SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE
|
|
- Wesley Wilkins
- 5 years ago
- Views:
Transcription
1 LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD W5M and W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between Sta and on SH 549, approximately 1.5 km west of the junction with SH 762 UTM COORDINATES: N E (NAD27) NTS Map Sheet 82 J/9 (Turner Valley) AI FILE: AI PLAN & PROFILE: SH549:02 Sta (Metric)/Sta (Imperial) Date of Initial Observation: Spring 1987 Date of Last Inspection: July 2003 Instruments read May 2003 Instruments Installed: Instruments Operational: March slope inclinometers, 2 pneumatic piezometers, 4 standpipes 2 pneumatic piezometers 2 standpipes Risk Assessment: PF(13) * CF(5) = 65 (increased from 11*5 = 55 in June 2002) Last updated by: AMEC Earth & Environmental Limited, August 2003 Comments:
2 Location The slide area is located between Sta and on SH 549, approximately 1.5 km west of the junction with SH 762. This site is approximately 12 km west of Millarville, AB. General Description Of Instability The road in the failure area is aligned east-west and located on a sidehill with the south side upslope. The embankment in the failure area is 5 to 6 m in height and is constructed at the cut-to-fill transition between a cut section immediately west of the failure area and lower areas to the east. In the spring of 1987 a landslide occurred in the road embankment in this area. The slide consisted of a rotational earth slide encompassing the entire north slope of the embankment between approximately Sta and The slide was characterized by downdropping of the upper half of the slope face and bulging outwards of fill in the lower half of the slope face. In addition, sinkholes and depressions in the fill material were noted above a culvert located at Sta and upslope of the outlets of a pair of horizontal drain pipes between approximately Sta and No cracking or other signs of distress were noted in the pavement adjacent to the slide. After a geotechnical investigation by AI personnel, the failure was attributed to a combination of the following factors: Saturation of the embankment/elevated groundwater table within the embankment due to slope runoff from the south and discharge from the horizontal drains onto the embankment slope in the vicinity of Sta The presence of a weak organic layer on the natural slope face beneath the embankment fill. Poor weathering characteristics of the sandy shale rock fill used to construct the embankment. Geological Setting/Geotechnical Conditions A series of boreholes drilled by AMEC during the geotechnical investigation in March 2001 encountered clay fill in the road embankment, which was underlain by high plastic clay (likely glaciolacustrine), which was in turn underlain by high plastic clay till that extended beyond the completion depth of the boreholes. A 0.5 m thick layer of organic material was encountered at the base of the road fill in one of the boreholes. Chronology Table A1 provides the Chronological Background of the slide.
3 Past Investigations AI personnel performed a site reconnaissance and excavated a series of test pits in the slide area in June, Test pit logs were not available in the AI files. No records of any other geotechnical investigations were found. AMEC performed a geotechnical investigation in March The results of this investigation, including recommendations for further remedial measures, were submitted to AT during the summer of Remedial Measures A number of remedial measures were recommended by AI personnel in order to reconstruct the embankment with improved foundation and drainage conditions. These measures were as follows: Excavate the slide mass and any underlying weak organic material to expose a competent base. Bench the exposed base and place a 0.3 m thick gravel drainage blanket. Reconstruct the embankment using suitable material. Improve the surface drainage in the area adjacent to the north toe of the embankment so that water discharging from the drainage blanket and surface runoff is not able to accumulate adjacent to the toe of the embankment. Extend the outlets of the horizontal drain pipes between approximately Sta and so that they would not discharge onto the north embankment slope. Install a subsurface drain beneath the upslope (south) ditch to intercept groundwater flow and prevent it from saturating the embankment. Repair culverts as necessary. The remedial measures were implemented by AI personnel from August to November, It was reported that the job went well and there were no significant problems. The road surface was repaved on several occasions between the fall of 2000 and the fall of 2001 in order to repair significant cracking and settlement of the road surface. Monitoring Results No records of any follow-up site inspections or other monitoring prior to the fall of 2000 were found. The results of the ongoing monitoring by AMEC since the fall of 2000 are as follows: Active shear zones have been noted in both of the slope inclinometers installed during the March 2001 geotechnical investigation. The slope inclinometer in BH-
4 1, on the slope face below the road, measured approximately 100 mm of displacement between March and October 2001 along a shear zone approximately 5.7 m below ground surface. Additional movement at this depth sheared off the slope inclinometer in BH-1 between October 2001 and May The slope inclinometer in BH-2, in the westbound lane of the road, measured approximately 12 mm of movement between March and July 2001 along a shear plane approximately 3 m below ground surface before being paved over in late summer Tension cracking has been noted on the slope face below the road and to the east of BH-1. Significant cracking and settlement of the road surface has continued, with horizontal and vertical displacements of up to approximately 100 mm noted to have occurred between the September 2001 repaving and the last instrumentation readings on October 16, 2001.
5 Table A1 S7: Embankment Failure West Of Millarville - Chronological Background YEAR MONTH DESCRIPTION 1986 Fall Overlay construction in area. Spring Slide first observed June Initial inspection by AI personnel on June 9 th. Backhoe test pit investigation on June 23 rd. August Report on slide issued with recommended remedial measures August to November Remedial measures implemented September Site inspection by AMEC and AT personnel. October Road repaved after continued settlement and cracking. March Geotechnical site investigation by AMEC, including the installation of 2 slope inclinometers and 2 pneumatic piezometers. May Site inspection by AMEC and AT personnel. Summer Instrument readings taken by AMEC Repaving after continued settlement and cracking of road surface. One August slope inclinometer paved over. September Repaving after continued settlement and cracking of road surface. October Cracking/settlement area repaved on October 12 th. Instruments read by AMEC. Instruments read by AMEC. Slope inclinometer in BH-1 sheared off at 5.7 m depth below ground surface. May Piezometer appears to be blocked by debris/ice. Annual inspection by AMEC and AT personnel New cracking noted near cattle pass culvert. Increased Probability Factor from 11 to 13. Piezometers in BH-1 read by AMEC. October Road appears to have been repaved at least once since the site inspection in May. November AT reports that this site has been repaved twice during May Instruments read by AMEC Annual inspection by AMEC and AT personnel. July Site was seen to be recently repaved.
6 Alberta Transportation Southern Region Landslide Monitoring Program Summer 2003 Assessment Report August 2003 S7 West of Millarville The site west of Millarville site was visited on July 8, Photographs from this site visit are included in Appendix S7, along with a site plan, air photograph, and a detailed discussion of the visit. This discussion has also been submitted in separate unbound sheets for inclusion in Appendix B of the West of Millarville binder. No significant changes in the stability conditions at this site since the previous inspections were noted. The road surface at this site had been repaved recently prior to the site inspection, therefore it was not possible to directly observe the magnitude of additional cracking and settlement that had occurred since the previous inspection. It is evident that at least the eastern portion of the site is experiencing ongoing movements. AMEC has investigated this site and submitted a design report for remedial measures under separate cover. Without repairs, this area will undoubtedly require ongoing maintenance and patching. The Risk Level at this site was kept at 65. AMEC recommends that the annual assessments and semi-annual monitoring at this site be continued and that the proposed remedial measures be implemented if possible. Please refer to Appendix S7 for further discussion.
7 APPENDIX S7 West of Millarville
8 Alberta Transportation Southern Region Landslide Monitoring Program Summer 2003 Assessment Report August Site Visit The Annual Inspection site visit was conducted on July 8, At the time of the visit, the weather was clear with a light breeze. Please note that this site is approximately 1 km to the east of the site identified as S7 in the original contract. As noted in the Spring 2000 assessment report, the original S7 site was renamed Shale Fill Embankment, assigned a low priority and dropped from the list of sites requiring annual inspection in favor of the more extensive failure to the east which is now referred to as S7 West of Millarville. 2.0 Significant Observations The following observations, considered to be relevant to the stability of the slope were made. No significant changes in the slope stability conditions since the previous site inspections. The road surface through the slide area had been recently repaved (Photos1 to 4), apparently only hours before the site visit. Therefore, no observations of cracking and settlement of the road surface since the previous inspections were possible. 3.0 Changes from Previous Visits No significant changes since the previous visits. 4.0 Discussion The recent repaving had covered any new cracking or continued road surface settlement since the previous inspection. However, given the fact that this site apparently required repaving and the observations and assessment from previous work, it is considered certain that continued slope movement had caused additional settlement and cracking of the road surface. Without the construction of the recommended remedial measures, this area will undoubtedly require ongoing maintenance/patching. 5.0 Assessment The eastern portion of the slide area continues to move at a relatively high rate and will require ongoing maintenance in the future. Therefore, the Probability Factor with respect to this slide should be maintained at 13. It is likely that in the short term, continuing movements will result in repairs and patching being required to the north half of the road (westbound lane). However, larger movements are P:\Specproj\CG25132\Annual Assessment Reports\Spring 2003\files for CD\S7\S7 - Text and Photos.doc S7 - Millarville
9 Alberta Transportation Southern Region Landslide Monitoring Program Summer 2003 Assessment Report August 2003 possible and likely in the longer term, which would effect a significant portion of the highway. On this basis, the Consequence Factor for this slide should be maintained at 5. Based on the above, the Risk Level at this site is calculated as Recommendations The instrumentation monitoring program currently in place should be discontinued. The only remaining, functioning instruments at this site are the two pneumatic piezometers installed in BH1 on the slope face below the road (one of which has been giving erratic readings over the past year). The two slope inclinometers installed at this site are no longer readable (the SI on the road was paved over in the fall of 2001 and the SI on the slope face has sheared off at the slide plane). Future data from the piezometers will not provide any basis for modifying or further deferring the recommended remedial measures for this site. Therefore, future readings of these instruments will not provide significant value and should not be performed. Annual Assessments at this site should be continued. The surface conditions of the road at this location should be carefully monitored by maintenance personnel. Additional movement and damage to the road surface will occur this summer and maintenance work/patching will be required at some point. Mitigative works be considered for this site. The recommended shear key and slope flattening measures for this site should be implemented. Without remedial measures, ongoing maintenance will continue to be required. The likelihood of more significant failures will likely increase as time passes. P:\Specproj\CG25132\Annual Assessment Reports\Spring 2003\files for CD\S7\S7 - Text and Photos.doc S7 - Millarville
STRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical
More informationTownship of Springwater
Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved
More informationAnnual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1
Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS
More informationANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)
ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel
More informationAnnual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:
Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy
More informationConstruction Dewatering
Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue
More informationInitial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1
Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS
More informationInstrumentation and Monitoring of Mahawewa Landslide off Walapane in Central Hills of Sri Lanka
Instrumentation and Monitoring of Mahawewa Landslide off Walapane in Central Hills of Sri Lanka Idirimanna 1 IAND, Perera 1 KAC, Bandara 1 KMT, Kumara 1 WGBT, Indrathilake 2 HML, Premasiri 1 HMR and Abeysinghe
More informationANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)
ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel
More informationFOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC
Page 1 of 14 FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC FSH 7709.55 - TRAVEL PLANNING HANDBOOK Amendment No.: 7709.55-2009-3 Effective Date: January 8, 2009 Duration: This amendment
More informationDepartment of Civil & Geological Engineering GEOE Engineering Geology
Department of Civil & Geological Engineering GEOE 218.3 Engineering Geology Assignment #3, Head, Pore Pressure & Effective Stress Due 08 Oct, 2010 NOTE: Numbered subscripts indicate depth, in metres, below
More informationCENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1
CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.
More informationDIRECTIONAL DRILLING
DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation
More informationWhitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report
Whitewater Valley Station Wayne County, Indiana GAI Project Number: C151119.07 July 2017 Prepared by: GAI Consultants, Inc. Murrysville Office 4200 Triangle Lane Export, Pennsylvania 15632-1358 Prepared
More informationHISTORY OF CONSTRUCTION
HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power
More informationREPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE
REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION
More informationAPPENDIX G SCA BASIN CALCULATIONS
ONONDAGA LAKE SEDIMENT MANAGEMENT FINAL DESIGN APPENDIX G SCA BASIN CALCULATIONS p:\honeywell -syr\444853 - lake detail design\09 reports\9.22 sediment management final design\110930 submittal\110906 onon
More informationIH 20 RANGER HILL PUBLIC MEETING
IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the
More informationOctober 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.
October 16, 2018 Mr. Mike Bednar Superintendent of Environmental Compliance GRDA-Ecosystems and Education Center PO Box 70 420 Hwy 28 Langley, OK 74350-0070 RE: GRDA CCR Landfill Compliance Report Grand
More informationGreen CCR Surface Impoundment
Green CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138A
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationAnnual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B
Technical Memo To: Brian Trower, From: Peter Daniels, PE (Iowa PE# 21569) Dave Parenteau, PE (MN), Wenck Associates, Inc. Date: Subject: Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck
More information2018 ROAD MAINTENANCE PROGRAM
2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process
More informationKennedy Bridge - Summary of Pier 6 Movement Records
KENNEDY BRIDGE - SUMMARY OF PIER 6 MOVEMENT RECORDS TECHNICAL MEMORANDUM Kennedy Bridge - Summary of Pier 6 Movement Records PREPARED FOR: COPY TO: MnDOT Dale Thomas / CH2M HILL File PREPARED BY: DATE:
More informationREPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE
REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.
More informationAPPENDIX J HYDROLOGY AND WATER QUALITY
APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary
More informationLyndale Drive Retaining Wall. Study. Public Meeting Registration: 6:00-6:30 Presentation and Discussion: 6:30-8:30 pm Tuesday, February 2 nd, 2016
Study Public Meeting Registration: 6:00-6:30 Presentation and Discussion: 6:30-8:30 pm Tuesday, February 2 nd, 2016 2 Welcome Thank you for attending tonight s public meeting for the Lyndale Drive Retaining
More informationMr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No
October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationExisting conditions of each bridge and repair plan are presented in Table
2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road
More informationFigure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1
INTRODUCTION Located along the western coast of Kauai, the Mana Drag Racing Strip (MDRS) at the Kauai Raceway Park was originally constructed in 1971. This 40+ year old track, once home to taro fields
More informationSwedge 6.0. Now with a Basal Failure Plane and Bench Design. Basal plane, improved water pressure distribution, and more
Swedge 6.0 Now with a Basal Failure Plane and Bench Design Basal plane, improved water pressure distribution, and more Swedge is an easy-to-use analysis tool for evaluating the stability of surface wedges
More informationThe Challenge of Wave Scouring Design for the Confederation Bridge
13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge
More information2017 Annual Inspection Report
2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2018 Table of Contents Certification...
More informationIntroduction Methodology Study area and data collection Results and recommendation Conclusion References
Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationPeter Jansson - MDOT Bridge Field Services Tia Klein - Fishbeck, Thompson, Carr & Huber Peter MacAskill Hubbell, Roth & Clark, Inc.
Peter Jansson - MDOT Bridge Field Services Tia Klein - Fishbeck, Thompson, Carr & Huber Peter MacAskill Hubbell, Roth & Clark, Inc. Timeline July 2012 Wall movement reported Initial investigation and monitoring
More informationThe Use and Performance of Geogrids in Kentucky
Transportation Kentucky Transportation Center Research Report University of Kentucky Year 2003 The Use and Performance of Geogrids in Kentucky Aric Cowne Richard Reitenour David L. Allen R. Clark Graves
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More informationHuntington District. For More Information Contact (304)
Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation
More informationUNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.
More information2016 Annual Inspection Report
2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Pawnee Station 14940 Morgan County Road 24 Brush, Colorado 80723 January 18, 2017 Table of Contents
More informationAPPENDIX A1 - Drilling and completion work programme
APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme
More informationCCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area
CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 2018 OPPD Nebraska City Station NC1 Ash Disposal Area
More informationRULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS
RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention
More informationFish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #
Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared
More informationExcavations and Trenches
Purpose Excavation and trenching are among the most hazardous work activities undertaken by the TNRD. This document outlines general requirements and specific safe work procedures to ensure the health
More informationImproving Road Safety for North Eastern State Roads of India A Case Study
Improving Road Safety for North Eastern State Roads of India A Case Study North Eastern States Portugal Debasis Chakrabarty, Transportation Engineer Key figures of North Eastern States Road Project Total
More informationGENERAL LEGEND 12"CMP
PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET
More informationThis section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.
Appendix H Specific Excavation Requirements This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Surface encumbrances All surface encumbrances
More informationKnight Piésold COMMUNICATIONS RELATING TO TRANSFER OF ENGINEER OF RECORD FROM KNIGHT PIÉSOLD LTD. TO AMEC
COMMUNICATIONS RELATING TO TRANSFER OF ENGINEER OF RECORD FROM KNIGHT PIÉSOLD LTD. TO AMEC PREPARED BY: Knight Piésold Ltd. Suite 1400 750 West Pender Street Vancouver, BC V6C 2T8 Canada p. +1.604.685.0543
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationCASE STUDY OXLEY HIGHWAY SLIP STABILISATION
MAY 2015 CASE STUDY OXLEY HIGHWAY SLIP STABILISATION IRF & ROADS AUSTRALIA REGIONAL CONFERENCE ASIA AND AUSTRALASIA DR SUDAR ARYAL LOCATION STOPPING BAY, OXLEY HIGHWAY 2 Armidale Nambucca Heads Tamworth
More informationPRELIMINARY STORM DRAINAGE REPORT
PRELIMINARY STORM DRAINAGE REPORT DRURY LANE DEVELOPMENT 704 1ST STREET SULTAN, WA 98294-94240 PARCEL #28083200305500 AUDITOR S FILE NO. 1090255 CITY OF SULTAN SNOHOMISH COUNTY, WASHINGTON PREPARED FOR:
More informationUSING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1
USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently
More informationPlan B Dam Breach Assessment
Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationShovelnose Creek Off-Channel Complex Berm Repair
Shovelnose Creek Off-Channel Complex Berm Repair Recent high discharge events have put valuable off-channel salmonid rearing and spawning habitat at risk in the upper Squamish River. This document is a
More informationDesigning and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser
Designing and Benchmarking Mine Roads for Safe and Efficient Haulage Roger Thompson Alex Visser Departments of Mining and Civil & Bio-systems Engineering University of Pretoria, South Africa Aim of Presentation
More informationcomputed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23.
computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. (2) For the resisting side, passive pressure theory indicates
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationAttachment 6. HDD Feasibility Report
May 2016 May 2016 May 2016 Page 1 of 21 The Pipeline Project TABLE OF CONTENTS 1 Introduction... 3 2 HDD Crossings... 3 3 Design Parameters... 3 4 Tributary to Simonette River Crossing... 4 4.1 Watercourse
More informationAugust 20,
Ltd. 2390 Argentia Road Mississauga, Ontario, Canada L5N 5Z7 Telephone: (905) 567-4444 Fax: (905) 567-6561 August 20, 2008 08-1111-0004 itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationStudy of the Effects of Buried Pipe Integrity on Roadway Subsidence
Pipe-RU6558 Study of the Effects of Buried Pipe Integrity on Roadway Subsidence FINAL REPORT October 2005 Submitted by Dr. Husam Najm * Professor Dr. Ali Maher * Professor/Director Dr. Nenad Gucunski *
More informationCity of West Des Moines PAVEMENT MANAGEMENT SYSTEM
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000
More informationTAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005
TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 1.0 OVERVIEW This safety policy provides guidance for conducting trenching and excavation activities at project sites. Emphasis is placed on sloping
More informationSUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES
SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]
Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered
More informationCCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill
CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill Omaha Public Power District Nebraska City, Nebraska January 18, 2019 OPPD North Omaha Ash Landfill CCR Landfill 2018 Annual Inspection
More informationGROUND IMPROVEMENT USING RAPID IMPACT COMPACTION
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical
More informationATCE-II. Construction Dewatering. Advanced Topics in Civil Engineering Construction Dewatering. Professor Kamran M. Nemati Second Semester
Construction Dewatering ecture 13 The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure to be constructed in the
More informationKentucky Transportation Center
Kentucky Transportation Center TECHNICAL ASSISTANCE REPORT Forensic Pavement Evaluation for US 31 W, Jefferson County, Kentucky KTC TA-15 02/KH91 14 1F DOI: http://dx.doi.org/10.13023/ktc.ta.2015.02 Author(s):
More information2018 Annual Inspection Report
2018 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2019 Table of Contents Certification...
More informationNon-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s
Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer
More informationAmerican Railway Engineering and Maintenance of Way Association Letter Ballot. Draft
American Railway Engineering and Maintenance of Way Association Letter Ballot 1. Committee and Subcommittee: Committee 5 Track Subcommittee 9 Road Crossings 2. Letter Ballot Number: 05-17-16 3. Assignment:
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationNotice of Intent to Close Inactive CCR Surface Impoundments
Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia
More informationLecture 8&9: Construction Dewatering
Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction
More informationLevels, and Road Uses
Tahoe Unsurfaced Roads Workshop UC Cooperative Extension / SAF / TRPA / LWQCB / CGS / USFS Road Standards, Maintenance Levels, and Road Uses Gordon R. Keller, PE, GE Geotechnical Engineer grkeller@fs.fed.us
More informationEPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015
EPA R6 Dive Team Operations Report San Jacinto Waste Pits Channelview, TX December 9-10, 2015 BACKGROUND The San Jacinto River Waste Pit Site history has been documented in several documents prepared for,
More informationTutorial 2 Time-Dependent Consolidation. Staging Groundwater Time-dependent consolidation Point query Line query Graph Query
Tutorial 2 Time-Dependent Consolidation Staging Groundwater Time-dependent consolidation Point query Line query Graph Query Model Set-up For this tutorial we will start with the model from Tutorial 1 Quick
More informationCubzac-les-Ponts Experimental Embankments on Soft Clay
Cubzac-les-Ponts Experimental Embankments on Soft Clay GEO-SLOPE International Ltd. www.geo-slope.com 1, 7 - th Ave SW, Calgary, AB, Canada TP T Main: +1 3 9 Fax: +1 3 39 Introduction In the 197 s, a series
More informationReport Date: July 16, 2012 Contact: Annette Klein Contact No.: RTS No.: 9651 VanRIMS No.: Meeting Date: July 24, 2012
P1 POLICY REPORT PUBLIC SAFETY Report Date: July 16, 2012 Contact: Annette Klein Contact No.: 604.873.7789 RTS No.: 9651 VanRIMS No.: 08-2000-20 Meeting Date: July 24, 2012 TO: FROM: SUBJECT: Vancouver
More informationIntroduction to Roadway Design
Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,
More informationGeotechnics, Face and Stockpile Operations
Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationIllinois State Water Survey
Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies
More informationMechanical Stabilisation for Permanent Roads
Mechanical Stabilisation for Permanent Roads Tim Oliver VP Global Applications Technology Tensar International toliver@tensar.co.uk Effect of geogrid on particle movement SmartRock Effect of geogrid on
More informationITEM 400 STRUCTURAL EXCAVATION AND BACKFILL
AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for
More informationCoal Combustion Residuals Closure Plan
Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C150035.00 October 2016 Prepared by: GAI Consultants, Inc. Richmond Office
More informationFAIRWAY PALMS II CONDOMINIUM PROPERTY
FAIRWAY PALMS II CONDOMINIUM PROPERTY 6533, through 6553 SE Federal HWY, Stuart Florida, 34997. Structural Inspection Report Prepared by CA 26583 Ph: 561-204-5000 Fax: 561-204-1050 E-mail: aali@universalengineering.net
More informationSlope inclinometers for landslides
Technical Development DOI 10.1007/s10346-008-0126-3 Received: 21 August 2006 Accepted: 26 July 2007 Springer-Verlag 2008 Timothy D. Stark. Hangseok Choi Slope inclinometers for landslides Abstract Slope
More informationINSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad
INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING Tutorial Question Bank Name : FOUNDATION ENGINEERING Code : A60126 Class : III B. Tech II Semester Branch
More information