ATCE-II. Construction Dewatering. Advanced Topics in Civil Engineering Construction Dewatering. Professor Kamran M. Nemati Second Semester
|
|
- Wendy Chase
- 5 years ago
- Views:
Transcription
1 Construction Dewatering ecture 13 The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure to be constructed in the dry. Dewatering means the separation of water from the soil, or perhaps taking the water out of the particular construction problem completely. This leads to concepts like pre-drainage of soil, control of ground water, and even the improvement of physical properties of soil. 1 Dewatering: CAISSONS Excavation from within the permanent structure. If the site is on land, the structure is built in place. If the site is offshore, the structure is floated into position. To reduce the frictional resistance between the caisson and the surrounding ground: Add weight Bentonite clay slurry is injected at the soil-structure interface. Jetting is used in cohesionless soils. Second Semester 005 1
2 CAISSONS (Cont d) During unwatering a caisson in cohesionless soils, the upward flow from the surrounding groundwater induces a uick condition which results in loss of strength at the bottom of excavation. To prevent uick condition, the head difference causing flow should be kept low. Caissons should not be used in the vicinity of existing structures that can be damaged due to loss of ground from beneath their foundations. 3 Permeability and Seepage Flow of Water in Soil Soils have interconnected voids through which water can flow from points of high energy to points of low energy. It is necessary to estimate the uantity of underground seepage for investigating problems involving the pumping of water for underground construction, and making stability analysis of earth dams and earthretaining structures that are subjected to seepage forces. 4 Permeability Test (Constant ead Test) ASTM D434 = Water flowing through the soil at a constant rate Q = Amount of water collected in a given time period, t Then: Q = t Apparent velocity of the flow v= A or = va Soil area,a Q 5 Second Semester 005
3 Permeability (Cont d) In 1856, Darcy published a simple euation for the discharge velocity of water through saturated soils: ν : the apparent velocity k : the coefficient of permeability (aka: ydraulic conductivity a material s constant) i : hydraulic gradient By definition: v = i= ki : the head causing flow over the distance. 6 Permeability (Cont d) Q = t => Q = (va)t => Q = (ki) At = va v = ki i= Q = k ( ) At Solve for k : Q At 7 Range of Permeability for Various Soils Soil Permeability Coefficient, k (cm/sec) Relative Permeability Coarse gravel Exceeds 10-1 igh Sand, clean 10-1 to 10-3 Medium Sand, dirty 10-3 to 10-5 ow Silt 10-5 to 10-7 Very low Clay ess than 10-7 Impervious Gravels are 1 million times more pervious than clays 8 Second Semester 005 3
4 Example for the Constant ead Test For a constant head laboratory permeability test on a fine sand, the following values are given: ength of specimen = 10 in. Diameter of specimen =.5 in. ead difference = 18 in. Water collected in minutes = in. 3 Determine: a. ydraulic conductivity, k, of the soil (in./min.) b. Discharge velocity a. b. Q At v = ki = = ( 0.031)( 10) π ( 18).5 ( ) 4 = in./min. 18 = ( ) in./min 9 Permeability in the Field by Pumping from Wells In the field, the average hydraulic conductivity of a soil deposit in the direction of flow can be determined by performing pumping tests from the well. π k( 1) = R ln R 1 π π R ln R ( ) 1 1 R ln ( ) W R W 10 k Determined from Pumping Tests For D 10 = 0.3 mm, 000x10-4 cm/sec = 0. cm/sec Second Semester 005 4
5 --IIII -II Example Consider the case of pumping from a well in an unconfined permeable layer underlain by an impermeable stratum. Given: = 6 ft3/min 1 = 15.7 ft at R1 = 100 ft = 18.0 ft at R = 00 ft Calculate the hydraulic conductivity (in ft/min) of the permeable layer. R (6 ) ln ( ) k= ln = = ft/min π ( 1 ) R1 π ( ) 1 -II Small pipes, up to.5 inches in diameter, connected to screens at the bottom and to a vacuum header pipe at the surface constitute a wellpoint system. 13 -II Effective lifts of 15 ft. are uite common at sea level, and under certain circumstances, lifts can be increased to as much as 5 ft. 14 Second Semester 005 5
6 15 16 Multistage wellpoint system 17 Second Semester 005 6
Construction Dewatering
Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue
More informationLecture 8&9: Construction Dewatering
Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction
More informationDIRECTIONAL DRILLING
DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation
More informationPumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE
October 21, 2010 Pumping Systems for Landscaping Pumps, Controls and Accessories Mark Snyder, PE Pump Station Design Purpose of Pump Stations Pump stations are designed to boost water pressure from a lower
More information(Revised February,2005) CULVERTS, BRIDGES, AND FORDS
GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.
More informationITEM 400 STRUCTURAL EXCAVATION AND BACKFILL
AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for
More informationCONE PENETRATION TESTS
February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme
More informationGROUND IMPROVEMENT USING RAPID IMPACT COMPACTION
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical
More informationAn Improved Understanding of LNAPL Behavior in the Subsurface LNAPL - Part 1
An Improved Understanding of LNAPL Behavior in the Subsurface LNAPL - Part 1 Dave Thomas Copyright 2011 Chevron Corporation All Rights Reserved Copyright claimed throughout, except where owned by others
More informationCIVE 554/650. Geotechnical Engineering. Rock. Soil. Water. Site Investigation Techniques. CIVE Knight 1. 1/8/2006 CIVE Knight 1
CIVE 554/650 Site Investigation Techniques 1/8/2006 CIVE 554 - Knight 1 Geotechnical Engineering Soil Rock Water 1/8/2006 CIVE 554 - Knight 2 CIVE 554 - Knight 1 Key Soil Engineering Properties Compressibility
More informationResponse of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction
Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction Mouth of Columbia River, Cape Disappointment State Park, Washington 12 Hans R. Moritz
More informationBENCH-SCALE INVESTIGATIONS ON VIBRATORY MOBILIZATION OF IMMISCIBLE LIQUID GANGLIA
BENCH-SCALE INVESTIGATIONS ON VIBRATORY MOBILIZATION OF IMMISCIBLE LIQUID GANGLIA L.N. Reddi *, H. Wu, and J. Nichols, Department of Civil Engineering, Kansas State University, Manhattan, KS, 66506, Phone:
More informationAn Introduction to Deep Foundations
An Introduction to Deep Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the
More informationTAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005
TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 1.0 OVERVIEW This safety policy provides guidance for conducting trenching and excavation activities at project sites. Emphasis is placed on sloping
More informationWater Storage for Agriculture
Water Storage for Agriculture Ted van der Gulik, P.Eng. Partnership for Water Sustainability in BC Water Storage Options Dam! usually constructed within a watercourse! must follow the dam safety regulation!
More informationm v = 1.04 x 10-4 m 2 /kn, C v = 1.29 x 10-2 cm 2 /min
2.10 Problems Example 2.1: Design of Shallow Foundation in Saturated Clay Design a square footing to support a column load of 667 kn. The base of the footing will be located 1 m below the ground level
More informationE.2 CAP SETTLEMENT RA D AND OUTBOARD
DRAFT ONONDAGA LAKE CAPPING, DREDGING AND HABITAT INTERMEDIATE DESIGN E.2 CAP SETTLEMENT RA D AND OUTBOARD Parsons P;\Honeywell-SYR\444576 2008 Capping\09 Reports\9.1 Capping and Dredge Area & Depth IDS\Appendices\Appendix
More informationBearing Capacity and Settlement Response of PMS Tanks on Cohesionless Soil Lithology in Lekki, Lagos of Nigeria
Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research,, ():- (http://scholarsresearchlibrary.com/archive.html) ISSN: 8 Bearing Capacity and
More informationUNIT-I SOIL EXPLORATION
SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem
More informationPerched Box Caisson Overview. January 2014
Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur
More informationFIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall
More informationSample Project with EPB TBM according to DIN 4085
1 General The aim of the document is to provide information about the required input parameters and the necessary steps for the calculation of a face support pressure. This calculation is carried out under
More informationOctober 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.
October 16, 2018 Mr. Mike Bednar Superintendent of Environmental Compliance GRDA-Ecosystems and Education Center PO Box 70 420 Hwy 28 Langley, OK 74350-0070 RE: GRDA CCR Landfill Compliance Report Grand
More informationCPT and MiHpt Programs Bayou Corne 8 AUG 2013
CPT and MiHpt Programs Bayou Corne 8 AUG 2013 Agenda Introduction and purpose of meeting Why CPT and MiHpt Charlie Faust, Tt CPT and MiHpt overview Charlie Faust, Tt Program progress Charlie Faust, Tt
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical
More informationShallow foundations settlement
References: 1. Rajapakse, Ruwan. Geotechnical Engineering Calculations and Rules of Thumb. 2. Schroeder, W.L., Dickenson, S.E, Warrington, Don, C. Soils in Construction. Fifth Edition. Upper Saddle River,
More informationHuntington District. For More Information Contact (304)
Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation
More informationW I L D W E L L C O N T R O L FLUIDS
FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general
More informationSTUDY PERFORMANCE REPORT
STUDY PERFORMANCE REPORT State: Michigan Project No.: F-80-R-4 Study No.: 702 Title: Effects of sediment traps on Michigan river channels Period Covered: October 1, 2002 to September 30, 2003 Study Objectives:
More informationOPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS Combination Permeameter ELE International Chartmoor Road, Chartwell Business Park Leighton Buzzard, Bedfordshire, LU7 4WG England phone: +44 (0) 1525 249200 fax: +44 (0) 1525 249249
More informationCivil Application Solutions
Civil Application Solutions Features - Chiseled Cutting Edges - Increased Surface Area - Lateral Direction Guide Ribs Benefits - Faster Installation and Penetrates Harder Soils - Quicker Loading, Stronger
More informationTECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC
SECANT CAISSON WALL TECHNICAL TECHNICAL Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC Submitted to: Toby Seward City of Nanaimo 455 Wallace Street Nanaimo, BC V9R 5J6 Report Number: Distribution:
More informationSITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE
LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between
More informationMulti-Flow Product Catalog
Multi-Flow Product Catalog Multi-Flow offers a variety of multi-purpose reducing connectors (06005-0600N, 12005-1200Q, and 18005-1800Q) that allow for complete flexibility in the design of drainage patterns.
More informationKhosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following;
Khosla's theory After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following; Following are some of the main points from Khosla's Theory From observation
More informationSpecial Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following:
SUPPLY EQUIPMENT FOR DRIVING PILES - Item No. SUPPLY EQUIPMENT FOR INSTALLING CAISSON PILES - Item No. SUPPLY EQUIPMENT FOR INSTALLING DISPLACEMENT CAISSON PILES - Item No. SHEET PILES - Item No. H-PILES
More informationTABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1
TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum
More informationProposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT
RISK ASSESSMENT Mining and allied activities are associated with several potential hazards to both the employees and the public at large. A worker in a mine should be able to work under conditions, which
More informationSAND IS ONE of the most common
Sand- The Building Block by CHARLES B. WHITE Director, Southeastern Region, USGA Green Section SAND IS ONE of the most common naturally occurring resources at our disposal today. It is used by turfgrass
More informationDesign Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000)
Design Data M Flotation of Circular Concrete Pipe There are several installation conditions where there is the possibility that concrete pipe may float even though the density of concrete is approximately.4
More informationOHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES
Page 1 of 6 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES 1. SCOPE A. This test method covers the laboratory determination of the water conductivity of a compacted asphalt
More informationOTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy
OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation
More informationVACUUM TESTING PRECAST CONCRETE MANHOLES
1 OF 5 testing is a quick, safe and practical way to validate manhole system integrity. Manhole sections can be tested at the precast concrete plant prior to delivery or on site prior to backfilling. Here
More informationEffect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators
Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators Timothy Townsend and Pradeep Jain Department of Environmental Engineering University of Florida 2005 SWANA Landfill
More informationChapter 9 Fluids and Buoyant Force
Chapter 9 Fluids and Buoyant Force In Physics, liquids and gases are collectively called fluids. 3/0/018 8:56 AM 1 Fluids and Buoyant Force Formula for Mass Density density mass volume m V water 1000 kg
More informationINSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK
INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 00 04 CIVIL ENGINEERING TUTORIAL QUESTION BANK Course Name Course Code Regulation Course Structure Course Coordinator Course Faculty
More informationDESIGN REPORT RANNEY NO. 5 WELL CLEANING PROJECT
HDR Engineering, Inc. DESIGN REPORT RANNEY NO. 5 WELL CLEANING PROJECT City of Kennewick, Washington LLC June 2007 , LLC 6595 Bear Claw Lane Bozeman, MT 59715 Telephone: (406) 585-5947 Fax: (406) 522-8653
More informationCAISSONS SECTION Section CAISSONS. Part 1-GENERAL
Section 02380-CAISSONS Part 1-GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply
More informationTECHNICAL MEMORANDUM 002 EMORANNO. 001
TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)
More informationPUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT
PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction
More informationOHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES
Page 1 of 7 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES 1. SCOPE A. This test method covers the laboratory determination of the water conductivity of a compacted asphalt
More informationMemorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes.
Memorandum To: Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes Date: 10/17/2013 Re: Routes Decision Matrix Decision Matrix Methodology The
More informationSimulation of tidal effects on groundwater flow and salt transport in a coastal aquifer with artificial drains (Pressure Equilibrium Modules)
Simulation of tidal effects on groundwater flow and salt transport in a coastal aquifer with artificial drains (Pressure Equilibrium Modules) Peter Engesgaard Department of Geography and Geology University
More informationProf. B V S Viswanadham, Department of Civil Engineering, IIT Bombay
43 Module 3: Lecture - 5 on Compressibility and Consolidation Contents Stresses in soil from surface loads; Terzaghi s 1-D consolidation theory; Application in different boundary conditions; Ramp loading;
More informationNotice of Intent to Close Inactive CCR Surface Impoundments
Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia
More informationHCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST
HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST Release Date: January 7, 2014 Sampling Coarse Aggregate PERFORMANCE CHECKLIST AASHTO T-2 Sampling of Aggregates Sampling From A Stockpile 1 When
More informationINSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad
INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING Tutorial Question Bank Name : FOUNDATION ENGINEERING Code : A60126 Class : III B. Tech II Semester Branch
More informationDepartment of Civil & Geological Engineering GEOE Engineering Geology
Department of Civil & Geological Engineering GEOE 218.3 Engineering Geology Assignment #3, Head, Pore Pressure & Effective Stress Due 08 Oct, 2010 NOTE: Numbered subscripts indicate depth, in metres, below
More informationTutorial 2 Time-Dependent Consolidation. Staging Groundwater Time-dependent consolidation Point query Line query Graph Query
Tutorial 2 Time-Dependent Consolidation Staging Groundwater Time-dependent consolidation Point query Line query Graph Query Model Set-up For this tutorial we will start with the model from Tutorial 1 Quick
More informationCENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1
CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.
More informationStandard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer 1
This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically
More informationCHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS
CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated
More informationExclusively by: ENFRA, LLC
Soil Stabilization For Road Construction & Natural Liners Version 1.2 June 24, 2002 Distributed in the USA Exclusively by: ENFRA, LLC 4081 East La Palma Avenue, Suite A, Anaheim, CA 92807 (800) 501-9007
More informationLicensed Copy: Puan Ms. Norhayati, Petroliam Nasional Berhad, 12 March 2003, Uncontrolled Copy, (c) BSI
BRITISH STANDARD BS 1377-1: 1990 Incorporating Amendment No. 1 Methods of test for Soils for civil engineering purposes Part 1: General requirements and sample preparation Committees responsible for this
More informationPRELIMINARY STORM DRAINAGE REPORT
PRELIMINARY STORM DRAINAGE REPORT DRURY LANE DEVELOPMENT 704 1ST STREET SULTAN, WA 98294-94240 PARCEL #28083200305500 AUDITOR S FILE NO. 1090255 CITY OF SULTAN SNOHOMISH COUNTY, WASHINGTON PREPARED FOR:
More informationEVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS.
ICC-ES Report PMG-1171 Reissued 11/2018 This report is subject to renewal 11/2019 EVALUATION SUBJECT: UNDERGROUND SINGLE WALL & DOUBLE WALL INSULATED DUCT FOR HVAC DIRECT BURIAL APPLICATIONS AND UNDERGROUND
More informationComponents of a Barrage
Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier
More informationTACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT
TACKLING JACK-UP RIG NO-GO LOCATIONS Prakasha Kuppalli ABSTRACT Jack-up rigs are deployed for drilling and work-over (maintenance) of offshore oil and gas wells for producing hydrocarbons. Rigs drill through
More informationSeattle City Light Construction Management
Seattle City Light Construction Management Submittal Transmittal & Response Shaded areas are for SCL use only Submittal Number: 0102.1 Date: 10/26/2015 (Contractor: give each submittal transmittal a consecutive
More information;0iii] C*Iq'FgRHI{CE --::-- ;: -.. !: t,' li l:j. :t. ti?-. tlr. . *,, :;. :slill I iii-: .ir,::ri:}.:f :aei*l$ljai:!r. ; i:r ;: i:- ; i I!
--::--.ir,::ri:}.:f :aei*l$ljai:!r..lt'., +ri :l lii ";l r*,r i!,t a'j ii - :i :t. ti?-. tlr C*q'FgRH{CE ; i:r ;: i:- ; i! ;0iii]!: t,' li l:j 20 09 -l- ;: -... *,, :;. :slill iii-: Proceedings 5th New
More informationDesign Guide. Table of Contents
DESIGN GUIDE Table of Contents Table of Contents... 1 1.0 Introduction... 2 2.0 Product Information... 3 3.0 Structural Design... 8 4.0 Subsurface Foundation Requirements... 9 5.0 Installed Storage Volumes
More informationCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA , United States.
LastD 4429 93 standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically possible to adequately
More informationRichards Bay Coal Terminal
Text Leon Goussard Manager Port Infrastructure Transnet National Ports Authority Port of Richards Bay leon.goussard@transnet.net Railway and harbour engineering New berth 306 expands capacity of Richards
More informationFlorida Method of Test for MEASUREMENT OF WATER PERMEABILITY OF COMPACTED ASPHALT PAVING MIXTURES
Florida Method of Test for MEASUREMENT OF WATER PERMEABILITY OF COMPACTED ASPHALT PAVING MIXTURES 1. SCOPE Designation: FM 5-565 1.1 This test method covers the laboratory determination of the water conductivity
More informationGround control for slurry TBM tunnelling GEO Report 249
Cutter head Slurry feed line Excavation chamber Submerged wall Plenum air cushion Pressure bulkhead Opening at base of submerged wall Slurry suction line Nick Shirlaw Ground control for slurry TBM tunnelling
More informationSuction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers.
Case history: Soil investigation for offshore suction anchors anchor foundations for tension and taut leg floaters in deep waters Alternative anchors for floating structures pile Over last 5 - years anchoring
More information[REGIONAL ENVIRONMENTAL IMPACT ASSESSMENT] STUDY AREA-2
Risk Assessment 7-1 7.1RISK ASSESSMENT Mining and allied activities are associated with several potential hazards to both the employees and the public at large. A worker in a mine should be able to work
More information1) INTRODUCTION 2) THE UNFAIR ADVANTAGE
1 1) INTRODUCTION 2) THE UNFAIR ADVANTAGE and Stingray earth anchors are driven tipping plate soil anchors for reaction of tensile loads. anchors have ultimate capacities up to 20 tons, and Stingray anchors
More informationMETHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the
287 METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE NOTE: This method does not include all of the specifications (e.g., equipment and supplies) and procedures (e.g., sampling and analytical)
More informationHISTORY OF CONSTRUCTION
HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power
More informationSediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.
7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion
More information19.1 Problem: Maximum Discharge
19.1 Problem: Maximum Discharge In partially full channel having an equilateral triangular cross section, the rate of discharge is Q = KAR/3 in which K is a constant, A flow area, R is the hydraulic mean
More informationW I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS
PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient
More informationCasing Spacer Technology Leaders
Casing Spacer Technology Leaders Benefit today. Save down the line. www.racispacers.com NORTH AMERICA Why Raci Raci has been the global leader in casing spacer technology since 1952. Our uniquely designed,
More informationBULK SPECIFIC GRAVITY AND UNIT WEIGHT OF COMPACTED HOT MIX ASPHALT (HMA) (Kansas Test Method KT-15)
5.9.15 BULK SPECIFIC GRAVITY AND UNIT WEIGHT OF COMPACTED HOT MIX ASPHALT (HMA) (Kansas Test Method ) 1. SCOPE This method of test covers the procedure for determining the bulk specific gravity of specimens
More informationCubzac-les-Ponts Experimental Embankments on Soft Clay
Cubzac-les-Ponts Experimental Embankments on Soft Clay GEO-SLOPE International Ltd. www.geo-slope.com 1, 7 - th Ave SW, Calgary, AB, Canada TP T Main: +1 3 9 Fax: +1 3 39 Introduction In the 197 s, a series
More informationDesaturating sand deposit by air injection for reducing liquefaction potential
Desaturating sand deposit by air injection for reducing liquefaction potential M. Ishihara, M. Okamura & T. Oshita Public Works Research Institute, Tsukuba City, Japan. ABSTRACT: It has been known that
More informationSeptic Tank Buoyancy Control 101. David Lentz, P.E.
Septic Tank Buoyancy Control 101 David Lentz, P.E. Archimedes Principle https://physics.weber.edu/carroll/archimedes/principle.htm Archimedes Principle: The buoyant force is equal to the weight of the
More informationBefore we start. Copyright William C Cromer 2015
Before we start Welcome to this preview of the Cromer Constant Head Permeameter. In Microsoft PowerPoint, the preview is best viewed as a full-screen Slide Show presentation. If your current view is smaller,
More information3aseball field maintenance is unique, and many of the FIELD SCIENCE. By Jim Brosnan and Dr. Andy McNitt. 22 March
By Jim Brosnan and Dr. Andy McNitt 3aseball field maintenance is unique, and many of the maintenance practices used to prepare baseball fields for play are rooted more in tradition than science. Maintenance
More informationSWI NAPL Recovery. Cemcor Environmental Services. represented by. Contact: Craig Marlow Phone Cell
SWI NAPL Recovery represented by Cemcor Environmental Services Contact: Craig Marlow Phone 419.867.8966 Cell 419.349.7970 Email cemarlow@att.net Physical mechanisms of SWI Injection in the saturated zone
More informationSOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM
18 th Southeast Asian Geotechnical & Inaugural AGSSEA Conference 29-31 May 213, Singapore Leung, Goh & Shen (eds) SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM GOUW TJIE-LIONG
More informationfor Prepared for: Mr. Greg Hartz Tompkins Trust Company 121 East Seneca Street Ithaca, NY 14850
Elwyn & Palmer Consulting Engineers, PLLC Subsurface Investigation Report for Proposed ew Headquarters and Drive-Through Tompkins Financial 118-119 East Seneca Street Ithaca, Y Prepared for: Mr. Greg Hartz
More informationAPPENDIX G SCA BASIN CALCULATIONS
ONONDAGA LAKE SEDIMENT MANAGEMENT FINAL DESIGN APPENDIX G SCA BASIN CALCULATIONS p:\honeywell -syr\444853 - lake detail design\09 reports\9.22 sediment management final design\110930 submittal\110906 onon
More informationusing Strength Ratios
Shear Strength of Liquefied Soil using Strength Ratios Prof. Scott M. Olson, PhD, PE 86 th Annual Meeting Transportation Research Board January 22, 2007 Liquefaction Problems Photos from eeri.org Undrained
More informationREPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE
REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION
More informationREPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE
REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION
More informationInstruction Manual 1
Instruction Manual 1 TABLE OF CONTENTS 3 Introduction 4 Stabilization components 5 Accessories 6 Baffle behavior 7 Connection method 8 Lifting pipe procedure 9 Lifting timber procedure 10 Worksite safety
More informationThe tensile capacity of suction caissons in sand under rapid loading
Frontiers in Offshore Geotechnics: ISFOG 25 Gourvenec & Cassidy (eds) 25 Taylor & Francis Group, London, ISBN 415 3963 X The tensile capacity of suction caissons in sand under rapid loading Guy T. Houlsby,
More informationGOM Diving Safety Work Group
GOM Diving Safety Work Group COMMITTEE WORK GROUP Underwater Excavation with Hand Jetting July 14, 2015 DISCLAIMER This US GOM DSWG document is not meant to be all inclusive, and not every rule and regulation
More information