Departure October 23, 2008 Moscow,
More informationBASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager
BASICS OF ASPHALT PAVING: SCREEDS Kevin Jeske Great Lakes Regional Manager CONSTRUCTING QUALITY PAVEMENTS Whether its new construction or rehabilitation, these key steps are necessary to ensure a good
More informationAsphalt Mixture Quality Assurance
Supplemental Technical Specification for Asphalt Mixture Quality Assurance SCDOT Designation: SC-M-400 (10/13) 1. SCOPE Base field acceptance of asphalt mixtures on asphalt binder content, air voids, voids
More informationPerformance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research
2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research
More informationADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1
ADDENDUM REPORT Project: 13286 Bid Package: 2 Current Let: 06/24/2005 11:00 AM Version: Addendum Addendum : 1 District: 06 County: BUCKS SR/SEC/GROUP ID: 4027/33M/R26\Kantner Description R26 - Script C
More informationAEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA
AEMA-ARRA-ISSA-PPRA Fall Meeting 2015 Recycling, Ayrton Senna Highway Brasil, & USA CCPR (Cold Central Plant Recycling) 2012: The Ayrton Senna Highway in Brazil was rehabilitated under challenging conditions
More informationSECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS
SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL...48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS...48.1 48-3 PAINTED TRAFFIC STRIPES AND PAVEMENT
More informationStop Chasing & Start Managing Density
Stop Chasing & Start Managing Density Session: TH-78 Presented by: Todd Mansell, Caterpillar Inc. What is chasing density Measuring, then thumbs up or thumbs down Roller move on www.conexpoconagg.com 2
More informationASPHALT PAVING LEVEL 1
ASPHALT PAVING LEVEL 1 Module 3: Yield Calculations: Tack Coat and Mix Spread Rate FDOT Course Module 3 1 Welcome the students to the third module in this course that covers tack coat and mix spread rates,
More informationAdvantages & Specifications for the Use of Perma-Patch for the Repair of Potholes
Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently
More informationSECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS
SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL... 48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS... 48.1 48-3 PAINTED TRAFFIC STRIPES AND
More informationPROPOSAL. PROPOSAL OF, a corporation a
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More informationRESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)
5.9.56 RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method ) 1. SCOPE This test covers preparation of specimens and measurement of the change of tensile strength resulting
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationSECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN
SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3
More informationDRAFT WSDOT PAVEMENT POLICY
DRAFT WSDOT PAVEMENT POLICY JANUARY 2010 Washington State Department of Transportation Environmental and Engineering Programs Division State Materials Laboratory Pavements Division P.O. Box 47365 Olympia,
More informationIN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8
OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 Scope This test method describes a test procedure for determining the density of bituminous mixes by means of a nuclear gauge
More informationCounty of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS
County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 48 TRAFFIC STRIPES AND PAVEMENT MARKINGS 48-1 GENERAL Traffic stripes and pavement markings shall
More informationFive Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research
I-70 Five Years Later Illinois Asphalt Pavement Association Annual Meeting March 9, 2009 William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research Joint Venture: Howell Asphalt/Paving Champaign Asphalt
More informationImplementing Strategies from Missouri s Blueprint for Safer Roadways Using System-wide Safety Solutions to Save Lives
Implementing Strategies from Missouri s Blueprint for Safer Roadways Using System-wide Safety Solutions to Save Lives John Schaefer Sr. Traffic Studies Specialist Missouri Department of Transportation
More information(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.
S-1 (2399) PAVEMENT SURFACE SMOOTHNESS Use this with SP2016-115 (CONCRETE PAVEMENT) (unless it s an alternate job) and SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE
More informationMethod of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method
Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method 1. Scope: This test is for determining the in place density of asphalt concrete
More informationPENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)
PENNDOT HPMS DATA COLLECTION GUIDE Bureau of Planning and Research April 2016 (Updated March 2018) State Street Dauphin County NOTES INTRODUCTION The purpose of this document is to provide you with some
More informationPENNDOT HPMS DATA COLLECTION GUIDE
PENNDOT HPMS DATA COLLECTION GUIDE Bureau of Planning and Research April 2016 (Updated September 2017) State Street Dauphin County INTRODUCTION The purpose of this document is to provide you with some
More informationPavement Management Report. City Council Meeting of May 21, 2013
Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies
More informationSponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE
PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation
More informationHigh Performance Racetracks
High Performance Racetracks Good for a Racetrack, Good for a Highway? 38 th Annual Rocky Mountain Asphalt Conference and Equipment Show Brian D. Prowell, Ph.D., P.E. Road Courses Advanced Materials Services
More information2018 ROAD MAINTENANCE PROGRAM
2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process
More informationChapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures
Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Contents: Section 1 Overview... 37-2 Section 2 Apparatus... 37-3 Section 3 Calibration... 37-5 Section 4 Preparations...
More informationOn Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.
Memorandum CITY OF DALLAS DATE December 9, 2011 TO subject Honorable Members of the Transportation & Environment Committee: Linda Koop (Chair), Sheffie Kadane (Vice Chair), Pauline Medrano, Vonciel Jones
More informationStandard Test Procedures Manual
STP 204-6 Standard Test Procedures Manual Section: 1. SCOPE This procedure determines the density of asphalt concrete in place by using the backscatter position (the gamma radiation source remains on the
More informationOLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD
STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213
More informationBids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)
General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS
More informationFigure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1
INTRODUCTION Located along the western coast of Kauai, the Mana Drag Racing Strip (MDRS) at the Kauai Raceway Park was originally constructed in 1971. This 40+ year old track, once home to taro fields
More informationTabulation of Bids. Counties: Project(s):
Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012
More informationRestoration Requirements
Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public
More informationRoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed
VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed Seite 1/11 Job Site Details 1/2 Rehabilitation
More informationEASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO
General Info Number: Description: Deadline: PROJECT NO. 59-18-04 (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST 80.50 TO MILEPOST 86.15 OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018
More informationRoaDrain Synthetic Subsurface Drainage Layer (SSDL)
RoaDrain Synthetic Subsurface Drainage Layer (SSDL) INSTALLATION QUALITY ASSURANCE MANUAL Contents 1.0 INTRODUCTION... 1 2.0 ROLL PACKAGING... 1 3.0 MATERIAL DELIVERY... 1 4.0 UNLOADING & STORAGE PROCEDURES...
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 7/14/2015 Project 158021 Addendum No. 5 PID No. 83667 PIK SR 104
More informationGDOT Cross Section Elements. Course ID: GDOT PDH Credits
GDOT Cross Section Elements Course ID: GDOT-01 2 PDH Credits Civil Engineer Educators LLC 1026 Timberwolf Lane Juneau, AK 99801 Email: support@civilpdh.com Chapter 6 Contents 6. CROSS SECTION ELEMENTS
More informationUse of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.
Use of Performance Metrics on The Pennsylvania Turnpike Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc. Presentation Outline Background- Turnpike Construction
More informationTex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC)
Contents: Section 1 Overview...2 Section 2 Part I, Compacting Specimens Using the TGC...3 Section 3 Part II, Correlating the Texas...9 Section 4 Notes...12 Section 5 Archived Versions...13 Texas Department
More informationIllini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering
Illini Union Champaign, IL February 24, 2015 Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Temporary Concrete Barrier Pinning and Drop-off Policy
More informationVDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010
VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data
More informationKansas Department of Transportation DISTRICT 1. Project(s): Max: Min:
Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000
More informationAgenda. NTTA Network of Roadways. Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA
Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA J.C. Wood, P.E. Director of Maintenance North Texas Tollway Authority September 19, 2011 Agenda Setting the Stage
More information***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***
General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.
More informationPRESENTATION OUTLINE
November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL
More informationThe first lift, mainline, shall be placed using a spray paver.
Page 1 of 15 The first lift, mainline, shall be placed using a spray paver. No patches shall be left open without proper traffic control. 11. The contractor shall be responsible for noting the location
More informationWeymouth - Abington Route 18 Widening and Reconstruction Project File No
Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013
More informationNCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement
NCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement Louay N. Mohammad Louisiana Transportation Research Center Louisiana State University Emulsion: Design, Construction, and Performance
More informationSoutheaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division
Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee Michael J. Doran, P.E. Maintenance Division Why are we here today? The Solution Background Information Geographic Locations
More informationDriving Indiana s Economic Growth
Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for
More informationBases, Ballasts, and Paving
Sections Included In This Standard: 1.1 Paving and Surfacing 1.2 Protection of the Work 1.3 Repair of Pavement 1.4 Pavement Marking 1.1 PAVING AND SURFACING A. DESIGN REQUIREMENTS 1. Applicable Design
More informationOHD L-47. Guidelines for Resolving Differences in Test Results
Guidelines for Resolving Differences in Test Results Page 1 of 21 1 SCOPE 1.1 The guidelines provided are as follows: 1.1.1 Standard Practice for the Evaluation of Different Superpave Gyratory Compactors
More informationSALUDA DAM MIX DESIGN PROGRAM INTRODUCTION
Page 1 of 17 SALUDA DAM MIX DESIGN PROGRAM By Paul C. Rizzo Luis Ruiz Gaekel* John P. Osterle* INTRODUCTION Saluda Dam is owned and operated by South Carolina Electric & Gas Company (SCE&G) and is located
More informationRURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.
RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project
More informationCounty of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program
County of Greenville South Carolina Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program (rev) August 2008 I. PURPOSE The potential negative impacts from vehicular traffic
More informationNew Mexico Transportation Funding Challenges
New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES
More informationTANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects
January 2012 TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects 1. PURPOSE OF REPORTING The purpose of Tangible Capital Asset (TCA) reporting is to comply with PSAB 3150 reporting
More informationCOMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for
Test Procedure for COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR Texas Department of Transportation TxDOT Designation: Tex-206-F Effective Dates: May 2008 May 2009. 1. SCOPE 1.1 Use Part I of
More informationRoadway Construction Defects: Hydroplaning and Other Dangerous Conditions
Roadway Construction Defects: Hydroplaning and Other Dangerous Conditions Or Presented By Richard A. Rice, PE Whose Doors Should You Be Knocking On When You Get a Claim/File Involving a Roadway Incident?
More informationREVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018
REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT
More informationRoad Usage Permit Application Form
15/06/2012 Road Usage Permit Application Form City Yards 1495 Hardy Street Kelowna, BC V1Y 7W9 Tel: (250) 469-8600 Fax: (250) 862-3330 PERMITS WILL BE APPROVED OR DECLINED WITHIN 5 BUSINESS DAYS. WORK
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. January 15, 2016
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING January 15, 2016 1055.01 General 1055.02 Equipment and Operation 1055.03 Minimum Density Target Determination
More information