SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION

Size: px
Start display at page:

Download "SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION"

Transcription

1 Page 1 of 17 SALUDA DAM MIX DESIGN PROGRAM By Paul C. Rizzo Luis Ruiz Gaekel* John P. Osterle* INTRODUCTION Saluda Dam is owned and operated by South Carolina Electric & Gas Company (SCE&G) and is located on the Saluda River approximately ten miles upstream (west) of Columbia, South Carolina. The Dam impounds Lake Murray, which is one of the largest man-made lakes in North America. The Dam is a semi-hydraulic fill structure constructed in 1930 following typical puddle dam construction technology popular in the early 1900 s. Table 1 presents a summary of the main parameters describing the existing Dam and the impounded Lake. Existing Dam Hydroelectric Plant Lake Murray Picture 1 View of Existing Dam Table 1. Summary of the Main Parameters Lake Area 78 Square miles Lake Capacity 2,096,000 acre feet Dam Length 7,800 feet Max Dam Height 211 feet Powerhouse Capacity 206 MW Original Construction Semi-Hydraulic Fill Original Completion 1930 The primary purpose of the Dam when originally constructed was for hydroelectric generation by the Saluda Hydroelectric Plant located at the toe of the Dam. As such, the Dam is under the jurisdiction of the Federal Energy Regulatory Commission (FERC). Today, the Lake is a source * Paul C. Rizzo Associates, 105 Mall Blvd. Suite 270 E, Monroeville, PA USA

2 Page 2 of 17 of cooling water for the coal-fired McMeekin Steam Electric Plant located along the downstream toe of the dam, drinking water for Columbia and adjacent communities, and a major recreation and residential community with statewide economic benefits. Beginning in 1989, Paul C. Rizzo Associates (PCRA) began a series of geotechnical investigations to assess the safety of the existing Dam, particularly under seismic loading. In this part of South Carolina, seismic design bases for critical facilities are, for all practical purposes, governed by a postulated re-occurrence of the 1886 Charleston Earthquake. The Charleston Earthquake is estimated to have had a Magnitude in the range of 7.1 to 7.3 with a recurrence interval in the range of 650 to 1000 years. This event has been established as the Design Seismic Event (DSE) for assessing the integrity of Saluda Dam. A comprehensive liquefaction analysis and a post-earthquake stability analysis were conducted with the DSE yielding typical results as shown on Figure 1. This Figure shows that under certain assumptions, deemed by the authors to be very conservative, a major portion of the embankment will liquefy if the DSE occurs Figure 1 Existing Saluda Dam Factor of Safety Against Liquefaction Should Saluda Dam fail, approximately 120,000 people would be in jeopardy, water supplies for Columbia and surrounding communities would be lost, extreme environmental impacts would be realized and countless millions of dollars would be lost in the local economy. Consequently, a major remediation project has been developed for implementation in the 2002 to 2005 time period. The selected remediation consists of constructing a combination Roller Compacted Concrete (RCC) and Rock Fill Berms along the downstream toe of the existing Dam. This Project is the largest active Dam construction project in the United States today and the final Project will involve the placement of approximately 1.4 million cubic yards of RCC and a 3.5 million cubic yards of Rockfill. The rock required for the RCC and Rockfill Berm will obtained from an onsite borrow area located approximately ¼ mile to the east of the southern side of the Dam. The RCC Berm will be about 2,300 feet long and the Rockfill berm will be about 5,500 feet long. PCRA has prepared the Bid Documents for the seismic upgrade of the Saluda Dam. The Bid Documents were issued to three bidders in early April and SCE&G anticipates awarding the contract in August of 2002.

3 Page 3 of 17 As part of the remediation design effort for the RCC Berm, a four-phase RCC Mix Design Testing Program was initiated. This paper presents the results from Phase III of the Testing Program. RCC TEST PROGRAM OVERVIEW The RCC Mix Design Program was undertaken to evaluate RCC constituents and engineering parameters as they relate to the RCC Berm. The four phases of this Program and their status are summarized below in Table 2. Table 2. Summary of RCC Mix Design Program Phases Phase No. Description Schedule I Initial Lab Program (13 Mixes) Started May 2000 Status: Complete; 365-Day II Final Lab Program (7 Verification Mixes) Started December 2000 Status: Complete; 365-Day III On-Site, Full-Scale RCC Test Pads using on-site Borrow Area. Started August 2001 Status: Placement Completed in Dec. 2001; Testing ongoing. Results available at 180 days. IV Pre-Construction Test Pad for Verification of Contractor Methodology Status: Future Work after Contractor Awarded Phase I and Phase II Mix Design Program (Lab Phases) The Phase I Mix Design Program was initiated in May 2000 to provide a preliminary evaluation of the properties of RCC manufactured with locally available materials. Aggregates were obtained from a local commercial quarry. A total of 13 mixes were prepared at a local lab facility in Columbia, SC. All mixes used sluiced and landfilled ash obtained from the on-site ash landfill. A wide range of cement and fly ash contents was tested which provided useful data to refine the goals of the second Phase of the Program. The Phase II Mix Design Program was undertaken to optimize the RCC Mix Design by building on the knowledge gained from the previous Phase. The Phase II Program was initiated in February 2001and the aggregates were quarried from the Saluda Spillway and taken off-site for crushing and processing. Based on information learned in Phase I, seven mix designs were developed for testing in Phase II. Two of these mix designs were based on the (Cement+Pozzolan) mix and only moisture contents were varied. The intent was to evaluate the effect of water content on the strength of the mix. Mix 3 was the baseline mix determined from the Phase I Program and Mix 2 varied the moisture content of the baseline mix. Similarly, Mixes 5 and 6 were developed to compare moisture content with strength for mixes with a higher cementous content. A secondary objective of the Phase II Program was to determine the optimum fly ash content. Three additional mixes were designed with similar cement contents (125 pounds) but with fly ash contents ranging between 54 to 67 percent (Mix 1,1A 3 and 4). As with Phase I, McMeekin landfill Fly Ash was used in Phase II.

4 Page 4 of 17 Full Scale Phase III RCC Mix Design The major goal of the Phase III Testing Program was to confirm that the RCC properties required for the structural design are ultimately realized in the completed structure. SCE&G awarded the Phase III Testing Program to Barnard Construction Company to define the appropriate RCC mix proportions to yield the required properties in the field, i.e., shear strength, in situ RCC density and acceptable lift joint quality (bond, no segregation). Additionally, this full-scale field test program was conducted to find site specific problems related to different stages of RCC technology, such as aggregate crushing, handling, proportioning and RCC mixing, transporting, placing, and compaction. The trial placements were utilized to simulate particular placement conditions, demonstrate various lifts joint treatments, and research a variety of other aspects related to RCC construction including facing systems and anchor bars. To achieve the outlined objectives, the Phase III Test Program included three sets of RCC Pads (A, B and C). Each set was placed with a different mix design. Pad A was placed with 175 pounds per cubic yard (pcy) of cement (Alternate I Mix), Pad B was placed with 125 pcy of cement (Primary Mix) and Pads C with 150 pcy of cement (Alternate II Mix). All mixes contained 150 pcy of McMeekin Fly Ash. Two different types of Pads (Type 1 and 2) were constructed with each of the three mix designs. While Type 1 Pads aimed to simulate general aspects of RCC construction (placeability, density, joint treatment, facing systems, etc); Type 2 Pads were specifically designed to determine the shear strength of horizontal lift joints at different joint maturities. The overall layout of the Phase III Project area is shown on Picture 2, and a typical Data Summary for Tests Pads Type 2 is depicted in Figure 2. Picture 2 Phase III Project Test Area

5 Page 5 of 17 PADS C2 DATA SUMMARY MIX PAD C2-2 Date of Placement: 12-Dec-01 Mix Data Start Batching: 7:52 PM Vebe Time (sec.): 33 Start Spreading 8:10 PM RCC Placing Temperature: Unit Weight (pcf): Stop spreading 8:15 PM Pad C2-2 Lift 2 Air temperature: Start Rolling: 8:15 PM Moisture (Plant) = 7.2% Stop Batching: 8:10 PM Stop Rolling: 8:20 PM Bedding mix = 3/4" MSA Target Joint Maturity: 3000 deg-hr 10-Dec-01 Actual Joint Maturity: 3033 deg-hr Vebe Time (sec.): 25 Continuos placement RCC Placing Temperature: 59.3 Unit Weight (pcf): between Pad 1 and Pad 2 Pad C2-2 Lift 1 Air temperature: 48.9 Figure 2 Test Pad Data Summary Moisture (Plant) = 7.2% Based on the test results of the Phase I and Phase II Programs, a mix containing 125 pcf of cement and 150 pcf of pozzolan was selected as the Primary Mix for Phase III. This mix design was selected to optimize density, strength, and modulus properties while meeting all minimum design strengths. Two additional alternate mixes were added to Phase III test program. The goal of these additional mixes was to assess the behavior of a different mix consistency and higher cement content, in order to address suggestions from the FERC and Board of Consultants. Initially, the alternate mixes were targeted for a Vebe time in the range of 15 to 20 seconds and selected cement content were 175 pcf and 150 pcf Both mixes contained 150 pcf of fly ash. As explained later on, a drier mix consistency (Vebe time secs) was chosen for the alternate mixes and proportions adjusted accordingly. The final mix proportions are presented in Table 3. Table 3 Final RCC Mix Design for Phase III Test Program COMPONENT Primary Mix (lbs./cy) Pad B Alternate I (a) Mix (lbs./cy) Vebe s Pad A Alternate I (b) Mix (lbs./cy) Vebe s Pad A Alternate II Mix (lbs./cy) Vebe s Pad C Cement Fly Ash Aggregates Water Water Content (SSD) 6.3% 6.0% 7.0% 6.8%

6 Page 6 of 17 PHASE III TEST PROGRAM EXECUTION Materials for RCC Rock to produce aggregates was quarried from the gneiss formation located at the Test Borrow Area downstream Saluda Dam. The location of the Test Borrow Area in relation to the RCC Test Pad Area and the existing dam is shown on Figure 3. Aggregate, for RCC, was produced in two piles. The coarser fraction size was from nominal 1-1 / 2 -inch (MSA) to 3 / 16 inch. The fine fraction consisted of material minus 3 / 16 inch. All natural fines were included in this fraction, as no washing was performed during the crushing operations. Once blended, the aggregate had to comply with the specified gradation discussed later in this paper. Figure 3 Plan View of Saluda Dam Site Meeting gradation specifications with only two crushing stages was somewhat problematic. Typically, the produced sand was coarse on the #4 to #16 sieves region and tended to stick to the lower limits of the specifications. On the other hand, the coarse fraction leaned toward the finer side of the specifications. As a combined effect, the overall aggregate gradation curve tended, to meander from the upper to lower limit of the envelope. To stay within specifications, a relatively low percentage of sand without ash was used (48 percent). Although this produced an aggregate that was within the aggregate band provided in the specifications, the general shape of the aggregate curve was not the most favorable. Therefore, the project specifications were modified to include a tertiary crusher. Cement used at the project was Holnam Portland cement type I/II, produced by Holcim in the Columbia Region. Type II was desirable but wasn t available in the area. Cement was transported to the project in 25 Ton trucks and delivered to an intermediate storage tank deployed close to the mixing plant from which it was later transferred to the pugmill s 60-ton silo. Fly ash used for Phase III was taken from the onsite ash landfill. This ash is a by-product of the coal burning operation of McMeekin Station. The ash was excavated from the landfill, and

7 Page 7 of 17 blended and disked with an agricultural 36-inch disk and stockpiled in the landfill area. From there, it was hauled to a secondary surge stockpile to be later loaded into one of the five bin feeders. The bin feeder was utilized to proportionate and blend the fly ash with the aggregates. Finally, combined aggregate and fly ash was fed to the pugmill. Fly ash feeding was one of the main concerns during the Phase III Test Program. The potential for clumping and clogging was considered high, because of the sticky nature of moist fly ash. The Contractor took preventive measures such as installing breaking chains at the bin feeder, use of an auger inside the bin feeder, and close supervision on the bin hopper to assure continuos flow of fly ash. These measures managed to keep the fly ash feed within the initially specified limits of 15 percent. Nevertheless, uniformity tests performed during the program showed that this tolerance was too high to obtain an acceptable final product. As a consequence, fly ash feeding tolerance for future construction (as batched weight accuracy) was restricted to 5 percent maximum. Water for RCC mixing and curing was obtained from Lake Murray. The intent was to take advantage of the lower temperature water from the depths of the lake. Lab test results indicated that this water is acceptable for use in RCC. Time of setting (Vicat Needle) and compressive strength tests to compare Lake water versus tap water suggested that Lake water produces only a slight retardation in the setting time and a minor reduction of compressive strength. RCC PRODUCTION AND PLACEMENT RCC was produced in a GEARS Accumix 600B Plant, which is a modified ARAN 280B, a model required in the Project Specifications. ARAN 280B is a continuous pugmill mixer that meters material delivery by volume. The GEARS Accumix has been equipped with a scale backup system, which records material delivery by weight. Although, the maximum capacity of this plant is about 600 tons per hour, it was typically, operated at 350 tons per hour during Phase III, due to the relatively small volume of the RCC placements. Plant calibration was performed before the start of RCC placement and was repeated at the end of the placements. The Accumix Plant at Saluda delivered material within the specified limits listed in Table 4. Table 4 Accuracy Limits for RCC Materials Delivery as Delivered to the Mixer Component Accuracy Limit (% by Weight) Cement +/- 2% Fly Ash +/- 15%* Aggregates +/- 3% Water +/- 2% Notes: (*) Fly ash proportioned at the bin feeder. Limit reduced to 5 percent for future construction based on results of Phase III. A total volume of about 4,500 cubic yards of RCC was placed in Phase III Test Pads (Type 1, Type 2 and bases) between November 17 to December 14, Considering Contractor s trial

8 Page 8 of 17 placements, ramps, and waste, the gross volume produced was above 6,000 cubic yards. Peak daily production was achieved on November 19, 2001 during the construction of the Pad Bases when 671 cubic yards of RCC was placed and compacted. TRANSPORTING, DELIVERING, SPREADING AND COMPACTION All RCC produced during Phase III Test Program was transported to the placement area by a ROTEC 18-inch conveyor belt system. A ROTEC Super Swinger delivered the material to the point of deposition. It was equipped with an elephant trunk at the end of the belt to prevent segregation. The Super Swinger was controlled by joystick and was able to comfortably reach any point within the Pads limits. Once deposited on the Pad, RCC was spread by a D-5 Dozer in layers one-foot thick after compaction. The Dozer operator was assisted by a laser guided system to keep the lift surface leveled to grade. The main compaction equipment consisted of a Caterpillar CS563D, single drum, vibratory roller. Normally, 8 single passes were applied to achieve the required density. In some cases, a different number of passes were applied in order to establish the correlation between number of passes and density. For restricted areas and compaction close to the forms, small compaction equipment was used: small Roller Compactor IR SD 175, Plate Type Compactors Wacker BS600 and BPU 3345A. Lift Joint Cleaning/Treatment Phase III mix design program aimed to evaluate the impact of joint maturity in the construction process and in the properties of the hardened RCC mass, as well. The first aspect was assessed by closely following construction operations in Pads Type 1 and the later will be quantified when the 1-year shear strength of blocks extracted from Pads Type 2 become available. Table 5 shows the joint maturities studied during Phase III. Table 5 Joint Maturities for Phase III Testing Program Joint Type Normal Cold 1 Cold 2 Cold 3 Maturity Less than 200 degf-hr 500 degf-hr 1500 degf-hr 3000 degf-hr Cleaning of lift joints by air blowing was the standard treatment required to remove loose material and contamination. Washing of the surface was not required and was expected only for high maturity cold joints on lower Vebe time mixes. Nevertheless, some areas in Pad B ( ) (which normally, doesn t need washing because of its drier consistency) required washing to remove laitance related to bleed water in the RCC. As this is a relatively rare occurrence, further assessments of this phenomenon are scheduled before placement in the RCC berm starts.

9 Page 9 of 17 As standard practice, cold joints were prepared for the next lift by removing laitance, loose debris, and contaminants with air jet. Pressure water washing was occasionally used when necessary. After preparation, the surface was maintained in a damp condition until placement of the subsequent lift. A vacuum truck was available at all times at the placement area to assist in the lift cleaning operations. Bedding Mix All lifts of Type 1 Pads received a bedding mix treatment on half of their exposed horizontal surface. On the other hand, Type 2 Pads were placed in pairs; while one of the pads was covered with bedding mix, its companion pad was left without treatment. This was done in order to compare shear strength of lift joints treated with bedding mix versus joints without treatment. Two different types of bedding mix were tried: Sand mortar and 3 / 4 -inch MSA gravel mix. The initial design compressive strength of the bedding mix was 4,000 psi. However, this requirement was later modified to 2500 psi at one year based on the structural demands of the RCC. A local concrete producer located outside of the Project supplied bedding mix. Transport from the mixing plant to the test area was by mixer trucks. TESTING DURING PHASE III Testing during Phase III covered three main aspects: Lab testing to determine RCC engineering properties; Uniformity testing to evaluate pugmill performance and production uniformity; and miscellaneous field tests to assess constructability. A comprehensive Lab testing program was implemented to determine physical, thermal and expansive properties of the three different RCC Mixes tested during the Phase III Program. Part of this testing is standard practice in RCC construction and was in place to verify the quality of the RCC mix and its components during placement, others are specific, supplementary tests performed to gather information to achieve the goals of the Mix Design Program. The Phase III QC Subcontractor (S&ME) conducted most of the testing work with the assistance of the Contractor and under the supervision of PCRA. The following tests were performed on fresh RCC during the Phase III Testing Program: Moisture content, unit weight (full mix and air free mortar), percent of coarse aggregate, and Vebe time. In addition, the following tests were performed on hardened cylinders of RCC: compressive strength, indirect tensile strength, and modulus of elasticity. Field tests consisted of Nuclear gage density and moisture content. Production Uniformity Testing A uniformity test was conducted to provide information on the suitability of the mixing plant, the properties of the mix by comparison to the mix design and the uniformity of the RCC after mixing, delivering, and spreading. Three samples were collected throughout a shift of placement and tested for moisture content, coarse aggregate content, unit weight of the full mix, unit weight of the air-free mortar, air content, and 7-day compressive strength. Cement content testing was optional during Phase III. The results were calculated and were compared to permissible limits to assess performance. These results are shown on Table 6. Uniformity test was required during

10 Page 10 of 17 Phase III Program at the start of placement only. However, an additional uniformity test was conducted due to the excessive variation on the 7-days compressive strength in the first test. Table 6 Mixer Performance Test Results TEST SERIES A Variation (%) Nov. 20, 2002 SERIES B Variation (%) Nov.29,2002 MAX. ALLOWED DIFFERENCE (%) Water content (%) Air Content Compacted Unit Weight Unit Weight of Air Free Mortar 1.1 N/A 2 Coarse Aggregate content (+#4) 6.9 N/A 15 Vebe Time ** Compressive Strength (7 days) SUMMARY OF RESULTS RCC Mix Design A key issue during Phase III testing was the definition of the optimum consistency of the RCC mix for Saluda RCC Berm. Three cement contents and two different consistencies were evaluated. The Primary Mix ( ) was designed for a Vebe Time of 30 to 35 seconds and the alternate mixes with ( and ) a Vebe Time of 15 to 20 seconds. Aggregate gradation was kept constant for all mixes. After the first lifts of low Vebe Time mix were placed in Pad A, several problems were evident. These included, excessive paste migration to the lift surface, deep steps between roller lanes, and deep ruts of tired equipment that produced mix pumping on the sides of the tire tracks. After evaluation, the alternate mixes were adjusted to a drier consistency (Vebe time 25 to 35seconds). Based on the results of the Phase III Program, the general consensus was that the optimum mix consistency should be around a Vebe time of 30 seconds. RCC Mix Gradation In general, the combined gradation of RCC aggregate was within the specified envelope shown on Figure 4. Nevertheless, as mentioned above, some episodes where the gradation curve was close to the limits were experienced and in two cases the aggregate gradation utilized in the RCC Test Pads plotted outside of the specified gradation band. As shown on Figure 5, this was especially evident during placement of Pad B (Mix ), when coarse sand and aggregate variations caused segregation problems in the mix. The tendency for segregation and variability in the stockpiles was partially originated in the initial difficulties experienced to optimize stockpile-building techniques. Specifically, the specifications called for constructing the stockpiles in layers, with the material for each layer delivered in piles or windrows not to exceed about five feet. Windrows initially exceeded five feet and PCRA directed the Contractor to separate non-conforming material. Although the Contractor was quality conscious and his corrective actions successfully resulted in an acceptable overall gradation, some variable spots remained in the piles. Problems in the mix developed when these materials were utilized. The problems experienced highlighted the critical importance of stockpile construction methodology in RCC and demonstrate the necessity of a

11 Page 11 of 17 close and strict supervision on this issue during the RCC Berm construction. Additionally, based on this experience, the gradation envelope for the RCC Berm has been adjusted, tightened and specified not only in the terms of percent passing, but also by percent retained on each individual sieve Fine Aggregate (-3/16) Gradation S&ME Avg.( ) Percent Passing Overall Average Combined Gradation (including Ash) Specs. Limits (including ash) Coarse Aggregate Gradation Average Samples by E.S Particle Size (mm) Figure 4 Phase III Test Program RCC Aggregate Gradation PAD A MIX PAD B MIX PAD C MIX ¾ specs limits 70 Percent Passing (%) #4 3/8" # 3 / 8 specs limits 30 #16 specs limits Nov Nov Nov-01 3-Dec-01 3-Dec-01 4-Dec-01 5-Dec-01 6-Dec-01 7-Dec-01 8-Dec Dec Dec Dec Dec Dec Dec Dec Dec-01 #200 specs limits Figure 5 RCC Aggregate Gradation (percent passing on selected individual sieves)

12 Page 12 of 17 UNIT WEIGHT AND AIR CONTENT Unit Weight is a key design parameter, since the stability of a gravity structure relies on its magnitude. For Saluda RCC Berm, an average density of 146 pcf has been established as the design criteria. Table 7 presents densities of laboratory prepared cylinders. Except for the initial ( ) Mix, laboratory unit weights for all other mixes exceeded the 146-pcf criteria. The average air content was in the range of 0.8 to 0.9 percent for all mixes. As shown on Figure 6, unit weights of cores extracted from the pads, correlate reasonably well with lab and field density measurements. Cores extracted from the Mix with low Vebe time (15 to 20 seconds) showed lower unit weights than other mixes. Overall, cores from Pad A (Mix ) average pcf, Pad B (Mix ) reached pcf and Pad C (Mix ) showed the highest average at pcf. A summary of results is presented in Table 8. Unit Weight (pcf) Plant Moisture Setting (%) Unit Weight (pcf) Field Density PAD A ( ) PAD B ( ) PAD C ( ) Air (%) Moisture and Air Content(%) A1L1 A1L2 A1L3 A1L4 A1L5 A1L6 A1L7 U-4 U-5 U-6 B1L2 B1L3 B1L4 B1L5 B1L6 B1L7 B1L8 B1L9 C1L1 C1L1A C1L2 C1L3 C1L4 C1L5 C1L6 C1L7 C1L8 C1L9 Sample ID Unit Weight(pcf) Field Density (Double Probe) Plant Setting Air Content (%) Figure 6 Summary of Unit Weight and Air and Moisture Content Mix ID Table 7 Lab Unit Weights and Air Content Vebe Time (seconds) Average Unit Weight (pcf) Air Content (%) Method of Compaction Alternate I (a) PadA ( ) Hilti Hammer Alternate I (b) Pad A( ) Hilti Hammer Primary MixPad B ( ) Air Tamper Alternate IIPad C( ) Hilti Hammer

13 Page 13 of 17 Table 8 Average Test Pad Unit Weights Based on Cores Pad Pad Side/Area Average Unit Weight using Production Lift Cores Only (pcf) Average Unit Weight of All Cores (Including initial lifts used for mix adjustments) (pcf) A Bedding Mix Area A Non-Bedding Mix A Entire Pad B Bedding Mix Area B Non-Bedding Mix B Entire Pad C Bedding Mix Area C Non-Bedding Mix C Entire Pad As shown on Figure 7, both Mix and Mix reach the required 2300 psi compressive strength. While Mix needs about 250 days to attain this strength, Mix reaches this level at 150 days. Compressive strength at the design age (one year) is 2700 and 3300 for Mix 125 and 150, respectively. Although compressive strength is not the mix selection criteria for Saluda Dam, it represents an overall indicator of material properties and since Mix 150 provides a comfortable margin to allow for production variability, data point towards using this mix for the project. However, the final selection will be made on the basis of 1-year, post-cracked direct shear strength results from blocks extracted from the Type 2 Test Pads. An important design consideration for the RCC Berm is the post-cracking peak and residual direct shear strength along parent RCC material and along the RCC Bedding joint. Based on dynamic finite element analyses of the proposed RCC Berm conducted by PCRA and the FERC, it is postulated that a tension crack may form along the entire width of the Berm during the DSE. Therefore, the sliding stability of the RCC Berm along this horizontal plane of the postulated crack must be confirmed by post-earthquake limit equilibrium analysis. The key parameter in this analysis is the one-year residual shear strength along an RCC lift joint. The proposed Laboratory testing program will be conducted at the United States Army Engineer Research and Development Center located in Vicksburg, Mississippi. The testing program will consist of Direct Shear Tests on both intact and cracked block samples of RCC (12 inches by 12 inches by 24 inches) in general accordance with ASTM D and the International Society of Rock Mechanics document entitled Suggested Methods for Laboratory Determination of Direct Shear Strength (ISRM, 1974). The post-cracked shear strength of the RCC samples will be tested at the following normal stresses: 25 psi, 150 psi, and 300 psi (i.e., 3.6 ksf, 21.6, and 43.2 ksf). We anticipate that sample displacements to provide representative residual strengths will be on the order of 0.1 to 0.2 inches. However, we will load the block samples up to a maximum displacement of 0.5 inches to ensure that no further reduction in shear strength occurs. The intact samples will be tested to allow comparison with results from other similar RCC projects.

14 Page 14 of 17 Preliminary post-cracked direct shear testing on RCC core samples obtained from the Phase II test program was performed in December of Residual shear strengths measured from these tests suggest that an adequate residual shear strength is maintained along a cracked RCC surface for postseismic stability. However, these tests were not representative of an actual lift joint of RCC placed under representative construction conditions. Therefore, the results from the proposed one-year direct shear tests on block samples of RCC placed during the Phase III testing program will be used to select the appropriate RCC mix for the Saluda project Mix Compressive Strength (psi) Mix Required 1-year strength Required Average Strength = 2300 psi Age (Days) Figure 7 RCC Compressive Strength Gain Tensile Strength Tensile strength is not a primary design criteria for the RCC Berm, but it is a relevant parameter in both the thermal and structural analyses. Tensile strength was evaluated by the Splitting test Method; also know as the Brazilian Method. As shown on Figure 8, split tensile results at 180 days from all mixes tried in Phase III fall in the range of percent of the compressive strength. Using correlation equations developed by E. Schrader, split test results were converted to Direct Tensile Strength. Estimated long-term static direct tensile strength for the RCC mass is within 9 to 12 percent of the compressive strength at the age. Same parameter for untreated lift joints (no cold joints) has been estimated as 5-6 percent of the compressive strength.

15 Page 15 of 17 Split Tensile Strength (psi) Predcited Mix Mix Mix C om p ressive S treng th (p si) Figure 8 Split Tensile Strength Versus Compressive Strength Compaction and Field Densities The Phase III Test Program specification required a minimum field density of 146 pcf or 97 percent of the theoretical air free density (TAFD) whichever was greater. The actual density reference values varied for each mix design. As a standard procedure, eight single drum passes were applied to the RCC to get the required compaction. Mixes with a wetter consistency appeared to reach full compaction at a lower number of passes as compared to the drier consistency mixes. Compaction beyond eight single passes was found to bring marginal benefits only. Nevertheless, it was found that pausing for some minutes after initial compaction; then applying additional passes before initial set, was effective in increasing density. Preliminarily, this effect has been related to bleed water in the RCC mix. Further lab testing to investigate this observation is scheduled. As depicted in Figure 9, the impact of this effect was particularly evident during placement of Pad C Mix ( ), which was the last pad to be constructed. This technique was effectively utilized during the construction of Pad C to achieve the required RCC density. Field densities in Pad C were less variable than in other Pads and all nuclear gauge average readings were above 146 pcf Lab Unit Weight Cores Unit Weight (pcf) Field Density A1L1 A1L2 A1L3 A1L4 A1L5 A1L6 A1L7 U-4 U-5 U-6 B1L2 B1L3 B1L4 B1L5 B1L6 B1L7 B1L8 B1L9 C1L1 C1L1A C1L2 C1L3 C1L4 C1L5 C1L6 C1L7 C1L8 C1L9 PAD A (MIX ) PAD B ( ) PAD C ( ) Sample ID Figure 9 Field Densities and LAB Unit Weights for All Pads

16 Page 16 of 17 CONCLUSIONS Lessons learned during the execution of Phase III highlighted the importance of undertaking a full-scale Mix Design Program. All the parties involved, Owner, Designer and Contractor concurred that benefits offset by far the costs incurred in the program and agreed that such an exercise shall be a must in large dam projects as Saluda. The following paragraphs outline some of the lessons learned in Phase III Mix design program. Mix Consistency The general consensus in Phase III was that the optimum consistency, for a RCC mix with Saluda materials and gradation, should be a Vebe Time of about 30 seconds. Although wetter mixes (Vebe 15 to 20 seconds) showed less tendency to segregate during placement, they also showed excessive paste migration to the lift surface, presented deep roller marks and ruts from tired equipment, and required a higher cleaning effort. Gradation and Segregation Although the gradation of RCC aggregate during Phase III was, in general, within the specified envelope the aggregate crushing system must be improved for the RCC Berm construction. The available crushing scheme produced a combined aggregate curve that tended to be fine on the gravel and coarse on the sand. This contributed to mix segregation and bleed water during placement. The results of Phase III suggest that a third crushing stage might be necessary during the main job execution. Mix Segregation problems were also caused by aggregate variability in the stockpiles. Stockpile segregation was partially due to pile building techniques applied at the beginning of the Project. Although corrective actions were successfully applied and a final overall acceptable product was achieved; some variability remained in the piles. In order to have a gradation, which is less susceptible to segregation, the aggregate specified for the main job is slightly finer than the Phase III gradation in the 3 / 4 -inch region. Also, to avoid aggregate gradation meandering, the specifications require that the amount of material retained on each individual sieve be within a specified range. RCC Production Fly ash feeding system required close supervision during the Phase III Program. The system used by the Contractor was able to deliver fly ash within the specified accuracy of 15 percent by weight; nevertheless, uniformity tests showed that ash variations had an important effect in water demand and density in the mix. In consequence, this tolerance was restricted to a maximum of five percent for the RCC Berm construction. Density and Unit Weight An average density of 146 pcf can be achieved in the field. Average nuclear gauge (double probe) readings were equal to or higher than 146 pcf in all Pads. Pad A and Pad B both had the same average density of pcf. Pad C showed not only the highest average field density (146.9 pcf) but also showed less scattered results. Except for the Alternate I (a) Mix ( ), which averaged pcf, unit weights from laboratory cylinders were above 146 pcf. The Primary Mix ( ) and Alternate II Mix ( ) showed a mean unit weight around

17 Page 17 of pcf while the modified Alternate I (b) Mix ( ) reached pcf. Density measurements from core samples taken from the test pads indicate that the required density is also achievable in the field. Average air content measured at the lab was in the range of 0.8 to 0.9 percent for all mixes. Bedding Mix Sand Mortar bedding mix was compared to 3 / 4 -inch MSA gravel bedding mix. Both mixes showed good performance in the field. Sand mortar was easier to place and distribute over the RCC lift surface, but the trench cut evaluations, showed that the gravel bedding mix interlocks better with RCC, resulting in a more homogeneous concrete mass. When bedding was used as a facing system, both types of mixes appeared to be suited for this application. However, it was evident that when using sand mortar, more skilled manpower and guidance were necessary to obtain acceptable results. Properties of Hardened RCC Hardened RCC Properties during Phase III are consistent with predictions made on the basis of experienced gained from the Phase I and II laboratory Programs. Compressive strength test results indicate that required one-year design strength of 2300 psi icon be achieved during construction. Elastic modulus values obtained in Phase III are also consistent with the previous Mix Design Program Phases. SUMMARY This Paper presents a detailed description and documentation of the RCC Testing Program for the Remediation of the Saluda Dam. The focus of the Paper was to describe various field activities. The Phase III Test Program included a full-scale test program and construction project undertaken to confirm design parameters and material properties for the Roller Compacted Concrete (RCC) and Rockfill Berms of the Saluda Dam Remediation Project.

Paper USSD Annual Meeting June 24-28, 2002 DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT

Paper USSD Annual Meeting June 24-28, 2002 DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT By Paul C. Rizzo * William Argentieri ** Jeffrey M. Bair * Kristina Massey ** Harold Moxley ** ABSTRACT Saluda Dam, part of the FERC regulated

More information

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST Release Date: January 7, 2014 Sampling Coarse Aggregate PERFORMANCE CHECKLIST AASHTO T-2 Sampling of Aggregates Sampling From A Stockpile 1 When

More information

REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS. Abstract

REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS. Abstract REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS Paul C. Rizzo 1, Scott Newhouse 2, Jeff Bair 3 Abstract Saluda Dam, part of the FERC regulated Saluda Hydroelectric Project located near Columbia, South

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 7/14/2015 Project 158021 Addendum No. 5 PID No. 83667 PIK SR 104

More information

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS James N. McLeod, P.Eng. Regional Manager - Rail Adam Laughlin, EIT Project Engineer Telephone: (780) 486-7000 Fax: (780) 486-7070

More information

OVERVIEW OF THE SALUDA DAM REMEDIATION PROJECT RCC AND ROCKFILL DAMS. Abstract

OVERVIEW OF THE SALUDA DAM REMEDIATION PROJECT RCC AND ROCKFILL DAMS. Abstract OVERVIEW OF THE SALUDA DAM REMEDIATION PROJECT RCC AND ROCKFILL DAMS Page 1 of 22 By Paul C. Rizzo* and Ray Ammarell** Abstract Saluda Dam, part of the FERC regulated Saluda Hydroelectric Project located

More information

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:

More information

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003 SUPERPAVE Construction Lessons Learned NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003 SUPERPAVE Construction Lessons Learned LESSON #1 Lesson #1 What is this Stuff? Lesson #1 What is This Stuff?

More information

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER +)) SNC LAVALIN Lower Churchill Project RIPRAP DESIGN FOR SLI Document No. 505573-3001-4HER-0011-00 Nalcor Reference No. MFA-SN-CD-0000-CV-RP-0006-01 Rev. 81 Date: 07 -Dec-2012 Prepared by: Checked by:

More information

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council

More information

Stop Chasing & Start Managing Density

Stop Chasing & Start Managing Density Stop Chasing & Start Managing Density Session: TH-78 Presented by: Todd Mansell, Caterpillar Inc. What is chasing density Measuring, then thumbs up or thumbs down Roller move on www.conexpoconagg.com 2

More information

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56) 5.9.56 RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method ) 1. SCOPE This test covers preparation of specimens and measurement of the change of tensile strength resulting

More information

Specifier Note: Retain or delete material(s) below to conform to project requirements.

Specifier Note: Retain or delete material(s) below to conform to project requirements. SECTION 32 15 40 DECOMPOSED GRANITE SURFACING NOTE: These specifications were current at the time of publication but are subject to change at any time without notice. Please confirm the accuracy of these

More information

OHD L-47. Guidelines for Resolving Differences in Test Results

OHD L-47. Guidelines for Resolving Differences in Test Results Guidelines for Resolving Differences in Test Results Page 1 of 21 1 SCOPE 1.1 The guidelines provided are as follows: 1.1.1 Standard Practice for the Evaluation of Different Superpave Gyratory Compactors

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In

More information

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department of Transportation Bureau of Materials and Tests 110 + MILES ALDOT FDR TOTALS

More information

Best Practices for Smoothness & Density

Best Practices for Smoothness & Density Best Practices for Smoothness & Density 55 th Annual Paving Conference Presented by Todd Mansell, CAT Paving Outline 1. Paver Setup Smoothness 2. Balanced Paving Paver & Roller Speed Paver operation 3.

More information

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE CONTRACTOR MIX DESIGN GUIDELINES For ASPHALT CONCRETE OREGON DEPARTMENT OF TRANSPORTATION CONTRACTOR MIX DESIGN GUIDELINES for ASPHALT CONCRETE These guidelines outline the procedures to be used in developing,

More information

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E Presented to: Louisiana Transportation Conference February 26, 2018 Presenter: Corey Zollinger, P.E. - 1 - AGENDA What is Roller Compacted Concrete, Where has it Been Used, and Why? RCC Construction Process

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

Hot Mix Asphalt (HMA) Quality Assurance

Hot Mix Asphalt (HMA) Quality Assurance Supplemental Technical Specification for May 2, 2008 Hot Mix Asphalt (HMA) Quality Assurance SCDOT Designation: SC-M-400V (06/08) 1. SCOPE Base field acceptance of hot mix asphalt (HMA) mixtures on asphalt

More information

Method of Test for Sieve Analysis

Method of Test for Sieve Analysis Method of Test for Sieve Analysis 1. Scope: This test is for determining sieve analysis of subbase, base course, mineral aggregate (Surface course materials), concrete aggregates, fillers, and similar

More information

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES C. Zollinger Paving Solutions, CEMEX, Inc, Houston, TX USA Coreyj.zollinger@cemex.com ABSTRACT Roller Compacted Concrete

More information

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST Release Date: November 6, 2014 AASHTO T-168 Sampling of Bituminous Material Funnel Device 1 Select units to be sampled by what method? 2 Relative size and

More information

Rennick Yard Roller-Compacted Concrete Pavement

Rennick Yard Roller-Compacted Concrete Pavement RCC Pavement Council Rennick Yard Roller-Compacted Concrete Pavement February 12, 2016 Submitted By: NCE 1885 S. Arlington Ave., Suite 111 Reno, NV 89509 Phone: 775.329.4955 Site Plan and Pavement Sections

More information

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method 1. Scope: This test is for determining the in place density of asphalt concrete

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 Scope This procedure covers the determination of density, moisture content, and relative compaction

More information

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING SECTION [32 15 40] [02730] STABILIZED DECOMPOSED GRANITE SURFACING EDIT SPECIFICATION: Edit the following guide specification to comply with project requirements. This document is available in word processing

More information

T-24. A Practical Approach to Managing Density

T-24. A Practical Approach to Managing Density T-24 A Practical Approach to Managing Density PRESENTED BY: TODD MANSELL, CATERPILLAR March 22-24, 2016 Nashville, TN www.worldofasphalt.com Why do we chase density instead of manage it? Lack of training

More information

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS 1. SCOPE This specification details the six (6) stage permanent strain Repeated Load Triaxial (RLT) test for unbound and modified

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station 33200 East Johnson Rd Sibley, Missouri KCP&L Greater Missouri Operations Company October 14, 2016 TABLE OF CONTENTS SECTION 1

More information

Effect of Moisture Content of Wet Fly Ash on Basic Properties of Mortar and Concrete

Effect of Moisture Content of Wet Fly Ash on Basic Properties of Mortar and Concrete Fourth International Conference on Sustainable Construction Materials and Technologies http://www.claisse.info/proceedings.htm SCMT4 Las Vegas, USA, August 7-11, 216 Effect of Moisture Content of Wet Fly

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

Stability of slopes of municipal solid waste landfills with co-disposal of biosolids

Stability of slopes of municipal solid waste landfills with co-disposal of biosolids Geo-Environment and Landscape Evolution II 215 Stability of slopes of municipal solid waste landfills with co-disposal of biosolids M. Chopra, D. Reinhart, M. Vajirkar & B. Koodhathinkal University of

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

Asphalt Mixture Quality Acceptance

Asphalt Mixture Quality Acceptance Supplemental Technical Specification for Asphalt Mixture Quality Acceptance SCDOT Designation: SC-M-400 (January 1, 2018) 1. SCOPE Use this specification for the acceptance of both hot mix and warm mix

More information

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009 BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009 DAILY SAFETY-QUALITY- PRODUCTION EVERY PROJECT EVERY DAY EVERY TON 101 COST SAVING IDEAS FROM NAPA WARM MIX ASPHALT RAP STOCKPILE

More information

Hot Mix Asphalt (HMA) Quality Assurance

Hot Mix Asphalt (HMA) Quality Assurance Supplemental Technical Specification for March 3, 2010 Hot Mix Asphalt (HMA) Quality Assurance SCDOT Designation: SC-M-400 (05/10) 1. SCOPE Base field acceptance of hot mix asphalt (HMA) mixtures on asphalt

More information

Asphalt Mixture Quality Assurance

Asphalt Mixture Quality Assurance Supplemental Technical Specification for Asphalt Mixture Quality Assurance SCDOT Designation: SC-M-400 (10/13) 1. SCOPE Base field acceptance of asphalt mixtures on asphalt binder content, air voids, voids

More information

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1 ADDENDUM REPORT Project: 13286 Bid Package: 2 Current Let: 06/24/2005 11:00 AM Version: Addendum Addendum : 1 District: 06 County: BUCKS SR/SEC/GROUP ID: 4027/33M/R26\Kantner Description R26 - Script C

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

WYDOT CONCRETE MIX DESIGN PROCEDURE

WYDOT CONCRETE MIX DESIGN PROCEDURE WYDOT CONCRETE MIX DESIGN PROCEDURE Scope: This procedure documents the requirements for obtaining a concrete mix design or referencing an approved mix design from the WYDOT Materials Program, and the

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

SUPERPAVE MIX DESIGN. Superpave Mix Design 1

SUPERPAVE MIX DESIGN. Superpave Mix Design 1 SUPERPAVE MIX DESIGN Superpave Mix Design 1 Superpave Gyratory Compaction and Mixture Requirements Section objectives Describe the Superpave gyratory compactor Review the Superpave mixture requirements

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Tex-416-A, Air Content of Freshly-Mixed Concrete by the Pressure Method

Tex-416-A, Air Content of Freshly-Mixed Concrete by the Pressure Method by the Pressure Method Contents: Section 1 Overview...2 Section 2 Apparatus...3...5 Section 4 Calculations...12 Texas Department of Transportation 1 08/99 06/08 Section 1 Overview Effective dates: August

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Analysis of Shear Lag in Steel Angle Connectors

Analysis of Shear Lag in Steel Angle Connectors University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2013 Analysis of Shear Lag in Steel Angle Connectors Benjamin Sawyer

More information

Tex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC)

Tex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC) Contents: Section 1 Overview...2 Section 2 Part I, Compacting Specimens Using the TGC...3 Section 3 Part II, Correlating the Texas...9 Section 4 Notes...12 Section 5 Archived Versions...13 Texas Department

More information

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23.

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. (2) For the resisting side, passive pressure theory indicates

More information

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS Shaw QHW 1 1, Director: ARQ (PTY) Ltd, +27 12 348 6669, Fax,quentin@arq.co.za Abstract: The original 2003 ICOLD Bulletin 126 on Roller Compacted Concrete dams proved

More information

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Contents: Section 1 Overview... 37-2 Section 2 Apparatus... 37-3 Section 3 Calibration... 37-5 Section 4 Preparations...

More information

Method of Test for Flat & Elongated Particles

Method of Test for Flat & Elongated Particles Method of Test for Flat & Elongated Particles 1. Scope: This test is for determining the percentage by weight of coarse aggregate that have a maximum to minimum dimension greater than the specified ratio

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 PROJECT DESCRIPTION EXHIBIT A DECEMBER 2007 Prepared by: SOUTH CAROLINA ELECTRIC & GAS COMPANY

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

Row / Distance from centerline, m. Fan side Distance behind spreader, m 0.5. Reference point. Center line

Row / Distance from centerline, m. Fan side Distance behind spreader, m 0.5. Reference point. Center line 1 Standardisation of test method for salt spreader: Air flow experiments Report 7: Effect of crosswind on salt distribution by Jan S. Strøm, Consultant Aarhus University, Engineering Centre Bygholm, Test

More information

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 525 Vine Street, Suite 1800 Cincinnati, Ohio 45202

More information

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure Matthew Gray 1 * and Steve Kestel 1 1 BioChem Technology, King of Prussia, PA *Email: mgray@biochemtech.com ABSTRACT

More information

RECYCLED AGGREGATES FOR MINOR SCHEMES (RAMS)

RECYCLED AGGREGATES FOR MINOR SCHEMES (RAMS) RECYCLED AGGREGATES FOR MINOR SCHEMES (RAMS) Project Report May 2011 By Prof N Ghazireh Head of R & D, Tarmac Ltd Tarmac Ltd Millfields Road Ettingshall Wolverhampton WV4 6JP 1 CONTENTS EXECUTIVE SUMMARY...4

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 Scope This test method describes a test procedure for determining the density of bituminous mixes by means of a nuclear gauge

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Revision: 1 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station. Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

2 are both ways of saying a ratio of 2 to 5

2 are both ways of saying a ratio of 2 to 5 Unit 4 Ratios A Ratio is a comparison of two related quantities. Ratios are expressed in two forms. 2 : 5 or 5 2 are both ways of saying a ratio of 2 to 5 1. Conversion factors are ratios. Express 100

More information

Density of Soils and/or Granular Material In-place by the Sand-Cone Method

Density of Soils and/or Granular Material In-place by the Sand-Cone Method Density of Soils and/or Granular Material In-place by the Sand-Cone Method 1. Scope: This test is for determining the in-place density of soils and/or granular materials. 2. Apparatus: 2.1 Density apparatus

More information

Tex-207-F, Determining Density of Compacted Bituminous Mixtures

Tex-207-F, Determining Density of Compacted Bituminous Mixtures Overview Effective date: August 1999 to October 2004. Use this method to determine the bulk specific gravity of specimens of compacted bituminous mixtures. Use the bulk specific gravity of the compacted

More information

DEVELOPMENT AND TESTING OF AIR EXCHANGE RATE METHODS TO IMPROVE COST EFFECTIVENESS WHILE MAINTAINING ACCURACY

DEVELOPMENT AND TESTING OF AIR EXCHANGE RATE METHODS TO IMPROVE COST EFFECTIVENESS WHILE MAINTAINING ACCURACY DEVELOPMENT AND TESTING OF AIR EXCHANGE RATE METHODS TO IMPROVE COST EFFECTIVENESS WHILE MAINTAINING ACCURACY Prepared by: Joachim Eberharter (Joachim.Eberharter@tetratech.com) and James Elliot (Tetra

More information

Pneumatic blending in a bin or silo that is, aerating. Saving time, labor, and money with pneumatic batch blending

Pneumatic blending in a bin or silo that is, aerating. Saving time, labor, and money with pneumatic batch blending As appeared in January 2013 PBE www.powderbulk.com Saving time, labor, and money with pneumatic batch blending Mike Weyandt Nol-Tec Systems With a pneumatic blender, you can mix batches of dry bulk materials

More information

Managing Density For Asphalt Pavement

Managing Density For Asphalt Pavement Managing Density For Asphalt Pavement 1 Density vs. Pavement Performance 2 Cost of Compaction Least expensive part of the process Compaction adds little to the cost of a ton of asphalt Importance of Compaction

More information

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD Standard Method of Test for Field Determination of Target Density for Plant Produced Asphalt Mix by Use of the Control Strip Technique SCDOT Designation: SC-T-65 (08/18) 1. SCOPE 1.1 This test method is

More information

Other Si min/max. Cr min/max. 0.4/ / / / Bal.

Other Si min/max. Cr min/max. 0.4/ / / / Bal. 178.46 Specification 3AL seamless aluminum cylinders. (a) Size and service pressure. A DOT 3AL cylinder is a seamless aluminum cylinder with a imum water capacity of 1000 pounds and minimum service pressure

More information

Pneumatic blending in a bin or silo that is, aerating. Saving time, labor, and money with pneumatic batch blending. Copyright CSC Publishing

Pneumatic blending in a bin or silo that is, aerating. Saving time, labor, and money with pneumatic batch blending. Copyright CSC Publishing As appeared in January 2013 PBE Copyright CSC Publishing www.powderbulk.com Saving time, labor, and money with pneumatic batch blending Mike Weyandt Nol-Tec Systems With a pneumatic blender, you can mix

More information

Structural Design of Tank Weighing Systems

Structural Design of Tank Weighing Systems Structural Design of Tank Weighing Systems 1. Initial observations Some essential rules must be followed when installing load cells in tanks. For example, tanks are frequently subject to weather conditions

More information

Inspection and Approval of Asphalt Mix Design Laboratories

Inspection and Approval of Asphalt Mix Design Laboratories Supplemental Technical Specification for Inspection and Approval of Asphalt Mix Design Laboratories SCDOT Designation: SC-M-405 (06/07) 1. SCOPE 1.1 This method covers the process for inspection and approval

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

FIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall

More information

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

Density of Granular Material by Modified Sand-Cone Method for Thin Layers Density of Granular Material by Modified Sand-Cone Method for Thin Layers 1. Scope: This test is for determining in-place density of granular materials that have a total thickness of 3 or less. 2. Apparatus:

More information

ASPHALT PLANT LEVEL 1

ASPHALT PLANT LEVEL 1 ASPHALT PLANT LEVEL 1 Module 6: Maximum Specific Gravity FM 1 T 209 FDOT Course Release: 10, Module 6 1 Specification Year: January 2015 The terms Gmm or Maximum Specific Gravity or Rice gravity are often

More information

DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES

DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES Test Procedure for DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES TxDOT Designation: Tex-240-F Effective Date: December 2004 1. SCOPE 1.1

More information

Aug 17, 2001 LAB MANUAL MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified))

Aug 17, 2001 LAB MANUAL MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified)) Aug 17, 2001 LAB MANUAL 1807.0 1807 MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified)) 1807.1 SCOPE This test method covers the determination of the

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical

More information

Uphill / Downhill. Super Elevations. Wide-Width 2/15/2016. March 22-24, 2016 Nashville, TN

Uphill / Downhill. Super Elevations. Wide-Width 2/15/2016. March 22-24, 2016 Nashville, TN Uphill / Downhill Wide-Width 1 Uphill Issue Loss of traction Downhill Issue Spills caused by truck rollaway Uphill Paving Obvious things Apply correct amount of tack Wait for tack to break 2 Uphill Paving

More information

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC SECANT CAISSON WALL TECHNICAL TECHNICAL Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC Submitted to: Toby Seward City of Nanaimo 455 Wallace Street Nanaimo, BC V9R 5J6 Report Number: Distribution:

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Equipment Productivity

Equipment Productivity Arab Academy for Science, Technology & Maritime Transport College of Engineering & Technology Construction & Building Engineering CB 524 Methods and Equipment for Construction 2 Equipment Productivity

More information

INTRODUCTION TABLE OF CONTENTS

INTRODUCTION TABLE OF CONTENTS 2 INTRODUCTION Thank you for choosing Servometer to design and manufacture your unique, new electrodeposited bellows for your particular application. The definitions, formulas and design parameters inside

More information

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices NCHRP Project 20-05 Synthesis Topic 48-02 Tack Coat Specifications, Materials, and Construction Practices Danny Gierhart, P.E. Dave Johnson, P.E. Principal Investigators What Exactly Is a Synthesis? A

More information

D DAVID PUBLISHING. Manufacturing Ultra High Performance Concretes by Silica Fume, Ultra Fine Fly Ash and Metakaolin Addition. 1.

D DAVID PUBLISHING. Manufacturing Ultra High Performance Concretes by Silica Fume, Ultra Fine Fly Ash and Metakaolin Addition. 1. Journal of Materials Science and Engineering A 7 (5-6) (2017) 136-142 doi: 10.17265/2161-6213/2017.5-6.003 D DAVID PUBLISHING Manufacturing Ultra High Performance Concretes by Silica Fume, Tony Song, Ion

More information

OIL AND GAS INDUSTRY

OIL AND GAS INDUSTRY This case study discusses the sizing of a coalescer filter and demonstrates its fouling life cycle analysis using a Flownex model which implements two new pressure loss components: - A rated pressure loss

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information