TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT

Size: px
Start display at page:

Download "TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT"

Transcription

1 TACKLING JACK-UP RIG NO-GO LOCATIONS Prakasha Kuppalli ABSTRACT Jack-up rigs are deployed for drilling and work-over (maintenance) of offshore oil and gas wells for producing hydrocarbons. Rigs drill through the well slots provided in the pre-installed offshore platforms. Deployments of jackup rigs often face problems of punch-through, slippage due to previous pugmarks and leg retrieval. In addition, small jack-up barges have the problem of insufficient leg length. These can be classified into problems related to bearing capacity and those related to contrast in soil strengths. Punch through occurs due to contrast in soil strength in the vertical plane i.e., when a weaker layer underlies a stronger layer. Leg slippage occurs due to contrast in soil strength in the horizontal plane. Though the natural soils generally show very little variation in strength over the diameter of the spudcans, previous deployment of rigs remold the soils over the footprint and create a strength contract between the virgin and the remolded soil in the horizontal plane. This creates a strength contrast across the diameter of the spudcan when a jack-up rig having a different footprint than that deployed earlier is mobilized. Hence these spudcans have a tendency to slide into the weak depressions left by the earlier deployment. Thick layers of soft clays at the seabed often necessitate that the legs penetrate deep in to the sea bed to get enough bearing capacity. This sometimes limits deployments of rigs which have limited leg length. Since these Jack-up rigs are intended to move from location to location, their legs have to be pulled up (retrieved) after the drilling operation. However problems during leg retrieval are encountered when spudcans rest on a soil layer of very high capacity due to suction created. The problems are compounded when a thick soft clay layer overlies a hard clay layer and the rigs with conical spudcans have been deployed earlier. Locations where rig owners refuse to go to certain platforms due to these problems are popularly known as No-Go locations. Though considerable research has been carried out, solution to such problems require a comprehensive understanding of the various rig and geotechnical issues. Solutions to such problems include dumping stones on the seabed, constructing stone columns for soil improvement, mobilizing lighter mat supported rigs and dredging & partial gravel filling. Dredging and gravel placing for levelling the surface at the isopach to the hard layer (depth to change in soil strata) provides a level, hard and permeable surface at the bottom of the spudcan during the next deployment of the jack-up rig. Since this ensures uniform strength over the diameter of the spudcan it obliterates the leg slippage problem. Also, gravel being permeable, no suction develops under the spudcan resting on gravel. Hence this approach solves all the geotechnical issues related to jack-up rig deployment. Keywords: Jack-up, No-Go locations, Punch Through, Slippage, Retrieval Prakasha Kuppalli, Engineering Specialist, Saudi Aramco, Dhahran, Saudi Arabia, prakasha.kuppalli@aramco.com

2 TACKLING JACK-UP RIG NO-GO LOCATIONS Prakasha Kuppalli, Engineering Specialist, Saudi Aramco, Saudi Arabia, ABSTRACT: Jack-up rigs are deployed for drilling and work-over (maintenance) of offshore wells. Deployments of jack-up rigs often face problems of punch-through, slippage due to previous pugmarks and leg retrieval. In addition, small jack-up barges have the problem of insufficient leg length. These can be classified into problems related to bearing capacity and those related to contrast in soil strengths. Punch through occurs due to contrast in soil strength in the vertical plane, slippage occurs due to contrast in soil strength in the horizontal plane, excessive leg penetration occurs due to low bearing of soil strata and leg retrieval problems occur due to very high capacity of the soil strata below the spudcan. The problems are compounded when a thick soft clay layer overlies a hard clay layer and the rigs with conical spudcans have been deployed earlier. Locations where rig owners refuse to go to certain platforms due to these problems are popularly known as No-Go locations. Though considerable research has been carried out, solution to such problems require a comprehensive understanding of the various rig and geotechnical issues. One such solution is dredging and gravel placing for levelling the surface at the isopach (depth to change in soil strata) to the hard layer, which is explained in this paper. INTRODUCTION Oil production involves drilling and maintaining the wells. In offshore environment, this is being carried out by using jack-up rigs and smaller barges. While the Jack-up rig legs can have high leg length, even of the order of 70m, while the barges have limited leg length of 45m. Figure 1 shows a typical jack-up rig deployed close to an offshore platform. The first time deployment is generally analyzed thoroughly for any possibility of punch through (sudden uncontrolled penetration of one of the legs of the rigs relative to the others leading to tilting and instability of the rig), before deploying the jack-up rig. Nevertheless, punch throughs happen even to this date. Figure 2 shows the tilted rig after an punch through incident (gcaptain.com). But, redeployments do not receive the same care as for the first deployment. Rigs with different foot prints are deployed based on availability without any consideration to geotechnical issues. This sequence of operation creates a seabed with lateral contrast in strength and an undulating isopach. This increases leg penetration in subsequent deployments and the legs slip into the earlier created depressions in the hard layer. So, Geotechnical issues related to Jack-up rig deployment have to address issues related to having enough leg length, punch throughs and sliding of rigs and bending of legs due to the presence of pugmarks left during earlier deployments.

3 Prakasha Kuppalli Jack-up Operation Jack ups are towed barges carrying oil drilling rigs. They are anchored at any location by three (rarely four) legs which are supported by spudcans at their bottom. The legs can be lowered or rised using a rack and pinion arrangement. The jack-up anchoring operation typically includes the following steps: Figure 1. Jack-up rig positioned close to a platform When the jack-up reaches the location the legs are lowered to touch the seabed. Then the hull of the barge is lifted using the rack and pinion arrangement transferring the self-weight of the barge to the legs. The selffight of the barge and equipment on it is generally known as the light ship weight (LSW). When the hull is completely in air the preload is applied onto the legs by filling the ballast tanks in the hull. The preloading is carried out leg by leg, by ballasting the tanks close to each leg. The penetration at full preload is the final leg penetration. Then drilling is carried out by extending/cantilevering the rig out from the barge. After the drilling, the hull is lowered in to the water. The legs are pulled out from the soil, by depressing the hull into water (by rack and pinion arrangement) to take advantage of the buoyancy to apply an upward force on the legs. If the force of buoyancy is found insufficient to pull the legs off the seabed, suction at the bottom of the spudcans is released by jetting water through the nozzles (if provided) at the bottom of the spudcans. The barge is then towed to the next drilling location. Geotechnical issues related to jack-up rigs Figure 2. Tilted Jack-up rig after punch through The geotechnical issues related to jack-up operation include; estimating the leg penetration and Saudi Aramco: Company General Use

4 confirming the jack-up has sufficient length, punch through and leg getting stuck in the sea bed. Estimating jack-up leg penetration into the seabed Generally, the seabed soils are layered and it is common to have 3-4 layers of soil within the depth of jack-up leg penetration. SNAME 5-5A ( ) recommendations are generally used to estimate the penetration depth as well as the variation of bearing capacity with depth. The estimated penetration for the problem analyzed (see next section) is shown in figure 3. The estimated penetration is 13m. Too much penetration If the legs penetrate considerably into the seabed and the available leg length is not sufficient to push the spudcans to a depth sufficient to bear the preload, the barge has to be demobilized. This is generally problem related to smaller barges. Generally barges have leg lengths less than 45m, which limits the penetration in the present case (see next section) to 11m below seabed, as the water depth is 34m. Punch through Punch through is the phenomenon in which one of the legs penetrate suddenly during the preload causing the hull to tilt. These can be catastrophic. Leg getting stuck in the seabed This problem is encountered when the spudcans rest on a clay layer. After the jack-up rig is anchored, drilling operations are carried out, which generally takes 6-9 months. This gives enough time for the pore pressures in the clay layers (at least close to the spudcan) to dissipate. After the drilling operation, the negative pore pressures in the clay layer below the spudcan, resist pulling out of the legs. Some of the rigs have been provided with water jetting system to release the suction, but their effectiveness has not been consistent Depth (m) Capacity (MN) Punch Throu Capacit y at p (MN) Figure 3. Bearing capacity and punch through So, it becomes necessary to provide enough pull to ensure a reverse end bearing failure below the spudcan. Since the pull that can be mobilized is limited to the buoyant force on the hull, it is not always possible to provide enough pull and the legs get stuck in the seabed. This is shown schematically in Figure 4. Problem definition One of the real-life situation is presented below, which illustrates all the geotechnical problems associated with jack-up rig operation. The location had a water depth of 35m. The soil stratigraphy consisted of soft clay followed by a thin

5 Prakasha Kuppalli medium sand layer underlain by hard clay as shown in Table 1. The sub-bottom profiler survey after 3 deployments shows an undulating seabed and completely disturbed sand layer with large depression in the hard clay layer (refer Figure 5). La yer No. Dept h to top (m) Dept h to botto m (m) Laye r Desc riptio n Wat er cont ent (%) Shear strength/phi(kpa /degrees) Very soft clay Very soft clay Fine to medi um sand Figure 4. Typical conical spudcan and mechanism of leg retrieval Hard clay Table 1. Soil stratigraphy and parameters Figure 5. Cross section from a sub-bottom profiler survey This was caused by the following sequence of events: The first deployment remolded the top soft clay layer. The conical spudcan penetrated the sand layer and rested on the hard clay layer After the drilling operation the leg was retrieved by pressing on the hull, without applying suction (older rigs didn t have the arrangement for jetting at the base of the spudcan to relieve the suction between the spudcan and the hard clay layer). The hard clay layer failed due to reverse loading and a wedge of the hard clay layer Saudi Aramco: Company General Use

6 came out sticking to the spudcan due to low permeability of hard clay layer. A depression was created in the hard clay layer Subsequent deployments had different foot prints which both widened and deepened the depression in the hard clay layer This led to deeper penetrations and more slippage of the legs into the earlier depressions during subsequent deployments at the second isopach. The location was finally declared a No Go location. The paper enumerates the various possible solutions, their merits and demerits and proposes a feasible solution. Possible Solutions 1) Dumping rocks or concrete blocks on the seabed this is feasible but is highly risky as it creates a contrast in strength with depth, which is known to increase punch through possibilities. See Figure 3, which shows the bearing capacity curve after surface strengthening, demonstrating the possibility of punch through of about 12m. Rigs can generally tolerate a sudden penetration of 1-2m and hence such a punch through of 12m would be catastrophic. 2) Improving the soft clay with stone columns - Though this could increase the bearing capacity, it has been shown to be insufficient to sustain bearing pressures in excess of 250 kpa exerted by the spudcans on the seabed. 3) Using mat supported rigs These have very limited drilling and work-over capabilities and the pressures they exert on the seabed exceed the bearing capacity of remolded soft clay at the seabed. 4) Using anchored barges It is difficult to deploy them at the location due to presence of cables and pipelines on the seabed 5) Dredging and levelling the hard clay layer by gravel filling This appears to be a feasible option and can solve all the rig deployment problems a. It can solve the rig slippage problem as it eliminates lateral contrast in strength of the hard layer at the bottom of the spudcan b. It resolves the leg retrieval problems, as the gravel is highly permeable and does not offer any reverse bearing resistance. c. It solves the leg length issues as the thickness of gravel filling can be adjusted to suit the leg length. Implementation of dredging and gravel filling This involves dredging out the soft clay layer first and then filling the hole with gravel to the required thickness. Dredging: This can be accomplished either by dredging and removing the dredged material by fluidizing the soil in-situ. Dredging can be carried out by mechanical dredgers or by fluidizing the soft clay layer and the thin sand layer and pumping them out as slurry. Since the clays are of soft consistency they can be easily fluidized and pumped like sand. While the mechanical dredgers are easy to operate, caution should be exercised while deploying them close to the offshore platforms for their limited dynamic positioning capabilities. However this is a feasible option. Other disadvantage with dredging is that the piles of the platform loose the soil support up to the level of dredging. Since remolded soil strengths are used in the design, this is not expected to be a serious issue. Nevertheless the dredging should be carried out during calm weather conditions to ensure minimal environmental loading on the platform and dredger stability and eliminate possibility of any accident.

7 Prakasha Kuppalli The other approach is to fluidize the soft clay layer through jetting in-situ and place gravel at the bottom of the slurry through a pipe. This involves high volume and high pressure jetting to excavate the soft clays and sand up of 11.7m. These can be directly deployed from the offshore platform and do not require a vessel. However ensuring proper placement and levelling of gravel in the fluidized clay could be a concern (Jan De Nul). Typical dredging operation is shown in Figure 6. length is expected to be a concern, the thickness of the gravel can be increased accordingly. However there could be some problem in placing though fluidized slurry and properly levelling it. The dredged hole is left open and will be filled by natural back-filling. Figure 7. Gravel placing in progress Conclusion Figure 6. Dredging in progress Gravel placing: Gravel dumpers that can accurately place gravel through a pipe are available. Figure 7 shows the gravel placing operation. These vessels have a good dynamic positioning system and can easily be deployed very close to the platform. They are equipped with echo sounders to ascertain proper levelling of the gravel layer. Hence the thickness of the gravel fill can be accurately controlled to bring the level up to the first isopach (say 2-3m). If leg Dredging and gravel filling only over a small thickness (2-3m) is the most economical and feasible solution to ensure safe deployment of jackup rigs and barges at No Go locations. References 1. Jack-Up Collapses at Maersk-Operated Al Shaheen Field Off Qatar. gcaptain. Mike Schuler, 7 July Web. 29 July < 2. The Society of Naval Architects and Marine Engineers (2005), Guidelines for Site Specific Saudi Aramco: Company General Use

8 Assessment of Mobile Jack-Up Units, Technical and research bulletin 5-5A. 3. People and global expertise. Jan De Nul. N.p., n.d. Web. 29 July <

An Introduction to Deep Foundations

An Introduction to Deep Foundations An Introduction to Deep Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations OIL & GAS Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview Review of several incidents:

More information

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments OIL & GAS Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview What are we talking

More information

Protectingpipelinesfor

Protectingpipelinesfor 24 Protectingpipelinesfor Michael Paulin, Damien Humby and Joseph Cocker, INTECSEA Canada, and Glenn Lanan, INTECSEA Inc., describe the process of trenching for the protection of pipelines in ice environments.

More information

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction

More information

Department of Civil & Geological Engineering GEOE Engineering Geology

Department of Civil & Geological Engineering GEOE Engineering Geology Department of Civil & Geological Engineering GEOE 218.3 Engineering Geology Assignment #3, Head, Pore Pressure & Effective Stress Due 08 Oct, 2010 NOTE: Numbered subscripts indicate depth, in metres, below

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

Shallow successes. OES, previously Ocean Engineering Systems,

Shallow successes. OES, previously Ocean Engineering Systems, Shallow successes John Lincoln, OES Companies International, provides a case history timeline of landfalls and shore approach trenching projects carried out by the company worldwide. OES, previously Ocean

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Aberdeen Maritime Branch (28th January 2015) PRESENTATION Introduction to the Subsea Deployment Vessel Installation method Tank test video Potential

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation

More information

Learn more at

Learn more at Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,

More information

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras (Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform

More information

Lecture 8&9: Construction Dewatering

Lecture 8&9: Construction Dewatering Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction

More information

SPECIALISED SERVICES. Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia.

SPECIALISED SERVICES. Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia. SPECIALISED SERVICES Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia. Figure 1. Shore approach for the Macedon project in Australia.

More information

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION

GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical

More information

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) Presented by: Tomasz Płotka - StoGda 0. StoGda Ship Design & Engineering Ltd Beginning of the StoGda Ship Design

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers.

Suction anchor foundations for tension and taut leg floaters in deep waters. Tension Leg Platform. Taut Leg Platform. upper chain. risers. Case history: Soil investigation for offshore suction anchors anchor foundations for tension and taut leg floaters in deep waters Alternative anchors for floating structures pile Over last 5 - years anchoring

More information

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM 18 th Southeast Asian Geotechnical & Inaugural AGSSEA Conference 29-31 May 213, Singapore Leung, Goh & Shen (eds) SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM GOUW TJIE-LIONG

More information

Stevpris installation

Stevpris installation chaser Stevpris deployment for MODUs Introduction Typical methods for deployment and retrieval of Stevpris anchors with an anchor handling vessel (AHV) are described, focusing on the use of chasers for

More information

(Refer Slide Time: 1:22)

(Refer Slide Time: 1:22) Foundation for Offshore Structures Professor S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology Madras Module 1 Lecture 17 Pile Installation 2 Anyway we will continue with pile

More information

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 5 Dredging II In the fifth lecture we discussed

More information

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual. All information correct as of 25 th September 2013 and subject to change without notice 6 inch HURRICANE modular dredge equipment operations manual. Introduction. Hurricane 6 inch modular dredge. The HURRICANE

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Ground control for slurry TBM tunnelling GEO Report 249

Ground control for slurry TBM tunnelling GEO Report 249 Cutter head Slurry feed line Excavation chamber Submerged wall Plenum air cushion Pressure bulkhead Opening at base of submerged wall Slurry suction line Nick Shirlaw Ground control for slurry TBM tunnelling

More information

What makes Ultra Anchor special?

What makes Ultra Anchor special? What makes Ultra Anchor special? Some sailors say that the value of the boat can be measured by its anchor. Some boaters believe that the vessel anchor is more important then its engine. Any boater who

More information

OTC Copyright 2008, Offshore Technology Conference

OTC Copyright 2008, Offshore Technology Conference OTC 19545 Comparison of Jackup Rig Spudcan Penetration Methods in Clay David Menzies, Fugro-McClelland Marine Geosciences, Inc., and Richard Roper, ENSCO International, Inc. Copyright 2008, Offshore Technology

More information

Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 4 Dredging I (Refer Slide Time: 00:22) The

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

Chapter 2 Hydrostatics and Control

Chapter 2 Hydrostatics and Control Chapter 2 Hydrostatics and Control Abstract A submarine must conform to Archimedes Principle, which states that a body immersed in a fluid has an upward force on it (buoyancy) equal to the weight of the

More information

Reverse Circulation Drilling Rig

Reverse Circulation Drilling Rig BUILT ON BUILT TRUST ON BUMA Reverse Circulation Drilling Rig 02. www.bumace.com COMPANY BUMA CE is a leading manufacturer and supplier of foundation equipment in Korea. Since the company was built in

More information

DREDGING. with particular emphasis on Oil and Gas activities in Canada

DREDGING. with particular emphasis on Oil and Gas activities in Canada DREDGING with particular emphasis on Oil and Gas activities in Canada Dredging is an excavation activity or operation usually carried out at least partly underwater, in shallow seas or fresh water areas

More information

Fishing Vessel Stability

Fishing Vessel Stability Fishing Vessel Stability Or How To Stay Upright Fishing Vessel Stability What It Is? How Does It Work? What is Adequate Stability? What Happens During Typical Fishing Operations? 1 What is Stability? Stability

More information

Trenching of Pipelines for Protection in Ice Environments

Trenching of Pipelines for Protection in Ice Environments Trenching of Pipelines for Protection in Ice Environments Michael Paulin, Damien Humby, and Joseph Cocker, INTECSEA Canada; and Glenn Lanan, INTECSEA, Inc. Summary Subsea pipelines located in ice environments

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

Proposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT

Proposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT RISK ASSESSMENT Mining and allied activities are associated with several potential hazards to both the employees and the public at large. A worker in a mine should be able to work under conditions, which

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines. Dry Hydrants What is a Dry Hydrant? A dry hydrant is a non-pressurized pipe system permanently installed in existing lakes, ponds and streams that provides a suction supply of water to a fire department

More information

Assessment and operation of Wind Turbine Installation Vessels.

Assessment and operation of Wind Turbine Installation Vessels. Noble Denton Marine Services Assessment and operation of Wind Turbine Installation Vessels. Risk reduction through implementation of good practice recommendations Mark Hayward 24 January 2017 1 DNV GL

More information

APPENDIX D Oil Loading Pipeline - Options

APPENDIX D Oil Loading Pipeline - Options MAUREEN DECOMMISSIONING PROGRAMME APPENDIX D CONTENTS D.1 Summary of Decommissioning Options Considered 3 D.1.1 D.1.2 D.1.3 Option 1 - Float the Pipeline and Tow it to Shore for Disposal 3 Option 2 Recover

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

POWER LIFT LOW PRESSURE LIFTING BAGS. Instructions for use

POWER LIFT LOW PRESSURE LIFTING BAGS. Instructions for use POWER LIFT LOW PRESSURE LIFTING BAGS Instructions for use The system of WEBER-HYDRAULIK low pressure lifting bags of the 0.5 and 1.0 bar series is used particularly for rescuing persons captured in various

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Inflatable Packers for Grouting 11/10/00

Inflatable Packers for Grouting 11/10/00 Introduction Inflatable Packers for Grouting 11/10/00 Inflatable packers are frequently used for grout injection in geotechnical applications for structural reinforcement and/or water-proofing of foundations,

More information

Kennedy Bridge - Summary of Pier 6 Movement Records

Kennedy Bridge - Summary of Pier 6 Movement Records KENNEDY BRIDGE - SUMMARY OF PIER 6 MOVEMENT RECORDS TECHNICAL MEMORANDUM Kennedy Bridge - Summary of Pier 6 Movement Records PREPARED FOR: COPY TO: MnDOT Dale Thomas / CH2M HILL File PREPARED BY: DATE:

More information

The tensile capacity of suction caissons in sand under rapid loading

The tensile capacity of suction caissons in sand under rapid loading Frontiers in Offshore Geotechnics: ISFOG 25 Gourvenec & Cassidy (eds) 25 Taylor & Francis Group, London, ISBN 415 3963 X The tensile capacity of suction caissons in sand under rapid loading Guy T. Houlsby,

More information

Chapter 2. Turbulence and the Planetary Boundary Layer

Chapter 2. Turbulence and the Planetary Boundary Layer Chapter 2. Turbulence and the Planetary Boundary Layer In the chapter we will first have a qualitative overview of the PBL then learn the concept of Reynolds averaging and derive the Reynolds averaged

More information

The SDS Skip. Subsea Deployment Systems Ltd.

The SDS Skip. Subsea Deployment Systems Ltd. The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field

More information

Figure 1 Figure 1 shows the involved forces that must be taken into consideration for rudder design. Among the most widely known profiles, the most su

Figure 1 Figure 1 shows the involved forces that must be taken into consideration for rudder design. Among the most widely known profiles, the most su THE RUDDER starting from the requirements supplied by the customer, the designer must obtain the rudder's characteristics that satisfy such requirements. Subsequently, from such characteristics he must

More information

SafetyBuletin. Se ingoutriggerstopreventaccidents

SafetyBuletin. Se ingoutriggerstopreventaccidents SafetyBuletin Se ingoutriggerstopreventaccidents Safety Bulletin This document is intended to supplement but not supersede the manufacturer s applicable insrtuctions. Copyright 2010 ACPA All rights reserved

More information

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements STRIDE PROJECT Steel Risers in Deepwater Environments Achievements 1999-21 Neil Willis Principal Engineer 2H Offshore Engineering 6 th Annual Deepwater Technologies and Developments Conference 21 The presentation

More information

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer

More information

from ocean to cloud PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM

from ocean to cloud PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM PARAMETRIC SUB-BOTTOM PROFILER, A NEW APPROACH FOR AN OLD PROBLEM Geoff Holland, Alcatel-Lucent Submarine Networks Geoff.holland@alcatel-lucent.com Alcatel-Lucent Submarine Networks Ltd, Christchurch Way,

More information

Khosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following;

Khosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following; Khosla's theory After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following; Following are some of the main points from Khosla's Theory From observation

More information

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Lew Dennis Decommissioning Manager Chevron Gulf of Mexico Business Unit 1 Key Messages Focusing on Risk Reduction in Decommissioning

More information

Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc.

Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc. Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc. 1 ANSYS, Inc. September 12, Fire and safety related applications Gas Dispersion and Ventilation Formation of combustible

More information

Safety in Precast Erection

Safety in Precast Erection Safety in Precast Erection C. Kirubakaran R Star Consultants Pte Ltd, Singapore Abstract: Construction industry is known to be one of the most hazardous among different industries all over the world. The

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Cathodic Protection Retrofit Options Comparison of Current Distribution

Cathodic Protection Retrofit Options Comparison of Current Distribution Cathodic Protection Retrofit Options Comparison of Current Distribution 1.0 Introduction There are three basic methods available for the deployment of anode systems when considering an offshore cathodic

More information

Stevpris Mk 6. The Industry Standard

Stevpris Mk 6. The Industry Standard Stevpris Mk 6 The Industry Standard Strong and versatile The range of water depths in which the offshore industry operates is expanding fast. The requirements for the mooring of floating units ask for

More information

APPENDIX G SCA BASIN CALCULATIONS

APPENDIX G SCA BASIN CALCULATIONS ONONDAGA LAKE SEDIMENT MANAGEMENT FINAL DESIGN APPENDIX G SCA BASIN CALCULATIONS p:\honeywell -syr\444853 - lake detail design\09 reports\9.22 sediment management final design\110930 submittal\110906 onon

More information

CONE PENETRATION TESTS

CONE PENETRATION TESTS February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme

More information

ATCE-II. Construction Dewatering. Advanced Topics in Civil Engineering Construction Dewatering. Professor Kamran M. Nemati Second Semester

ATCE-II. Construction Dewatering. Advanced Topics in Civil Engineering Construction Dewatering. Professor Kamran M. Nemati Second Semester Construction Dewatering ecture 13 The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure to be constructed in the

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 00 04 CIVIL ENGINEERING TUTORIAL QUESTION BANK Course Name Course Code Regulation Course Structure Course Coordinator Course Faculty

More information

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI Identification and Screening of Scenarios for LOPA Ken First Dow Chemical Company Midland, MI 1 Layers of Protection Analysis (LOPA) LOPA is a semi-quantitative tool for analyzing and assessing risk. The

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

Dynamic Positioning Control Augmentation for Jack-up Vessels

Dynamic Positioning Control Augmentation for Jack-up Vessels DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Design and Control Session Dynamic Positioning Control Augmentation for Jack-up Vessels By Bradley Deghuee L-3 Communications 1 Introduction Specialized

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research, 201, 2 (4):20-27 (http://scholarsresearchlibrary.com/archive.html) ISSN: 22 0041 Influence

More information

Examining the merits of jack up platforms as foundations for the offshore wind industry

Examining the merits of jack up platforms as foundations for the offshore wind industry Examining the merits of jack up platforms as foundations for the offshore wind industry By 20 May 2011 1 ABSTRACT A new type of offshore wind foundation has emerged from the offshore oil fields and is

More information

TARPON A Minimal Facilities Platform

TARPON A Minimal Facilities Platform TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application

More information

The cost-efficient fixing for flexible use in non-cracked concrete VERSIONS. zinc-plated steel stainless steel hot-dip galvanised steel

The cost-efficient fixing for flexible use in non-cracked concrete VERSIONS. zinc-plated steel stainless steel hot-dip galvanised steel The cost-efficient fixing for flexible use in non-cracked concrete VERSIONS APPROVALS zinc-plated steel stainless steel hot-dip galvanised steel BUILDING MATERIALS Approved for: Concrete C20/25 to C50/60,

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

Civil Application Solutions

Civil Application Solutions Civil Application Solutions Features - Chiseled Cutting Edges - Increased Surface Area - Lateral Direction Guide Ribs Benefits - Faster Installation and Penetrates Harder Soils - Quicker Loading, Stronger

More information

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS Geoff Holland, Sarah Dzinbal (Alcatel-Lucent Submarine Networks) Email: geoff.holland@alcatel-lucent.com Alcatel-Lucent Submarine Networks

More information

New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO

New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO Wokshop on Deepwater Subsea TieBack Damai Puri Resort & Spa,

More information

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses

More information

Proper Operation of Heath Consultants Incorporated Plunger Bar

Proper Operation of Heath Consultants Incorporated Plunger Bar Proper Operation of Heath Consultants Incorporated Plunger Bar Heath Consultants Incorporated 9030 Monroe Road Houston, TX 77061 (800) HEATH-US www.heathus.com Notice The contents of this manual are proprietary

More information

Pre-Trenching, Pre-Sweeping and Backfilling for the 36 Offshore Pipeline Project in Taiwan

Pre-Trenching, Pre-Sweeping and Backfilling for the 36 Offshore Pipeline Project in Taiwan Edward van Melkebeek Pre-Trenching, Pre-Sweeping and Backfilling for the 36 Offshore Pipeline Project in Taiwan Abstract The advantages of a trailing suction hopper dredger for a pipeline trenching job

More information

Ennore Coal Port Project: Port Basin and Entrance Channel

Ennore Coal Port Project: Port Basin and Entrance Channel Ennore Coal Port Project: Port Basin and Entrance Channel André Luypaert Ennore Coal Port Project: Port Basin and Entrance Channel Abstract The Chennai Port on the eastern coast of India is the main port

More information

Performance of Anchors for Floating Offshore Windfarms

Performance of Anchors for Floating Offshore Windfarms Geotechnical Engineering for US Offshore Wind Infrastructure Boston April 25, 2016 Performance of Anchors for Floating Offshore Windfarms Charles Aubeny Texas A&M University Background: Multi-Line Attachment

More information

USER GUIDE / PRODUCT MANUAL

USER GUIDE / PRODUCT MANUAL 1234 Main St. Swartz Creek, MI 48420 Phone support: 1 888 555 0123 support@sandaconda.com The Sandaconda Anchor System USER GUIDE / PRODUCT MANUAL For more information, please visit us atsandaconda.com

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

Challenges in Ship Design to Maintain Thrusters inside Ship

Challenges in Ship Design to Maintain Thrusters inside Ship DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Thrusters Challenges in Ship Design to Maintain Thrusters inside Ship Tom Nylund and Timo Rintala Beacon Finland 1 DP Conference - Challenges in Ship Design

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab

Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab REQUIRED READING FOR THE GLOBAL OIL AND GAS INDUSTRY SINCE 1975 www.offshore-engineer.com NOVEMBER 2005 Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab Barging in on Trent PLUS:

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

Global Buckling Design for Flexible Flowlines

Global Buckling Design for Flexible Flowlines Global Buckling Design for Flexible Flowlines Challenges, Approach and Lessons Learned Mostafa Tantawi 1 Agenda Background to flexible lines Mechanical behavior of Flexible vs Steel. Why flexible buckling

More information