1 Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016)

2 CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation options 2

3 LEADON 3

4 TOWHEAD A - NORTH Length 29.0m (32.0m incl. carrier) Width 6.6m (excl. cut spool ends) Height 4.6m (excl. shoes and flooding cages) Weight 231.5Te (wet and in place weight) 270Te (dry, excl. trapped water) 4

5 MIDLINE STRUCTURE Length 22.0m (28.0m incl. carrier, excl. off MLS buoyancy) Width 6.0m Height 4.6m (excl. shoes and riser bases) Weight 200.0Te (wet) 230Te (est. dry, excl. trapped water) 5

6 TOWHEAD B - SOUTH Length 26.0m (29.0m incl. carrier) Width 6.6m (excl. cut spool ends) Height 4.6m (excl. shoes and flooding cages) Weight 204.0Te (wet and in place weight) 235Te (est. dry, excl. trapped water) 6

7 SRF (BUOYANCY TANK) MAIN PARTICULARS Potential for smaller unit if towhead was partially dewatered Stability during load transfer to be checked if lifted solution Length 40.0m Width 12.0m Height 4.6m (9.0m incl. towers) Mass 150Te, Displacement 450Te, Capacity 300Te System would be fitted with transponder and monitoring equipment Fenders / bumpers piping not shown 7

8 SRF (BUOYANCY TANK) MAIN COMPONENTS Tow Chain Clump Weight Control Chain Control Tower Castles Ballast Lockers Leadon Structure Floodable Tanks 8

9 PREPARATION WORK All flooded member valves in open position Structure pre-rigged with lift rigging Prepare structure with pins / interface arrangement Deploy contingency weight to be used as extra securing in case mass / displacement estimation is wrong 9

10 SET DOWN IN FIELD Adjust tow speed and tow wire to maintain SRF at required depth Slow down when approaching field to lower the system Pay out tow wire to lower tow chain clump weight on to target System will float well above seabed (within range of the Structure) 10

11 DOCK ONTO STRUCTURE Lower control chains into the control chain towers Slew crane to create lead on control chains Pay out chain until the system is neutral (chain weight on seabed) Lower SRF on to structure by paying out on the control chains When landed on structure pay out control chain into control chain towers and disconnect 11

12 CONTROL CHAIN TOWERS & DYNAMICS Control Chain / Towers Vertical Control Lateral Control Rotational Control On-bottom Weight Dynamics Natural Period > 120s Response Amplitude < 20% of Surface Vessel Soft-Soft Landing 12

13 DOCKING AND INTERFACE Pin arrangement (pre-installed interface) Supports Latching System Slings (back-up) 13

14 RAISE STRUCTURE WROV to connect SRF to structure with interface connectors Deploy hoses and de-ballast compartments Deploy control lines and reconnect to the control chains Slowly raise the control chains until SRF and structure are rising When clear of seabed, fully recover control chains Note: Excess buoyancy at one end to break-out the structure. 14

15 SUBMERGED TOW Tow chain clump weight balances the subsea deployment vessel Recover wire to bring the chain clear of the seabed and slowly move forward Increase tow speed and adjust tow wire until SDV at suitable depth AHT tows the subsea deployment vessel back to shore 15

16 Submerged tow Recover chain for surface tow Support / Work Boat De-pressurisation TOW 16

17 LOAD IN All valves open to let drain Pre-rigged with lift rigging Terex Demag TC will have approx. 370Te cap. Pins/interface operation 17

18 Submersible barge Floating dock / dry dock Float off and Lift OTHER LOAD IN METHODS 18

19 19

20 20

21 POSSIBLE VESSEL 12 AHTs on the spot market with WROV Other 30+ AHTs on the spot market 21

22 Lerwick Shore Crane / Subm. Barge 95nm DEMOB LOCATIONS Bergen Dry dock 130nm Nigg Dry dock 210nm Haugesund Dry dock 110nm Rosyth Dry docks 270nm Stavanger Dry dock 135nm 22

23 Based on Lerwick Quay SCHEDULE DSV in field to prepare and support during hook-up Tow speed approx knots Does not consider other DSV work in field 23

24 SAFETY AND ENVIRONMENT Low tech / fail safe Operations can be suspended at any time (no point of no return) Operations insensitive to weather Negligible dynamic loading Structures are not recovered to deck Reduced risk of catastrophic loss Fewer personnel involved Low carbon footprint + VS 24

25 SEASTATE STATISTICS Subject to operational windows and seasonal variations 25

26 INHERENT SAFETY Total loss minimised Close to neutral No point of no return Rigging failure Buoyancy loss TOW WIRE FAILURE (10x) 26

27 COMPETITIVENESS (CASE STUDIES) 27

28 CONVENTIONAL METHODS Heavy lift vessel (semi submersible) Day cost base > $ Transit speed < 7 knots (mob/demob expensive) Can lift in relative rough weather (off deck) Limited availability Constrained project scheduling Heavy lift vessel (shipshape) Day rates > $ Transit speed > 13 knots Weather sensitive Hs < 1.5m Limited capacity in ultra deep water Only few with DP capability 28

29 GORGON-JANSZ ( ) 29

30 SHTOKMAN ( ) 30

31 DECOMMISSIONING OPTIONS 31

32 SKIP / PIPE RACK Skip with SRF interface can be placed at towhead locations May be filled with mats, spools and other rubbish Avoids multiple and risky lifts to DSV/RSV deck Similar interface may be created to transport bundle sections 32

33 SKIP Skip hold can be de-ballasted to bring it to shallow draught Skip can be used for both subsurface and surface transport Demonstrated skip Length Width Depth Weight 32m 16m 8m 300Te Capacity (sub) 300Te Depth rating* 150m * May be deeper if upper tubulars are pressurised 33

34 Remotely operated (Valves will be operated remotely for de-ballasting) SURFACING Hold (water can be pumped out of the hold using pressurised air from lower tubular) Side and Double Bottom Tanks (high point open to the sea) Upper tubular (fully sealed, buoyancy equals submerged weight of skip) Lower tubular (c/w ballasting facilities) 34

35 INSTALLATION OPTIONS 35

36 U-SHAPE WITH INTERFACE FRAME 36

37 U-SHAPE WITH INTERFACE FRAME Templates / manifolds Opportunity to increase slots Suction cans vs. mudmats 37

38 SUBSEA COMPRESSION (MODULES) 38

39 DEEPWATER SDV / SKIP SDV hold can be de-ballasted to bring it to shallow draught SDV can be used for both subsurface and surface transport 39

40 SUBSEA STORAGE UNIT 40

41

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Aberdeen Maritime Branch (28th January 2015) PRESENTATION Introduction to the Subsea Deployment Vessel Installation method Tank test video Potential

More information

The SDS Skip. Subsea Deployment Systems Ltd.

The SDS Skip. Subsea Deployment Systems Ltd. The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field

More information

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins GLS New Technology Rising to the Challenge of Subsea lifting Subsea 2012 Paddy Collins Introductions Aubin Design, Develop and Supply own chemical technical technology Cement and Stimulation Pipeline products

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

APPENDIX D Oil Loading Pipeline - Options

APPENDIX D Oil Loading Pipeline - Options MAUREEN DECOMMISSIONING PROGRAMME APPENDIX D CONTENTS D.1 Summary of Decommissioning Options Considered 3 D.1.1 D.1.2 D.1.3 Option 1 - Float the Pipeline and Tow it to Shore for Disposal 3 Option 2 Recover

More information

Field Development & Construction

Field Development & Construction Field Development & Construction Michael Cowie Technical Director Ecosse Subsea Systems Ltd Ambient Lifting: A Real Alternative to Heavy Lift Vessels 4 th February 2016, AECC, Michael Cowie Presentation

More information

Faculty of Science and Technology MASTER S THESIS

Faculty of Science and Technology MASTER S THESIS Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology/Marine and Subsea Spring semester, 2014 Open / Restricted access Writer: Simen Thorgersen Faculty supervisor:

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05

More information

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7 Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR

More information

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen Aasta Hansteen Operational Experiences FFU Seminar 28 th January 2016 Tom-Erik Henriksen Agenda Introduction to Aasta Hansteen Main Challenges & Risks Operational Experiences - 2015 Campaigns 2 seabed-to-surface

More information

Quicker and Safer Deployment of Deepwater MODU Moorings.

Quicker and Safer Deployment of Deepwater MODU Moorings. Quicker and Safer Deployment of Deepwater MODU Moorings www.offspringinternational.com Deepwater MODU Mooring Deepwater exploration increasing further offshore Deeper moorings over 7,000ft Larger MODUs

More information

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical

More information

Appendix 11-B Anchor Handling Systems, Set Up and Handling

Appendix 11-B Anchor Handling Systems, Set Up and Handling Revision History Revision Date Section Changes Number 1 Sept 1 Permanent Chaser Pendant (PCP) Drawing updated 2018 2 Pennant Buoy System Drawing updated 3 Working Wire/Chaser Termination on Drawing updated

More information

Learn more at

Learn more at Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations

More information

Deepwater Floating Production Systems An Overview

Deepwater Floating Production Systems An Overview Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been

More information

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer

More information

Isis Deployment. TMS and Live Boating. Inmartech08. Dave Turner Operations Co-ordinator.

Isis Deployment. TMS and Live Boating. Inmartech08. Dave Turner Operations Co-ordinator. Isis Deployment TMS and Live Boating Inmartech08 Dave Turner Operations Co-ordinator TMS Operations Why Why do do we we have have aa TMS? TMS? ItIt was was deemed deemed an an essential essential part

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

Risers for Deepwater FPSO s

Risers for Deepwater FPSO s Risers for Deepwater FPSO s John Bob-Manuel Senior Engineer 2H Offshore Engineering Ltd. March 2013 Agenda 2H overview Challenges of Deepwater Operations Freestanding Riser Overview Riser Configurations

More information

Faculty of Science and Technology MASTER S THESIS

Faculty of Science and Technology MASTER S THESIS Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology/ Subsea and Marine Technology Spring semester, 2015 Open Writer: Chernov Dmitrii Faculty supervisor:

More information

CB-50 Data Buoy Quick Start Guide

CB-50 Data Buoy Quick Start Guide CB-50 Data Buoy Quick Start Guide The NexSens CB-50 Data Buoy is designed for quick deployment in emergency response situations including industrial spills and natural disasters. The buoy can be deployed

More information

BACKGROUND TO STUDY CASE

BACKGROUND TO STUDY CASE BACKGROUND TO STUDY CASE German Aerospace Center (DLR) is using Andøya Rocket Range for a sounding rocket campaign. On 27th October 2005 a 300 kg payload (SHEFEX) was launched Due do a technical problems

More information

OVERVIEW. Capabilities & Services

OVERVIEW. Capabilities & Services +1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore

More information

Grouped SLOR Deep Water Riser System and Installation Assessment

Grouped SLOR Deep Water Riser System and Installation Assessment Grouped SLOR Deep Water Riser System and Installation Assessment Daniel Karunakaran, Dan Lee, Subsea 7 Stephen Hatton, Nick Dale, 2H Offshore Engineering Ltd John Mair, Subsea 7 Abstract The growing trend

More information

PSI France DESCRIPTION Mise à Jour : 02/09/02 SMAL202 Version : 0 Page 1 sur 9

PSI France DESCRIPTION Mise à Jour : 02/09/02 SMAL202 Version : 0 Page 1 sur 9 SMAL202 Version : 0 Page 1 sur 9 1. SUMMARY SPECIFICATIONS...2 2. PERSONNEL COMPARTMENT...3 3. BATTERY...4 4. 120V DISTRIBUTION...4 5. 24V DISTRIBUTION...5 6. THRUSTERS...5 7. PROJECTORS...5 8. AIR DISTRIBUTION...5

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

S0300-BV-CAT-020 AIR COMPRESSOR SYSTEM, SUB SALV, 1150-CFM, 500-PSI. System - DS0130. System DS0130 7/8/2018 2:56:57 AM

S0300-BV-CAT-020 AIR COMPRESSOR SYSTEM, SUB SALV, 1150-CFM, 500-PSI. System - DS0130. System DS0130 7/8/2018 2:56:57 AM System DS0130 Page 1 The Submarine Salvage Air Compressor System DS0130 is a portable unit used to provide high-pressure compressed air to dewater sunken vessels in up to 1000 feet of seawater. The system

More information

Three Lines of Defence

Three Lines of Defence Three Lines of Defence 1. Prevent Grounding of Drifting Vessels 2. Contain Pollutants inside Damaged Hull 3. Remove Pollutants from Sunken Ship This is Miko Marine Miko Marine AS (Miko) is an innovative

More information

CB-40 Data Buoy Quick Start Guide

CB-40 Data Buoy Quick Start Guide CB-40 Data Buoy Quick Start Guide The NexSens CB-40 Data Buoy offers a compact and affordable platform for deploying water quality sondes and other instruments that integrate power and data logging. The

More information

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE LIST OF TOPICS A B C D E F G H I J Hydrostatics Simpson's Rule Ship Stability Ship Resistance Admiralty Coefficients Fuel Consumption Ship Terminology Ship

More information

Deepwater Challenges Pipeline Installation Case

Deepwater Challenges Pipeline Installation Case Deepwater Challenges Pipeline Installation Case Seminar Nasional Oceano, ITS, 28 March 2011, Surabaya Gunawan Suwarno, 28 March 2011 DeepLay Energy Services email : marketing@deep-lay.com 1 Deepwater Development

More information

SIMOPRO Riser Replacement Novel method for replacement of pliant wave risers whilst continuing production on platform

SIMOPRO Riser Replacement Novel method for replacement of pliant wave risers whilst continuing production on platform SIMOPRO Riser Replacement Novel method for replacement of pliant wave risers whilst continuing production on platform Helen Tunander Ocean Installer What is it? Simultaneous Marine Operations and Production

More information

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during

More information

A Novel Platform for Drilling in Harsh High-Latitude Environments.

A Novel Platform for Drilling in Harsh High-Latitude Environments. AADE-7-NTCE-73 A Novel Platform for Drilling in Harsh High-Latitude Environments. Brian Roberts, Technip; Chunqun Ji, Technip; Jim O Sullivan, Technip and Terje Eilertsen, Technip. Copyright 27, AADE This

More information

FPSO Riser Solutions for Harsh environments

FPSO Riser Solutions for Harsh environments FPSO Riser Solutions for Harsh environments Hanh Ha and Hugh Howells AOG Perth, March 2015 Overview Design challenges Flexibles Configurations and response Mild Environment Riser Harsh Environment Riser

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

Wind Turbine Shuttle. Ferdinand van Heerd

Wind Turbine Shuttle. Ferdinand van Heerd Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency

More information

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 DECOMMISSIONING Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 FEELINGS AGENDA BACKGROUND THE VESSEL THE FUNCTIONS PARTNERS BACKGROUND BACKGROUND BACKGROUND OLSO PARIS CONVENTION

More information

Subsea Tooling Services Range of Dredgers

Subsea Tooling Services Range of Dredgers Subsea Tooling Services Range of Dredgers (STS) has a large selection of ROV / Diver operated dredgers. The range includes 3 4 6 8 10 and 12 dredgers. We are confident we have a dredger that will suit

More information

ATL 6.6 R/V ATLANTIS SWIMMER QUALIFICATIONS

ATL 6.6 R/V ATLANTIS SWIMMER QUALIFICATIONS 1. Purpose The purpose of this procedure is to set forth the requirements for a swimmer to qualify for Alvin Operations on the R/V Atlantis. The launch and recovery of the submersible, DSV Alvin, requires

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

LaserSnake Underwater Laser Cutting Phase 1 TWI

LaserSnake Underwater Laser Cutting Phase 1 TWI LaserSnake2 110128 Underwater Laser Cutting Phase 1 TWI-002 6-13 Contents 1 Introduction 1 2 Objectives 1 3 Underwater Cutting Nozzle Design and Operation 1 3.1 Design 1 3.2 Dry-zone testing 3 4 Equipment

More information

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT TACKLING JACK-UP RIG NO-GO LOCATIONS Prakasha Kuppalli ABSTRACT Jack-up rigs are deployed for drilling and work-over (maintenance) of offshore oil and gas wells for producing hydrocarbons. Rigs drill through

More information

Impact of Passive Heave Compensator on Offshore Lifting

Impact of Passive Heave Compensator on Offshore Lifting Journal of Shipping and Ocean Engineering 5 (2015) 166-180 doi: 10.17265/2159-5879/2015.04.003 D DAVID PUBLISHING Impact of Passive Heave Compensator on Offshore Lifting Arvind Keprate Department of Mechanical

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

Salvage of USS SQUALUS. Submarine Sunk

Salvage of USS SQUALUS. Submarine Sunk ------------------------------------------- APPENDIX Salvage of USS SQUALUS Submarine Sunk On 23 may 1939, USS SQUALUS was on training operations near Portsmouth, New Hampshire. While making a quick dive

More information

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Thank you Greg. 1 The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Mr. Muhammad Sadiq, however in short,

More information

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual. All information correct as of 25 th September 2013 and subject to change without notice 6 inch HURRICANE modular dredge equipment operations manual. Introduction. Hurricane 6 inch modular dredge. The HURRICANE

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Stevpris installation

Stevpris installation chaser Stevpris deployment for MODUs Introduction Typical methods for deployment and retrieval of Stevpris anchors with an anchor handling vessel (AHV) are described, focusing on the use of chasers for

More information

Chapter 9: Sea operations

Chapter 9: Sea operations Chapter 9: Sea operations ANTARES takes advice from IFREMER for the sea operations, which concern the installation and recovery of the different components of the detector : Junction Box, Strings, Interconnecting

More information

PHYS 101 Previous Exam Problems

PHYS 101 Previous Exam Problems PHYS 101 Previous Exam Problems CHAPTER 14 Fluids Fluids at rest pressure vs. depth Pascal s principle Archimedes s principle Buoynat forces Fluids in motion: Continuity & Bernoulli equations 1. How deep

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

IMCA Safety Flash 03/00 July 2000

IMCA Safety Flash 03/00 July 2000 AB IMCA Safety Flash 03/00 July 2000 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learned from them. The information below has been provided in good

More information

QUICK START GUIDE CB-450 DATA BUOY PLATFORM

QUICK START GUIDE CB-450 DATA BUOY PLATFORM What s Included (1) Buoy hull with data well, 450 lb buoyancy (1) Buoy tower (3) 10W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes (1)

More information

Subsea Tooling Services Range of Dredgers

Subsea Tooling Services Range of Dredgers Subsea Tooling Services Range of Dredgers Subsea Tooling Services UK Ltd (STS) has a large selection of ROV / Diver operated dredgers. The range includes 3 4 6 8 10 and 12 dredgers. We are confident we

More information

List of modifications

List of modifications PS 2000 Version: 2 Page 0 sur 9 List of Diffusion Name Company Number of For For Copies Information Action Onofri PSI 1 *** Bureau Véritas 1 *** Affaires Maritimes CEO 1 *** Affaires Maritimes CCS 1 ***

More information

Geo-Vibro Corer

Geo-Vibro Corer High Frequency Vibro Coring System Operational Features Proven performance & high quality cores 30 kn impulse at 30 Hz for fast penetration Reliable, lightweight & cost effective Modular construction (cores

More information

Chapter 2 Hydrostatics and Control

Chapter 2 Hydrostatics and Control Chapter 2 Hydrostatics and Control Abstract A submarine must conform to Archimedes Principle, which states that a body immersed in a fluid has an upward force on it (buoyancy) equal to the weight of the

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES ContiTech Rubber Industrial Kft. Hose Technical Department HANDLING Page: 1/9 Date: 31.07.2008 Invalidate the document TKO AS3 rev.4 INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

More information

Subsea Heave Compensators. Bob Wilde - InterMoor Jake Ormond- InterMoor. Deep Offshore Technology

Subsea Heave Compensators. Bob Wilde - InterMoor Jake Ormond- InterMoor. Deep Offshore Technology Subsea Heave Compensators Bob Wilde - InterMoor Jake Ormond- InterMoor Deep Offshore Technology - 2009 Abstract In an effort to expand InterMoor s Subsea installation business and the Back of the Boat

More information

Case History. Kinetics Controls & Innovation Ltd

Case History. Kinetics Controls & Innovation Ltd Case History The Operations Team for Customer have a requirement to place temporary isolations on an 18 spool piece on K-3110 1 st stage compressor pipe work and a vertical 12 spool on 1 discharge Header

More information

GERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME

GERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME GERMAN VESSEL PORTFOLIO ANY VESSEL ANYTIME YOU THINK OFFSHORE WE FOLLOW YOUR THOUGHTS! A vessel for construction works at sea? An installation vessel for wind turbine generators or a sale and purchase

More information

QUICK START GUIDE CB-150 DATA BUOY PLATFORM

QUICK START GUIDE CB-150 DATA BUOY PLATFORM What s Included (1) Buoy hull with data well, 150 lb buoyancy (1) Buoy tower (3) 6W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes Common

More information

Edit this text for your title

Edit this text for your title Edit this text for your title MEK 4450 Marine Operations 1-3 Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2014 Installation of flexibles and cables Typical

More information

IMCA Competence Assessment Portfolio June 2013

IMCA Competence Assessment Portfolio June 2013 IMCA Competence Portfolio June 2013 Name: Start Date in Current Self- Checklist Entry Level Criteria Acceptance Criteria Attained Certification 500 GRT or more: Valid certificate of competency or certificate

More information

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA Arun S. Duggal, FMC SOFEC Floating Systems, USA Charles O. Etheridge, FMC SOFEC Floating Systems, USA James Mattinson, FMC SOFEC Floating Systems,

More information

ULMATEC LAUNCH AND RECOVERY SYSTEMS

ULMATEC LAUNCH AND RECOVERY SYSTEMS M L U NC LAU MS ERY V ECO DR N HA C E AT TE SYS S R LA ULMATEC LAUNCH AND RECOVERY SYSTEMS Ulmatec develops efficient, safe and robust solutions for handling remotely operated vehicles (ROVs) from ships

More information

QUICK START GUIDE CB-950 DATA BUOY PLATFORM

QUICK START GUIDE CB-950 DATA BUOY PLATFORM What s Included (1) Buoy hull with data well, 950 lb buoyancy (1) Buoy tower (3) 40W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes (1)

More information

S/Y MORSKI ZEKAN TECHNICAL INFORMATION

S/Y MORSKI ZEKAN TECHNICAL INFORMATION S/Y MORSKI ZEKAN TECHNICAL INFORMATION Cabins: 3 Toilets: 1 Max. Persons: 8 (6+2) LOA: 11,35 m Beam: 3,80 m Draft: 1,95 m Engine: Volvo 28HP Water tanks: 360 L Fuel tank: 150 L Anchor windlass Speed and

More information

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL ESIGNS TABLE OF CONTENTS 01 GENERAL 03 1.1 Introduction 03 1.2 Development 03 02 DRILL SHIPS 06 2.1 HuisDrill 12000 06 03 MOBILE OFFSHORE DRILLING UNITS 07

More information

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR ATMA 2006 HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR Partie 1 Pierre-Armand THOMAS TECHNIP Division Offshore - Paris (France) Diapositives

More information

ACFM ARRAY PROBE TECHNOLOGY WELD INSPECTION DATA Array probe scan on test piece with longitudinal and transverse cracks. ALTERNATIVE CONTOUR PLOT REDUCING COSTS FOR OPERATORS REMOTELY DEPLOYED ACFM INSPECTION

More information

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

CLIENT NAME: LOCATION: CALM BUOY INSPECTION: INSPECTOR REVIEWED INSPECTION OF CALM BUOY OVERALL PHOTO REVISION DESCRIPTION: Preliminary / Final Page: 1 TABLE OF CONTENT 1. MANAGEMENT SUMMARY... 3 1.1. SCOPE OF WORK:... 3 1.2. CORRECTIVE ACTIONS...

More information

Protectingpipelinesfor

Protectingpipelinesfor 24 Protectingpipelinesfor Michael Paulin, Damien Humby and Joseph Cocker, INTECSEA Canada, and Glenn Lanan, INTECSEA Inc., describe the process of trenching for the protection of pipelines in ice environments.

More information

Grade 8 Science: Unit 2-Fluids Chapter 9: Force, Pressure Area

Grade 8 Science: Unit 2-Fluids Chapter 9: Force, Pressure Area Grade 8 Science: Unit 2-Fluids Chapter 9: Force, Pressure Area Key Terms: hydraulic systems, incompressible, mass, neutral buoyancy, pascal, pneumatic systems, pressure, unbalanced forces, weight, Archimedes

More information

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras (Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Lew Dennis Decommissioning Manager Chevron Gulf of Mexico Business Unit 1 Key Messages Focusing on Risk Reduction in Decommissioning

More information

Fishing Vessel Stability

Fishing Vessel Stability Fishing Vessel Stability Or How To Stay Upright Fishing Vessel Stability What It Is? How Does It Work? What is Adequate Stability? What Happens During Typical Fishing Operations? 1 What is Stability? Stability

More information

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations OIL & GAS Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview Review of several incidents:

More information

Edit this text for your title

Edit this text for your title Edit this text for your title MEK 4450 Marine Operations Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2013 Lesson 2/3 Lift phases Load out Transportation

More information

Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 1 Lecture - 3 Compliant type offshore structures -1 Welcome to the

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...

More information

Standard Operating Procedure

Standard Operating Procedure Standard Operating Procedure BOOMS Offshore RO-BOOM / Lamor HD boom Equipment description SOP intended for the use and deployment of Lamor HD 1300 and Desmi Ro-clean 1500 offshore boom. The boom reel holds

More information

The TURTLE Concept Contents:

The TURTLE Concept Contents: The TURTLE Concept Contents: General Assumptions The Turtle In Brief Why Developing the Turtle Turtle Lay Outs A Field Presentation The Delta TURTLE Concept General assumptions It must be possible to develop

More information

SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology

SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS Providing Total Solutions Through Swaging Technology STRUCTURAL CONNECTIONS HISTORY The structural connection described in this brochure

More information

Trine Risøy, Bergen,

Trine Risøy, Bergen, part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea

More information

SBM Installer. Diving Support & Construction Vessel

SBM Installer. Diving Support & Construction Vessel Diving Support & Construction Vessel New, all-in-one, state-of-the-art installer Safety, versatility and redundancy are the three key concepts to have driven the design of SBM Offshore installation vessels.

More information

OMAE Large Marine Lifts in Shallow Water by Alan P. Crowle CB&I

OMAE Large Marine Lifts in Shallow Water by Alan P. Crowle CB&I Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-49168 Large Marine Lifts in Shallow Water

More information

STRUCTURAL INTEGRITY & ABANDONMENT SERVICES. Decommissioning Services

STRUCTURAL INTEGRITY & ABANDONMENT SERVICES. Decommissioning Services STRUCTURAL INTEGRITY & ABANDONMENT SERVICES Decommissioning Services STRUCTURAL INTEGRITY & ABANDONMENT SERVICES Decommissioning Abrasive Water Jet Cutting Technology Introduction Oil States has been an

More information

Dec 6 3:08 PM. Density. Over the last two periods we discussed/observed the concept of density. What have we learned?

Dec 6 3:08 PM. Density. Over the last two periods we discussed/observed the concept of density. What have we learned? Over the last two periods we discussed/observed the concept of density. What have we learned? is a ratio of mass to volume describes how much matter is packed into a space is a property of both solids

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering

More information

Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science

Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science Ocean Observatories Initiative Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science presented by Ed Dever and Walt Waldorf November 20, 2014 OOI Science Themes Coastal and

More information

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Includes Basic ship Terminologies and Investigation Check list Index 1. Ship Terminology 03 2. Motions of a Floating Body...09 3. Ship Stability.10 4. Free

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 12 Choose the best answer to the following Multiple Choice Questions. 1. What class of bulkhead is required around

More information