OVERVIEW OF THE SALUDA DAM REMEDIATION PROJECT RCC AND ROCKFILL DAMS. Abstract

Size: px
Start display at page:

Download "OVERVIEW OF THE SALUDA DAM REMEDIATION PROJECT RCC AND ROCKFILL DAMS. Abstract"

Transcription

1 OVERVIEW OF THE SALUDA DAM REMEDIATION PROJECT RCC AND ROCKFILL DAMS Page 1 of 22 By Paul C. Rizzo* and Ray Ammarell** Abstract Saluda Dam, part of the FERC regulated Saluda Hydroelectric Project located near Columbia, South Carolina, is being upgraded to resist a recurrence of the 1886 Charleston Earthquake. Concurrent with this upgrade is a major outage and refurbishment of the adjacent McMeekin Plant, which draws cooling water from Lake Murray, formed by Saluda Dam. The existing, semi-hydraulic fill embankment Dam was completed in 1930 and, based on current technology, is viewed as being susceptible to liquefaction during the design seismic event. Several remediation options were considered with the selected approach being a back-up berm, essentially a Dry Dam, at the downstream toe of the existing Dam. The Dry Dam will consist of about 5500 feet of Rockfill and about 2300 feet of RCC. This Project is the largest active (year 2002) dam construction project in the United States and the final Project will involve the placement of 1.3 million cubic yards of RCC and 3.5 million cubic yards of Rock Fill. This paper presents an overview of the design aspects of the RCC Dam and the Rockfill Dam plus portions of the McMeekin Plant upgrade that have a direct impact on the Dam Remediation Project. We address topics such as the new cooling water system and ash handling systems for McMeekin and their impact on the Dam Remediation, seismic design basis, loading conditions, finite element analysis, mix design parameters, drainage and joint design, facing considerations, thermal stress analysis joint spacing, and the mix design testing programs. An unusually large number of load cases had to be considered as the fix must consider dry conditions and wet conditions as well as the postulated condition of the existing embankment Dam after a recurrence of the 1886 Earthquake. The mix design program addresses the use of aggregate, from an on-site borrow area and the use of landfilled, waste flyash as a constituent of the RCC. Introduction Saluda Dam owned and operated by South Carolina Electric & Gas Company (SCE&G) impounds the Saluda River to form Lake Murray near Columbia, South Carolina, one of the largest manmade lakes in North America. *Paul C. Rizzo Associates, 105 Mall Blvd. Suite 270E, Monroeville, Pennsylvania, USA **South Carolina Electric & Gas Company, 2112 North Lake Drive, Columbia, South Carolina, USA

2 Page 2 of 22 The Dam is a semi-hydraulic fill structure completed in 1930 following typical puddle dam construction technology popular in the early 1900 s. Table 1A is a summary of the main parameters describing the existing Dam and the impounded Lake. Existing Dam Hydroelectric Plant Lake Murray Table 1A Summary - Main Parameters for Saluda Hydro Lake Area 78 Square miles Lake Capacity 2,096,000 acre feet Dam Length 7,800 feet Max Dam Height 211feet Hydro Capacity 206 MW Original Construction Semi-Hydraulic Fill Original Completion 1930 The primary purpose of the Dam when originally constructed was for hydroelectric generation by the Saluda Hydroelectric Plant located at the toe of the Dam. As such, the Dam is under the jurisdiction of the Federal Energy Regulatory Commission (FERC). Today, the Lake is a source of cooling water for the McMeekin Plant, drinking water for Columbia and adjacent communities, and a major recreation and residential community with statewide economic benefits. Cooling water for the McMeekin Plant is drawn from two (out of total of five) of the Penstocks that service the Hydro Plant. In addition, the wet ashing system includes pipelines that run across the downstream face of the existing Dam to the south side of the Saluda River where it is disposed in an existing dedicated landfill. The main Parameters pertaining to McMeekin are summarized as follows in Table 1B. Table 1B Summary - Main Parameters for McMeekin Steam Electric Plant Steam Plant Capacity 252 Mwe Fuel Coal No of Units 2 Cooling Water Demand 113,000 gpm Ash Handling System Wet to Landfill Original Completion 1958

3 Page 3 of 22 Beginning in 1989, a series of geotechnical investigations were undertaken to assess the safety of the existing Dam, particularly under seismic loading. In this part of South Carolina, seismic design bases for critical facilities are, for all practical purposes, governed by a postulated re-occurrence of the 1886 Charleston Earthquake. The Charleston Earthquake is estimated to have had a Magnitude in the range of 7.1 to 7.3 with a recurrence interval in the range of 650 to 1000 years. This event has been established as the Design Seismic Event (DSE) for assessing the integrity of Saluda Dam. A comprehensive liquefaction analysis and a post-earthquake stability analysis were conducted with the DSE yielding typical results as shown on Figure 1. This Figure shows that under certain assumption a major portion of the embankment will liquefy if the DSE occurs. Figure 1 - Existing Saluda Dam Factor of Safety Against Liquefaction Should Saluda Dam fail, approximately 120,000 people would be in jeopardy, water supplies for Columbia and surrounding communities would be lost, extreme environmental impacts would be realized and countless millions of dollars would be lost in the local economy. Consequently, a major remediation project has been developed for implementation in the 2002 to 2005 time period. Remediation Concept The Design Basis for the Remediation Concept has two major objectives and a corollary expected behavior criteria. The two major objectives are: Prevent catastrophic flooding downstream of the Dam and, Assure Safe shutdown of the facilities, including lowering of Lake Murray in a controlled manner. From a behavior perspective, the Owner and the FERC accept that some remediation and repair may be required after the Design Earthquake, but catastrophic flooding is not acceptable. These major objectives were translated into loading cases and factors of safety by the authors with major over-riding input from the FERC. After consideration, both technical and financial, the remediation concept was developed as a Dry Dam immediately downstream of the existing earth embankment. The existing Dam will remain in place and function as the primary impounding barrier for Lake Murray. The Dry Dam will become a water retention structure if Saluda Dam ever fails. Hence, the Dry Dam is designed for both dry and wet conditions with a series of loading cases that reflect hydrostatic pressures and uplift pressures in the wet case and

4 Page 4 of 22 neither in the dry case. Both cases consider seismic forces acting both directions horizontally as well as vertical excitation. Additional design criteria to be implemented with the chosen remediation concept include the following: No excavation into the original sluiced Dam. Riprap placed after original dam construction will be removed to facilitate excavation. No excavation or construction into the Saluda River as defined by the maximum normal tailwater at El NAVD. The crest of the new Berm will be El. 372 NAVD 1 (i.e., current minimum crest elevation of the existing Dam). The Dry Dam concept is illustrated on Figures 2 and 3 below. Approximately 5500 feet of the total length of 7,800 feet is a Rockfill Berm (referred to as a berm rather than a dam as it does not retain water under normal conditions) and 2,600 feet of RCC Berm. (Also referred to as a berm rather than a dam for the same reason.) Figure 2 Typical Section, Rockfill Berm Figure 3 - Typical Section, RCC Berm In reply to the obvious question of, why not use a less expensive Rockfill Berm for the entire remediation. We refer the reader to the photo with Table 1 and Figure 3 where it may be seen that the existing Saluda Hydroelectric Powerhouse is at the toe of the existing Dam, thereby precluding a Rockfill Berm because of space limitations. It is in this 1 North American Vertical Datum of 1988

5 Page 5 of 22 zone behind (upstream) of the Powerhouse where we chose an RCC Berm as the primary remediation concept. Impact of the Remediation Concept on the McMeekin Steam Electric Plant The McMeekin Steam Electric Plant is located at the toe of the existing Dam and has several features directly associated with the Dam and the Remediation Project. The remediation of the dam has necessitated extensive modifications to the McMeekin site and several of the plant systems as discussed below. Circulating Cooling Water Lines Cooling water for the Steam Electric Plant is supplied from Lake Murray via two 90 inch diameter pipes which connect to Penstocks 1 and 3 at Saluda Hydro, directly West of the Hydro Powerhouse. The existing cooling lines which draw from Penstock Nos. 1 and 3 will remain operational until two new lines are constructed connecting to Penstocks 2 and 4. The new cooling water lines will be 72-inch diameter, and will be embedded in a new mass concrete foundation for the RCC Berm between the Hydro Powerhouse and the existing Dam. The construction of the new cooling water lines will take place after the excavation of existing riprap from the area just west of the Saluda Hydro powerhouse. This riprap was placed in the early 1940 s as part of a program of modifications undertaken to increase the stability of the dam and the hydraulic capacity of the spillway. Once the riprap is removed and the toe of the existing dam stabilized with a temporary tieback wall, portions of the new cooling water lines will be constructed and connected to Penstocks 2 and 4. When this part of the cooling piping is complete, mass concrete will be placed around them and brought up to final elevation. This mass concrete will serve as the foundation for part of the RCC berm. The parts of the cooling system located outside of the new berm s footprint will be constructed, and final connection and commissioning of the new cooling water system will take place during an outage at McMeekin Plant in Ash Handling System-Pipelines The existing Ash Handling System is a wet sluice system in which ash is removed from the boiler hoppers and pumped through two ash pipe lines that cross over the Saluda River on the downstream slope of the existing Dam to ash disposal ponds and a dedicated ash landfill. The ash sluice pipes directly interfere with the Remediation Concept as they lie partially in areas where the slope will eventually be covered with rock comprising the Rockfill Berm. In order to remove the existing ash sluice pipelines from the dam, a new ash handling system is being installed at McMeekin Plant in the fall of The new system will handle all of the plant s ash in totally dry state, and will convey it to new silos adjacent to the plant.

6 Page 6 of 22 Wastewater Treatment System The industrial process wastewater from McMeekin Plant is presently collected in sumps and pumped across the Dam in a third pipeline running in the same alignment as the ash sluice lines discussed in the previous section. This 10-inch diameter waste line will also need to be removed from the Dam prior to placement of the new rock berms. New waste treatment ponds are under construction on the north side of the Saluda River to provide treatment for the process wastewater without pumping it across the Dam. Construction of these ponds also allows demolition of an existing coal pile runoff pond just east of McMeekin Plant. The former pond site will be used for the new dry ash silos. A new NPDES outfall has been permitted and is under construction. Ash Ponds and Landfill The existing ash ponds and landfill will play a crucial role in the construction of the RCC berm. Once McMeekin Plant has been converted to the all-dry ash handling system described above, the two ash settling ponds will be emptied, capped, and graded to provide a 10 acres work area for aggregate processing and stockpiles, along with the RCC mixing plant. Although the existing landfill will continue to be used for ash storage during construction, the western end of the landfill will be excavated and the ash used in the RCC mix. This ash resides inside the excavation footprint of the south rock berm, and must be removed to allow construction. Gas Transmission Line An existing natural gas transmission line located on the downstream slope of the dam has been demolished, and a new line constructed on an alignment downstream of all remediation work. Construction of the new gas line involved crossing both the emergency spillway rock channel, and the Saluda River. Open cut methods were used to cross the spillway channel, while directional drilling was used in crossing the river. The old pipeline on the dam was removed early in Other Impacts on McMeekin Plant Several other facilities at McMeekin will be displaced during the remediation, including: Plant entrance road, which also serves Saluda Hydro. A new entrance road was constructed utilizing the original rail spur used during construction of Saluda Hydro in the late 1920s. The new entrance road is almost a mile long, and includes a laydown yard well east of the remediation for use by contractors. The warehouses for both plants. New warehouses will be located outside the remediation work footprint. Electric transmission and distribution lines. One major 115kV line which runs through the middle of the on-site rock borrow area is being relocated, and several distribution lines had to be relocated on the site.

7 The Lake Management Group facilities. This group maintains Company owned recreation facilities on the reservoir, and was relocated to a new facility on site in The old buildings will become part of the QA/QC lab complex during the Remediation Project. Page 7 of 22 RCC Berm Design The RCC Berm, or Dam depending on one s perspective, is one of the largest in the world and the United States as indicated in Table 2. Table 2 - RCC Dams Completed and Under Construction 1999 Dimensions Volume Countr Name Owner Purpose River Heig Lengt y ht h RCC (m) (m) (m 3 x10 3 ) Minister de l Hydraulique, 1. Beni Algeria de l Environment et des WI Kebir Haroun Forets Colombi 2. Miel I Hidromiel S.A. HFI LaMiel a 3. Miyagase Japan Ministry of Construction FWH Nakatsu Colombi Empresas Publicas de 4. Porce II H Porce a Medellin 5. Urayama Japan W.R.D.P.C. FWH Urayama Guanyinge 6. (Kwan-in- Benxi City, Liaoning China HFI Taizhe Temple) Province 7. Bureya Russia RAO EDD ROSSI FH Bureya Upper Central Utah Water Rock USA WI Stillwater Conservancy District Creek 9. Oliverhain San Diego County Water USA EW Colorado Dam District 10. Saluda South Carolina Electric USA FHRW Saluda Dam & Gas Lishui Hydropower 11. Jiangya China HFIWN Loushui Corporation 12. Salto Brazil COPEL H Iguacu Caxias It is noted that Olivenhain Dam is slightly larger and is being designed and constructed contemporaneously with the RCC Berm at Saluda. Detailed design criteria for the Saluda RCC Berm include the following: The RCC Berm is founded on competent rock as defined by the commencement of coring operations and verified during construction.

8 Uplift pressures for stability analyses are calculated assuming that the foundation drains will achieve a minimum drainage efficiency of 67 percent. The foundation drainage system consists of four-inch diameter drains installed at tenfoot spacing to a depth into the foundation rock equal to 30 percent of the total head. Usual (normal pool) and Extreme (earthquake) loading conditions include hydrostatic loads based on existing (i.e., pre-dse) groundwater levels. Pseudo-static dynamic analyses are based on a horizontal seismic coefficient of 0.2g. Dynamic finite element analyses are used to determine the distribution of tensile and compressive stresses within the Berm using the DSE as input. Short-term, post-dse loading conditions assume liquefied material (from the failure of the existing dam) on the upstream slope to El. 302 NAVD. For long-term, post-dse loading conditions, the upstream-liquefied material has been assumed to be at El. 274 NAVD. In the following paragraphs, we describe the following design topics. Seismic Design Basis; Loading Conditions; Finite Element Analyses; RCC Mix Design Program; Joint and Drain Design; Facing Options; and Bedding Mix Application. Page 8 of 22 Seismic Design Basis The Design Seismic Event (DSE) at the Saluda Site used to develop the remedial design of the RCC Berm is defined in terms of the Newmark-Hall (NUREG-0098) medianbased response spectra anchored to a horizontal peak ground acceleration (PGA) of 0.2g. These response spectra reflect a peak ground velocity of 7.2 in/sec and a peak ground displacement of 4.02 inches. The vertical response spectra are taken to be two-thirds the horizontal across the entire range of frequencies. Thus, the PGA in the vertical direction is 0.133g. The seismic time history applied to the RCC Berm utilizes Artificial Time Histories (ATH) of acceleration. The artificial time histories are developed iteratively on the basis of the Design Response Spectra with consideration of the Power Spectral Density Function. The time envelope function defines a strong ground motion duration of about 16 seconds and a total duration of 30 seconds.

9 Page 9 of 22 Loading Conditions The loading conditions (i.e., load cases) and associated factors of safety used for developing the remedial design were developed by PCRA in conjunction with comments received from the FERC. The FERC Engineering Guidelines (FERC, 1991), Draft Peer Review Chapter III of the FERC Engineering Guidelines (FERC, 2000), and generally accepted design methodologies have been used to develop the loading conditions. However, recognizing that the stability analyses used to develop the remedial design for the Dam present a unique case, engineering judgement and interpretation were utilized in the development of the appropriate loading conditions. The following load cases were used to analyze the stability of the proposed remedial design of the RCC Berm: Case I Usual Loading Conditions (Normal Operating Conditions); Case II Unusual Loading Conditions (Probable Maximum Flood Conditions); Case IIIA Extreme Loading Conditions (Dry Dam with DSE earthquake forces); Case IIIB-1 Post-Seismic Loading Conditions (Short-Term Operating Conditions after the postulated failure of the existing Dam); and Case IIIB-2 Post-Seismic Loading Conditions (Long-Term Operating Conditions after the postulated failure of the existing Dam). As the proposed Berm will be dry prior to the DSE and the existing Dam can pass the PMF without overtopping, the results for Case II (Unusual loading Conditions) will be identical to Case I. For clarity, we have not included these results in the Summary Tables. The acceptable factors of safety for these loading conditions are presented in Table 3. Table 3 - Acceptable Safety Factors RCC Berm LOAD CONDITION FS Case I 3.0 Case IIIA 1.1 Case IIIB Case IIIB The critical load case occurs immediately following the DSE (i.e., Case IIIB-1) and after the postulated failure of the existing Saluda Dam. Uncertainties associated with the probable loading for the RCC Berm during this particular load case are a function of the following factors: Height of silt (liquefied soil from the existing Dam against the upstream face of the RCC Berm. Residual shear strength (if any) of the liquefied embankment materials and Rockfill from the Highway Berm (i.e., combination of silt, rockfill, and water) which will be located against the upstream face of the RCC Berm.

10 Page 10 of 22 Buildup of uplift pressure beneath the RCC Berm and, specifically, whether the uplift pressure fully develops before the pore pressure dissipates from the potentially liquefied material on the upstream side of the RCC Berm. To address these uncertainties, we analyzed the RCC Berm for a range of possibilities following the DSE. Our best estimate of the post-seismic loading conditions utilizes partial uplift (i.e., equal to uplift prior the DSE) beneath the RCC Berm and a best estimate strength for the combination of silt, rockfill, and water, which will be located along the upstream face of the Berm. Additionally, we have analyzed the Berm for worst-case post-seismic parameters which include full uplift beneath the foundation of the RCC Berm and a lower bound shear strength for the combination of silt, rockfill, and water which will be located along the upstream face of the RCC Berm. The results of these analyses have been used to design an RCC Berm that is stable under all postulated post-seismic design parameters. Finite Element Analyses The RCC Berm has three basic cross sections the Powerhouse section, which bears on a mass concrete foundation, and the South Section and the North Section which bear directly on rock. The mass concrete foundation behind the Powerhouse embeds the existing Penstocks and McMeekin Plant cooling water lines. These cross sections were analyzed using conventional finite element analyses (FEA) and we report in this paper the results for the Powerhouse section only. Also, while the FEA model for the Powerhouse section includes the mass concrete foundation, we discuss only the results in the RCC Berm, with particular emphasis on the tensile stresses as they control the RCC mix design. The FEA performed for the RCC Berm assumes that the RCC Berm will be dry prior to the DSE. The evaluation combines the static stress state of the RCC Berm prior to the seismic event with the seismic stresses generated in the Berm due to seismic ground motions. Additionally, the evaluation addresses the stresses in the Berm for the postseismic loads. Both the static and seismic analyses utilize two-dimensional models of Powerhouse Section. Finite Element Models The static analysis of the Powerhouse Section of the RCC Berm assumes plane stress conditions and uses a two-dimensional finite element model of the Planar Section shown in Figure 4. RISA-3D, a general-purpose finite element program suitable for the analysis of frame and panel structures, was used to evaluate the static stresses.

11 Figure 4 - Finite Element Model (Powerhouse) Without Rockfill Page 11 of FEET 40 FEET FEET Location of ATH Input to model FEET 200 FEET FEET The finite element model of the RCC Berm utilized in the static analysis includes panel elements representing the RCC Berm. Assigning a material density to the panels includes the dead load of the RCC. All other conditions existing on the RCC Berm prior to the seismic event are included as applied loads to the finite element model. For example, equivalent lateral loads on the Berm represent the retained rock-fill on the upstream face. Table 4 lists the properties used in the model. Table 4 - Material Properties for Static Finite Element Model Material Compressive strength f c (psi) Elastic modulus (ksi) Poisson s ratio Density (kcf) Roller compacted concrete 2,300 2, Conventional concrete facing 3,000 3, Mass concrete base 3,000 3, Existing concrete 4,000 3, Rock foundation Not applicable 1, Not applicable

12 Page 12 of 22 Table 5 shows the material properties for the structural portion of the model. The dynamic elastic modulus for the various types of concrete is calculated by multiplying the static modulus by The soil and rock-fill area retained by the upstream portion of the RCC Berm is treated in the analysis as part of the structure. Table 5 - Material Properties for Seismic Finite Element Model Material Description Density (kcf) Shear wave velocity (fps) Compressio n wave velocity (fps) Shear wave damping ratio Compressio n wave damping ratio Shear modulu s (ksf) 1 Existing concrete ,307 11, ,800 2 Mass concrete ,800 11, ,400 3 Conventional concrete ,800 11, ,400 facing 4 Roller compacted ,452 10, ,800 concrete 5 Soil ,099 1, , Rock-fill ,108 to (bottom) to 1,709 to 2,791 11,790 Stress Results in the RCC Table 6 presents the maximum principal tension stresses at the upstream and downstream locations of the RCC Berm Section at the Powerhouse. These stresses are presented for the static loads and the seismic loads resulting from the Artificial Time Histories matching the Design Response Spectra. Table 6 - Maximum Principal Tension Stress in RCC (psi) powerhouse section Location RCC - downstream face Upstream concrete facing Pre-seismic 1.4*Dead + 1.7*Live Design Response Spectra Without Rockfill With Rockfill Post-seismic Unlimited cohesion at base No cohesion at base As seen from Table 6, the Maximum Principal tension ranges from 5 to 359 psi (based on use of the ground Design Response Spectrum). The stresses with rock-fill on the upstream face are somewhat higher than the stresses without rock-fill. The maximum tension occurs on the downstream face at the interface of the RCC and the underlying mass concrete. Please note that the seismic analysis described herein assumes linear material behavior and allows, as much tension in the RCC and RCC/rock interface as the loads will generate. In reality, the material may sustain cracking at

13 Page 13 of 22 locations where the tension stress exceeds the material tension strength. For example, the tension at the RCC/rock interface will be limited by the cohesion mobilized at this interface. Therefore, the tension stresses reported in Table 6, are an upper bound to the actual tension stresses in the RCC. Limit Equilibrium Analyses and Bedding Mix Requirements The results of a post-dse Limit Equilibrium Analysis (LEA) were used to determine interface friction angle necessary to achieve a sliding factor of safety of 1.1. The analysis assumes that cohesion is zero and that the lift joint considered is fully cracked along the entire width of the Berm. Based on the results of the dynamic analyses, we do not expect appreciable cracking between the RCC lift joints. However, we have conservatively assumed that cracking does occur along the entire length of the RCC lift line and have performed static sliding stability analysis along these planes. A sensitivity analysis was performed to determine the minimum shear strength parameters at the lift joints and within parent RCC. Two limiting cases were considered in each Section; cohesion with no friction and friction with no cohesion. The results indicate bedding mortar should be placed up to El. 215 NAVD to assure a sliding factor of safety in excess of 1.1 along the RCC lift lines. Bedding mix will also be applied along a 22-foot wide zone at the upstream face of the RCC, full-height, for seepage control. At El. 215 NAVD, the interface friction angle to achieve a minimum sliding factor of safety of 1.1 is equal to or less than 35 degrees for both lower bound and best-estimate parameters. RCC Mix Design Program We have established the Minimum Design Strength for the Final RCC mix based on Phase I and II laboratory testing conducted on various RCC mixes. The final RCC mix design will meet or exceed these minimum strengths. A Dynamic Increase Factor (DIF) of 1.5 is applied to the static tensile strength to compute the dynamic tensile strength. A summary of the Minimum Design Strengths for the final RCC mix are provided in Table 7. Table 7 - Minimum Design Strength Final RCC Mix Property Static Compressive Strength Minimum Design Strength At One Year 2,300 psi Static Direct Tensile Strength Parent RCC and bedded lift joints Unbedded Lift Joints Dynamic Direct Tensile Strength Parent RCC and bedded lift joints Unbedded Lift Joints 239 psi 115 psi 359 psi 173 psi Note: Dynamic Direct Tensile Strengths are calculated utilizing a DIF of 1.5

14 Page 14 of 22 Direct tensile strength criteria used for design were correlated with a compressive strength of 2,300 psi. The relationship between the compressive strength and the direct tensile strength was extrapolated from the project-specific RCC laboratory test results. Thermal Analysis and Joint Spacing A Simplified Thermal Analysis (STA) or Level I Thermal analysis has been completed to evaluate the potential for thermal cracking of the RCC during placement. A more rigorous thermal analysis, i.e., a Level II Analysis, which utilizes detailed finite element analyses and placement schedules, was being performed while this paper was in preparation. The actual temperature rise in the RCC Berm depends on the heat generating characteristics of the RCC mix and accompanying thermal properties, environmental conditions, geometry of the section, and construction conditions. Peak temperatures are reached a few days or weeks after placement. For massive structures, the temperature of the RCC slowly decreases until it reaches the average annual temperature of the site. As the RCC cools, the volume of the RCC decreases. Since this volume reduction is constrained by the bedrock foundation, sufficient strain can develop to cause a tensile failure or crack of the RCC. To prevent excessive cracking of the RCC, transverse contraction joints are placed into the RCC mass at a prescribed interval. A thermal analysis is used to justify the selection of the contraction joint spacing. The methodology followed for this Project is described in the American Society of Civil Engineers publication entitled Roller Compacted Concrete III (Tatro and Schrader, 1992). The results of this analysis are summarized in Table 8. Please note that the analysis assumes that aggregate production and stockpiling commences two months before RCC placement. Table 8 - Summary of Results Simplified Thermal Analysis Placement Schedule (Month) Placing Temperature ( F) L (in) Number of Cracks (Assuming 0.05 width) Avg. Crack Spacing (ft c/c) February Infinite May August November As shown on Table 8, RCC placement in the summer months (i.e., August) significantly increases the thermal displacements in the RCC mass.

15 Page 15 of 22 The results of this analysis, for the proposed transverse contraction joint spacing of 60 feet center-to-center (c/c), indicate that RCC construction stockpiling and aggregate production should be limited to the Fall and Winter months and that placement and/or stockpiling of RCC in the spring and summer months may require some form of precooling to minimize cracking. Mix Design Testing Program The Mix Design Testing Program was established in the early project as a four Phase Program summarized in the following Table 9. Table 9 Summary of RCC Mix Design Phases Phase No. Description Schedule I Initial Lab Program (13 Mixes) Started May 2000 Status: Complete II Final Lab Program (5 Verification Mixes) Started December 2000 Status: Complete III On-Site, Full-Scale Design RCC Test Pads with Aggregate from On-Site Borrow Area Started August 2001 Status: Ongoing IV Pre-Construction Test Pad for Verification of Contactor Methodology Status: Future Work after RCC Berm Contractor Selection As seen on the table, we began with an exploratory Phase I laboratory testing program to determine if sluiced, landfilled flyash from the adjacent McMeekin Steam Electric Plant operations could be utilized. Offsite aggregate was used in Phase I as well as in Phase II. The ash is disposed in an on-site landfill located at the toe of the existing Dam and a portion of it has to be moved in any event. Phase I yielded positive results and Phase II was used to refine the mix options and to hone in on a final mix design. We then proceeded with a full-scale test pads using aggregate from our on-site borrow area, fully processed in accordance with a plan for crushing and screening. Phase III consists of three main test pads, each with a different mix with the cement content being the primary differing constituent as shown on Table 10. In addition to the three main pads, a series of smaller pads were constructed to allow for variation of placement parameters, testing procedures and the like. Phase III is currently in the curing stage (April 2002).

16 Table 10 - Phase III RCC Mixes Page 16 of 22 Mix Designation a Cement (lbs / yd 3 ) Pozzolan (McMeekin Fly Ash) (lbs / yd 3 ) Water in excess of SSD b (lbs / yd 3 ) Mod. VB Time (sec) Blended Aggregate (Fine + Coarse) (lbs / yd 3 ) Design 3% Air (lbs / ft 3 ) Primary RCC Mix Design , Secondary RCC Mix Design , Tertiary Mix , RCC Berm Drainage Design The design of the drainage system for the RCC Berm as shown on Figure 5 consists of three primary elements as follows: A Drainage Gallery 14 feet from the Upstream Face just above Tailwater; Bedrock Drains (4 dia.) from the Gallery drilled to a depth equal to 30% of normal headwater; and Crest-to-Gallery Drains (6 dia.) to intercept drainage through cracks on the upstream face. Figure 5 Typical RCC Section NORMAL POOL CREST TO GALLERY DRAINS RCC BERM SILT / ROCK MIXTURE UPSTREAM FACING DRAINAGE GALLERY GROUND SURFACE RESIDUAL SOIL FOUNDATION DRAINS COMPETENT ROCK

17 Page 17 of 22 Upstream and Downstream Facing Upstream and downstream facing considerations include constructability, aesthetics, economics and, in the case of the upstream face, watertightness. Final decisions will be based on cost as quoted by bidders, but options for the downstream face include (a) formed RCC Steps, and (b) precast concrete panels, with the former illustrated on Figure 6. Figure 6 Formed RCC Face 6 FILLET OF BEDDING MIX 3/8 THICK BEDDING MIX RCC FACE OF TEMPORARY FORMWORK 2 LIFT (TYP.) For the Upstream face, we are currently considering (a) conventional concrete, (b) grout enriched RCC against forms, and (c) precast panels. Figure 7 illustrates the conventional concrete and the treatment of the top of the Berm. Figure 7 Upstream Facing Rockfill Berm Design As mentioned above, the Rockfill Berm portion of the Remediation Concept will be approximately 5500 lineal feet of rockfill dam comprising of approximatley four million cubic yards. The Design Cross section shown on Figure 8 includes upstream filters against a

18 Page 18 of 22 transition zone, essentially a low permeability core, downstream blanket drain and founded on residual soil. Figure 8 Typical Rockfill Berm Design Section Basic Design Criteria for the Rockfill Berm The basic design criteria utilized to design the Rockfill Berm is summarized as follows: The design has minimized the volume of embankment material required by aligning the crest of the new Rockfill Berm as far upstream as practical. In this way, the amount of new Rockfill placed to create the upstream shell of the new Berm has been minimized. Avoid excavation of the sluiced embankment material. The toe of the existing Dam defines the start of the excavation of the residual soil. The excavation proceeds downstream from this point to the foundation elevation. The transition zone is founded completely on dense residual soil or weathered rock. The foundation of the Rockfill Berm will be excavated to a depth to preclude piping and limit seepage. The Transition Zone (i.e., the core) of the new Rockfill Berm will be founded below pipeable materials. The gradation of the Rockfill has been specified such that the outer slopes of the final structure can be constructed at 1.5H to 1V. Toe of the Existing Dam Determination of the location of the toe of the original Dam in the field is not straightforward. The toe has been covered with riprap and the area has been generally disturbed and vegetated. We have used two methods to estimate the position of the toe of the existing Dam and enveloped the results in a conservative manner. First, the as-built cross section drawings provided every 50 feet along the longitudinal axis of the dam were

19 Page 19 of 22 reviewed and the distance from the centerline of the Dam to the downstream toe of the Dam was measured and recorded for each as-built cross section. Second, we projected a 2.5H to 1V slope (design slope of the original Dam) from the edge of the upstream crest down to the residual soil (as noted on the as-built drawings). This was done for each 250- foot Design Cross Section and the results were combined to develop a set of design cross section drawings. Foundation Excavation Depth The required depth of excavation beneath the Filter/Transition Zone of the proposed Rockfill Berm has been an item of discussion between all of the concerned parties. It was finally agreed that the excavation would be extended to a depth where (N 1 ) 60 is greater than 25. Proof rolling of the foundation will be conducted to identify and remediate soft zones, if any. Other features related to the depth of excavation include the following: The Transition Zone will be constructed utilizing on-site residual soil. Piping will be controlled through a combination of internal filters and a downstream drainage blanket. Rockfill Berm Alignment The alignment of the Rockfill Berm has been determined based on the location of the toe and the required depth of excavation with the following considerations. There shall be no excavation into the original embankment Dam. However, a portion of the subsequently placed riprap may be excavated. At least 25 percent of the upstream shell, measured laterally, shall be founded on residual soil with an SPT value greater than 5 to 7. The entire Transition Zone and downstream shell of the Rockfill Berm shall be founded on material meeting the depth of excavation requirements discussed above. Embankment Design The following paragraphs describe the design rationale and proposed gradation for the materials comprising the Rockfill Berm (i.e., transition zone, filters, and rockfill). Transition Zone Gradation The purpose of the Transition Zone is to control seepage through the Rockfill Berm. To prevent piping of the Transition Zone material, a graded filter, consisting of fine and coarse zones, will be placed on the upstream and downstream sides of the Transition Zone. Similarly, to prevent piping of the foundation material, both fine and coarse filters will be placed between the downstream shell and the foundation. The embankment design includes a vertical upstream face of the Filter/Transition Zone to minimize the footprint of the Rockfill Berm. The Filter/Transition Zone will be located completely on a stable foundation of residual soil. A vertical upstream side of the

20 Page 20 of 22 Filter/Transition Zone keeps the Rockfill Berm Crest as close as possible to the crest of the existing Dam, thereby minimizing earthwork quantities and the impact on downstream land without sacrificing other design criteria. The gradation band of the Transition Zone was designed by considering the gradations of core and transition zones for existing rockfill dams. An extensive Bulk Sampling Program (borings and test pits) and laboratory analyses were conducted to determine if the on-site residual soil would be acceptable for use in the Transition Zone and laboratory testing program. Filter Material Gradation Filters consisting of cohesionless material will be placed both upstream and downstream of the Transition Zone and between the foundation and the downstream Rockfill Shell. Due to the large difference in gradation between the Transition Zone and the Rockfill, a two-layer graded filter will be used. Upstream Filters between the Transition Zone and Rockfill Shell will be 4-feet thick and Downstream Filters will be 6-feet thick to minimize the impact of material segregation during construction and to assure filter integrity. Two, 4-foot-thick filter layers are adequate to withstand lateral deformations of the Rockfill Berm up to 2 feet. Rockfill Gradation The Rockfill Shell will be composed of reasonably well graded, angular rock fragments with less than 10 percent fines passing the No. 200 sieve to assure adequate shear strength. To assure proper compaction, the maximum rock particle size will not exceed the thickness of the lift. We plan to place and compact rock fill in 3-foot-thick lifts, hence the maximum particle size of 30 inches will be adequate. The gradation band for the Rockfill is shown on Figure 9. Figure 9 Rockfill Gradation Band

21 Page 21 of 22 Material Properties The material properties used in the stability analysis of the proposed Rockfill Berm consisting of unit weights, effective friction angles, and effective cohesions are summarized on Table 11. Table 11 - Material Properties for Rockfill Berm Embankment Material Unit Weight (pcf) Effective Friction Angle (degrees) Normal Stress (psf) Effective Cohesion (psf) Rockfill <2,800 0 Rockfill >2, Transition Zone Filter Zone Residual Soil Existing Dam (Unwashed Fill) Failed Material (short-term) Failed Material (long-term) A two-stage bi-linear shear strength envelope has been used to model the shear strength of the rockfill. An effective friction angle of 50 degrees was selected for the lower normal stress range (i.e., less than 2,880 psf) and an effective friction angle of 43 degrees and an effective cohesion of 864 psf was used for the higher normal stress range (i.e., greater than 2,880 psf). A unit weight of 130 pounds per cubic foot was used as the unit weight of the Rockfill. The material properties used for the transition zone are based on the results of the bulk soil sampling program which included a series of Direct Shear tests on recompacted samples compacted to 95 percent of the maximum dry density within + 2 percent of the optimum moisture content as determined from Modified Proctor Compaction Tests. The Average shear strength parameters from the laboratory testing program were used to represent the shear strength for the transition zone material. The material properties used for the residual soil and existing Dam material are based on the results of Consolidated Undrained Triaxial Compressive Strength Tests (with pore pressure measurements) performed on undisturbed samples of both the residual soil and unwashed fill material. An effective friction angle of 37 degrees was used to represent the shear strength for the filter materials (i.e., compacted sand or gravel).

22 Page 22 of 22 Stability Analysis Slope stability analyses have been conducted for six representative cross sections of the proposed Rockfill Berm. These stability analyses have been conducted in general accordance with the FERC Engineering Guidelines and the SLOPE/W Computer program (GEO-SLOPE, 1998). This program has been selected for the analysis because of its ability to develop different slope stability models at a rapid pace due to its compatibility with the Windows environment. SLOPE/W also has the ability to handle pore water pressures specified as either a phreatic line or imported pore water pressures from a flow net or finite element analysis. Typical results are shown on Table 12. Table 12 - Rockfill Berm Stability Analysis Results Section FS LOADING CONDITION (1) Upstream Downstream Circle Wedg Circle Wedg e e I NA NA IIIA NA NA IIIB-1 (normal pool) IIIB-1 (lowered pool) IIIB-2B (normal pool) CLOSING REMARKS FS req (2) The Saluda Dam Remediation Project is one of the largest, active dam remediation projects in the world and will be one of the top ten largest RCC Dams in the world. The Project includes practically all of the complicating factors that a dam engineer can face in remediating an existing dam, including deep toe excavations under near-full head, variable soil and rock conditions and exceptionally difficult space constraints. The use of RCC aided significantly to solving the space constraints, but involved a great deal of up front testing and verification analysis. We still have to complete testing on the Phase III samples to finalize the mix design and we still have to complete a Phase IV testing program.

REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS. Abstract

REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS. Abstract REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS Paul C. Rizzo 1, Scott Newhouse 2, Jeff Bair 3 Abstract Saluda Dam, part of the FERC regulated Saluda Hydroelectric Project located near Columbia, South

More information

Paper USSD Annual Meeting June 24-28, 2002 DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT

Paper USSD Annual Meeting June 24-28, 2002 DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT By Paul C. Rizzo * William Argentieri ** Jeffrey M. Bair * Kristina Massey ** Harold Moxley ** ABSTRACT Saluda Dam, part of the FERC regulated

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION

SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION Page 1 of 17 SALUDA DAM MIX DESIGN PROGRAM By Paul C. Rizzo Luis Ruiz Gaekel* John P. Osterle* INTRODUCTION Saluda Dam is owned and operated by South Carolina Electric & Gas Company (SCE&G) and is located

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 DESCRIPTION OF SALUDA HYRDOELECTRIC PROJECT EXHIBIT A AUGUST 2008 Prepared by: SOUTH CAROLINA

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 PROJECT DESCRIPTION EXHIBIT A DECEMBER 2007 Prepared by: SOUTH CAROLINA ELECTRIC & GAS COMPANY

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Revision: 1 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23.

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. (2) For the resisting side, passive pressure theory indicates

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

D.B. Wilson Station CCR Landfill

D.B. Wilson Station CCR Landfill D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big

More information

Cubzac-les-Ponts Experimental Embankments on Soft Clay

Cubzac-les-Ponts Experimental Embankments on Soft Clay Cubzac-les-Ponts Experimental Embankments on Soft Clay GEO-SLOPE International Ltd. www.geo-slope.com 1, 7 - th Ave SW, Calgary, AB, Canada TP T Main: +1 3 9 Fax: +1 3 39 Introduction In the 197 s, a series

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

APPENDIX G SCA BASIN CALCULATIONS

APPENDIX G SCA BASIN CALCULATIONS ONONDAGA LAKE SEDIMENT MANAGEMENT FINAL DESIGN APPENDIX G SCA BASIN CALCULATIONS p:\honeywell -syr\444853 - lake detail design\09 reports\9.22 sediment management final design\110930 submittal\110906 onon

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

Coal Combustion Residuals Closure Plan

Coal Combustion Residuals Closure Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C150035.00 October 2016 Prepared by: GAI Consultants, Inc. Richmond Office

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

PHASE 1 WIND STUDIES REPORT

PHASE 1 WIND STUDIES REPORT PHASE 1 WIND STUDIES REPORT ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN FOR A SUICIDE DETERRENT SYSTEM Contract 2006-B-17 24 MAY 2007 Golden Gate Bridge Highway and Transportation District Introduction

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER +)) SNC LAVALIN Lower Churchill Project RIPRAP DESIGN FOR SLI Document No. 505573-3001-4HER-0011-00 Nalcor Reference No. MFA-SN-CD-0000-CV-RP-0006-01 Rev. 81 Date: 07 -Dec-2012 Prepared by: Checked by:

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

AMEC010570_0001. Via  . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1. { TIME\@ "d MMMM yyyy" } AMEC Project Number VM00448 Via EMAIL Imperial Metals Corporation 200-580 Hornby Street Vancouver, B.C. V6C 3B6 Attention: Mr. Ron Martel Environmental Superintendent Reference:

More information

5th International Symposium on RCC Dams General Introduction

5th International Symposium on RCC Dams General Introduction OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

UNIT 15 WATER HAMMER AND SURGE TANKS

UNIT 15 WATER HAMMER AND SURGE TANKS UNT 15 WATER HAMMER AND SURGE TANKS Structure 15.1 ntroduction Objectives 15.2 Water Hammer 15.2.1 Expression for Rise in Pressure 15.3 Rapid Acceleration of Flow 15.4 Surge Tanks 15.5 Summary 15.6 Keywords

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION Presented by James Law SCS Engineers Master Class ISWA Congress 2009 Lisbon 10 October 2009 PRESENTATION OVERVIEW Landfill Slope Stability

More information

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra

More information

SOIL-STRUCTURE INTERACTION ANALYSIS OF THE MANHATTAN BRIDGE FOUNDATIONS

SOIL-STRUCTURE INTERACTION ANALYSIS OF THE MANHATTAN BRIDGE FOUNDATIONS 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska SOIL-STRUCTURE INTERACTION ANALYSIS OF THE MANHATTAN BRIDGE FOUNDATIONS

More information

Study to Establish Relations for the Relative Strength of API 650 Cone Roof Roof-to-Shell and Shell-to- Bottom Joints

Study to Establish Relations for the Relative Strength of API 650 Cone Roof Roof-to-Shell and Shell-to- Bottom Joints Thunderhead Engineering Consultants I N C O R P O R A T E D 1006 Poyntz Ave. Manhattan, KS 66502-5459 785-770-8511 www. thunderheadeng.com Study to Establish Relations for the Relative Strength of API

More information

Design Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000)

Design Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000) Design Data M Flotation of Circular Concrete Pipe There are several installation conditions where there is the possibility that concrete pipe may float even though the density of concrete is approximately.4

More information

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr. October 16, 2018 Mr. Mike Bednar Superintendent of Environmental Compliance GRDA-Ecosystems and Education Center PO Box 70 420 Hwy 28 Langley, OK 74350-0070 RE: GRDA CCR Landfill Compliance Report Grand

More information

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE 1 1) INTRODUCTION 2) THE UNFAIR ADVANTAGE and Stingray earth anchors are driven tipping plate soil anchors for reaction of tensile loads. anchors have ultimate capacities up to 20 tons, and Stingray anchors

More information

An Introduction to Deep Foundations

An Introduction to Deep Foundations An Introduction to Deep Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report Whitewater Valley Station Wayne County, Indiana GAI Project Number: C151119.07 July 2017 Prepared by: GAI Consultants, Inc. Murrysville Office 4200 Triangle Lane Export, Pennsylvania 15632-1358 Prepared

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010. BChydro CD FOR GEf\lE IONS B-2 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 bchydroregulatorygroup@bchydro.com January 19, 2010 Ms. Erica M. Hamilton Commission Secretary

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

Water Storage for Agriculture

Water Storage for Agriculture Water Storage for Agriculture Ted van der Gulik, P.Eng. Partnership for Water Sustainability in BC Water Storage Options Dam! usually constructed within a watercourse! must follow the dam safety regulation!

More information

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016 CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio September, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical Engineering

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

The tensile capacity of suction caissons in sand under rapid loading

The tensile capacity of suction caissons in sand under rapid loading Frontiers in Offshore Geotechnics: ISFOG 25 Gourvenec & Cassidy (eds) 25 Taylor & Francis Group, London, ISBN 415 3963 X The tensile capacity of suction caissons in sand under rapid loading Guy T. Houlsby,

More information

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST Release Date: January 7, 2014 Sampling Coarse Aggregate PERFORMANCE CHECKLIST AASHTO T-2 Sampling of Aggregates Sampling From A Stockpile 1 When

More information

Tension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis.

Tension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis. Tension Cracks 16-1 Tension Cracks In slope stability analyses with cohesive soils, tension forces may be observed in the upper part of the slope. In general, soils cannot support tension so the results

More information

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical

More information

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION LESSONS LEARNED AT THE TAUM SAUK REBUILD Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT The Authors served in key roles for the design and rebuild of the Dam for the Taum Sauk Rebuild

More information

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016 CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Northeastern 3&4 Power Station Oologah, Oklahoma October, 2016 Prepared for: Public Service Company of Oklahoma Oologah, Oklahoma Prepared by: American Electric

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING Tutorial Question Bank Name : FOUNDATION ENGINEERING Code : A60126 Class : III B. Tech II Semester Branch

More information

Lecture 8&9: Construction Dewatering

Lecture 8&9: Construction Dewatering Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 525 Vine Street, Suite 1800 Cincinnati, Ohio 45202

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 00 04 CIVIL ENGINEERING TUTORIAL QUESTION BANK Course Name Course Code Regulation Course Structure Course Coordinator Course Faculty

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

[Barve, 4(7): July, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785

[Barve, 4(7): July, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY PARAMETRIC STUDY TO UNDERSTAND THE SEISMIC BEHAVIOUR OF INTZE TANK SUPPORTED ON SHAFT Prasad S. Barve *, Ruchi P. Barve * Civil

More information

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report REPORT Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number 2 2018 Annual RCRA CCR Unit Inspection Report Submitted to: Northern Indiana Public Service

More information

Stability of slopes of municipal solid waste landfills with co-disposal of biosolids

Stability of slopes of municipal solid waste landfills with co-disposal of biosolids Geo-Environment and Landscape Evolution II 215 Stability of slopes of municipal solid waste landfills with co-disposal of biosolids M. Chopra, D. Reinhart, M. Vajirkar & B. Koodhathinkal University of

More information

SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES

SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES Page 1 of 101 Written by: Ming Zhu Date: 08/20/2008 Reviewed by: R. Kulasingam/J. Beech Date: 08/20/2008 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES 1. INTRODUCTION This Summary of Subsurface

More information

Gerald D. Anderson. Education Technical Specialist

Gerald D. Anderson. Education Technical Specialist Gerald D. Anderson Education Technical Specialist The factors which influence selection of equipment for a liquid level control loop interact significantly. Analyses of these factors and their interactions

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Revised: March 27, 2019 Table of Contents 1.0 General Information... 3 2.0 Description

More information

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006 ZIN Technologies PHi Engineering Support PHi-RPT-0002 CFD Analysis of Large Bubble Mixing Proprietary ZIN Technologies, Inc. For nearly five decades, ZIN Technologies has provided integrated products and

More information

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado. Written Closure Plan Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS Shaw QHW 1 1, Director: ARQ (PTY) Ltd, +27 12 348 6669, Fax,quentin@arq.co.za Abstract: The original 2003 ICOLD Bulletin 126 on Roller Compacted Concrete dams proved

More information

2016 Annual Inspection Report

2016 Annual Inspection Report 2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Pawnee Station 14940 Morgan County Road 24 Brush, Colorado 80723 January 18, 2017 Table of Contents

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles Coastal Douglas-fir Field Raked and Tangent Poles LAMINATED POLES engineered to solve problems 1 Design Criteria Submission Form You can either fax this information to 253-627-4188 or submit your drawings

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

Application of Computational Fluid Dynamics to Compressor Efficiency Improvement

Application of Computational Fluid Dynamics to Compressor Efficiency Improvement Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 1994 Application of Computational Fluid Dynamics to Compressor Efficiency Improvement J.

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

Irrigation &Hydraulics Department lb / ft to kg/lit.

Irrigation &Hydraulics Department lb / ft to kg/lit. CAIRO UNIVERSITY FLUID MECHANICS Faculty of Engineering nd Year CIVIL ENG. Irrigation &Hydraulics Department 010-011 1. FLUID PROPERTIES 1. Identify the dimensions and units for the following engineering

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station 33200 East Johnson Rd Sibley, Missouri KCP&L Greater Missouri Operations Company October 14, 2016 TABLE OF CONTENTS SECTION 1

More information

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016 CLOSURE PLAN CCR 257.102(b) East and West Bottom Ash Ponds Pirkey Power Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company - Pirkey Plant Hallsville, Texas Prepared by:

More information