2 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR s/cor s connected together by a buoyant guide frame
3 Single Line Offset Riser - SLOR TM
4 ExxonMobil Kizomba A & B SLOR TM
5 SLOR TM and COR TM Design SLOR TM and COR TM Excellant fatigue performance Decoupled from vessel motion Pre-installable Low vessel payload Gas lift capability Field proven
6 Multiple single SLOR TM Spacing Clash avoidance - flexibles Wake interference of air cans
7 Grouped SLOR TM Design
8 Grouped SLOR TM Design Riser and air can - Single line or pipe-in-pipe - Slender air can Guide Frame - Light weight truss with buoyancy tanks - Tethered to suction pile - Integral receptacles with bearing pads SLOR STEM RECEPTACLE GUIDE FRAME CENTRAL FLANGED CONECTION BUOYANCY TANK TETHER
9 Grouped SLOR TM - Configuration Typical 4 SLOR s/cor s - 5 to 6m air can diameter - 10 to 25m air can length with compartments to 150Te base tension - 50Te tether base tension - Suction pile foundations
10 Grouped SLOR TM Design Development Pipe sizing Air can sizing Optimization - F/L routing Vessel interface Clearance Stability / splay optimization Storm / fatigue analysis Special joint / forging design Installation planning
11 Grouped SLOR TM - Qualification Finite Element Analysis (FEA) - Assumed C D of Frame Offset < 2% water depth for deep water (800m), <6% for ultra-deep water (2000m) - Guide frame typically 150m away from vessel - Frame bearing loads <10Te, well within capacity of bearing pads - Riser stroke < 4m Elevation from Mudline (m) C D =10 100yr Current 730 C D = yr Current No Current SLOR Frame Distance from Frame Centreline (m)
12 Grouped SLOR TM - Qualification Computational Fluid Dynamics (CFD) - Confirm hydrodynamic coefficients employed in FEA - Drag coefficient (C D ) < Air can spacing of 1.0 diameter gives best response in terms of VIV, wake effects and galloping - CFD further verified using model tow test
13 Grouped SLOR TM - Qualification Tow Model Test - Conducted in MARIN s test centre in Holland - Model towed at speeds up to 0.7m/s - Incidence of model to flow is varied - Air can separation increased from 0.5D 2.0D -C D ~ 1.0 to 1.5 for air can spacing of 1.0 time diameter - No possibility of clashing between air cans
14 Full Grouped SLOR TM Model Test MARIN (in Netherlands) was engaged to conduct the model test of Grouped SLOR involving for a water depth of 800m Model scaling of 1:73 is adopted Model test results gathered should be applicable for deeper water depth Results indicate VIV response of risers in Grouped SLOR is smaller than single SLOR
15 Grouped SLOR TM Installation Assessment Installation of Guide Frame Installation of Riser - Towing : Tug boats - Reel-lay vessel : Seven Oceans - J-Lay vessel : Seven Seas Mating of SLOR/COR with Guide Frame Installation of Flexible Jumper Seven Oceans Seven Seas
16 Grouped SLOR TM Installation Assessment Riser Installation by J-Lay - Subsea 7 Vessel Seven Seas - Assembling of double joints - Lower riser components via the moon pool using the A&R wire - Cross-haul operation to transfer riser to main crane and auxiliary crane for connecting riser bottom assembly
17 Conclusions Well developed riser solution for deep and ultradeep water environments. Concepts are qualified Eliminate clearance issue with good fatigue performance. Installation flexibility. High usage of local content.
18 Contact Information: Daniel Karunakaran, Subsea 7 Daniel.Karunakaran@subsea7.com subsea partner of choice
Grouped SLOR Deep Water Riser System and Installation Assessment
Grouped SLOR Deep Water Riser System and Installation Assessment Daniel Karunakaran, Dan Lee, Subsea 7 Stephen Hatton, Nick Dale, 2H Offshore Engineering Ltd John Mair, Subsea 7 Abstract The growing trend
More informationRisers for Deepwater FPSO s
Risers for Deepwater FPSO s John Bob-Manuel Senior Engineer 2H Offshore Engineering Ltd. March 2013 Agenda 2H overview Challenges of Deepwater Operations Freestanding Riser Overview Riser Configurations
More informationFPSO Riser Solutions for Harsh environments
FPSO Riser Solutions for Harsh environments Hanh Ha and Hugh Howells AOG Perth, March 2015 Overview Design challenges Flexibles Configurations and response Mild Environment Riser Harsh Environment Riser
More informationThe Impact of Composites on Future Deepwater Riser Configurations
The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater
More informationThe Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd
The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer
More informationDevelopment of Self-Installing Deepwater Spar. Ashit Jadav February 2017
Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability
More informationLearn more at
IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation
More informationRIGID RISERS FOR TANKER FPSOs
RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application
More informationFeasibility of Steel Lazy Wave Risers in the North Sea
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Feasibility of Steel Lazy Wave Risers in the North Sea Rohit Shankaran 2H Offshore Engineering Ltd. Agenda Risers in deepwater North Sea Are steel catenary
More informationDesign Challenges & Solutions for Large Diameter Export Risers
Design Challenges & Solutions for Large Diameter Export Risers Elizabeth Tellier, Hugh Howells & Mark Cerkovnik 2H Offshore Engineering AOG 2011 Agenda WA export riser design challenges Development options
More informationProceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011
Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the ASME 2011 30th International
More informationCatenary Offset Buoyant Riser Assembly for Malaysian Deepwater
Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater F.E. Jamaludin, a and J. Koto, a,b,* a) Faculty of Mechanical Engineering,Universiti Teknologi Malaysia, 81200 Skudai, Johor Bahru, Malaysia
More informationGLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins
GLS New Technology Rising to the Challenge of Subsea lifting Subsea 2012 Paddy Collins Introductions Aubin Design, Develop and Supply own chemical technical technology Cement and Stimulation Pipeline products
More informationLearn more at
vs. for Deepwater Applications Technical Appraisal John McGrail and Frank Lim 2H Offshore Engineering Limited Woking, UK ABSTRACT This paper provides a technical appraisal of the use of Single Line Offset
More informationFully Submersible Heavy Lift Vessel
Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Aberdeen Maritime Branch (28th January 2015) PRESENTATION Introduction to the Subsea Deployment Vessel Installation method Tank test video Potential
More informationEdit this text for your title
Edit this text for your title MEK 4450 Marine Operations Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2013 Lesson 2/3 Lift phases Load out Transportation
More informationRPSEA UDW Forum June 22 & 23, Secure Energy for America
RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors
More informationHISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR
ATMA 2006 HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR Partie 1 Pierre-Armand THOMAS TECHNIP Division Offshore - Paris (France) Diapositives
More informationFully Submersible Heavy Lift Vessel
Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation
More informationSteel Lazy Wave Risers A Step Change in Riser Technology for the NWS
Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Tze King Lim, Dhyan Deka, Elizabeth Tellier, Hugh Howells AOG 2018, Perth 15 th March 2018 Agenda Lazy wave risers an enabling technology
More informationLearn more at
STRIDE JIP Phase III SUT Talk 15th November 2 Offshore VIV monitoring (vortex induced vibration) Catenary riser interaction with deepwater seabeds 3 Full Scale Riser Monitoring To get real measurements
More informationMinimal Structures for Marginal Nova Scotia Developments
Minimal Structures for Marginal Nova Scotia Developments May 12, 2009 Cameron Dunn Martec is a member of the Lloyd s Register Group 1 2 Minimal Structures Project NSDOE working to make the Nova Scotia
More informationInnovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.
Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)
More informationA New Thermoplastic Composite Riser for Deepwater Application
A New Thermoplastic Composite Riser for Deepwater Application Martin van Onna, Managing Director Airborne Composite Tubulars Patrick O Brien, Group Director Strategic Business & Marketing, Wood Group Kenny
More informationEdit this text for your title
Edit this text for your title MEK 4450 Marine Operations 1-3 Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2014 Installation of flexibles and cables Typical
More informationDeepwater Floating Production Systems An Overview
Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been
More informationSUBSEA HYBRID RISER SYSTEMS
Guidance Notes on Subsea Hybrid Riser Systems GUIDANCE NOTES ON SUBSEA HYBRID RISER SYSTEMS JANUARY 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016
More informationLearn more at
Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations
More informationThe topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by
Thank you Greg. 1 The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Mr. Muhammad Sadiq, however in short,
More informationFlexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France
DOT-2014 Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France Copyright 2014, Deep Offshore Technology International This paper was
More informationLearn more at
Design Challenges of Deepwater Dry Tree Riser Systems for Different Vessel Types Claire Chedzoy and Frank Lim 2H Offshore Engineering Limited Woking, UK ABSTRACT This paper aims to review the key design
More informationTop Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific
June 2011 Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific Daniel Brooker, MCS Kenny Presentation Agenda 1. Objectives 2. Top Tensioned Riser (TTR) Selection Drivers
More informationThe SDS Skip. Subsea Deployment Systems Ltd.
The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field
More informationTLP Minimum tendon tension design and tendon down-stroke investigation
Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org TLP Minimum tendon tension design and tendon down-stroke investigation
More informationTechnip Presentation. Deep Water Umbilicals Challenges. & Technology Solutions. Ian Probyn R&D Business Development Manager
Deep Water Umbilicals Challenges Technip Presentation & Technology Solutions Ian Probyn R&D Business Development Manager MCE Deep Water Developments London, March 25th 2015 Technip Today With engineering,
More informationField Development & Construction
Field Development & Construction Michael Cowie Technical Director Ecosse Subsea Systems Ltd Ambient Lifting: A Real Alternative to Heavy Lift Vessels 4 th February 2016, AECC, Michael Cowie Presentation
More informationSOFTWARE. Sesam user course. 02 May 2016 HydroD Input. Ungraded SAFER, SMARTER, GREENER DNV GL 2016
SOFTWARE Sesam user course DNV GL 1 SAFER, SMARTER, GREENER About the presenter Name: Torgeir Kirkhorn Vada Position: Product Manager for floating structures Background: PhD in Applied mathematics/hydrodynamics
More informationSTRIDE PROJECT Steel Risers in Deepwater Environments Achievements
STRIDE PROJECT Steel Risers in Deepwater Environments Achievements 1999-21 Neil Willis Principal Engineer 2H Offshore Engineering 6 th Annual Deepwater Technologies and Developments Conference 21 The presentation
More informationFaculty of Science and Technology MASTER S THESIS. Writer: Lurohman Mamin Masturi
Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology, Subsea Technology Spring semester, 2014 Open / Restricted access Writer: Faculty supervisor: Prof.
More informationWIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE
WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05
More informationOTC Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc.
OTC 1672 Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc. Copyright 24, Offshore Technology Conference This paper was prepared
More informationRe-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008
Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical
More informationSubsea Wellhead and Conductor Fatigue
Subsea Wellhead and Conductor Fatigue 29th January 2014 Simeon Powell, PE Importance of Wellhead Fatigue Fatigue failure of high pressure wellhead housing Due to VIV West of Shetland Region 440 meter water
More informationAasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen
Aasta Hansteen Operational Experiences FFU Seminar 28 th January 2016 Tom-Erik Henriksen Agenda Introduction to Aasta Hansteen Main Challenges & Risks Operational Experiences - 2015 Campaigns 2 seabed-to-surface
More informationTime-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs
PAU, FRANCE 5-7 APRIL 2016 Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs Author: Fan Joe Zhang Presenter: Styrk Finne DNV GL - Software Contents Typical
More informationLearn more at
Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,
More informationINSTRUCTIONS FOR THE USE OF LONG LENGTH AND SPLICED HOSES
ContiTech Rubber Industrial Kft. Hose Technical Department HANDLING Page: 1/6 Date: 31.07.2008 Invalidate the document TKO AS1 rev.3 INSTRUCTIONS FOR THE USE OF LONG LENGTH AND SPLICED HOSES Prepared by:
More informationTrine Risøy, Bergen,
part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea
More informationDESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)
DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) Presented by: Tomasz Płotka - StoGda 0. StoGda Ship Design & Engineering Ltd Beginning of the StoGda Ship Design
More informationCopyright by Turbomachinery Laboratory, Texas A&M University
Proceedings of the 2 nd Middle East Turbomachinery Symposium 17 20 March, 2013, Doha, Qatar Effectiveness of Windage Features on High Speed Couplings Steven Pennington Global Engineering Manager John Crane
More informationOVERVIEW. Capabilities & Services
+1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore
More informationLow Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development
Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology
More informationOffshore Oil and Gas Platforms for Deep Waters
Offshore Oil and Gas Platforms for Deep Waters Atilla Incecik Department of Naval Architecture, Ocean and Marine Engineering University of Strathclyde, Glasgow, UK (atilla.incecik@strath.ac.uk) Summary
More informationOcean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science
Ocean Observatories Initiative Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science presented by Ed Dever and Walt Waldorf November 20, 2014 OOI Science Themes Coastal and
More informationPRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction
PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during
More informationOCEAN BREEZE. Ocean Breeze is a Deeper Water Wind turbine Foundation System for The Largest Wind Turbine Towers Sited in Waters up to 200m
OCEAN BREEZE Ocean Breeze is a Deeper Water Wind turbine Foundation System for The Largest Wind Turbine Towers Sited in Waters up to 200m Ocean Energy & Resource Ltd 1 OCEAN BREEZE Ocean Breeze is designed
More informationCathodic Protection Retrofit Options Comparison of Current Distribution
Cathodic Protection Retrofit Options Comparison of Current Distribution 1.0 Introduction There are three basic methods available for the deployment of anode systems when considering an offshore cathodic
More informationWind Turbine Shuttle. Ferdinand van Heerd
Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency
More informationIntroduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc
DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc Presented at OMAE, New Orleans, February 2000 Introduction Characteristics
More informationDevelopment of TEU Type Mega Container Carrier
Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore
More informationCompletion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk
Completion Workover Riser System Enabling efficient operations by reducing interface complexities and minimizes operational risk Well integrity with fatigue management were key drivers for our system design
More informationMarine Technology Society
Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session I Review of DP Applications, Consequences and Cost of Failures Drilling Fundamentals-DP Operations-Drilling with Riser
More information$ Millions. The PC Semi: A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration. Semi Hull CAPEX Differentials. Topsides.
The : A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration In our ever changing and uncertain market conditions, it is extremely important to ensure capital investments are successful
More informationACFM ARRAY PROBE TECHNOLOGY WELD INSPECTION DATA Array probe scan on test piece with longitudinal and transverse cracks. ALTERNATIVE CONTOUR PLOT REDUCING COSTS FOR OPERATORS REMOTELY DEPLOYED ACFM INSPECTION
More informationPile Gripper Systems
Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +
More informationTARPON A Minimal Facilities Platform
TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application
More informationSIMOPRO Riser Replacement Novel method for replacement of pliant wave risers whilst continuing production on platform
SIMOPRO Riser Replacement Novel method for replacement of pliant wave risers whilst continuing production on platform Helen Tunander Ocean Installer What is it? Simultaneous Marine Operations and Production
More informationSustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson
Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson Managing Director Ecosse Subsea Systems Ltd Personnel ESS
More informationLNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN
LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;
More informationA NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING
A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses
More informationDEEP WATER DRILLING RISER TECHNOLOGY, VIV & FATIGUE MANAGEMENT
DEEP WATER DRILLING RISER TECHNOLOGY, VIV & FATIGUE MANAGEMENT by Dr Hugh Howells 2H Offshore Engineering Limited Drilling Engineering Association (Europe), 4th Quarter Meeting, Paris 1998 SCOPE OF PRESENTATION
More informationNew Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO
New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO Wokshop on Deepwater Subsea TieBack Damai Puri Resort & Spa,
More informationDeepwater Challenges Pipeline Installation Case
Deepwater Challenges Pipeline Installation Case Seminar Nasional Oceano, ITS, 28 March 2011, Surabaya Gunawan Suwarno, 28 March 2011 DeepLay Energy Services email : marketing@deep-lay.com 1 Deepwater Development
More informationComputer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System
JOURNAL ARTICLES BY FLUENT SOFTWARE USERS JA187 Computer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System Computer simulation has helped NATCO engineers make dramatic improvements
More informationStudy on the shape parameters of bulbous bow of. tuna longline fishing vessel
International Conference on Energy and Environmental Protection (ICEEP 2016) Study on the shape parameters of bulbous bow of tuna longline fishing vessel Chao LI a, Yongsheng WANG b, Jihua Chen c Fishery
More informationCost efficient deep-water lowering with HMPE rope. Neil, LIU Yong-Le Technical Manager DSM Dyneema APAC Dec 02, 2016
Cost efficient deep-water lowering with HMPE rope Neil, LIU Yong-Le Technical Manager DSM Dyneema APAC Dec 02, 2016 Why are we looking for new solutions? More demand to install larger components Contractor/operator
More informationThe Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration. M. Burak Şamşul
The Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration M. Burak Şamşul ITU AYOC 2014 - Milper Pervane Teknolojileri Company Profile MILPER is established in 2011 as a Research and Development
More informationDynamic Positioning: Method for Disaster Prevention and Risk Management
Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and
More informationACCESS the BLUE ECONOMY ALL OCEANS Engineering Ltd
Subsea Expo 2018 ROV Conference 07.02.2018 ACCESS the BLUE ECONOMY The BLUE ECONOMY - DEFINITION The Blue Economy is a book by Gunter Pauli publish in 2010 based on the idea that he developed in 2004 In
More informationVoith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour
Amsterdam, The Netherlands Organised by the ABR Company Ltd Day Paper No. 2 9 Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Dr Dirk Jürgens and Michael Palm, Voith Turbo Schneider
More informationWellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering
Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering ABSTRACT Drilling operations for subsea wells are typically carried out
More informationDIVERLESS SUBSEA HOT TAPPING OF PRODUCTION PIPELINES
DIVERLESS SUBSEA HOT TAPPING OF PRODUCTION PIPELINES Dale Calkins Senior Project Engineer, TD Williamson Inc Biography Dale Calkins joined TD Williamson Inc in November of 1999 after working as a consulting
More information17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe
API Specification 17J Third Edition, January 2008 National Adoption of ISO 13628:2006(Identical) Petroleum and natural gas industries Design and operation of subsea production systems Part 2: Unbonded
More informationINDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS
I-ET-300.00-59-27-PPC-00 CLIENT OR JOB OR PROJECT PRODUCTION DEVELOPMENT CC Fro m UNITS AND PRODUCTION SYSTEMS CENPES INDEX OF REVISIONS REV. DESCRIPTION AND/OR AFFECTED S 0 ORIGINAL ORIGINAL REV. A REV.
More informationAidin Kazemi Daliri, Sepanta Naimi*
JER Manuscript Template 1 The fixed marine risers dynamic analysis with 1 st and 5 th order rogue wave Aidin Kazemi Daliri, Sepanta Naimi* Department of Civil Engineering, Specialty of Coastal Engineering,
More informationOcean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras
Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 1 Lecture - 3 Compliant type offshore structures -1 Welcome to the
More informationFocus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic
Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic R. Tonnessen* (Petroleum Geo-Services) & T. Skadberg (Petroleum Geo- Services) SUMMARY
More informationMASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, Offshore Technology, Subsea Technology
Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology, Subsea Technology Spring semester, 2012 Writer: Faculty supervisor: Dr. Daniel Karunakaran, Ph.D (University
More informationOFFSHORE WIND: A CRASH COURSE
OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: DEFINED OFFSHORE WIND: Construction of wind farms in bodies of water to generate electricity from wind. Unlike the typical usage of the term offshore in the
More informationNITROGEN collection. clearcoat: matte/gloss. color: black/red
NITROGEN color: black/red MG clearcoat: matte/gloss 2015 collection Design Features NITROGEN Specs HDS HORIZONTAL D U A L S Y S T E M Optimal Balance the perfect combinaison of light weight, rigidity and
More informationThe TURTLE Concept Contents:
The TURTLE Concept Contents: General Assumptions The Turtle In Brief Why Developing the Turtle Turtle Lay Outs A Field Presentation The Delta TURTLE Concept General assumptions It must be possible to develop
More informationExamining the merits of jack up platforms as foundations for the offshore wind industry
Examining the merits of jack up platforms as foundations for the offshore wind industry By 20 May 2011 1 ABSTRACT A new type of offshore wind foundation has emerged from the offshore oil fields and is
More informationStandard Operating Procedures
Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production
More informationNumerical modelling of disconnectable turret mooring systems
Numerical modelling of disconnectable turret mooring systems A. Duggal, S. Ryu & O. De Andrade Research & Development Department, SOFEC Inc., USA. Abstract Floating, Production, Storage, and Offloading
More informationTHE PERFORMANCE OF PLANING HULLS IN TRANSITION SPEEDS
THE PERFORMANCE OF PLANING HULLS IN TRANSITION SPEEDS BY DOYOON KIM UNIVERSITY OF SOUTHAMPTON LIST OF CONTENTS AIM & OBJECTIVE HYDRODYNAMIC PHENOMENA OF PLANING HULLS TOWING TANK TEST RESULTS COMPUTATIONAL
More informationDesign of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras
(Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform
More informationProtection for Vessels Engaged in Servicing Submarine Cables
Protection for Vessels Engaged in Servicing Submarine Cables Proposed Amendments to COLREGS Brief to Navigation Safety Advisory Council November 28, 2012 Tampa, FL Dr. Ronald J. Rapp TE SubCom and Representing
More information(a) Calculate the speed of the sphere as it passes through the lowest point of its path.
1991 Q33 A sphere of mass 3 kg on the end of a wire is released from rest and swings through a vertical distance of 0.4 m. (Neglect air friction.) (a) Calculate the speed of the sphere as it passes through
More informationNOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY
DENTON INTEGRITY STUDY APPENDIX C INCIDENT REPORTS Incident One FPSO Questionnaire Failure of gripper used to rotate turret Several months after installation This FPSO has an internal partially rotating
More informationSuperGen UK Centre for Marine Energy Research Progress Meeting 2018
SuperGen UK Centre for Marine Energy Research Progress Meeting 2018 Extreme loads and survivability Cameron Johnstone, Stephanie Ordonez-Sanchez, Song Fu and Rodrigo Martinez Energy Systems Research Unit,
More information